Old December 30th, 2009, 06:50 PM   #1081
Qwert
Moderator
 
Qwert's Avatar
 
Join Date: Jun 2006
Posts: 12,409
Likes (Received): 2533

D1 Jablonov - Studenec

U/C section of D1 in Eastern Slovakia:


Qwert no está en línea   Reply With Quote

Sponsored Links
Old January 2nd, 2010, 05:27 PM   #1082
Aan
Beijing, China
 
Aan's Avatar
 
Join Date: Nov 2007
Posts: 2,312
Likes (Received): 197

Paid roads in Slovakia for vehicle with weigh over 3500kg


translation for description:
Dialnica, rychlostna cesta (spoplatnena) - highway, expressway (paid)
cesta 1. triedy (spoplatnena) - 1st class road (paid)
cesta 1. triedy (bez poplatku) - 1st class road (for free)
Aan no está en línea   Reply With Quote
Old January 3rd, 2010, 07:20 PM   #1083
Qwert
Moderator
 
Qwert's Avatar
 
Join Date: Jun 2006
Posts: 12,409
Likes (Received): 2533

This is what should be put in use in 2010. Majority of it before the general elections in July of course.

2x2
D1 Sverepec - Vrtižer, 9.6 km
D1 Studenec - Beharovce, 3.5 km
D1 Svinia - Prešov West, 8 km
D4 Interchange Stupava South, 3.2 km
R1 Lehôtka pod Brehmi - Šášovské Podhradie, 8.4 km
Together: 32.7 km

2x1
D1 Jablonov - Studenec, 5.8 km
R3 Bypass of Trstená, 2nd part, 4.8 km
R3 Bypass of Horná Štubňa, 4.3 km
R4 Bypass of Svidník, 4.6 km
Together: 19.5 km

Source in Slovak: http://spravy.pravda.sk/v-tomto-roku..._ekonomika_p01

Last edited by Qwert; January 3rd, 2010 at 10:39 PM.
Qwert no está en línea   Reply With Quote
Old January 3rd, 2010, 10:35 PM   #1084
seem
Mornar bez mora
 
seem's Avatar
 
Join Date: Jun 2008
Location: Slovakia
Posts: 8,012
Likes (Received): 79

Quote:
Originally Posted by Qwert View Post
This is what should be put in use in 2010. Majority of it before the general elections in July of course.

2x1
D1 Jablonov - Studenec, 5.8 km
Heh, elections will be (really) soon

So in 2010 NDS is going to put in use 21,1 km of D1. We can expext, 100 km of D1 will be under construction from February.

On way from Bratislava to Žilina will be complete motorway (D1) probably in May.
__________________
Slovakia-One photo a day

Zauvik si tu, u mojim mislima i grudima..

Last edited by seem; January 4th, 2010 at 10:40 AM.
seem no está en línea   Reply With Quote
Old January 3rd, 2010, 11:14 PM   #1085
seem
Mornar bez mora
 
seem's Avatar
 
Join Date: Jun 2008
Location: Slovakia
Posts: 8,012
Likes (Received): 79

Probably the most famous motorway service in Slovakia - Dechtáre (D1) near Liptovský Mikuláš

"Salaš Dechtáre má poměrně zajímavou historii. Její název patří do pozůstalosti vesničky, která v současné době odpočívá na dně Liptovské Mary. Každopádně už od padesátých let na cestě z Ružomberoku do Martina v Dechtároch stála salaš, ve které jeden podnikavý bača hostil pocestné haluškami a ovčím sýrem. V sedmdesátých letech, kdy komunističtí zvěstovatelé světlých zítřků rozhodli spoutat další vodní tok a postavit mu do cesty horu šutrů, se rovněž rozhodlo o stavbě dálnice podél budoucího břehu přehradní nádrže. Nevím co je na tom pravdy, ale salaš, ve které se už tehdy vařili nejlepší bryndzové halušky na světě, byla přesunuta na kopec, kde se měla stát prvním a na dlouhou dobu jediným odpočívadlem na tom žertovném kousku dálnice."

- beautifle "skyline" of Tatras
- the best "halušky" in the world
- since 50`, it was located in village, this is new location, and village is "under" reservoir

-and, I have not been there

so post what do you thik about..







__________________
Slovakia-One photo a day

Zauvik si tu, u mojim mislima i grudima..
seem no está en línea   Reply With Quote
Old January 5th, 2010, 12:06 PM   #1086
msz2
Registered User
 
msz2's Avatar
 
Join Date: May 2006
Location: Kielce; Civitas Kielcensis; Poland; European Socialist Union
Posts: 4,171
Likes (Received): 56

Quote:
Originally Posted by ChrisZwolle View Post
A good old viaduc de Millau imitation. Pretty impressive, though it runs right through the city of Povazka Bystrica, I don't know if the local population likes it as well. But then again, PB is already considered one of the ugliest cities in Slovakia due to the absence of an historic old town.
It's much different then Millau, this viaduct is extradosed structure whereas Millau is cable stayed. Besides there is big difference in the shape of supports.
__________________
"The European Union is doomed to failure because it is something crazy, utopian project, a monument of pride leftist intellectuals."
- Margaret Thatcher

Last edited by msz2; January 5th, 2010 at 03:46 PM.
msz2 no está en línea   Reply With Quote
Old January 5th, 2010, 12:35 PM   #1087
(HUN)RoGeR
MSc of Chem Engineering
 
Join Date: Jan 2008
Location: Budapest
Posts: 1,573
Likes (Received): 356

Quote:
Originally Posted by Aan View Post
Paid roads in Slovakia for vehicle with weigh over 3500kg
Interesting map. There are lots of free bypass routes.
(HUN)RoGeR no está en línea   Reply With Quote
Old January 5th, 2010, 12:43 PM   #1088
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,591
Likes (Received): 19378

Not really, "bez poplatku" means "without toll". There aren't a lot of free alternates to motorways.
ChrisZwolle no está en línea   Reply With Quote
Old January 5th, 2010, 01:54 PM   #1089
DrX
Registered User
 
Join Date: Mar 2008
Location: Košice
Posts: 861
Likes (Received): 0

In fact, there is only one (mostly) non-toll first-class road that connects PL & HU, and that's far east from Slovenske Nove Mesto to Vyšný Komárnik. A reasonable alterantive for connecting Budapest and Krakow might be this one (but this road goes through a mountain pass near Vernar).
DrX no está en línea   Reply With Quote
Old January 5th, 2010, 01:55 PM   #1090
(HUN)RoGeR
MSc of Chem Engineering
 
Join Date: Jan 2008
Location: Budapest
Posts: 1,573
Likes (Received): 356



From now truckers wouldn't use motorways if they can.
For example the Austrian A2 is a toll road and lots of truckers use the Hungarian Main Road 86 to avoid it.
Longer, slower but much cheaper...
(HUN)RoGeR no está en línea   Reply With Quote
Old January 5th, 2010, 09:12 PM   #1091
msz2
Registered User
 
msz2's Avatar
 
Join Date: May 2006
Location: Kielce; Civitas Kielcensis; Poland; European Socialist Union
Posts: 4,171
Likes (Received): 56

What about E77 route in Slovakia? Is it upgraded now?
__________________
"The European Union is doomed to failure because it is something crazy, utopian project, a monument of pride leftist intellectuals."
- Margaret Thatcher
msz2 no está en línea   Reply With Quote
Old January 5th, 2010, 09:15 PM   #1092
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,591
Likes (Received): 19378

Since the Poles have long-term plans to construct an S19 towards the Slovakian border at Barwinek, do the Slovaks have similar plans for a construction from Prešov towards the Polish border?
ChrisZwolle no está en línea   Reply With Quote
Old January 5th, 2010, 10:48 PM   #1093
DrX
Registered User
 
Join Date: Mar 2008
Location: Košice
Posts: 861
Likes (Received): 0

msz2 and ChrisZwolle: the map posted by (HUN)RoGeR partially answers both of your questions. Specifically, whatever is in blue is a finished expressway (rychlostna cesta). However, as things go in Slovakia, many of these "finished" expressways are either actually not finished yet, or finished and not open, or/and have just two lanes.

Specifically, for E77 (which is mostly identical with the planned expressway R3), nothing has been uprgraded in a long time to the south of Zvolen. Then, there is a 4-lane expressway between Zvolen and Banska Bystrica. Some upgrade (like adding 3rd lane for slow cars) has been made on the Donovaly mountain pass between BB and Ruzomberok, and one two-lane section is done between Ruzomberok and Trstenna (shown in blue). That's all as far as I know.

Expresway R4 is planned in eastern Slovakia, connecting polish S19 from Brawinek to Hungarian M3 near Tornyosnemeti. The central section of this expressway between Kosice and Presov is finished (since it's the same road as the existing D1), the construction of the southern section KE-Milhost is supposed to start early this year (it will have 4 lanes, and it's almost sure that its construction will start - everything's ready, including EU funding). As far as the northern section from Presov to Vysny Komarnik goes, a two-lane bypass of Svidnik has been finished last May (or June), but then it got damaged by a flooding. So, even though the map says it's done, it's been never opened and it looks like it'll take a while to fix it (at least till the May election in Slovakia :-) ). The only other section that will be constructed on this road in foreseeable future is a bypass of Presov.

Sadly, both expressways R3 and R4 have an extremely low priority in Slovakia. So, no serious construction can be expected in next 10 years (with the exception of some bypasses).
DrX no está en línea   Reply With Quote
Old January 6th, 2010, 04:03 PM   #1094
pijanec
Registered User
 
Join Date: Mar 2007
Location: Ptuj
Posts: 1,800
Likes (Received): 6

What is the main reason Slovakia is so lacking behind other EU countries regarding modern road construction?
pijanec no está en línea   Reply With Quote
Old January 6th, 2010, 10:39 PM   #1095
seem
Mornar bez mora
 
seem's Avatar
 
Join Date: Jun 2008
Location: Slovakia
Posts: 8,012
Likes (Received): 79

Ivachnová - Liptovský Mikuláš


Klik, klik na Wikipédiu

Úsek meria 14,332 kilometra a nachádza sa medzi mestami Ružomberok a Liptovský Mikuláš. Výstavba prebiehala od januára 1973 do decembra 1977 súčasne s výstavbou vodného diela Liptovská Mara. V smere na Košice boli vybudované odpočívadlá Ivachnová (v budúcnosti by malo byť aj v opačnom smere) a Čemice. Medzi nimi sa nachádza ešte veľké obojstranné odpočívadlo Dechtáre. Náklady na výstavbu úseku dosiahli hodnotu 241,3 milióna Kčs[12]. V rokoch 2005 až 2006 boli vybudované chýbajúce odbočovacie a pripájacie pruhy na odpočívadlo Dechtáre v celkovej dĺžke 1 006 metrov[13].

Shortly in English:

- length - 14,332 km
- between Ružomberok and Liptovský Mikuláš
-was under construction in years - 1973-1977
- there are motorway services - Ivachnová (to Košice), Dechtáre, Čemice
-241,3 mil. Kčs













































__________________
Slovakia-One photo a day

Zauvik si tu, u mojim mislima i grudima..
seem no está en línea   Reply With Quote
Old January 7th, 2010, 12:02 AM   #1096
Qwert
Moderator
 
Qwert's Avatar
 
Join Date: Jun 2006
Posts: 12,409
Likes (Received): 2533

Nice photos, seem.

Quote:
Originally Posted by msz2 View Post
What about E77 route in Slovakia? Is it upgraded now?
As DrX said, there are some upgrades. However, this corridor will be in long term rerouted from present Banská Bystrica - Zvolen to future R3 via Martin - Zvolen. Now there is open just one bypass (Oravský Podzámok) and two are U/C: Trstená and Horná Štubňa. Part of this corridor will be also D1 between Švošov/Kraľovany and Martin which is U/C. Future common section of R1 and R3 between Žiar nad Hronom and Zvolen is already built. There is U/C also short feeder next to Martin which will be part of R3. Sections Trstená - Dolný Kubín, Dolný Kubín - Švošov/Kraľovany, Martin - Horná Štubňa and Zvolen - Šahy are being prepared (EIA approval is in progress).

Quote:
Originally Posted by ChrisZwolle View Post
Since the Poles have long-term plans to construct an S19 towards the Slovakian border at Barwinek, do the Slovaks have similar plans for a construction from Prešov towards the Polish border?
When R4 Košice - Milhosť will be finished it will be possible to drive on 2x2 roads (expressway, motorway, national roads) all the way from Hungarian border to village Kapušany eastern of Prešov what is about 66 km. Map. (From Polish to Hungarian border it's about 130 km so it's one half of PL - HU route.) This year there will be put in use 2x1 bypass of Svidník close to Polish border, the rest is being prepared, in the most advanced stage is western bypass of Prešov (part of D1) followed by northern bypass of Prešov (R4). From the end of Prešov bypass to Polish border R4 will be built as 2x1 expressway, but noone knows when. Traffic there is quite low.

Quote:
Originally Posted by pijanec View Post
What is the main reason Slovakia is so lacking behind other EU countries regarding modern road construction?
Actually, construction is now pretty fast. Current status:
Qwert no está en línea   Reply With Quote
Old January 7th, 2010, 10:33 AM   #1097
rarse
Registered User
 
Join Date: Jan 2010
Posts: 188
Likes (Received): 1

What is the main purpose of D4?

Quote:
Originally Posted by Qwert View Post
This is what should be put in use in 2010. Majority of it before the general elections in July of course.

2x2
D1 Sverepec - Vrtižer, 9.6 km
D1 Studenec - Beharovce, 3.5 km
D1 Svinia - Prešov West, 8 km
D4 Interchange Stupava South, 3.2 km
R1 Lehôtka pod Brehmi - Šášovské Podhradie, 8.4 km
Together: 32.7 km

2x1
D1 Jablonov - Studenec, 5.8 km
R3 Bypass of Trstená, 2nd part, 4.8 km
R3 Bypass of Horná Štubňa, 4.3 km
R4 Bypass of Svidník, 4.6 km
Together: 19.5 km

Source in Slovak: http://spravy.pravda.sk/v-tomto-roku..._ekonomika_p01
Hi,

can you please tell me from where to where is this section of D4 and what is the purpose of open it?
rarse no está en línea   Reply With Quote
Old January 7th, 2010, 10:40 AM   #1098
panda80
Registered User
 
panda80's Avatar
 
Join Date: Sep 2008
Location: Braila/Bucharest
Posts: 4,371
Likes (Received): 333

D4 is a large bypass of Bratislava, that is going to be build to ease congestion on the city's motorways. Interchange Stupava is where it meets D2 to Czech Republik.
panda80 no está en línea   Reply With Quote
Old January 7th, 2010, 10:43 AM   #1099
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,591
Likes (Received): 19378

Currently, this is all of D4:
[IMG]http://i48.************/15dwbuw.jpg[/IMG]
ChrisZwolle no está en línea   Reply With Quote
Old January 7th, 2010, 10:49 AM   #1100
rarse
Registered User
 
Join Date: Jan 2010
Posts: 188
Likes (Received): 1

Hi guys,

thank you for quick reply.

I know where already built D4 is (thanks ChrisZwolle), but I was wondering, is the interchange Stupava, which will be built in may only an interchange or does it go from somewhere to somewhere (3,2 km).

My next question is when will be new signs with new fonts on SK motorways?

What is the new font look like?

Thank you.
rarse no está en línea   Reply With Quote


Reply

Tags
motorways

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 04:45 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium