Quote:
Originally Posted by VegaM View Post
Merci pour ces précisions, je ne savais pas que le passage de la RN 2 en 2x2 a été déjà réalisé.
Il n'est pas, il y a que deux mois que tout le trajet était une longue piste sans goudron. Je vous conseille à ne pas l'emprunter la nuit!! Je parle de la RN2 entre Tanger et Tétouan.
Morsue no está en línea   Reply With Quote

Sponsored Links
 
Old August 19th, 2009, 01:30 PM   #62
Tetwani
BANNED
 
Join Date: Oct 2008
Location: ⵟⴰⵏⵊⴰ ⵜⵉⵟⵟⴰⵡⵉ&#
Posts: 4,748
Likes (Received): 0

Quote:
Originally Posted by Morsue View Post
Il n'est pas, il y a que deux mois que tout le trajet était une longue piste sans goudron. Je vous conseille à ne pas l'emprunter la nuit!! Je parle de la RN2 entre Tanger et Tétouan.
Moi je l'ai prise il y a une semaine et elle était entièrement goudronnée et 2x2.
Tetwani no está en línea   Reply With Quote
Old September 10th, 2009, 05:23 PM   #63
VegaM
Registered User
 
Join Date: Jul 2008
Posts: 1,897
Likes (Received): 0

Rocade méditerranéenne : La liaison Al Hoceima-Jebha opérationnelle



· Coût du projet: 1,65 milliard de DH
· Une nouvelle route de 103 km


DERNIÈRE ligne droite pour la rocade méditerranéenne. L’avant-dernier tronçon reliant Ajdir (Al Hoceima) à Jebha vient d’être livré à la circulation. Il ne reste plus que quelque 120 km de route (Tétouan- Jebha) à construire pour achever l’ensemble du projet.
La liaison Al Hoceima-Jebha dont le coût de réalisation avoisine le 1,65 milliard de DH est, quant à elle, d’une longueur d’environ 103 km. Ainsi, 7 km sont à parcourir de Ajdir au centre-ville d’Al Hoceima. Avant l’achèvement des travaux de construction, aucune voie ne reliait les deux localités. Aujourd’hui, cette nouvelle route dessert successivement Jebha et Bouhanine avant de rejoindre Cala-Iris. Elle emprunte la RR 414 jusqu’à Ait Kamra sur 45 km, puis la RN 2 sur 10 km jusqu’à Imzouren et enfin la RR 610. Par ailleurs, et compte tenu du caractère très accidenté de la topographie et de la nature géotechnique vulnérable du terrain, le tronçon Al Hoceima- Jebha s’éloigne de quelques kilomètres de la côte méditerranéenne.

A noter que les travaux sur cette section ont été lancés en juin 2004 et devaient être bouclés, en principe, en 2008. Force est de constater, donc, que le projet a enregistré un retard d’une année. Un contrat établi avec des sociétés étrangères pour la réalisation de la liaison a été d’ailleurs résilié. «La liquidation du marché, le lancement d’un autre appel d’offres et la sélection d’un nouveau constructeur nécessitent tous des procédures administratives qui prennent souvent beaucoup de temps», indique-t-on auprès de la direction régionale de l’Equipement d’Al Hoceima. Pour le financement de ce projet, le ministère de l’Equipement et du Transport a dû verser environ 310 millions de DH (19%) pour achever les travaux déjà entamés par les entreprises étrangères. Quelque 1,34 milliard de DH (81%) étant un don de l’UE.

S’agissant de la liaison Jebha-Tétouan, les travaux sont lancés depuis 2008 et devraient être achevés en 2012, selon le planning arrêté par le ministère de l’Equipement et du Transport. «Cette dernière ligne droite du projet de la rocade nécessite une enveloppe budgétaire d’environ 2,3 milliards de DH», précise un responsable de la direction régionale de l’Equipement d’Al Hoceima. Et d’ajouter: «Les contributions sont du ministère et de l’Agence japonaise de coopération internationale (Jica)». La route Jebha-Tétouan emprunte un terrain plat au départ de Tétouan pour aborder très rapidement les reliefs montagneux. Elle traverse des zones instables caractérisées par des glissements de talus, sapements de la plate-forme par la mer et éboulements. Les travaux consistent à améliorer les caractéristiques géométriques de la route existante en adoptant un nouveau tracé pour certains tronçons, renforcer et élargir la chaussée pour présenter un profil en travers de 7 mètres. Pour rappel, la rocade méditerranéenne (507 km), reliant les villes de Tanger et Saïdia, permettra de réduire le temps de trajet de 11 à 7 heures.

