| daily menu » rate the banner | guess the city | one on one |
|
|
#1 |
|
slacker oui!
Join Date: Sep 2003
Location: Sweden
Posts: 4,175
Likes (Received): 1
|
Hyderabad (HYD) | Rajiv Gandhi International Airport
This thread is about the new Hyderabad International Airport (only)
GMR has updated its site and have launched a website for HIAL also.Hopefully we will see pictures from the construction-site. For project updates please visit the website. finished: 2008 (hopefully) http://www.newhyderabadairport.com/ http://www.gmrgroup.co.in/gmr_airports.html Project Phases Phase 1A A 104,100 sq mt terminal area will have the capacity to handle 5 million passengers per annum. Within it, will be a 17,000 sq mt technical services zone situated below the arrival level and a 1750 sq mt external circulation area at the departure level. Remaining buildings, including the ATC, technical section, cargo (100,000 tonnes capacity), aircraft maintenance, airport maintenance, CFR station and utilities, will have a combined area of 35,000 sq mts ![]() Phase 1B Post Phase 1A, construction of subsequent phases will be determined by actual traffic volume. Phase 1B will have a capacity increase to 7 million passengers per annum, by adding passenger boarding bridges and aircraft stands on the north side of the pier. A VIP terminal, facility for General Aviation (GA) and a Low Cost Terminal (LCT) for 0.3 million passengers per annum will also be built. ![]() Phase 1C Capacity of the terminal will be further increased to 10 million passengers per annum with an additional area of 37,000 sq mts. The LCT capacity will also be increased to 0.5 million passengers per annum and additional maintenance facilities, catering and offices will be provided 40,000 sq mts of space ![]() Phase 2 Terminal 1 is now approaching full development and therefore, needs to be expanded to an area of 250,000 sq mts. The LCT will also be expanded to its full capacity of 1.5 million passengers per annum A second runway will be needed before the construction of Terminal 2 can commence. A major increase in all the established facilities will be undertaken, including more hotels, offices, cargo and maintenance facilities. Total built up area at the end of this phase will be approx. 470,000 sq mts. ![]() Final Phase The airport has reached its full maturity. An additional floor area of 430,000 sq mts will be constructed bringing the total built up area to 900,000 sq mts. The ultimate master plan is for 40 million passengers per annum. To accomodate this potential increase, the present master plan allows freedom of expansion for both airside and landside facilities within the Airport site. Further acquisition of land to the north and south will allow expansion of a third and fourth runway system.
Last edited by drwho; August 13th, 2005 at 12:08 AM. |
|
|
|
|
|
#2 |
|
id owns all
Join Date: Mar 2005
Location: All over the place
Posts: 1,698
Likes (Received): 0
|
that airport is obviously world-class I mean that thing is quite classy architecture-wise.
I thought they started construction in Feb. when Sonia gandhi laid the foundation stone but then there was some kind of agitation by Naidu's boys or something like that.
__________________
Dude where's my car? |
|
|
|
|
|
#3 | |
|
Registered User
Join Date: Jun 2004
Posts: 310
Likes (Received): 0
|
Quote:
|
|
|
|
|
|
|
#4 | |
|
id owns all
Join Date: Mar 2005
Location: All over the place
Posts: 1,698
Likes (Received): 0
|
Quote:
But who the hell cares, the current one's official name is Rajiv gandhi airport but everyone calls it Hyderabad Begumpet airport. So why not just call this one Hyderabad Shamshabad airport?
__________________
Dude where's my car? |
|
|
|
|
|
|
#5 |
|
Registered User
Join Date: Mar 2005
Posts: 86
Likes (Received): 0
|
Looks awesome! whoever selected this consorita to build the airport I
This really is "world class" not like the one being built in Bangalore. Way to go Hyderabad!!! |
|
|
|
|
|
#6 |
|
Registered User
Join Date: Aug 2004
Location: DED, LKO, PHL
Posts: 4,494
Likes (Received): 1
|
How long before we reach the final phase, forumites?
Oh lord, its gargantuan! |
|
|
|
|
|
#7 |
|
Nocturnal...!!!!
Join Date: Mar 2005
Posts: 7,480
Likes (Received): 343
|
Very nice architecture...i like those images of airport interiors.
|
|
|
|
|
|
#8 |
|
Registered User
Join Date: Feb 2005
Posts: 2,948
Likes (Received): 1
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
|
|
|
|
|
|
#9 | |
|
Registered User
Join Date: Feb 2005
Posts: 98
Likes (Received): 0
|
Quote:
The website is really good and informative. Particularly impressive is the illustration of all the phases which clearly lays out what parts of the master plan are coming up during each phase and traffic that each phase can accomodate. |
|
|
|
|
|
|
#10 |
|
Registered User
Join Date: May 2005
Posts: 4,585
Likes (Received): 1
|
niiiiiccceee
that is huge. what is the maximum capacity they can have with that size of airport? i would guess quite a few tens of millions |
|
|
|
|
|
#11 |
|
Registered User
Join Date: Jul 2004
Posts: 4,015
Likes (Received): 7
|
Am I the only one suffering from adiepus complex??
![]() drwho.....................terrific job finding the official site. LuckyStreak.............nice work with those renderings. ATC the most important architecture missing from all the renderings. I guess I am the only one suffering from adiepus complex. But I'll live with it.
|
|
|
|
|
|
#12 |
|
CrAzY FrOg
Join Date: Jul 2005
Location: london
Posts: 479
Likes (Received): 0
|
![]()
|
|
|
|
|
|
#13 |
|
BANNED
Join Date: Jul 2005
Posts: 181
Likes (Received): 0
|
To be honest, it looks a zillion times better than Bangalore International. I only expect it to be a bit bigger, considering the fact that it would be used for domestic operatins too. Allthemore, since Sahara has chosen to establish its base in Hyd, it can be argued that they themselves would be needing this much space for their operations. What about the rest + the International operators? Our planners still think of the very near future only.
|
|
|
|
|
|
#14 |
|
id owns all
Join Date: Mar 2005
Location: All over the place
Posts: 1,698
Likes (Received): 0
|
Just be glad that (a) construction has started and (b) this airport can rub shoulders with the best of the world, asthetics-wise.
And remember they're gonna carry out this project in multiple phases, and the final phase is gonna kick butt, look up there, kronik posted an image of the final phase layout.
__________________
Dude where's my car? |
|
|
|
|
|
#15 | |
|
id owns all
Join Date: Mar 2005
Location: All over the place
Posts: 1,698
Likes (Received): 0
|
Quote:
__________________
Dude where's my car? |
|
|
|
|
|
|
#16 |
|
Registered User
Join Date: Jun 2004
Posts: 310
Likes (Received): 0
|
then what will happen to begumpet airport, break it down and make it a commercial center?
|
|
|
|
|
|
#17 | |||
|
Registered User
Join Date: Mar 2005
Posts: 86
Likes (Received): 0
|
Quote:
Quote:
Quote:
|
|||
|
|
|
|
|
#18 |
|
Registered User
Join Date: Oct 2004
Location: S H E N Z H E N
Posts: 517
Likes (Received): 12
|
I think they make the ATC as per the futere expansions.. when both the airport is operational, the the ATC will be at the center and its easy to see both the airport operations simultaneously.
|
|
|
|
|
|
#19 | |
|
Registered User
Join Date: Jul 2004
Posts: 4,015
Likes (Received): 7
|
Quote:
|
|
|
|
|
|
|
#20 | |
|
id owns all
Join Date: Mar 2005
Location: All over the place
Posts: 1,698
Likes (Received): 0
|
Quote:
Or...keep the current airport and use it for flying cars (when they come out), and helicopter flights and stuff to rural areas.
__________________
Dude where's my car? |
|
|
|
|
![]() |
| Tags |
| hyd airport, hyderabad, rgia |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|