Old September 7th, 2017, 11:01 PM   #1081
bongo-anders
Registered User
 
Join Date: Oct 2008
Location: Køge
Posts: 5,186
Likes (Received): 3605

Funding for part 1 of the timeplanen project is now secured after, Dansk Folkeparti, Socialdemokraterne, Radikale Venstre and others made a deal without the governing parties Venstre, Konservative and Liberal Alliance.

Part 1 costs 15 billion danish kroner and for that you get.

A 35 kilometer line between Odense and Middelfart on western Funen that costs 4,5 billion.

Electrification of the line between Roskilde and Kalundborg and Fredericia and Aalborg.

Speed upgrades between Fredericia and Hobro, they will get rid of sharp curves etc etc
What the top speed will be is not known yet but I´m guessing they will just remove speed restrictions.

Hobro Aalborg is speed upgraded to 200 km/h

Long distance platforms at Ny Ellebjerg so passengers trains to and from Copenhagen Airport can stop at this soon to be huge intersection.
Currently its the terminus for S-train line F, Line A and E stops here as well.
It will be a stop on the Copenhagen Ringsted High Speed line and terminus for Metro line M4 when it opens in 2023.

Then some boring stuff like internet on the trains and projects to increase freight traffic in northern jutland.
__________________

kapo311, vigiliant, Grotlaufen liked this post
bongo-anders no está en línea   Reply With Quote

Sponsored Links
Old September 8th, 2017, 11:28 AM   #1082
JumpUp
Registered User
 
Join Date: Aug 2010
Posts: 123
Likes (Received): 45

So it will be a new railway from Odense to Middelfart? When will it get built?
JumpUp no está en línea   Reply With Quote
Old September 8th, 2017, 12:26 PM   #1083
bongo-anders
Registered User
 
Join Date: Oct 2008
Location: Køge
Posts: 5,186
Likes (Received): 3605

This investment frame is from 2018 to 2025 so I imagine that all the projects will be build in this timeframe.

Btw they have chosen the northern alignment and that's the reason why its 500 million more expensive.

The advantage is this alignment is that its avoid the more populated areas south of the Fynsmotorvejen motorway.

But they have to relocate a gas pipe that runs along the motorway.

Last edited by bongo-anders; September 9th, 2017 at 12:59 PM.
bongo-anders no está en línea   Reply With Quote
Old September 9th, 2017, 08:34 AM   #1084
ulca01
Registered User
 
Join Date: Feb 2017
Location: Nakskov
Posts: 9
Likes (Received): 0

The 2018 to 2025 seems somewhat unlikely to me.

Why?

Because the new line Copenhagen - Køge - Ringsted has been debated and discussed since the late 1980's, while some for example the DSB wanted a 5th between Høje Taastrup and Roskilde instead, until it was finally decided to build the new line.

Knowing Danish politicians and their eager to get things done, at least when it comes to public transportation, I can not shake the feeling that it will be sometime between 2030 and 2035 before any of those projects will be build or completed.
ulca01 no está en línea   Reply With Quote
Old September 9th, 2017, 12:59 PM   #1085
bongo-anders
Registered User
 
Join Date: Oct 2008
Location: Køge
Posts: 5,186
Likes (Received): 3605

The difference is that the railway over Funen has been through the systems with VVM studies and town hall meetings etc for around 3 years now so its far beyond just talking about it.

But as I also said, there hasn´t been anything concrete announced (like what speed upgrades we see between Fredericia and Hobro) so until we see something announced its just my guess.


BTW DSB wanted a 5th track between Hvidovre Fjern and Høje Taastrup (2 for S-train and 3 for long distance trains), Høje Taastrup Roskilde already has 4 tracks for long distance trains as the S-train only goes as far as Høje Taastrup.
bongo-anders no está en línea   Reply With Quote
Old September 9th, 2017, 01:04 PM   #1086
bongo-anders
Registered User
 
Join Date: Oct 2008
Location: Køge
Posts: 5,186
Likes (Received): 3605

Woop woop finally the high speed line start to looks like something.


The pictures are taken from the Kongsted Nord Service station east of Ringsted on E20 Vestmotorvejen.

I don´t have pictures of the rest of the works but the poles has reached Salbyvej west of Køge but only on the inbound tracks.

There was poles on both track as far as Ejbyvej (as I recall)














__________________

vigiliant liked this post
bongo-anders no está en línea   Reply With Quote
Old September 11th, 2017, 03:32 PM   #1087
Never give up
Registered User
 
Never give up's Avatar
 
Join Date: Apr 2009
Location: Copenhagen and Dublin
Posts: 4,334
Likes (Received): 7552

Revised togfund project goes ahead.

http://www.railjournal.com/index.php...ml?channel=537
__________________
Never give up está en línea ahora   Reply With Quote
Old October 17th, 2017, 11:04 AM   #1088
dysharmonica
Registered User
 
Join Date: Dec 2015
Posts: 241
Likes (Received): 129

Some Norwegian coverage of Banedanmark

https://www.tu.no/artikler/ny-metode...litasje/409131
dysharmonica está en línea ahora   Reply With Quote
Old October 23rd, 2017, 03:50 PM   #1089
bongo-anders
Registered User
 
Join Date: Oct 2008
Location: Køge
Posts: 5,186
Likes (Received): 3605

The Storstrøms Bridge contracts is awarded to an italian consortium.

http://www.vejdirektoratet.dk/DA/vej...strømsbro.aspx

__________________

dysharmonica liked this post
bongo-anders no está en línea   Reply With Quote
Old October 23rd, 2017, 03:53 PM   #1090
bongo-anders
Registered User
 
Join Date: Oct 2008
Location: Køge
Posts: 5,186
Likes (Received): 3605

And some old news not reportet here.

Swietelsky Baugesellschaft from austria will rebuild the Fehmarn rail line. (now called sydbanen or the southern railway)

https://www.building-supply.dk/artic...edfemern_banen
bongo-anders no está en línea   Reply With Quote
Old October 27th, 2017, 11:10 AM   #1091
NordikNerd
Rail & Road traveller
 
NordikNerd's Avatar
 
Join Date: Feb 2011
Location: Linköping
Posts: 2,748
Likes (Received): 1408

Only one train per hour will run on the new line.

Only one train per hour will run on the new railway between Copenhagen and Ringsted.

The capacity can not be fully utilized due to signal problems.


When the new high speed railway between Copenhagen and Ringsted opens in December next year, there will be a maximum of one train per hour on the line,
writes the technical magazine Ingeniøren.
The reason is trouble installing a new signal system in the trains, says Jan Schneider-Tilli, Project Director in Banedanmark.


The railway between Copenhagen and Ringsted is a public prestige project of around 1.2 billion EUR.
It will relieve traffic on the line between Høje Taastrup and Valby, which has been a big bottleneck for a long time.
NordikNerd no está en línea   Reply With Quote
Old October 27th, 2017, 09:39 PM   #1092
touya
Registered User
 
Join Date: Feb 2010
Posts: 86
Likes (Received): 15

Quote:
Originally Posted by bongo-anders View Post
A 35 kilometer line between Odense and Middelfart on western Funen that costs 4,5 billion.
What will be the maximum speed for the line? At 17 million Euro per km it does not look like high speed.
touya no está en línea   Reply With Quote
Old October 28th, 2017, 10:24 AM   #1093
1993matias
Registered User
 
Join Date: Apr 2013
Location: Copenhagen
Posts: 54
Likes (Received): 34

Quote:
Originally Posted by touya View Post
What will be the maximum speed for the line? At 17 million Euro per km it does not look like high speed.
Correct me if I'm wrong, but like the Køge-Ringsted line it will probably be made for 250 kph, with the track layout prepared for higher speeds.
__________________
Kind regards, Matias
Train and tram pictures from around Europe (still only a few, but more will come)
1993matias no está en línea   Reply With Quote
Old October 28th, 2017, 10:52 PM   #1094
bongo-anders
Registered User
 
Join Date: Oct 2008
Location: Køge
Posts: 5,186
Likes (Received): 3605

250 is the max speed but top speed of 280 or 300 have been mentioned .
bongo-anders no está en línea   Reply With Quote
Old October 29th, 2017, 12:02 AM   #1095
Klausenburg
Registered User
 
Klausenburg's Avatar
 
Join Date: Jul 2007
Location: Cluj/Kolozsvar/Klausenburg
Posts: 2,915
Likes (Received): 3781

The mysterious buyer of the three IC2 trains is Astra Transcarpatic from Romania. One of the trains was already painted:



Source: http://www.forumtrenuri.com/t4947p135-material-rulant
__________________

3737, EduardSA liked this post
Klausenburg no está en línea   Reply With Quote
Old October 30th, 2017, 05:31 PM   #1096
Nikolaj
Registered User
 
Join Date: Oct 2009
Posts: 289
Likes (Received): 77

Quote:
Originally Posted by bongo-anders View Post
250 is the max speed but top speed of 280 or 300 have been mentioned .
Equipped for 250 km/h, but prepared for 300 km/h
__________________

dysharmonica liked this post
Nikolaj está en línea ahora   Reply With Quote
Old October 31st, 2017, 07:52 PM   #1097
AlexNL
Registered User
 
AlexNL's Avatar
 
Join Date: May 2010
Posts: 2,629
Likes (Received): 537

Quote:
Originally Posted by NordikNerd View Post

When the new high speed railway between Copenhagen and Ringsted opens in December next year, there will be a maximum of one train per hour on the line,
writes the technical magazine Ingeniøren.
The reason is trouble installing a new signal system in the trains, says Jan Schneider-Tilli, Project Director in Banedanmark.
Sounds like they're implementing temporary block working until the signalling issues are resolved?
__________________
We are shaping the future
AlexNL no está en línea   Reply With Quote
Old November 1st, 2017, 01:06 PM   #1098
dysharmonica
Registered User
 
Join Date: Dec 2015
Posts: 241
Likes (Received): 129

Quote:
Originally Posted by AlexNL View Post
Sounds like they're implementing temporary block working until the signalling issues are resolved?
The signaling on the tracks seems ready / on time - it's the train conversions that are behind - apparently IC3/IR4 are hard to convert to convert and the project is FAR behind schedule meaning that there will not be enough trains ready to ride on the line. So for a while there would not be enough trains to fill the capacity -- and they would roll out gradually.

The alternative - temporarily adding the old signaling to the tracks is an option, but would also not be ready for the opening late next year.

They just moved the project director from the line itself (which is on time and on budget) to the signaling project (replacing signaling on all trains and all lines in DK) to get that project in shape .. we will see.
dysharmonica está en línea ahora   Reply With Quote
Old November 2nd, 2017, 10:20 AM   #1099
Coccodrillo
Moderator
 
Join Date: Sep 2005
Location: Switzerland
Posts: 7,200
Likes (Received): 768

Another pic and a video of the new life of the IC2: http://clubferoviar.ro/astra-trans-c...5-automotoare/
__________________
1.6.2016: Basistunnel!

für Güter die Bahn ~ pour vos marchandises le rail ~ chi dice merci dice ferrovia
Coccodrillo no está en línea   Reply With Quote
Old November 4th, 2017, 10:08 PM   #1100
milipumba
Registered User
 
Join Date: Nov 2008
Location: Køge
Posts: 655
Likes (Received): 467

The first big lift at Køge Nord station was today.
This piece has a lengh on 40 meters, and a weight on 160 tons.
5 more sections are waiting to be put in place, before the end of the year.
Quote:
Originally Posted by milipumba View Post
Today was the big day, for me and many more people in Køge.

__________________

vigiliant, pai nosso liked this post

Last edited by milipumba; November 5th, 2017 at 05:12 AM.
milipumba no está en línea   Reply With Quote


Reply

Tags
denmark, trains

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 10:37 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium