Old September 9th, 2009, 09:29 PM   #821
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,559
Likes (Received): 19352

They probably have engineers from TEXAS working there
ChrisZwolle no está en línea   Reply With Quote

Sponsored Links
Old September 10th, 2009, 06:51 AM   #822
H123Laci
BANNED
 
Join Date: Dec 2007
Location: Budapest, HUN
Posts: 1,647
Likes (Received): 3

Quote:
Originally Posted by bleetz View Post
I'm not a civil engineer so I don't quite understand why they would raise a road f.e. here:

Is it just preference or is there a point to it?
I think its a flood area, and they didnt want to obstruct the waterflow with embankments...
H123Laci no está en línea   Reply With Quote
Old September 10th, 2009, 02:18 PM   #823
Qwert
Moderator
 
Qwert's Avatar
 
Join Date: Jun 2006
Posts: 12,409
Likes (Received): 2531

Quote:
Originally Posted by H123Laci View Post
I think its a flood area, and they didnt want to obstruct the waterflow with embankments...
Yes, it's flood area. Entire D1 is designed to survive 100-year flood without traffic closure.

Here is map of the section. You can see the interchange above is between river Váh and artificial canal:

Source: www.highways.sk

Terrain map by Google: http://maps.google.com/?ie=UTF8&ll=4...54324&t=p&z=13
Qwert no está en línea   Reply With Quote
Old September 10th, 2009, 04:35 PM   #824
mirolesko
Registered User
 
mirolesko's Avatar
 
Join Date: Jun 2009
Location: Praha, Prešov
Posts: 239
Likes (Received): 13

R1 Nitra-Zlate Moravce

New pics from first PPP expressway on Slovakia:
mirolesko no está en línea   Reply With Quote
Old September 17th, 2009, 09:43 PM   #825
Qwert
Moderator
 
Qwert's Avatar
 
Join Date: Jun 2006
Posts: 12,409
Likes (Received): 2531

R1 Žarnovica - Šášovské Podhradie

Photos are from www.dialnice.info










Qwert no está en línea   Reply With Quote
Old September 17th, 2009, 09:51 PM   #826
Timoth12
Registered User
 
Join Date: Apr 2005
Posts: 976
Likes (Received): 6

Nice shots, also some days ago has been officially opened second profile of D1 12,6 km Poprad Matejovce - Jánovce section.

Here is google translation from Slovak source.
Timoth12 no está en línea   Reply With Quote
Old September 18th, 2009, 08:29 AM   #827
veteran
www.fotokosice.eu
 
veteran's Avatar
 
Join Date: Nov 2007
Location: Košice, Slovakia
Posts: 9,756
Likes (Received): 572

Construction of D1 between Martin and Prešov (sections Dubná Skala-Turany, Turany-Hubová, Hubová-Ivachnová, Jánovce-Jablonov, Fričovce-Svinia - total length 75,032 km) should start 15th Oct. 2009.

http://tvnoviny.sk/spravy/ekonomika/...5-oktober.html

English translation:
Quote:
Should sign another contract. When everything is ready, 15 October start construction on the eastern highway, said PM.

The government should at its next meeting next week to approve an amendment to the concession contract for the construction and operation of the five sections of the D1 motorway between Martin and Prešov.

This is a project under the first package of public-private partnership (PPP). "The government expects that construction work will commence on October 15 on the text amendment to the concession contract is still being negotiated, so we will not further comment on its parameters," said portfolio further transport.

Sitting in connection with the preparation of the highway project today to mention Prime Minister Robert Fico. "There was an agreement next week on Wednesday would be to sign another contract and should be approved by the Government. When everything is ready, Oct. 15 starting construction on the eastern highway, as was foreseen in the PPP project," said Fico.

Sections in northern Slovakia

The state has a concession for the construction of sections of the D1 during the concession period, gradually made in respect of developments around the price of money more than twice the amount vysúťaženej. As part of the first package of PPP projects are sections of the D1 Dubna Skala - Turany, Turany - fungal, fungus - Ivachnova, Jánovce - apple trees and Fričovce - pigs in the total length of about 75 kilometers.

GUARANTEE FROM STATE

The state seems to be able to assume the guarantee for the construction of the D1 motorway through PPP projects. Cabinet is 19th August approved a draft amendment to law on state debt and state guarantees to allow state to provide security for a loan from the European Investment Bank's concessionary financing for the construction of the highway D1. Draft amendments approved by parliament in shortened legislative proceedings.

European Investment Bank will provide the consortium, which has ensured the construction of highway, part of the EUR 1 billion. The concessionaire must provide loan up to 800 million euros corresponding to guarantee the respect of the current financial crisis virtually impossible to obtain in commercial banks.

Provision of state guarantees in such amounts, says the Ministry of Finance, is the only viable solution to create a state space and the winning consortium for the financial closure of the PPP.
Dates of opening of these sections:
Dubná Skala - Turany -> 20.07.2012
Turany - Kraľovany -> 20.07.2012
Kraľovany - Hubová -> 15.01.2013
Hubová - Ivachnová -> 15.01.2013
Jánovce - Jablonov -> 25.10.2011
Fričovce - Svinia -> 25.10.2011
__________________
"Make traffic fit the city, not the city fit the traffic."
Bertold Hornung (25.03.1925–20.03.1997)
veteran no está en línea   Reply With Quote
Old September 18th, 2009, 09:56 AM   #828
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,559
Likes (Received): 19352

Google Translate for placenames is ridiculous

Quote:
D1 Dubna Skala - Turany, Turany - fungal, fungus - Ivachnova, Jánovce - apple trees and Fričovce - pig
Anyway, great to see the remaining pieces of D1 going under construction. Too bad it's just before the winter, so we might not see a lot of progress until summer 2010.
ChrisZwolle no está en línea   Reply With Quote
Old September 18th, 2009, 11:26 AM   #829
PLH
Moderator
 
PLH's Avatar
 
Join Date: Mar 2007
Location: Warszawa / Łódź
Posts: 11,841
Likes (Received): 2823

Quote:
Originally Posted by ChrisZwolle View Post
Google Translate for placenames is ridiculous
But how precise
PLH no está en línea   Reply With Quote
Old September 18th, 2009, 02:28 PM   #830
Buddy Holly
BANNED
 
Join Date: Sep 2008
Location: Prishtina, RKS.
Posts: 6,133
Likes (Received): 120

Quote:
Originally Posted by mirolesko View Post
New pics from first PPP expressway on
Nice pics mirolesko. One question: what is this truck doing?
Buddy Holly no está en línea   Reply With Quote
Old September 18th, 2009, 02:45 PM   #831
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,559
Likes (Received): 19352

Fertilizing the ground, so the asphalt grows faster.
ChrisZwolle no está en línea   Reply With Quote
Old September 18th, 2009, 04:12 PM   #832
Qwert
Moderator
 
Qwert's Avatar
 
Join Date: Jun 2006
Posts: 12,409
Likes (Received): 2531

Quote:
Originally Posted by ChrisZwolle View Post
Google Translate for placenames is ridiculous

Quote:
D1 Dubna Skala - Turany, Turany - fungal, fungus - Ivachnova, Jánovce - apple trees and Fričovce - pig
Anyway, great to see the remaining pieces of D1 going under construction. Too bad it's just before the winter, so we might not see a lot of progress until summer 2010.
"Fričovce - pig" is the best.

Quote:
Originally Posted by Buddy Holly View Post
Nice pics mirolesko. One question: what is this truck doing?
It's laying temporary asphalt layer which should protect road embankment from damages caused by construction vehicles.
Qwert no está en línea   Reply With Quote
Old September 18th, 2009, 04:24 PM   #833
Buddy Holly
BANNED
 
Join Date: Sep 2008
Location: Prishtina, RKS.
Posts: 6,133
Likes (Received): 120

Quote:
Originally Posted by Qwert View Post
It's laying temporary asphalt layer which should protect road embankment from damages caused by construction vehicles.
Thanks for your answer Qwert. Did not know that.
Buddy Holly no está en línea   Reply With Quote
Old September 18th, 2009, 09:51 PM   #834
mirolesko
Registered User
 
mirolesko's Avatar
 
Join Date: Jun 2009
Location: Praha, Prešov
Posts: 239
Likes (Received): 13

Svinia really mean PIG
mirolesko no está en línea   Reply With Quote
Old September 18th, 2009, 11:33 PM   #835
Qwert
Moderator
 
Qwert's Avatar
 
Join Date: Jun 2006
Posts: 12,409
Likes (Received): 2531

Quote:
Originally Posted by Buddy Holly View Post
Thanks for your answer Qwert. Did not know that.
You are welcome.

Quote:
Originally Posted by mirolesko View Post
Svinia really mean PIG
It rather means something like piggish. BTW, I wonder why Google didn't translate also Dubná Skala - Oak Stone.
Qwert no está en línea   Reply With Quote
Old September 18th, 2009, 11:58 PM   #836
Qwert
Moderator
 
Qwert's Avatar
 
Join Date: Jun 2006
Posts: 12,409
Likes (Received): 2531

R3 Bypass of Horná Štubňa

Photos of this section weren't posted before. It's 2x1 4.3 km long bypass.It should be finished in November 2011.
















Photos are from www.dialnice.info
Map is from www.highways.sk
Qwert no está en línea   Reply With Quote
Old September 22nd, 2009, 08:06 AM   #837
hraby
Registered User
 
hraby's Avatar
 
Join Date: Feb 2008
Posts: 5,456
Likes (Received): 1794

Quote:
Originally Posted by ChrisZwolle View Post
Fertilizing the ground, so the asphalt grows faster.
yes, now will be asphalt grows very quickly new technology you don't stop..
hraby no está en línea   Reply With Quote
Old September 25th, 2009, 01:16 AM   #838
Qwert
Moderator
 
Qwert's Avatar
 
Join Date: Jun 2006
Posts: 12,409
Likes (Received): 2531

PPP

Quote:
Originally Posted by veteran View Post
Construction of D1 between Martin and Prešov (sections Dubná Skala-Turany, Turany-Hubová, Hubová-Ivachnová, Jánovce-Jablonov, Fričovce-Svinia - total length 75,032 km) should start 15th Oct. 2009.

http://tvnoviny.sk/spravy/ekonomika/...5-oktober.html

English translation:


Dates of opening of these sections:
Dubná Skala - Turany -> 20.07.2012
Turany - Kraľovany -> 20.07.2012
Kraľovany - Hubová -> 15.01.2013
Hubová - Ivachnová -> 15.01.2013
Jánovce - Jablonov -> 25.10.2011
Fričovce - Svinia -> 25.10.2011
And it's not true anymore.

Winning consortium must get necessary money before February 15th 2010. Original deadline October 15th 2009 was cancelled. Dates of opening of the section were also moved. Official excuse sounds: "Crisis". In other words, due to the crisis 28 banks led by Royal Bank of Scotland which should fund this project failed to provide needed € 3.3 billion. However, in the meantime our government signed additional agreement with the winning consortium thanks to which preparatory works for € 17 million will start soon thus in the end the delay may be not so big.

To sum up Slovak PPP projects:
  • 1st PPP - missing sections of D1 between Martin and Prešov: Preparatory works will start in 2009, main works in spring 2010.
  • 2nd PPP - R1 from Nitra to Tekovské Nemce + northern bypass of Banská Bystrica: Already U/C
  • 3rd PPP - D1 southern bypass of Žilina: Uncertain due to the credit crisis, but hopefully will start in 2010 either as PPP project or funded by government and eurofunds.

There's planned more PPP projects. Almost sure is southern half of D4 (Bratislava outer ring), officials are considering also expressway R7 close to Bratislava and R2 between Trenčín and Nováky and maybe some other motorways and expressways, but these will come after 2010.

Last edited by Qwert; September 28th, 2009 at 12:29 AM.
Qwert no está en línea   Reply With Quote
Old September 28th, 2009, 12:36 AM   #839
Qwert
Moderator
 
Qwert's Avatar
 
Join Date: Jun 2006
Posts: 12,409
Likes (Received): 2531

I made a PPP map using site www.highways.sk

Blue - 1st PPP (75.04 km)
Purple - 2nd PPP (51.53 km)
Pink - 3rd PPP (29.08 km)




Little update: D1 Sverepec - Vrtižer (Považská Bystrica)
Quote:
Originally Posted by Aan View Post
Fotky - JaMi - Povazska Bystrica 22.9.2009
Quote:
Originally Posted by Ali18 View Post








Quote:
Originally Posted by Ali18 View Post








Quote:
Originally Posted by Ali18 View Post


Qwert no está en línea   Reply With Quote
Old September 29th, 2009, 09:21 PM   #840
X236K
Registered User
 
Join Date: Mar 2007
Location: Prague, CZ
Posts: 804
Likes (Received): 46

Anyone of you driving from Martin to Zilina last Sunday afternoon? For the first time in my life (and hopefully for the last time as well), I saw police standing at the point where 2 lanes are merging into one and directing cars how to "zip"...
X236K no está en línea   Reply With Quote


Reply

Tags
motorways

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 10:20 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium