Old August 8th, 2016, 07:30 PM   #9021
Capt.Vimes
Да живее България!
 
Capt.Vimes's Avatar
 
Join Date: Jul 2009
Location: Varna
Posts: 10,539
Likes (Received): 13096

Quote:
Originally Posted by pasadia View Post

As for Calarasi - Silistra: there is no need! All the traffic is roumanian goers towards your seaside. But internationally speaking, the traffic is really low. Heavy traffic? Hmm, close to zero, and mostly agricultural products that are meant for Constanta harbour.
You definitely know what you are talking about



__________________
Capt.Vimes está en línea ahora   Reply With Quote

Sponsored Links
Old August 11th, 2016, 07:08 PM   #9022
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

Monthly Update A10 Turda-Sebeș (70 km):



Link video: https://www.youtube.com/watch?v=65CHD6v0RbQ

Eurocopter @ forum.peundemerg.ro
__________________

AlexAllex liked this post
Alpin no está en línea   Reply With Quote
Old August 14th, 2016, 10:10 PM   #9023
Qtya
sensational
 
Qtya's Avatar
 
Join Date: Aug 2006
Location: Budapest - Brussels
Posts: 15,226
Likes (Received): 9377

Could someone please give an update on the status of the Bors - Suplacu de Barca section?
__________________
„A nemzet csak akkor remélhet egy jobb jövőben, ha polgárai képesek közös erőfeszítéssel felelősséget vállalni a közjóért.”

II. János Pál pápa
Qtya no está en línea   Reply With Quote
Old August 15th, 2016, 06:58 PM   #9024
medicu' de garda
Moderator de garda
 
medicu' de garda's Avatar
 
Join Date: May 2010
Location: Bucharest
Posts: 1,798
Likes (Received): 1368

There really is nothing to speak of at the moment... After an announcement a couple of moths ago that the contractors finally resolved their internal disputes and comences works, and a few pictures of workers cleaning the gutters in preparation for largescale works, NOTHING happened. It looks increasingly more likely that this contract will be terminated before completion
__________________
Trust me, I'm an east-european doctor.
medicu' de garda no está en línea   Reply With Quote
Old August 15th, 2016, 07:02 PM   #9025
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,595
Likes (Received): 19389

There is satellite imagery of the Oradea area in Google Earth dated 25 June and 23 May 2016 that shows no construction at all.
ChrisZwolle no está en línea   Reply With Quote
Old August 15th, 2016, 07:16 PM   #9026
JackFrost
Hun Solo
 
JackFrost's Avatar
 
Join Date: Nov 2010
Location: Sopron/Wien
Posts: 4,278
Likes (Received): 11824

Fun times ahead for road 4808 when traffic from M4 tries to get to road 42 to cross the border at Ártánd, because there is no connection for M4 on RO side.

Even better: the road quality is as shitty as almost every secondary road in Hungary:

https://www.google.hu/maps/place/Poc...!6m1!1e1?hl=hu
JackFrost no está en línea   Reply With Quote
Old August 15th, 2016, 07:59 PM   #9027
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

A3 Targu Mures-Campia Turzii (56,5 km).

Video only covers part of it, up to Iernut.



ciprebbe @ http://forum.peundemerg.ro/
__________________

Qtya, medicu' de garda liked this post
Alpin no está en línea   Reply With Quote
Old August 17th, 2016, 12:29 PM   #9028
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

Monthly update A3 Gilau - Nadaselu (8.7 km):



ciprebbe @ forum.peundemerg.ro

+ CNADNR fixing the ~ 200 m highway stretch on A1 (closed Săliște - Cunţa section):

https://www.facebook.com/cnadnr/vide...4260906833981/

https://www.facebook.com/cnadnr/vide...4277240165681/

Last edited by Alpin; August 17th, 2016 at 12:36 PM.
Alpin no está en línea   Reply With Quote
Old August 19th, 2016, 07:11 PM   #9029
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

A cute video of a beam transportation (for A3). Enjoy!

http://www.tierraarmada.com/tae/inde...&id=27&lang=es
__________________

simondanut, Fooxx67 liked this post
Alpin no está en línea   Reply With Quote
Old August 23rd, 2016, 10:54 PM   #9030
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

CNADNR fixing the ~ 200 m highway stretch on A1 (closed Săliște - Cunţa section). Looks like an interesting solution for dealing with those underground springs in the motorway's path:



ciprebbe @ http://forum.peundemerg.ro/index.php...6485#msg126485

The missing/partially build (Bechtel) bridge/viaduct over the Someș river + Gilău maintenance facility on A3, which are set to be tendered soon:



ciprebbe @ http://forum.peundemerg.ro/index.php?topic=6.10560
__________________

alleks liked this post
Alpin no está en línea   Reply With Quote
Old August 28th, 2016, 01:59 AM   #9031
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

Future A10 - A3 Interchange:



CNADNR fixing the ~ 200 m highway stretch on A1 (closed Săliște - Cunţa section):



ciprebbe @ http://forum.peundemerg.ro/index.php?topic=2.29940
__________________

MirceaValahRO liked this post
Alpin no está en línea   Reply With Quote
Old August 28th, 2016, 02:38 AM   #9032
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

A3 Location of the (future) Bogata viaduct, which will pass over the village of Bogata and over the Mures river, twice (Note: the bridge U/C @ 1:15 is a railroad bridge, has nothing to do w. the motorway):





A3 Câmpia Turzii - Târgu Mureş LOT 2 (Ogra - Târgu Mureş Airport, 10.1 km):



ciprebbe @ http://forum.peundemerg.ro/index.php?topic=6.10620
Alpin no está en línea   Reply With Quote
Old August 28th, 2016, 10:20 AM   #9033
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,406
Likes (Received): 2082

Quote:
Originally Posted by Alpin View Post
A3 Câmpia Turzii - Târgu Mureş LOT 2 (Ogra - Târgu Mureş Airport, 10.1 km):

Hey, finally u/c

Are all sections u/c or just one lot? When have construction works began?

Any info about the estimated completion date - Fall 2017?

Quote:
Originally Posted by MichiH View Post
If I got the CNADNR right, a design&build contract was signed for lot 2A. 4 months design phase, 12 months execution (construction) phase and 48 months warranty.
I think that means, they will start construction of this section in August 2016 at the earliest...
Quote:
Originally Posted by Le Clerk View Post
The contract is for SECTION 2A (Ogra-Campia Turzii), LOT 2 (Iernut-Chetani), a 18 km long strip of motorway.

4 months design, 12 months construction and 48 months warranty

A3: Ludus – Iernut 18km map
__________________

Which new motorways are currently under construction?
Which new motorways will be opened next?

See 'New motorway projects' thread

** Please help completing and updating of the list **

Been/driven: A, AND, B, CDN, CH, CZ, D, DK, E, EST, F, FIN, FL, GB, H, I, L, LV, LT, N, NL, P, PL, RO, S, SLO, USA (My cumulative travel mapping)
MichiH no está en línea   Reply With Quote
Old August 28th, 2016, 01:18 PM   #9034
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

Quote:
Originally Posted by MichiH View Post
A3: Ludus – Iernut 18km map
Ops, sorry, some confusion here. The Campia Turzii - Targu Mures motorway is further divided into Campia Turzii - Ogra Lots 1,2,3 and Ogra - Targu Mures Lots 1,2. So, the "Lot 2" in the video is not Ludus - Iernut, it's the other Lot 2.

Quote:
Are all sections u/c or just one lot?
All but one. The contract for Ogra - Targu Mures Lot 2 (Targu Mures Airport - Targu Mures) has been terminated at the builder's request (works have never started on this lot). It will be retendered.

Quote:
When have construction works began?
Construction works have only started recently - a couple of months, if I recall correctly. The Campia Turzii - Ogra lots are design&build (yellow FIDIC), so there was also a 4-month design phase, while the Ogra - Targu Mures lots are build-only (red FIDIC) and, to answer your last question, this is likely to have an impact on the completion dates as well. Completion date for Campia Turzii - Ogra Lots 1,2,3 is August - September 2017, while for Ogra - Targu Mures Lot 1 it is May - June 2017. However, while for the Red FIDIC lot (first Red FIDIC motorway contract in Romania - finally!) construction is expected to progress smoother, Yellow FIDIC motorway contracts have "traditionally" encountered a series of issues causing delays, such as disputes btw the builder and the CNADNR regarding the proposed motorway design/solutions, late issue of construction permits/additional expropriations required.
__________________

MichiH liked this post
Alpin no está en línea   Reply With Quote
Old August 29th, 2016, 12:28 AM   #9035
pasadia
Registered User
 
pasadia's Avatar
 
Join Date: Jun 2013
Location: Brasov / Kronstadt, RO
Posts: 2,241
Likes (Received): 1934

Well, actually it is not the first Red Fidic in Roumania, there have been some before (Bucuresti - Ploiesti i think, Pitesti by-pass, etc...). It's the first on EU money, as far as I know.

And those lots on Campia Turzii - Ogra are on yellow FIDIC, but they have started building them only after ALL construction permits were issued. So there should be no more problems (at least major problems, will have to see if relocation of LEA goes smoothly).
__________________

Alpin liked this post
pasadia no está en línea   Reply With Quote
Old August 30th, 2016, 10:38 PM   #9036
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

UPDATE Lugoj - Deva LOT 3

Ecoduct/wildlife crossing #1:







Ecoduct/wildlife crossing #2:









Ohaba rest area:



Grind motorway junction:







Bridge over Mures River:





Quest @ http://forum.peundemerg.ro/
__________________

mihai5, 8166UY, winnipeg, InuTM liked this post

Last edited by Alpin; August 30th, 2016 at 11:07 PM.
Alpin no está en línea   Reply With Quote
Old August 30th, 2016, 11:33 PM   #9037
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

Quote:
Originally Posted by Alpin View Post
The missing/partially build (Bechtel) bridge/viaduct over the Someș river + Gilău maintenance facility on A3, which are set to be tendered soon:



ciprebbe @ http://forum.peundemerg.ro/index.php?topic=6.10560
(Romanian) CNADNR has launched the tender for the bridge over the Somesul Mic river

Bridge will link the completed motorway section Gilau - Campia Turzii (52km) and U/C section Campia Turzii - Targu Mures (56,5 km), on one side, and the almost completed section Gilau - Nadaselu (8.7km) and the section Nadaselu - Mihaiesti (16,8 km, construction works are supposed to start in the coming weeks), on the other. In total, a continuous motorway length of ~ 135 m btw. Mihaiesti ( CJ county, on the border w. SJ county) and Targu Mures.
__________________

simondanut liked this post
Alpin no está en línea   Reply With Quote
Old August 31st, 2016, 04:05 PM   #9038
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

MONTHLY UPDATE A1 Deva - Lugoj

Lots 4,3



Lot 2



Eurocopter @ http://forum.peundemerg.ro/
__________________

AlexAllex liked this post
Alpin no está en línea   Reply With Quote
Old August 31st, 2016, 04:58 PM   #9039
8166UY
Registered User
 
Join Date: Nov 2011
Location: Rotterdam
Posts: 733
Likes (Received): 294

I like that the Lugoj-Deva road actually has 2 ecoducts close to eachother, in different vegetation. It makes the entire road look way less like a barrier for a larger amount of species. I cannot think of a road which also has this.
__________________

Alpin liked this post
8166UY no está en línea   Reply With Quote
Old September 1st, 2016, 06:12 PM   #9040
Alpin
BANNED
 
Join Date: Mar 2008
Location: sectorul 5 / in exile
Posts: 548
Likes (Received): 1948

CNADNR fixing the ~ 200 m highway stretch on A1 (closed Săliște - Cunţa section):



https://www.facebook.com/cnadnr/?fref=ts
Alpin no está en línea   Reply With Quote


Reply

Tags
highways, infrastructure, motorways, romania

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 12:21 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium