|
|
| daily menu » news links | rate the banner | guess the satellite | guess the city | one on one |
|
|
|
|
#1 |
|
BANNED
Join Date: Aug 2007
Posts: 176
|
DAEJEON | Future-X| 245m | 53 fl | PREP
![]() Construction Start-2008.10 Complete Year-2012 Clusters-7 (1.Mixed-use residential-43~60 floor 6 2.Future-X office tower-53 floor,245m 1) Construction Company-GS Construction(LG Association Company) Location-Eunhaeng-dong,Daejeon,South korea Project real Name-Eunhaeng 1 district Urban development |
|
|
|
|
#2 |
|
BANNED
Join Date: Aug 2007
Posts: 176
|
recent news
Eunhaeng Future-X's development is allowed by Daejeon City Hall ![]() The electrification hour bank eastern u- hour mote construction project becomes real anger. The KT Samsung SDS the LG Electronics the LG Electronics it will know thu with su positive back 5 enterprises 2nd revealed from the ward office in 1st electrification wide area hour Yoo rain quota of 100 size su it constructs other fortune it acquired the union founding authorization for in bank eastern redevelopement sector region. It followed hereupon and these 5 enterprises exchanged 2005 understanding memorandum (MOU), it was in the process of advancing and ` phyu the wife leyk su it prepared the foot hold it will be able to propel a u- hour mote construction project ' stably. phyu The wife leyk su the u- hour mote begins the land mark tower of 60 bed height and the hotel and the department store, five blood su, only movie theater back various commerce facility it knows prismatic composition 5 east (2112 generations) 100 (about 31 desultory criticisms which it includes) it is a plan which will be constructed with the composition jar of size. These enterprise phyu the wife leyk su Yoo rain quota of the best in the world su creates the u- hour mote with Rog of Japan the flag which it sees hil su like will do to be located with one speciality is the compound eye with the demonstration jar. The hazard which will reach previous month u- service propriety investigation and verification test Soo Haeng Hal IT CM (the construction civil official) it starts the team, it develops the benefit model and the service model. phyu The wife leyk su to the u- hour mote free radio LAN service inside the jar, personal flower bed final period the ID recognition which leads, Intel li before thu it equips the dome elder brother screen ceiling of building system and 30 meter size and phul your tie bud back it is a plan where the solution which is various will be applied. To this time enterprise the research facility and each field inside the Taedok jar especially also the venture businesses which equip a professionalism participate, GS construction Daelim construction two mountain construction total Ryong construction backs keep a space-time. phyu The wife leyk su the u- hour mote enterprise passes by an end of this year construction mind and an enterprise enforcement authorization, next year it catches October starting construction and a sale in lots with aim. |
|
|
|
|
#3 |
|
BANNED
Join Date: Aug 2007
Posts: 176
|
recent design
|
|
|
|
|
#4 |
|
sould have been kazaaam !
Join Date: Aug 2007
Location: brussels
Posts: 335
|
cool name
|
|
|
| Thread Tools | |
| Display Modes | |
|
|