daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > World Development News Forums > City/Metro Compilations

City/Metro Compilations Help report active highrise/urban developments occurring in your city to the global SSC community.



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old April 20th, 2008, 07:29 AM   #1
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

BAKU | Projects & Construction

In this thread we are going to put together all the UNDER CONSTRUCTION and APPROVED projects of Baku:
__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote

Sponsored Links
 
Old April 20th, 2008, 07:34 AM   #2
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

Full Moon Rising and Crescent Tower

FULL MOON RISING and CRESCENT TOWER - APPROVED

Heerim Architects has attempted to reinvent the skyscraper beyond the traditional with two lunar inspired projects in the Republic of Azerbaijan.

The Korean firm has dreamed up Full Moon Bay and Caspian Plus that includes Crescent Place on neighbouring peninsulas in the Azerbaijani capital of Baku that look on to the Caspian Sea - the two projects on opposite extremes of the same bay acting as gateway markers.

Hotel Full Moon is essentially a disc with rounded edges and a hole in one of the top corners that appears radically different to the view depending on the angle it is seen from. The frontage thanks to the bulging centre makes it appear more like a glass death star whilst the side profile is more than a little gherkinesque.

Changing appearance depending on the view is reinforced by the cladding treatment the architect has selected. The front will have a glass diagrid whilst the back will be covered with hexagonal honeycombs.

This main building will be a 35 storey luxury hotel with 104,182 square metres of space for only 382 rooms, a relatively small amount of rooms given the sheer size of the internal space on offer. It will reach a maximum height of 158.68 metres.

The hotel is linked via a zoomorphically shaped podium that snakes curvaceously around the boundaries of the site to two residential apartment blocks entitled Palace of Wind 1 and 2.

Acting as the counterpoint to Hotel Full Moon is Hotel Crescent, part of the Caspian Plus redevelopment that stands as a curving arch similar to a crescent moon. The arch-like nature of the building is revealed by the fact that the structure isn't a pure crescent on its inside relying on more regularly shaped columns to help provide it with support.

At 32 floors tall it will also be a luxury hotel, this time with 221 rooms. There will also be 128 serviced apartments in the building. Floor space will 128,140 square metres.

Behind it will stand a further four tall buildings, three of which will be residential with the tallest of the quartet being a 43 floor office building standing 203 metres tall.

Heerim Architects have not long been established in Azerbaijan. They only opened their office in the country in July 2007 and yet have already secured these two major projects that face transforming the capital of one of the world's fastest growing economies.


CRESCENT TOWER






FULL MOON RISING





Source: Skyscrapernews.com

__________________
Join us on Facebook | SkyscraperCity Azerbaijan

Last edited by Galandar; December 19th, 2011 at 08:08 PM.
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 07:49 AM   #3
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

SKY PARK - UNDER CONSTRUCTION

Sky Park is a new cluster development project of azerbaijani-korean company AZKOR. For more information and details see: http://www.sky-park.co.kr

Sky Park is consist of 4 skyscrapers (two of the skyscrapers seem like the separated, but according to the project they will be the unique buildings) and a shopping mall.
The highest skyscraper will be 240m height 56-storey residential.








Territory has been fenced in March, 2008






Source: Azkor.net
__________________
Join us on Facebook | SkyscraperCity Azerbaijan

Last edited by Galandar; May 5th, 2008 at 08:07 AM.
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 07:59 AM   #4
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

PARK PLAZA - ON HOLD

Park Plaza is a project developed by korean GS Engineering & Construction Company Ltd. The project consist of 2 towers and a huge mall between them. Construction works have begun in 2007, but were on hold due to some financial problems.



__________________
Join us on Facebook | SkyscraperCity Azerbaijan

Last edited by Galandar; May 5th, 2008 at 08:07 AM.
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 08:07 AM   #5
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

SOCAR TOWER - APPROVED

Heerim Architects & Planners Co. Ltd. is to build a new skyscraper fot the State Oil Company of Azerbaijan. The building is slated to be 149.4 meters high, 59,102 sq. m and to accommodate more than 2,000 employees. The building will have 2 underground and 35 overhead floors. Construction works are expected to start in the mid 2008.

__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 08:21 AM   #6
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

FLAME TOWERS - UNDER CONSTRUCTION

Baku Flame Towers is a new project of Diaholding http://www.diaholding.com striking new addition to the skyline of Baku. Inspired by Azerbaijan’s long history with fire worshipping, the towers will be an eternal flame for a modern Baku.

Located on the Caspian Sea in Azerbaijan, the site is situated on a hill overlooking Baku Bay, the old city center and the park. With a site area of approx 28,000 m2, the project brief requires the development of detailed drawings for 3 towers located on a retail podium. The total construction built up area of the project is 234,500 m2.

RESIDENTIAL TOWER

The southern tower accommodates some 130 residential apartments
over 33 floors.

HOTEL TOWER

The Hotel, the most programmatically complex of the Flame Towers, is sited on the northern corner of the site and it consists of 250 rooms and 61 serviced apartments. Construction area of Hotel Tower is 56.292 m2 and it has 30 floors. Besides its health and wellness units like spa and fitness centers; Hotel Tower also has dual function both for recreational and for business related gatherings. *

OFFICE TOWER

The Office Tower is sited on the western side of the complex, between the Hotel and Residential Towers. It provides net 33.114 m2 of flexible commercial office space. 28 floors are grouped together into 4 tiers with each one allocated a dramatic 25 meter atria above a communal Sky Garden.

The construction is anticipated to start October 2007 and will be due for completion in April 2010.




Construction works on foundation of Flame Towers



Source: Diaholding.com
__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 08:39 AM   #7
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

NEW LIFE CITY - UNDER CONSTRUCTION

"NEW LIFE CITY" there is a complex which carries out function of small town, here there is everything, that is necessary for the person comfortable residing. Having bought here an apartment you will use all services of rest, trade and entertainments not leaving for repartitions of this complex.

The big multipurpose complex in which will be placed 7 block residential building “New Life residence” in 18 floors.

"New Life business center" separately standing building in 25 floors.





Source: Bakuyenihayat.com
__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 08:44 AM   #8
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

BAKU HILTON - UNDER CONSTRUCTION

The construction of Hilton hotel is undergoing on the place of former "Azerbaijan" hotel which was demolished last year. Construction works are made by BOROVA. Owner: ISR Holding. 20-storey Baku Hilton will be finished in 2010.




Construction works

__________________
Join us on Facebook | SkyscraperCity Azerbaijan

Last edited by Galandar; April 20th, 2008 at 09:30 AM.
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 08:51 AM   #9
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

PARK BOULEVARD - UNDER CONSTRUCTION

Park Boulevard will be a new shopping mall in the center of Baku next to Park Inn hotel. 4-storey building will include stores, cinemas, planetarium, restaurants and cafes.



__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 09:01 AM   #10
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

MUGHAM THEATRE - UNDER CONSTRUCTION

Mugham also spelled as Mugam (Azeri: Muğam) is one of the many musical traditions of Azerbaijan. Mugham Theatre is under construction on the territory of Baku boulevard. Construction works are supported by UNESCO.




Mugham Thetre is under construction

__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 09:09 AM   #11
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

HEYDAR ALIYEV CULTURAL CENTER - UNDER CONSTRUCTION

Cultural center named after Heydar Aliyev is under construction at Heydar Aliyev avenue instead of demolished an old Sattarkhan's factory. This center includes: a big library, concert hall, conference center, park and other. Construction works are expected to be finished in 2009.











Source: Turan.az
__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 09:11 AM   #12
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

BAKU BUSINESS CENTER - UNDER CONSTRUCTION

The Baku Business Center redevelopment will provide a touch of modern design on the Baku promenade while providing the business community access to first class conferencing and exhibition space of 4000 sq m

Architect: Chapman Taylor (Milan)
Completion: 2009





Source: http://www.pashaconstruction.com
__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 09:14 AM   #13
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

The new "Marriott" hotel - U/C
__________________
Join us on Facebook | SkyscraperCity Azerbaijan

Last edited by Galandar; February 12th, 2009 at 04:52 AM. Reason: U
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 09:16 AM   #14
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

BAKU INTERNATIONAL BUS TERMINAL - UNDER CONSTRUCTION







Source: http://www.zqan-construction.com
__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 09:21 AM   #15
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

BAKU CITY GARDENS (ATKINS)

project



January 2008




CLOCK TOWER APARTMENTS (ATKINS)

project



January 2008




Baku City Gardens - http://www.bakucitygardens.com
Clock Tower Apartments - http://www.bakuclocktower.com
__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 09:23 AM   #16
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

ENTRANCE TO BAKI SOVETI SUBWAY STATION IS UNDER RECONSTRUCTION

According to the approved design, the ground piece of Baki Soveti subway station is being reconstructed. After finishing reconstruction works, the name "Baki Soveti" will be changed to "Icheri Shekher" ("Icheri Sheher" means "Inner city", an old part of Baku, close to which subway station locates)

Reconstruction works:




Rendering:





Source: http://www.mediaforum.az ; http://www.day.az
__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 09:25 AM   #17
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

PORT BAKU - UNDER CONSTRUCTION

Construction company: Pasha Construction http://www.pashaconstruction.az
Floors: Four office buildings 12-27 floors and a shopping mall
Usage: Business center
Status: Under construction










Source:http://www.portbaku.az
__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 09:27 AM   #18
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

ALTES PLAZA - UNDER CONSTRUCTION

Constructed by Altes Group 5* residential complex in Baku






Construction works of ALTES PLAZA

__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote
Old April 20th, 2008, 09:35 AM   #19
Hed_Kandi
BANDITO
 
Join Date: Jan 2006
Posts: 3,276
Likes (Received): 3577

The Pearl of the World

The Pearl Hotel, located at the coast of the Caspian Sea and constructed in Baku’s urban frontier area, is designed to be the symbol of Azerbaijan.



It is named after the hidden beauty in its shell - The Pearl. The 26-storey hotels is designed to be a boutique hotel with its 115-meter height and 48,500 square meter buildable area.

Hed_Kandi no está en línea   Reply With Quote
Old April 20th, 2008, 09:43 AM   #20
Galandar
Azərbaycanlı Moderator
 
Galandar's Avatar
 
Join Date: Dec 2004
Location: Gəncə
Posts: 14,868
Likes (Received): 5252

BAKU MARINA SHOPPING CENTER - APPROVED

__________________
Join us on Facebook | SkyscraperCity Azerbaijan
Galandar no está en línea   Reply With Quote


Reply

Tags
azerbaijan, baku, baku projects, caucasus, skyscrapers

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 04:09 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu