#81 |
|
All about Washington Tran
Join Date: Dec 2007
Location: Kent
Posts: 29
Likes (Received): 0
|
Thank you very much! This site has been helping me with a lot of information and how it would involve transportation. I first stumbled on this site at the new Huron Tower in Seattle. Impressive!!
The boring should take about a that time but add another month for maintenance and a year to lay the rail inside the tunnel along with installing the Overhead Contact System. If there wasn't such an outcry regarding the cost, we'd probably already be at UW and making way towards Northgate and Federal Way but instead we'll have to opt for the slower method due to the issues that arose. Most, granted they were Sound Transit beginnings fault but since Joni took over it's (ST) has received 3 credit ratings, two of which happened a week a part from each other. With Senator Patty Murray securing the funding for Ground Breaking and initial construction, the second TBM will be purchased shortly and delivered to start boring from the University of Washington in late 2008. The Beacon Hill TBM (Emerald Mole) should be finishing it's duties shortly (next week or three it should be popping out from my understanding) and also head for the UW site. ST can not start boring at the Pine Street tunnel site due to noise and getting the tunnel liners easily in and out without disrupting bus and light-rail traffic. Testing along Mlk Way starts this Spring. Once full construction is completed, Mlk Way will go to 35mph until Henderson where it goes to 40mph. Light-Rail will be 45mph until Henderson and 50mph respectively along Mlk Way. From Boeing Access sans some curves, the rest of the route will be 55mph until the climb up to the Airport. Speed has not been set yet along that section from what I can see. I'm not exactly sure as to what the deal is with the S 200th Street Station but I am going to say that is deferred until more funding can be attained. |
|
|
|
|
|
#82 |
|
Twinkie
Join Date: Aug 2004
Location: Seattle/Bellevue
Posts: 744
Likes (Received): 2
|
I hope ST's next phase will have a more aggressive timeline. One of the drawbacks of the megaplan was that it was sooo effing slow to get built. I say build less at a faster pace rather than a lot of projects at a snail's pace. Salt Lake City voters overwhelmingly passed an increased tax measure that'll bring their light rail lines in by 2014 rather than 2025 or 2030 as originally planned.
Also, if you look at ST's website, they're doing all the final design *before* any construction starts. Other cities are saving time by beginning construction *while* final design is taking place, known as "design/build." (My rant stemmed from a post in the blog below that mentioned that UW could've been built by 2011 if they'd only bought another tunnel-boring machine...) |
|
|
|
|
|
#83 | |
|
Registered User
Join Date: Aug 2007
Location: Little Taipei, Everett
Posts: 1,047
Likes (Received): 0
|
I think we'd all like the idea of design-build. Look at the Everett I-5 HOV project; the WSDOT used design-build and it only took about 3 years (next year), even though there have been many delays.
However, design-build might not work well with the University Link in particular. Tunneling is still a very complicated task, and if we used design-build, we may get into problems that could extend the timeline and increase costs. I'm a little confused by the thing kub86 said: Quote:
__________________
Everett/Snohomish County Development News Thread |
|
|
|
|
|
|
#84 |
|
All about Washington Tran
Join Date: Dec 2007
Location: Kent
Posts: 29
Likes (Received): 0
|
My understanding now is that the boring will be finished in 2013 but the rest of the work will take the rest of the 4 years before the opening. If they had 4 tunnel boring machines, the boring would be finished in 2011 but because of the financial pinch, only 3 will be used.
Here are some night images of Link out and about. ST 105 at the Operations and Maintenance Facility image hosted on flickr ![]() ST 102 coming off the elevated section towards Downtown Seattle image hosted on flickr ![]() They were nice enough to do this... ah the future is coming! image hosted on flickr ![]() Link going by Holgate Street image hosted on flickr
|
|
|
|
|
|
#85 |
|
Registered User
Join Date: Feb 2007
Location: Seattle,Bellevue,Everett
Posts: 969
Likes (Received): 43
|
Those are some great shots!
Great color and blur.
__________________
The less you know on any given subject, the more in-depth you can debate that subject. |
|
|
|
|
|
#86 |
|
All about Washington Tran
Join Date: Dec 2007
Location: Kent
Posts: 29
Likes (Received): 0
|
Thanks! I have more posted here - http://www.flickr.com/photos/brian_m...7603783848157/
|
|
|
|
|
|
#87 |
|
the transit nazi
Join Date: Apr 2006
Location: Seattle
Posts: 1,019
Likes (Received): 0
|
So, University Link is in a bit of trouble.
The state government has Senate Bill 6772 in committee right now. It would radically change Sound Transit's governance, make them responsible for regional road funding, and essentially take our transit money and dump it into highway expansion. It would also make Sound Transit ineligible for their FTA FFGA - the $750 million federal grant for light rail. Anybody other than me live in WA and want to fight this? I helped knock the same thing down last year: http://seattletimes.nwsource.com/htm...yndication=rss |
|
|
|
|
|
#88 |
|
Registered User
Join Date: Jul 2007
Location: Seattle
Posts: 690
Likes (Received): 3
|
let's face it though, sound transit is gimped. they can only collect sales taxes and sub area equity is a serious hamper on building what's best for the region.
however, this is a horrible idea if it puts 750 million and future transit expansion at risk. |
|
|
|
|
|
#89 | |
|
the transit nazi
Join Date: Apr 2006
Location: Seattle
Posts: 1,019
Likes (Received): 0
|
Quote:
When light rail opens, public support will increase quickly. Even Sounder is helping - it has over 10,000 daily riders now. |
|
|
|
|
|
|
#90 |
|
Registered User
Join Date: Mar 2007
Posts: 483
Likes (Received): 3
|
As I understand it, between $750 million at stake and Ed Murray against it, it seems even less likely this time around than before. UrbanBen, do you think it's more likely for some other reason?
|
|
|
|
|
|
#91 |
|
Registered User
Join Date: Jul 2007
Location: Seattle
Posts: 690
Likes (Received): 3
|
what do you mean put the money in reserve? i thought sub area equity meant that if you tax an area you have to spend that money in that area? thereby hampering the whole point of a regional agency which is to collect money from everybody to build projects that would best benefit everybody.
the state probably won't start taxing income, but they could at least allow sound transit to collect mvet, property tax, and gas tax. |
|
|
|
|
|
#92 |
|
the transit nazi
Join Date: Apr 2006
Location: Seattle
Posts: 1,019
Likes (Received): 0
|
I think it's important to let legislators know we oppose it - otherwise it's easier for them to change their minds next time. The point is to ensure that there's continued opposition.
|
|
|
|
|
|
#93 | |
|
the transit nazi
Join Date: Apr 2006
Location: Seattle
Posts: 1,019
Likes (Received): 0
|
Quote:
The state used to allow Sound Transit to collect MVET. Statewide voters put a stop to that. We *could* have a constitutional amendment to allow regions to tax themselves, but I think that would be necessary first (but IANAL). Gas tax is protected by the state constitution already - you have to spend it on roads. In terms of giving Sound Transit a better funding source, like property taxes - WAIT. Get Central Link in operation. Get the rest of the Sounder round trips in operation. Build public support - wait until Sounder goes to Lakewood and the people in the southern suburbs start asking for more. Also, let Sound Transit consider their own options before having the state meddle. They weren't able to do much transit oriented development the first time around - they had to build surface parking at Tukwila International, and if they hadn't been in dire financial straits, they might have been able to build TOD and make the station property generate revenue through retail. |
|
|
|
|
|
|
#94 | |
|
Registered User
Join Date: Aug 2007
Location: Little Taipei, Everett
Posts: 1,047
Likes (Received): 0
|
Quote:
__________________
Everett/Snohomish County Development News Thread |
|
|
|
|
|
|
#95 |
|
the transit nazi
Join Date: Apr 2006
Location: Seattle
Posts: 1,019
Likes (Received): 0
|
|
|
|
|
|
|
#96 | |
|
Registered User
Join Date: Oct 2006
Posts: 648
Likes (Received): 3
|
Quote:
I agree with you entirely. Unfortunately, the political machine in Washington State (and particularly King County) is controlled by those who would prefer to take 50 years to build a project so that they have high-paying jobs for decades. Why should they hurry when everyone just accepts that transit projects always take 30 years to complete...the citizens should demand that transit that works be built sooner. I support rail projects but this attitude just pisses me off royally!
|
|
|
|
|
|
|
#97 | |
|
the transit nazi
Join Date: Apr 2006
Location: Seattle
Posts: 1,019
Likes (Received): 0
|
Quote:
|
|
|
|
|
|
|
#98 |
|
Registered User
Join Date: Jul 2007
Location: Seattle
Posts: 690
Likes (Received): 3
|
add another boring machine to the uw extention?
try a design/build process? |
|
|
|
|
|
#99 | |
|
the transit nazi
Join Date: Apr 2006
Location: Seattle
Posts: 1,019
Likes (Received): 0
|
Quote:
Everyone says design/build, design/build. We don't get federal grants without design done. Without federal grants, we collect taxes for another 5 years before we start. Construction isn't the slow part. Getting the money and getting approval, then getting easements on everyone's property and waiting for all the business leases to expire, those are the slow parts. All that is basically the contractor anyway - Sound Transit can set a schedule, but if the contractor can't make it, they can't make it. This sounds a lot like trying to fix the federal budget by cutting HUD instead of the Army. Find the problems first, before suggesting 'solutions'. |
|
|
|
|
|
|
#100 |
|
Registered User
Join Date: Aug 2007
Location: Bellevue
Posts: 137
Likes (Received): 0
|
"give me ONE thing that ST could do to build light rail faster."
How about build east link NOW? They may miss federal funds, but by the time we can start building costs will have probably gone up as much as the federal money. Delaying these projects are costing us a boatload, as I'm sure you know. If they don't have enough money as you say, then make some bonds to pay for it. Our federal government borrows trillions with no time line to pay it back to get things done, why can't we do something actually worthwhile with our fake money? |
|
|
|
![]() |