L'Economiste - 10/09/2009
VegaM no está en línea   Reply With Quote
Old September 10th, 2009, 11:56 PM   #64
timo9
think 想 大 big!
 
timo9's Avatar
 
Join Date: Oct 2008
Posts: 9,977
Likes (Received): 271

il s'agit bien de Saidia-Tanger et pas de Tanger-Oujda
il faut renommer le thread
__________________
timo9 no está en línea   Reply With Quote
Old September 20th, 2009, 04:26 PM   #65
VegaM
Registered User
 
Join Date: Jul 2008
Posts: 1,897
Likes (Received): 0

VegaM no está en línea   Reply With Quote
Old April 1st, 2010, 11:35 AM   #66
amedde62
Registered User
 
Join Date: Apr 2010
Posts: 4
Likes (Received): 0

hello has all I like to have news on the project of linking Africa to Europe a tunnel under the sea mediteranne thank you,,,
amedde62 no está en línea   Reply With Quote
Old April 1st, 2010, 11:40 AM   #67
amedde62
Registered User
 
Join Date: Apr 2010
Posts: 4
Likes (Received): 0

salut a tous j'aime bien avoir des nouvelles sur le projet de relier l'afrique a l'europe d'un tunelle sous la mer mediteranne merci;;;
amedde62 no está en línea   Reply With Quote
Old April 1st, 2010, 12:01 PM   #68
Superanouar
Registered User
 
Superanouar's Avatar
 
Join Date: May 2009
Location: Paris/Marrakech
Posts: 2,035
Likes (Received): 16

Bienvenue à toi amedde62

Pour le thread sur le tunnel sous le Détroit de Gibraltar, le thread se trouve ici, dans la section "Railways & Transportation"

PS : en jetant un oeil sur le programme prévisionnel de la page 1, j'ai lu ça :

Quote:
Jebha ? Ajdir (Al Hoceima) : BIENTOT OPERATIONNELLE
Aucune route ne relie aujourd?hui ces deux localités. Dans le cadre du projet de la rocade, des études détaillées on été conçues pour la réalisation de cette liaison.
Compte tenu du caractère très accidenté de la topographie et de la nature géotechnique vulnérable du terrain, le tracé projeté s?éloignera de quelques kilomètres de la c?méditerranéenne. D?une longueur d?environ 103 km, cette route dessert successivement Jebha et Bouhanine avant de rejoindre Cala-Iris, elle empruntera la RR 414 jusqu'à Ait Kamra sur 45 Km puis la RN 2 sur 10 Km jusqu'à Imzouren et enfin la RR 610. Les travaux sur cette section sont en cours .
Comment peut-elle rejoindre Cala Iris si elle s'éloige des côtes sur l'ensemble du trajet ? Sur les bases de données mises à jour de Google Maps, tout le tracé de la rocade a été dessiné (ils utilisent "N16" pour la nomenclature) et s'éloigne effectivement des côtes sans rejoindre Cala Iris, Torres et Badis/Peñon Velez de la Gomera. Par ailleurs, je n'ai pas réussi à repérer la Route régionale 414 ni même Aït Kamra (Aït Karma ?). Dommage qu'ils n'aient pas fait une rocade côtière, au moins d'El Jebha à Cala Iris où mis à part la crique d'El Jebha, la topographie n'est pas plus exigeante que les tronçons réalisés du côté de Oued Laou ! Après bien sur, entre Badis/Peñon Velez de la Gomera et la plage Charafinas, c'est autre chose ! Les falaises tombent à pic dans la mer, sur des dénivelés de plus de 300 m. Par contre, les pinèdes sont absolument splendides dans le Parc naturel d'Al Hoceima. Je crois aussi qu'il y a pas mal de champs de kif dans le coin et que des criques servent de point de départ pour les hors-bords.

Last edited by Superanouar; April 1st, 2010 at 12:25 PM.
Superanouar no está en línea   Reply With Quote
Old April 1st, 2010, 12:19 PM   #69
amedde62
Registered User
 
Join Date: Apr 2010
Posts: 4
Likes (Received): 0

The resolution was made in a 2008-2020 national plan on the development of the Pearl River Delta released by the National Development and Reform Commission (NDRC) at a news conference Thursday.

The plan sets the goal of turning the delta into the most efficient and safest passenger and cargo transport center in the Asia-Pacific region.

The move will help bolster exchange among the country's booming southern regions including the Pearl River Delta, Hong Kong, Macao and Taiwan.

Vice Minister in charge of NDRC Du Ying said construction on a bridge linking Hong Kong, Macao and the Pearl River Delta would be expected to start in 2009 and the central government would offer 5billion yuan (730 million U.S. dollars) for the construction of its main structure.

The main structure of the bridge stretches 29 km, the longest in the world. It will connect Hong Kong, Macao and Zhuhai of southern Guangdong Province.

According to the plan, operational highways in the region are set to reach 3,000 km by 2012, up from the 1,900 km by the end of 2006. Rails are expected to hit 1,100 km by 2012 and 2,200 km by 2020, compared with 287 km by the end of 2006.

Cargo throughput for ports aims to ship 900 million tonnes by 2012 and is expected to climb to 1.4 billion by 2020, up from 630 million tonnes in 2006.

Airports will handle 80 million passengers as of 2012 and 150 million by 2020. The figure stood at 45.36 million in 2006.

The construction would be carried out on an energy-efficient and environment-friendly basis by using renewable energy and clean tec
amedde62 no está en línea   Reply With Quote
Old April 1st, 2010, 12:21 PM   #70
amedde62
Registered User
 
Join Date: Apr 2010
Posts: 4
Likes (Received): 0

la chine comparee au maroc et oui et oui la chine comparee au maroc!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!



elta by expanding capacities of roads, railways, ports and airports over the next 12 years, the country's top economic planner said Thursday.

The resolution was made in a 2008-2020 national plan on the development of the Pearl River Delta released by the National Development and Reform Commission (NDRC) at a news conference Thursday.

The plan sets the goal of turning the delta into the most efficient and safest passenger and cargo transport center in the Asia-Pacific region.

The move will help bolster exchange among the country's booming southern regions including the Pearl River Delta, Hong Kong, Macao and Taiwan.

Vice Minister in charge of NDRC Du Ying said construction on a bridge linking Hong Kong, Macao and the Pearl River Delta would be expected to start in 2009 and the central government would offer 5billion yuan (730 million U.S. dollars) for the construction of its main structure.

The main structure of the bridge stretches 29 km, the longest in the world. It will connect Hong Kong, Macao and Zhuhai of southern Guangdong Province.

According to the plan, operational highways in the region are set to reach 3,000 km by 2012, up from the 1,900 km by the end of 2006. Rails are expected to hit 1,100 km by 2012 and 2,200 km by 2020, compared with 287 km by the end of 2006.

Cargo throughput for ports aims to ship 900 million tonnes by 2012 and is expected to climb to 1.4 billion by 2020, up from 630 million tonnes in 2006.

Airports will handle 80 million passengers as of 2012 and 150 million by 2020. The figure stood at 45.36 million in 2006.

The construction would be carried out on an energy-efficient and environment-friendly basis by using renewable energy and clean tec
amedde62 no está en línea   Reply With Quote
Old May 26th, 2010, 01:40 PM   #71
timo9
think 想 大 big!
 
timo9's Avatar
 
Join Date: Oct 2008
Posts: 9,977
Likes (Received): 271

Tunnel entre Jebha et Al Hoceima



Idafa
__________________
timo9 no está en línea   Reply With Quote
Old May 26th, 2010, 01:50 PM   #72
Mister79
Registered User
 
Mister79's Avatar
 
Join Date: Feb 2007
Location: Holland, Morocco.
Posts: 9,122
Likes (Received): 156

Quote:
Originally Posted by timo9 View Post
Tunnel entre Jebha et Al Hoceima



Idafa
Thx..

Timo, do you know how long this tunnel is?
Mister79 no está en línea   Reply With Quote
Old May 26th, 2010, 02:34 PM   #73
timo9
think 想 大 big!
 
timo9's Avatar
 
Join Date: Oct 2008
Posts: 9,977
Likes (Received): 271

sorry there's no precisions from the web site www.idafa-advice.com
__________________
timo9 no está en línea   Reply With Quote
Old May 26th, 2010, 02:43 PM   #74
timo9
think 想 大 big!
 
timo9's Avatar
 
Join Date: Oct 2008
Posts: 9,977
Likes (Received): 271

Saïdia => Nador
image hosted on flickr
__________________
timo9 no está en línea   Reply With Quote
Old May 26th, 2010, 02:47 PM   #75
[Prinny Man]
Mah *****h
 
[Prinny Man]'s Avatar
 
Join Date: Feb 2010
Location: Meknès/Tangier
Posts: 10,367
Likes (Received): 12

Quote:
Originally Posted by timo9 View Post
Tunnel entre Jebha et Al Hoceima



Idafa
Timo9, c'est le tunnel de l'Autoroute Marrakech-Agadir!
__________________
Catnip. I need Catnip. Yey bring meh Catnip ? Catnip.

Twitter : @PrinnyMan
My flickr gallery : [- Prinny Man -]
[Prinny Man] no está en línea   Reply With Quote
Old May 26th, 2010, 03:12 PM   #76
Gadiri
Moderator
 
Gadiri's Avatar
 
Join Date: Oct 2009
Location: Paris-Agadir
Posts: 30,289
Likes (Received): 174

Bien vu Prinny. C'est le tunnel sur l'autoroute d'Agadir.
__________________
?
Gadiri no está en línea   Reply With Quote
Old May 26th, 2010, 04:22 PM   #77
timo9
think 想 大 big!
 
timo9's Avatar
 
Join Date: Oct 2008
Posts: 9,977
Likes (Received): 271

Quote:
Originally Posted by [Prinny Man] View Post
Timo9, c'est le tunnel de l'Autoroute Marrakech-Agadir!
sur le site http://www.idafa-advice.com/ ils précisent bien que ça se trouve près de la ville de Jebha!!! c'est bizzare
__________________
timo9 no está en línea   Reply With Quote
Old May 26th, 2010, 04:28 PM   #78
Gadiri
Moderator
 
Gadiri's Avatar
 
Join Date: Oct 2009
Location: Paris-Agadir
Posts: 30,289
Likes (Received): 174

Quote:
Originally Posted by timo9 View Post
sur le site http://www.idafa-advice.com/ ils précisent bien que ça se trouve près de la ville de Jebha!!! c'est bizzare
Quand tu regardes le défilement des photos sur la droite, et que tu vois la photo que tu as posté, il est indiqué cela en cliquant : "Projet du Tunnel ZAOUIAT AITMELLAL : demarrage du creusement".

Il y a dû avoir une erreur de frappe sur une autre partie du site.
__________________
?
Gadiri no está en línea   Reply With Quote
Old May 26th, 2010, 04:33 PM   #79
madao
casablanca
 
madao's Avatar
 
Join Date: Feb 2007
Posts: 555
Likes (Received): 13

Quote:
Originally Posted by timo9 View Post
Tunnel entre Jebha et Al Hoceima



Idafa
Agadir- Marrakech tunnel
madao no está en línea   Reply With Quote
Old May 26th, 2010, 06:24 PM   #80
BiladAtlas
المخزن يطلع برا
 
BiladAtlas's Avatar
 
Join Date: Sep 2009
Location: Bilad Al Atlas
Posts: 5,846
Likes (Received): 53

Timo9, tu as un carton jaune l'ami. On a vu ce tunnel des centaines de fois sur ce forum. Comment t'as fait pour laisser ca filer de fon attention?
__________________
.... La patrie ne peut être forte et solide sans une citoyenneté complète ....
Bensaïd Aït Idder
BiladAtlas no está en línea   Reply With Quote


Reply

Tags
expressway, tangier

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 11:25 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 23.08%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu