daily menu » rate the banner | guess the city | one on one

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Highways & Autobahns

Highways & Autobahns All about automobility


Global Announcement

SkyscraperCity needs your help to do some house cleaning! please click here for more info!



Reply

 
Thread Tools Display Modes
Old August 10th, 2012, 07:40 PM   #4861
MirceaValahRO
Registered User
 
MirceaValahRO's Avatar
 
Join Date: Jan 2012
Location: DOBROGEA
Posts: 124
Likes (Received): 0

Quote:
Originally Posted by svt11 View Post
Do you have some problems with roughness on the new roads? Because in Bulgaria we have, unfortunately many, but still new parts from Trakia motorway are better than the old.
no , Dacian motorways are tested with a glass of water in the car, on the dasboard really. and the last prime minister Boc came out with his shirt dry.
MirceaValahRO no está en línea   Reply With Quote

Sponsored Links
 
Old August 11th, 2012, 04:13 AM   #4862
Tepes
Korean Style
 
Tepes's Avatar
 
Join Date: Sep 2011
Posts: 42
Likes (Received): 5

Umm... Trakya is actually the name of the motorway he was referring to as being rough... So, no need to use obscure historical names that others might find confusing or not get.

Last edited by Tepes; August 11th, 2012 at 04:18 AM.
Tepes no está en línea   Reply With Quote
Old August 12th, 2012, 01:49 PM   #4863
Le Clerk
In the brig
 
Join Date: Oct 2007
Posts: 30,459
Likes (Received): 330

Quote:
Originally Posted by iuli View Post
A1 Timisoara - Lugoj Part 5
I guess these pictures are from LOT 1 which is supposed to be opened by the end of the year?
Le Clerk no está en línea   Reply With Quote
Old August 12th, 2012, 01:50 PM   #4864
Le Clerk
In the brig
 
Join Date: Oct 2007
Posts: 30,459
Likes (Received): 330

Quote:
Originally Posted by bogdymol View Post

Awesome motorway pics man!

Last edited by Le Clerk; August 12th, 2012 at 02:01 PM.
Le Clerk no está en línea   Reply With Quote
Old August 12th, 2012, 03:50 PM   #4865
Le Clerk
In the brig
 
Join Date: Oct 2007
Posts: 30,459
Likes (Received): 330

Deva-Orastie works. The author of the pictures says the contractor hopes to open the entire section (32.5 km) by end of this year on half-profile. Let's see .....



Quote:
Originally Posted by Adrian! View Post
A1 Deva-Orastie km 30

PODUL 21 ULTIMUL

PODUL 21 vazut de jos…

…in dreapta Muresul!

Podul 20

Dupa podul 20 se vad Muntii Metaliferi (Certej, Hondol, Sacaramb al doilea cel mai mare zacamant de aur din Europa, dupa Rosia Montana, se afla aici)


Dupa Podul 20 in dreapta orasul Deva



Podul 19

Intre Podul 19 si 18







Constructia canalului de ape pluviale, cam invechita tehnologia in comparative cu celelalte tronsoane…

Podul 17, peste Podul 18 am sarit, am uitat de el , era asfaltul prea bun 











Intre podul 17 si 16



Podul 16

Dupa podul 16




In concluzie pe tronsonul Strabag, de la iesirea de pe Autostrada de la Simeria Veche unde este constructia nr 13(aceasta apartine de Straco) si pana la aprox. km 30 unde este Podul 21 , in mare au cam incheiat cu terasamentele, singurul terasament mai este de la km 30- la km 32 si sa incheie iesirile de serviciu la unele poduri cum este in poza de mai jos de la Podul 14


P.S. Constructorul doreste ca incepand cu sfarsitul lui octombrie sa dea in folosinta un sens de mers de la Deva la Orastie (nu stiu daca nodul de la Simeria Veche va fi dat in folosinta pana atunci)
P.P.S.S. Sunt slabe sperante sa inceapa anul aceasta proiectarea la tronsonul Deva-Lugoj susre neoficiale (mai ales ca din decembrie au obtinut acordul FMI sa mareasca salariile cu 7%)
Le Clerk no está en línea   Reply With Quote
Old August 12th, 2012, 03:53 PM   #4866
Le Clerk
In the brig
 
Join Date: Oct 2007
Posts: 30,459
Likes (Received): 330

Aciliu Viaduct again:


Quote:
Originally Posted by anacronox View Post
viaductul de la Aciliu
==============








organizare de santier la capatul dinspre Sibiu la capatul viaductului de la Aciliu
======================================================







bonusul - primul strat de asfalt pe zona de langa viaduct
=======================================








viaductul de la Sacel
==============








Le Clerk no está en línea   Reply With Quote
Old August 12th, 2012, 08:57 PM   #4867
Groningen NL
Registered User
 
Join Date: Dec 2010
Location: Groningen
Posts: 725
Likes (Received): 19

Quote:
Originally Posted by Le Clerk View Post
Awesome motorway pics man!
Why would you put your pants all the way down
Groningen NL está en línea ahora   Reply With Quote
Old August 12th, 2012, 10:25 PM   #4868
cinxxx
I ♥ Timişoara
 
cinxxx's Avatar
 
Join Date: Oct 2010
Location: Ingolstadt, Bayern
Posts: 7,459
Likes (Received): 938

Quote:
Originally Posted by Groningen NL View Post
Why would you put your pants all the way down
Maybe the pants were to tight
__________________
Visit my travelogues :: Postcard collection :: My Flickr :: My 500px
AUT, CH, CZ, DE, F, FL, HR, HU, ITA, LU, P, PL, RO, SK, SLO, SRB
-= last updates June '13 =-
cinxxx no está en línea   Reply With Quote
Old August 13th, 2012, 01:31 PM   #4869
Le Clerk
In the brig
 
Join Date: Oct 2007
Posts: 30,459
Likes (Received): 330

First vid of A3 (Suplacu-Bors/HU border) - pretty dissapointing - only a bit of earthworks there as the contract was suspended since last year AFAIK:

Le Clerk no está en línea   Reply With Quote
Old August 15th, 2012, 11:14 AM   #4870
Le Clerk
In the brig
 
Join Date: Oct 2007
Posts: 30,459
Likes (Received): 330

I'll post here a few pics of TransBucegi road - another recently built alpine road (3rd transalpine road currently) at over 2.000 m high:













A small part of the road loooks like this and one needs a capable off-roader to go there. The "road" will stay like that on that section because it is part of a protected natural parc:

Le Clerk no está en línea   Reply With Quote
Old August 15th, 2012, 03:53 PM   #4871
Le Clerk
In the brig
 
Join Date: Oct 2007
Posts: 30,459
Likes (Received): 330

Works on Timisoara-Lugoj motorway (part of A1) LOT 1 (10 km) - looks ready for opening later this year:


Quote:
Originally Posted by MNU View Post
Cateva poze de pe Timisoara-Lugoj lot 1.

Primele sint din zona pasajului de pe DC62 Remetea Mare - Ianova...

Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us

... si alte cateva la capatul de langa nodul Giarmata.

Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us
Le Clerk no está en línea   Reply With Quote
Old August 15th, 2012, 11:12 PM   #4872
Le Clerk
In the brig
 
Join Date: Oct 2007
Posts: 30,459
Likes (Received): 330

Aciliu viaduct works on A1 (near Sibiu):


Quote:
Originally Posted by boer_escu View Post
Imagini de astăzi de pe lotul 3 al Orăștie-Sibiu, capătul dinspre Sibiu al viaductului de la Aciliu.

Spre viaduct:

By boer_escu at 2012-08-15


By boer_escu at 2012-08-15


By boer_escu at 2012-08-15

Spre Sibiu:

By boer_escu at 2012-08-15

Bonus, viaductul de la Aciliu așa cum se vede din buza dealului unde va fi tunel sau debleu:


By boer_escu at 2012-08-

Quote:
Originally Posted by boer_escu View Post
Sfârșitul lotului 3 al celor de la Impregilo(nodul Săliște):

By boer_escu at 2012-08-15
Idem:

By boer_escu at 2012-08-15
Prima grindă a viaductului de la Aciliu:

By boer_escu at 2012-08-15
Intersecția cu DJ106G (lângă Apoldu de Jos):

By boer_escu at 2012-08-15
Idem:

By boer_escu at 2012-08-15
Undeva între Apoldu de Jos și Amnaș (practic sunt următorii km de după viaductul de la Aciliu spre Sebeș, porțiunea ce nu e vizibilă din DN):

By boer_escu at 2012-08-15
Idem:

By boer_escu at 2012-08-15
Idem (și aici a fost / este / mai este ceva de lucru!!!):

By boer_escu at 2012-08-15
Idem:

By boer_escu at 2012-08-15
Iată că am reușit să postez și pozele de pe lotul 3… lotul 4 urmează mâine.
Le Clerk no está en línea   Reply With Quote
Old August 16th, 2012, 10:53 PM   #4873
Strzala
READY TO GO!
 
Strzala's Avatar
 
Join Date: Aug 2005
Location: L U(-_-)b lin
Posts: 5,955
Likes (Received): 222

Daia - Bucuresti 13.08.2012:






https://www.youtube.com/watch?v=fPowLajrxMw
__________________
S17- Popieram!

S19- Popieram!

"Chwila!To nie jest niczyje, to jest nasze. To jest częścią mnie bo codziennie na to patrzę"
Strzala no está en línea   Reply With Quote
Old August 16th, 2012, 11:39 PM   #4874
Le Clerk
In the brig
 
Join Date: Oct 2007
Posts: 30,459
Likes (Received): 330

Thank you! We don't get many reports from that section.
Le Clerk no está en línea   Reply With Quote
Old August 16th, 2012, 11:41 PM   #4875
Le Clerk
In the brig
 
Join Date: Oct 2007
Posts: 30,459
Likes (Received): 330

A few more pictures from Orastie-Sibiu works:


Quote:
Originally Posted by boer_escu View Post
Revin cu continuarea imaginilor de ieri, de data asta cu lotul 4 al celor de la Astaldi.
S-a realizat deja sensul giratoriu de la baza hulei Săcelului, după ieșirea din Cristian spre Sebeș:

By boer_escu at 2012-08-16
Aproximativ aici vor începe viaductele gemene dinspre Cristian (porțiunea neatacată încă de Astaldi):

By boer_escu at 2012-08-16
Viaductele gemene in preajma viitorului tunel:

By boer_escu at 2012-08-16
Aproximativ în zona viitorului tunel (scuze de copac… cred ca am făcut poza din mersul mașinii, altfel nu-mi explic nici eu…)

By boer_escu at 2012-08-16
Zona dinainte de tunel, înspre Sibiu:

By boer_escu at 2012-08-16
Idem:

By boer_escu at 2012-08-16
Viaductele gemene în partea dinspre Sebeș:

By boer_escu at 2012-08-16
Idem:

By boer_escu at 2012-08-16
Supratraversarea autostrăzii de DJ către Mag și pasajul peste calea ferată Sibiu-Sebeș

By boer_escu at 2012-08-16
Ușor, în zare, viaductul răsărea…

By boer_escu at 2012-08-16
La nodul Săliște, pasajul peste calea ferată:

By boer_escu at 2012-08-16
Începutul lotului 4 la Săliște:

By boer_escu at 2012-08-16
Quote:
Originally Posted by boer_escu View Post
Asa este, se vede mai bine în această imagine:



Uploaded with ImageShack.us
Le Clerk no está en línea   Reply With Quote
Old August 17th, 2012, 12:07 PM   #4876
Capt.Vimes
Registered User
 
Capt.Vimes's Avatar
 
Join Date: Jul 2009
Location: Varna
Posts: 3,761
Likes (Received): 366

Quote:
Originally Posted by Strzala View Post
Daia - Bucuresti 13.08.2012:






https://www.youtube.com/watch?v=fPowLajrxMw
Just a small note: the video doens't end at point B on the map, but on the intersection of the Buchurest ring road (centura) and DN6.
__________________
Cyrillic=Bulgarian alphabet, copyright -First Bulgarian Empire
Кирилица=Българска азбука, авторско право -Първо Българско Царство
Capt.Vimes no está en línea   Reply With Quote
Old August 17th, 2012, 04:13 PM   #4877
Strzala
READY TO GO!
 
Strzala's Avatar
 
Join Date: Aug 2005
Location: L U(-_-)b lin
Posts: 5,955
Likes (Received): 222

It's only the effect of map outzooming:

https://maps.google.pl/maps?saddr=DN...p=1&sz=15&z=13

Can You show me on the google map where this video ends:

http://www.youtube.com/watch?v=7HJvHYujXlM

?
__________________
S17- Popieram!

S19- Popieram!

"Chwila!To nie jest niczyje, to jest nasze. To jest częścią mnie bo codziennie na to patrzę"
Strzala no está en línea   Reply With Quote
Old August 18th, 2012, 08:47 AM   #4878
pistacik
Registered User
 
Join Date: Jul 2012
Posts: 6
Likes (Received): 0

It is different country, but never mind. It ends here, point B:

https://maps.google.pl/maps?saddr=A2...p=1&sz=16&z=16

Last edited by pistacik; August 18th, 2012 at 08:53 AM.
pistacik no está en línea   Reply With Quote
Old August 18th, 2012, 05:21 PM   #4879
bogdymol
bogdymol
 
bogdymol's Avatar
 
Join Date: Feb 2010
Location: Arad, Romania
Posts: 7,725
Likes (Received): 807

New bridge over Mures river in Pecica, Arad county is currently u/c.

image hosted on flickr


Rest of the pictures are here.
__________________
Been in A BG CZ D F GR H HR I PL RO SK SLO SRB UK US V
Drove in A CZ D GR H HR I PL RO SK SLO SRB US
Visit my Travelogue thread: Croatia, Slovenia & Austria by bogdymol & Beograd, Serbia
My clinched highways: driver | passenger
My flightdiary statistics
join eRepublik!
bogdymol no está en línea   Reply With Quote
Old August 18th, 2012, 05:51 PM   #4880
Le Clerk
In the brig
 
Join Date: Oct 2007
Posts: 30,459
Likes (Received): 330

A3 overpass over the Bucharest ring U/C:


Quote:
Originally Posted by CornelB View Post
Se pare ca in zilele ce urmeaza, se vor monta grinzile supratraversarii A3 peste CB:



Deasemenea, se asfalta si breteaua de iesire din A3 in CB in directie Tunari:



The A3 section in between the ring and the city proper (about 7 km) is also U/C.
Le Clerk no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 05:59 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 23.08%)

SkyscraperCity ☆ High there, what's up!

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu