daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Asian Forums > Forum Pencakar Langit Malaysia > Pengangkutan

Pengangkutan aviation, automotive, rail and urban transportation



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old January 27th, 2009, 04:15 PM   #281
TWK90
Infrastructure
 
TWK90's Avatar
 
Join Date: May 2007
Location: Petaling Jaya
Posts: 4,644
Likes (Received): 1373

Quote:
Originally Posted by ntly1 View Post
The new train car is similiar to Irish Rail's train.



Source:http://www.irishrail.ie/projects/nat...investment.asp
Ah, indeed......

Both come from Rotem....

I can see a little difference in terms of frontal look, especially the lights on top
TWK90 no está en línea   Reply With Quote

Sponsored Links
 
Old January 27th, 2009, 04:29 PM   #282
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 79,530
Likes (Received): 2220

Quote:
Originally Posted by TWK90 View Post
As far as i know, there are proposals to rebuild the line from Tampin to Melaka and also to build a line from Mentakab to Kuantan..............according to newspaper lah...
you are right!
Quote:
Originally Posted by nazrey View Post
ECER railway system
Malaysia's national petroleum company Petronas owns a railway line which links its oil refinery complex and the nearby town of Kerteh, Terengganu, with the petrochemical complex in Gebeng, Kuantan and Kuantan Port near Kuantan, Pahang. The line is mainly used to transport petroleum products, but has recently been opened up for general freight transport, with operation being conducted by KTM. There have been proposals to extend the line to connect with the KTM line at Mentakab, and even suggestions to go as far as Kuala Terengganu and Tumpat



An efficient railway system is deemed as an economical mass mover and a necessity for any developing country to achieve develop status.

In the ECER, several proposed initiatives are :
Feasibility study
To conduct a feasibility study for upgrading of the ECER railway system, focusing on :

Phase 1 – To connect railway line from Mentakab – Kuantan – Kuala Terengganu – Tanah Merah/Pasir Mas

Phase 2 – To connect railway line from Tanah Merah/Pasir Mas – Butterworth and Kuala Lumpur – Mentakab

Train Station upgrades

To upgrade the facilities at various train station in Tumpat, Tanah Merah, Kuala Krai, Gua Musang, Merapoh, Kuala Lipis & Jerantut.
nazrey no está en línea   Reply With Quote
Old January 27th, 2009, 05:14 PM   #283
TWK90
Infrastructure
 
TWK90's Avatar
 
Join Date: May 2007
Location: Petaling Jaya
Posts: 4,644
Likes (Received): 1373

http://www.youtube.com/watch?v=UyX2r...eature=related

Of course, the train for KL-Ipoh will NOT be Pendolino....

But there is an old video in 1990's, about Pendolino.....that includes Malaysian version...which was proposed last decade...
TWK90 no está en línea   Reply With Quote
Old January 28th, 2009, 11:30 AM   #284
daeng_jal
Registered User
 
daeng_jal's Avatar
 
Join Date: Jul 2008
Location: KL, Malacca
Posts: 4,427
Likes (Received): 286



bukan ade banjaran titiwangsa ke antara KL dengan mentakab...how to built a railway??

better built the penang,kelantan line first,then built a port in kota bharu,then a transhipment land cannal like what thailand is purposing can be built....watch out singapore!!!!!
__________________

hartal day and melaka maju 2010 day are my birthday, hope the gomen will make it a public holiday
daeng_jal no está en línea   Reply With Quote
Old January 28th, 2009, 12:15 PM   #285
TWK90
Infrastructure
 
TWK90's Avatar
 
Join Date: May 2007
Location: Petaling Jaya
Posts: 4,644
Likes (Received): 1373

Quote:
Originally Posted by daeng_jal View Post
bukan ade banjaran titiwangsa ke antara KL dengan mentakab...how to built a railway??
You can build a tunnel through it, but of course, it will be very expensive...
TWK90 no está en línea   Reply With Quote
Old January 28th, 2009, 12:48 PM   #286
erwinkarim
Registered User
 
Join Date: Dec 2007
Posts: 716
Likes (Received): 260

distance between each side of the range is around ~20km. tunneled areas should be ~10 km

cost of building smart tunnel was around RM1.8 billion for a 10 km water tunnel. ~RM180 per km

so it'd should cost around RM1.8 billion, maybe a bit less as the tunnel for a train can be a bit smaller than a for a car.

but of course, it'd depends on the kind of terrain that needs to be tunneled through, how big it is, etc etc...
erwinkarim no está en línea   Reply With Quote
Old January 28th, 2009, 02:56 PM   #287
TWK90
Infrastructure
 
TWK90's Avatar
 
Join Date: May 2007
Location: Petaling Jaya
Posts: 4,644
Likes (Received): 1373

A railway tunnel in Japan.......

TWK90 no está en línea   Reply With Quote
Old January 28th, 2009, 04:49 PM   #288
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 79,530
Likes (Received): 2220

really remind me to the Malaysian railway line!
nazrey no está en línea   Reply With Quote
Old January 28th, 2009, 05:57 PM   #289
OshHisham
BANNED
 
Join Date: Nov 2005
Location: Damansara Kim
Posts: 3,908
Likes (Received): 4

Quote:
Originally Posted by daeng_jal View Post


bukan ade banjaran titiwangsa ke antara KL dengan mentakab...how to built a railway??

better built the penang,kelantan line first,then built a port in kota bharu,then a transhipment land cannal like what thailand is purposing can be built....watch out singapore!!!!!
i don't think the cannal will be built. sure got a serious objection from singapore. and as we are all ASEAN countries, such one sided decision is kinda impossible...
OshHisham no está en línea   Reply With Quote
Old January 28th, 2009, 06:03 PM   #290
TWK90
Infrastructure
 
TWK90's Avatar
 
Join Date: May 2007
Location: Petaling Jaya
Posts: 4,644
Likes (Received): 1373

Modern railway system in Malaysia

TWK90 no está en línea   Reply With Quote
Old January 29th, 2009, 05:27 AM   #291
dengilo
Registered User
 
dengilo's Avatar
 
Join Date: Oct 2005
Posts: 8,430
Likes (Received): 982

Yeah sure !!!But the only thing missing are the trains!!!Well done KTM!!!Ok lets build all
double tracking but emm lets see may be we can order the trains laterlah Malaysia memang boleh!!!
dengilo no está en línea   Reply With Quote
Old January 29th, 2009, 07:45 AM   #292
TWK90
Infrastructure
 
TWK90's Avatar
 
Join Date: May 2007
Location: Petaling Jaya
Posts: 4,644
Likes (Received): 1373



It is sad to see that, but at the very least, EMU from Rotem has been ordered and should be used next year for KL-Ipoh rapid intercity train...

Anyway, this video...i found from Youtube...........all about Pendolino.........Pendolino was proposed for Malaysia in 1990's, finally i found the video...er, of course, you wont see Pendolino in Malaysia....

http://www.youtube.com/watch?v=UyX2r...eature=related

TWK90 no está en línea   Reply With Quote
Old January 29th, 2009, 05:17 PM   #293
daeng_jal
Registered User
 
daeng_jal's Avatar
 
Join Date: Jul 2008
Location: KL, Malacca
Posts: 4,427
Likes (Received): 286

Quote:
Originally Posted by OshHisham View Post
i don't think the cannal will be built. sure got a serious objection from singapore. and as we are all ASEAN countries, such one sided decision is kinda impossible...
the cannal will probably very hard to built,what i mean is the "land cannal" where a ship stop at the straits of malacca,transfer the cargo to train,travel to the east cost,where a ship will take it to the far east...i think there a treat about it in the thailand forum....
__________________

hartal day and melaka maju 2010 day are my birthday, hope the gomen will make it a public holiday
daeng_jal no está en línea   Reply With Quote
Old February 1st, 2009, 03:29 PM   #294
James Foong
Registered User
 
James Foong's Avatar
 
Join Date: May 2005
Location: Kuala Lumpur
Posts: 2,434
Likes (Received): 2

Quote:
Originally Posted by daeng_jal View Post
better built the penang,kelantan line first,then built a port in kota bharu,then a transhipment land cannal like what thailand is purposing can be built....watch out singapore!!!!!
Transhipment across the land poses high security risk. If someone intend to sabotage the country, one of the most impactful way is to blow up the multi billions going-to-be landcanal. Before they talk about it, can they afford to manage such risk in the first place?
James Foong no está en línea   Reply With Quote
Old February 3rd, 2009, 12:27 PM   #295
daeng_jal
Registered User
 
daeng_jal's Avatar
 
Join Date: Jul 2008
Location: KL, Malacca
Posts: 4,427
Likes (Received): 286

why would anyone want to blow up malaysia?
we never did anything bad to anyone...
so again,why
__________________

hartal day and melaka maju 2010 day are my birthday, hope the gomen will make it a public holiday
daeng_jal no está en línea   Reply With Quote
Old February 3rd, 2009, 01:46 PM   #296
OshHisham
BANNED
 
Join Date: Nov 2005
Location: Damansara Kim
Posts: 3,908
Likes (Received): 4

if people talk about blowing up malaysia, then i guess KLIA, KLCC pun cannot be built lah bcoz of the 'risk'. and i even rarely heard about bombing in Kelantan-Narathiwat border towns of Pengkalan Kubur or Rantau Panjang...

apa punya thinking da.....
OshHisham no está en línea   Reply With Quote
Old February 3rd, 2009, 01:53 PM   #297
TWK90
Infrastructure
 
TWK90's Avatar
 
Join Date: May 2007
Location: Petaling Jaya
Posts: 4,644
Likes (Received): 1373

Update : Sentul - Batu Caves electrified double tracking project (Taman Wahyu)







TWK90 no está en línea   Reply With Quote
Old February 21st, 2009, 11:02 AM   #298
nazrey
Registered User
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 79,530
Likes (Received): 2220

Quote:
Originally Posted by nazrey View Post
Coming soon 2010!
New Shuttle Train for Rawang-Ipoh (From Rotem:5 sets 6 cars)
credit : kelvin khew.

nazrey no está en línea   Reply With Quote
Old March 12th, 2009, 05:46 AM   #299
rizalhakim
PROUD 2 B MALAYSIAN
 
Join Date: Nov 2007
Location: KL
Posts: 36,625
Likes (Received): 1113

Double track ready by 2014


TAIPING: The Electrified Double Track Project from Ipoh to Padang Besar will be completed by 2014.

Transport Minister Datuk Seri Ong Tee Keat said the project was now 20% completed.

“The project is an effort made by the ministry to add value to our railway system,” he said.


Site launch: Ong (right) being briefed by Gamuda Berhad managing director Datuk Lin Yun Ling (second right) at the Larut Tunnel in Taiping Wednesday.

Ong told reporters this after lunching the detonation of the 300m Larut Tunnel at Air Kuning near here yesterday. He said the project would create more job opportunities for the people.

Asked if the project was on schedule, Ong said it was progressing well although the project faced a few problems such as relocation of squatters from the construction site.

Ong also said the first service using the electric train was set to begin in November.

“Travelling time from Ipoh to Kuala Lumpur and vice versa will take two hours 15 minutes including the stopovers,” he added.

Earlier in his speech, Ong said the project would create an additional 6,000 jobs, in addition to the current 7,000 people being employed under the project.

“More than RM10bil downstream work will also be created,” he said.

The RM12.5bil infrastructure project involves the construction of two new electrified railway tracks across Perak, Penang, Kedah and Perlis.

Construction of the project began in early last year.
rizalhakim no está en línea   Reply With Quote
Old March 12th, 2009, 08:34 AM   #300
rizalhakim
PROUD 2 B MALAYSIAN
 
Join Date: Nov 2007
Location: KL
Posts: 36,625
Likes (Received): 1113

Landasan berkembar ikut jadual

Oleh ZAINI RABAN
utusanperak@utusan.com

TAIPING 11 Mac - Kelembapan ekonomi global pada masa ini tidak menjejaskan pembinaan Projek Landasan Berkembar Elektrik (PLBE) Ipoh-Padang Besar yang bernilai RM12.5 bilion malah ia berkembang mengikut jadual yang ditetapkan.

Menteri Pengangkutan, Datuk Seri Ong Tee Keat berkata, sehingga kini, kerja-kerja pembinaan di empat buah negeri terlibat iaitu Perak, Kedah, Pulau Pinang dan Perlis berjalan dengan lancar pada kadar 21.33 peratus.

''Walaupun ekonomi dunia agak lembap pada waktu sekarang namun PLBE Ipoh-Padang Besar dijangka siap pada 2012, kita harap soal penempatan semula setinggan dan pampasan juga dapat diselesaikan secepat mungkin.

''Ketika banyak syarikat lain mengurangkan bilangan pekerja dan kakitangan, projek ini sebaliknya telah mencipta 7,000 peluang pekerjaan dan 6,000 lagi peluang pekerjaan bakal ditawarkan apabila siap kelak," katanya.

Beliau menyatakan demikian kepada pemberita selepas melancarkan majlis penembusan Terowong Larut sepanjang 300 meter di Air Kuning di sini hari ini.

PLBE juga bakal mempunyai satu lagi terowong yang lebih panjang iaitu di Bukit Berapit, Padang Rengas sepanjang 2.9 kilometer yang bakal dilaksanakan tidak lama lagi.

Tee Keat berkata, projek mega berkenaan setakat ini telah membantu menjana ekonomi negara kerana membelanjakan sebanyak RM2 bilion untuk gaji dan faedah bagi para pekerja terlibat.

Katanya, sebanyak 305 subkontraktor dari keempat-empat negeri terbabit telah ditawarkan kerja-kerja berkaitan yang turut memberi manfaat kepada pembekal bahan binaan tempatan dan perniagaan untuk tempoh lima tahun akan datang.

''Saya juga ingin menyatakan bahawa projek ini bakal menyediakan kerja-kerja hiliran lebih daripada RM10 bilion dan sebanyak 95 kontrak telah ditawarkan kepada pelbagai pembekal bahan binaan," katanya.

Menurut Tee Keat, PLBE itu adalah sebahagian daripada pelan induk untuk memajukan sistem pengangkutan awam di Malaysia dan ia merupakan kesinambungan kepada PLBE Lembah Klang, Rawang-Ipoh dan Seremban-Gemas yang kini sedang dalam pembinaan.

Katanya, perkhidmatan tren yang disediakan itu bakal menarik perhatian ramai pengguna dan dijangka lebih popular apabila tren sedia ada digantikan dengan tren lebih pantas pada penghujung 2010.

Tambahnya, ia merupakan alternatif pengangkutan yang lebih murah dan selamat berbanding penggunaan lebuh raya selain dapat mengurangkan kadar kemalangan maut di jalan raya.
rizalhakim no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 03:21 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu