Old May 12th, 2011, 12:12 PM   #101
sergey220
Registered User
 
sergey220's Avatar
 
Join Date: Mar 2009
Location: Samara
Posts: 279
Likes (Received): 38

updates is ?
sergey220 no está en línea   Reply With Quote

Sponsored Links
Old May 12th, 2011, 04:23 PM   #102
sieradzanin1
Moderator
 
sieradzanin1's Avatar
 
Join Date: Dec 2007
Location: Sieradz [Poland]
Posts: 10,363
Likes (Received): 1046

Quote:
Originally Posted by sergey220 View Post
updates is ?
Yes

Quote:
Originally Posted by Oasis-Bangkok View Post
sieradzanin1 no está en línea   Reply With Quote
Old May 13th, 2011, 02:16 PM   #103
sergey220
Registered User
 
sergey220's Avatar
 
Join Date: Mar 2009
Location: Samara
Posts: 279
Likes (Received): 38

thanks
sergey220 no está en línea   Reply With Quote
Old August 8th, 2011, 01:46 PM   #104
ant35
Registered User
 
Join Date: Mar 2011
Posts: 1,939
Likes (Received): 28

Quote:
Originally Posted by chookdii View Post
For the bravehearted

Nice runway for catwalk



Source: RL FB
...
ant35 no está en línea   Reply With Quote
Old August 8th, 2011, 01:47 PM   #105
ant35
Registered User
 
Join Date: Mar 2011
Posts: 1,939
Likes (Received): 28

Quote:
Originally Posted by chookdii View Post
August construction update as posted by RL on the web:

Date: August 2011

Project progress up to the end of July continued according to programme.

Both the South and North Tower's structure has been completed; the structural steelworks for the building crown is complete awaiting secondary framing and partial glazing. The overall podium structure (podium A, B and C) remains at 99.88% finished, the Hardscape finishing works are progressing throughout the Podium and surrounding Ground Floor areas. Softscape works on Level 5 Podium Deck have been awarded. South Tower Glass Curtain Walls installation has reached Level 70, Window Wall system has reached Level 67; North Tower Glass Curtain Walls installation is complete to Level 41 and Window Wall system has reached Level 41 in Tower B. Installation of glass balustrades has reached Level 68 Tower A and is 100% complete in Tower B. Structural steelwork for Entrance Drop Off canopies is well developed.

Critical Path works of Architectural trades, MEP and finishing trades is now intensifying with Architectural works, including unit partition walls, masonry and plastering, have reached up to Level 71 Tower A and have been completed in Tower B. Internal Ceiling works to corridors have reached Level 34. Lift Lobbies, Unit Bathrooms and waterproofing/wall/floor tiling/wood flooring are ongoing. First fix Mechanical (fire, sanitary and HVAC systems) and Electrical services are ongoing up to Level 62 Tower A and Level 41 Tower B. Subsequent trade activities for the M&E 2nd fix trades activities is progressing to allow the commencement of ceiling closures. Testing of Mock-Up Suites MVAC systems is complete and the MVAC installations are now progressing in the residential Units. Main MEP Plant including transformers, Stand-By Generators and Main Distribution Boards site installation is progressing. Vertical riser pipes for all mechanical and water services are advancing.

The Kitchens have been received on site and installation is commencing according to programme. Passenger and Service lifts are complete and being employed as CTU (Construction Lifts to enable movement of construction workers) and will be serviced before final commissioning for public use. Lift car fit out contract has been awarded. Residential Level Lift Lobby contracts have been awarded and installation is ongoing. Contracts have now been awarded for the Main Lobbies fit-out, Gymnasiums, Sky Garden works. Delivery schedules of domestic appliances have been agreed and the appliances are being prepared for delivery to site.

Civil and External Works on roads, boundary fence, drainage, retention tanks are progressing. Test panels of Car Park/Podium cladding have been erected for inspection and approval. Principal Utility connections and incoming services have been contracted to appropriate authorities for installation.




Roof top crown Tower A




Vue 1st floor slab already 70% complete




Duplex 3G1 level 7




External facade
....
ant35 no está en línea   Reply With Quote
Old August 8th, 2011, 01:48 PM   #106
ant35
Registered User
 
Join Date: Mar 2011
Posts: 1,939
Likes (Received): 28

Quote:
Originally Posted by Oasis-Bangkok View Post
....
ant35 no está en línea   Reply With Quote
Old August 31st, 2011, 11:25 PM   #107
Bangroma-sky
from east to west
 
Join Date: Jun 2011
Location: Bangkok, Rotterdam
Posts: 2,011
Likes (Received): 488

Can the moderator change the status into T/O?
__________________
from east to west
Bangroma-sky no está en línea   Reply With Quote
Old September 2nd, 2011, 02:52 PM   #108
Ni3lS
Moderator
 
Ni3lS's Avatar
 
Join Date: Jun 2007
Location: Stuttgart
Posts: 16,465
Likes (Received): 3423

Sure
__________________
MY SHOWCASE
FLICKR / MY TRAVELS:
[2016] > Norway, Valencia, Arvidsjaur, Innsbruck, Moselvalley, Geneva, Lisbon, Basel, Vosges, Munich, Trieste, Barcelona, Nürburgring, Frankfurt, Spa, Berlin, Wuppertal, Dortmund, Como, Monaco, Saint-Tropez, Tegernsee, Hamburg, Lübeck, Madrid, Stuttgart, Faro, Hochgurgl
[2017] > Düsseldorf, Mallorca, Geneva, Annecy, Montafon, Vorarlberg, Barcelona, Zürich, Crete, Lisbon, Cascais, Málaga, Ronda, Dolomiti, Sistiana, Kitzbühel
Ni3lS no está en línea   Reply With Quote
Old September 9th, 2011, 06:14 AM   #109
knrOctober
Since 2552
 
knrOctober's Avatar
 
Join Date: Apr 2009
Location: 55000
Posts: 1,689
Likes (Received): 1074

The River and The River

Quote:
Originally Posted by Oasis-Bangkok View Post
Quote:
Originally Posted by Oasis-Bangkok View Post
knrOctober no está en línea   Reply With Quote
Old September 9th, 2011, 02:26 PM   #110
Bangroma-sky
from east to west
 
Join Date: Jun 2011
Location: Bangkok, Rotterdam
Posts: 2,011
Likes (Received): 488

Wow, Thailand 2nd tallest tower T/O.
__________________
from east to west
Bangroma-sky no está en línea   Reply With Quote
Old September 9th, 2011, 04:19 PM   #111
Divineator
BANNED
 
Divineator's Avatar
 
Join Date: Aug 2011
Location: Gothenburg/Shanghai
Posts: 156
Likes (Received): 8

Wow, Thailand 2nd tallest tower is ugly. No finesse or whatsoever.

No surprise.
Divineator no está en línea   Reply With Quote
Old September 9th, 2011, 05:10 PM   #112
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,755
Likes (Received): 15168

Not surprised by your comment either
__________________
-Noblesse Oblige-

Last edited by Codename B; September 9th, 2011 at 05:17 PM.
Codename B no está en línea   Reply With Quote
Old September 9th, 2011, 06:16 PM   #113
RaySthlm
BANNED
 
Join Date: Dec 2010
Posts: 835
Likes (Received): 50

Quote:
Originally Posted by Divineator View Post
Wow, Thailand 2nd tallest tower is ugly. No finesse or whatsoever.

No surprise.
says the person that comes from a small town named Gothenburg. How tall is the tallest structure in Gothenburg, 20-30 meters?
RaySthlm no está en línea   Reply With Quote
Old September 9th, 2011, 09:19 PM   #114
Imperfect Ending
Or is it?
 
Imperfect Ending's Avatar
 
Join Date: Apr 2003
Location: Portland, Oregon
Posts: 10,759
Likes (Received): 452

Well... seeing what else he's been writing, he's just a negative poster.
__________________

Imperfect Ending no está en línea   Reply With Quote
Old September 10th, 2011, 08:59 AM   #115
anakngpasig
...
 
anakngpasig's Avatar
 
Join Date: Jul 2005
Location: Third World
Posts: 8,788
Likes (Received): 8624

i like it, the building exudes a feeling of Vancouver or Gold Coast.
anakngpasig no está en línea   Reply With Quote
Old September 22nd, 2011, 09:26 AM   #116
japanese001
Registered User
 
japanese001's Avatar
 
Join Date: Mar 2007
Posts: 3,719
Likes (Received): 707

Bangkok is a big city.
japanese001 no está en línea   Reply With Quote
Old October 10th, 2011, 12:03 AM   #117
Bangroma-sky
from east to west
 
Join Date: Jun 2011
Location: Bangkok, Rotterdam
Posts: 2,011
Likes (Received): 488

Update october 2011

The River October construction update as published by RL on their net.

Date: October 2011

Both the South and North Tower's structure has been completed; the structural steelworks for the building crown is complete and glazing has commenced. The overall podium structure (is now finished with minor Hardscape finishing works being remaining. Softscape works on Level 5 Podium Deck have been awarded. Progress Tower A Glass Curtain Walls installation 96%; Window Wall system 95%; Balustrades 92%. Progress Tower B Glass Curtain Walls installation 99.8%; Window Wall system 95%; Balustrades 99.5%. Structural steelwork for Entrance Drop Off canopies has been installed and is now awaiting glazing.

Critical Path works of Architectural trades, MEP and finishing trades is intense with Architectural works, including unit partition walls, masonry and plastering reaching Level 71 of Tower A and have been completed in Tower B. Internal ceiling works in corridors has reached Level 43. Lift Lobbies, Unit Bathrooms and waterproofing/wall/floor tiling/wood flooring are ongoing. First fix Mechanical (fire, sanitary and MVAC systems) and Electrical services are ongoing up to Level 64 Tower A and Level 41 Tower B. Subsequent trade activities for the M&E 2nd fix trades activities is progressing to allow the commencement of ceiling closures. Testing of Mock-Up Suites MVAC systems is complete and the installations are now progressing in the residential Units. Main MEP Plant including transformers, Stand-By Generators and Main Distribution Boards site installation is progressing. Vertical riser pipes for all mechanical and water services are advancing.

Kitchen installation is ongoing. Passenger and Service lifts are complete and being employed as CTU (Construction Lifts to enable movement of construction workers) and will be serviced before final commissioning for public use. Lift car fit out contract has been awarded. Residential Level Lift Lobby contracts have been awarded and installation is ongoing. Contracts have now been awarded for the Main Lobbies fit-out, Gymnasiums, Sky Garden works. Delivery schedules of domestic appliances have been agreed and the appliances are being prepared for delivery. Civil and External Works on roads, boundary fence and drainage are progressing. Car Park/Podium cladding has been approved and is being installed. Principal Utility connections and incoming services should be completed by 30th September 2011



River frontage pool on level 5





Tower A crown painting near complete





Tower A fire system riser welding reaching floor 50





Level 5 pool side progress





Tower B lobby entrance





Exterior painting work progressing





Vue Lifestyle Mall Exterior





Vue Lifestyle Mall Interior

Images posted by chookdii
__________________
from east to west
Bangroma-sky no está en línea   Reply With Quote
Old October 10th, 2011, 12:18 AM   #118
Sid Vicious
BANNED
 
Join Date: Jul 2011
Posts: 1,033
Likes (Received): 269

what happens with the ruin across the river that exists an eternity.
Sid Vicious no está en línea   Reply With Quote
Old October 10th, 2011, 12:21 AM   #119
Bangroma-sky
from east to west
 
Join Date: Jun 2011
Location: Bangkok, Rotterdam
Posts: 2,011
Likes (Received): 488

image hosted on flickr

http://www.flickr.com/photos/justjn/...n/photostream/
image hosted on flickr

http://www.flickr.com/photos/justjn/...n/photostream/
image hosted on flickr

Sun Down by Zolashine September 10, 2011 in Prathunam, Phaya Thai


Images posted by chookdii
image hosted on flickr

image hosted on flickr

images from flickr

image posted by ChAiNaRai
__________________
from east to west
Bangroma-sky no está en línea   Reply With Quote
Old October 19th, 2011, 09:12 PM   #120
Bangroma-sky
from east to west
 
Join Date: Jun 2011
Location: Bangkok, Rotterdam
Posts: 2,011
Likes (Received): 488

New foto's of the River T/O .


image hosted on flickr
image hosted on flickr

image hosted on flickr
image hosted on flickr

image hosted on flickr
image hosted on flickr
__________________
from east to west
Bangroma-sky no está en línea   Reply With Quote


Reply

Tags
bangkok, thailand

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:49 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu