daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine

Go Back   SkyscraperCity > Asian Forums > India > Metropolitan Projects > Chennai



Reply

 
Thread Tools Rating: Thread Rating: 121 votes, 4.93 average.
Old June 19th, 2012, 04:45 PM   #4621
vinodgopal
Registered User
 
Join Date: Jul 2009
Location: Chennai
Posts: 2,243
Likes (Received): 248

dont u get it? they need walkalators. And also a cablecar. Otherwise they will only use the road. Cant blame them. Can you?
vinodgopal no está en línea   Reply With Quote

Sponsored Links
 
Old June 20th, 2012, 07:26 AM   #4622
pharaoh16
Registered User
 
Join Date: Jun 2012
Posts: 8
Likes (Received): 2

SOURCE: DC

Tamil Nadu infra gets better with new bridges, bypass, subway



Chief minister J. Jayalalithaa on Tuesday inaugurated 35 newly built bridges and a six-lane bypass constructed across the state at the cost of Rs. 181.65 crore.

Ms Jayalalithaa launched the facility through video-conferencing from the secretariat, an official release said.

State highways minister Edappadi K. Palaniswami and highways secretary T.K. Ramachandran were also present.

The vehicular subway in Villivakkam constructed at the cost of Rs. 39 crore by Chennai corporation and Southern Railway was also inaugurated along with various other bridges.

The work for the subway began in 2008 and its completion was much awaited by North Chennai residents.

The release said the bridges connect various towns and cities across the state benefiting transport and logistics services.

Besides, the chief minister launched the six-lane Thuraiyur bypass constructed at Rs. 9.45 crore in Tiruchirapalli district.

The chief minister also opened newly constructed buildings, one check post and a driving test facility for the transport department, it said
pharaoh16 no está en línea   Reply With Quote
Old June 20th, 2012, 01:05 PM   #4623
madrasi7777
Registered User
 
madrasi7777's Avatar
 
Join Date: Mar 2010
Location: Chennai
Posts: 937
Likes (Received): 139

When is the start of work of the Koyambedu signal flyover (Not the junction, I know it is already functioning) beginning? Is the approval over? any one got the details on this.
madrasi7777 no está en línea   Reply With Quote
Old June 20th, 2012, 02:41 PM   #4624
iniyachennai
Registered User
 
Join Date: Apr 2010
Posts: 130
Likes (Received): 56

Quote:
Originally Posted by madrasi7777 View Post
When is the start of work of the Koyambedu signal flyover (Not the junction, I know it is already functioning) beginning? Is the approval over? any one got the details on this.
Will never happen in next 4years
iniyachennai no está en línea   Reply With Quote
Old June 21st, 2012, 06:43 PM   #4625
krishnancv
Registered User
 
krishnancv's Avatar
 
Join Date: Jun 2008
Location: Chennai/Columbus
Posts: 1,918
Likes (Received): 413

The only thing that is required is a throughfare from CMBT exit towards Ashok pillar in 100 feet road If an over bridge for that is constructed that would remove half the traffic out of the junction. No need to think of complex interchanges.
__________________
visit my blog: Trends in Indian Aviation

My perspective
krishnancv no está en línea   Reply With Quote
Old June 21st, 2012, 07:30 PM   #4626
krishnancv
Registered User
 
krishnancv's Avatar
 
Join Date: Jun 2008
Location: Chennai/Columbus
Posts: 1,918
Likes (Received): 413

Here is my idea for it.

image hosted on flickr


1. The entrance must be replaced from the market side to the 100 feet road itself before the CMBT starts.

2. Arrival drop off bus bays must be created over there with ample no of lanes.

3. For departing buses on the north western side after they cross platform 1 instead of taking left the buses must be allowed to proceed under the metro ramp and then an overbridge could be built which joins 100 feet road towards Ashok pillar near the MTC bus stop.

4. An additional ramp could be built from the MTC bus bays inside CMBT to this bridge for buses proceeding towards Pillar.

This is the area marked as PIC 2 in the above pic.

1. The bus bays drawn are not to scale and will obviously be different. But this is just for a perspective.
2. 2 lanes for buses directly proceeding inside the terminus.
3. 3 lanes for passengers drop off.

image hosted on flickr


This way half the traffic on the CMBT junction would be reduced.

Buses from Koyembedu interchange may continue to use the existing routes.
__________________
visit my blog: Trends in Indian Aviation

My perspective
krishnancv no está en línea   Reply With Quote
Old June 22nd, 2012, 09:18 AM   #4627
krishnaswamy
Krishna
 
krishnaswamy's Avatar
 
Join Date: Sep 2010
Location: Chennai/Thanjavur
Posts: 10,241
Likes (Received): 3154


சென்னையில் மேலும் 8 மேம்பாலங்கள், 5 சுரங்கப் பாதைகள், ஆகாய நடை பாதை-ஜெ அறிவிப்பு

சென்னை: தமிழக அரசு வெளியிட்டுள்ள அறிக்கையில், ஒரு நாட்டின் வளர்ச்சிக்கு மிகவும் இன்றியமையாததாக விளங்குவது சாலைக் கட்டமைப்பு வசதிகள். எனவே தான் முதல்வர் ஜெயலலிதா தலைமையிலான தமிழக அரசு சாலைக் கட்டமைப்பினை மேம்படுத்துவதற்கும், வலுப்படுத்துவதற்குமான நடவடிக்கைகளுக்கு முன்னுரிமை அளித்து வருகிறது.

அந்த வகையில் 3,793 கோடி ரூபாய் மதிப்பில் புதுச் சாலைகள் மற்றும் புதிய ரயில்வே மேம்பாலங்கள் அமைப்பதற்கும், ஏற்கெனவே அமைக்கப்பட்டுள்ள சாலைகள் மற்றும் பாலங்களை பராமரிப்பதற்கும் கடந்த ஆண்டு உத்தரவிடப்பட்டது.

இதன் தொடர்ச்சியாக, சென்னை, ஜவஹர்லால் நேரு சாலையில், காளியம்மன் கோயில் தெரு மற்றும் சென்னை புறநகர் பேருந்து நுழைவு வாயில் சந்திப்பில் 40 கோடி ரூபாய் செலவில் மேம்பாலம் கட்டுதல்,

பெரியார் ஈ.வெ.ரா சாலையில், அமைந்தகரை அருகில் கூவம் ஆற்றின் குறுக்கே 8 கோடி ரூபாய் செலவில் கூடுதல் மூன்று வழித்தடப்பாலம் அமைத்தல்,

மவுண்ட் - பூந்தமல்லி ஆவடி சாலையில் 5 கோடி ரூபாய் செலவில் கூடுதலாக இரண்டு வழித்தடப்பாலம் அமைத்தல்,

மவுண்ட்-பூந்தமல்லி ஆவடி சாலையில் 1 கோடி ரூபாய் செலவில் பாலத்தை அகலப்படுத்துதல், சிங்கப் பெருமாள் கோயில் - ஸ்ரீபெரும்புதூர் -திருவள்ளூர் - செங்குன்றம் சாலையில் 2 கோடி ரூபாய் செலவில் கூடுதலாக இரண்டு வழித்தடப்பாலம் அமைத்தல்,
காரனோடை, மீஞ்சூர் சாலையில் 9 கோடி ரூபாய் செலவில் உயர்மட்ட பாலம் அமைத்தல், தாம்பரம் - முடிச்சூர் - ஸ்ரீபெரும்புதூர் சாலையில் 2 கோடி ரூபாய் செலவில் மூழ்கு பாலம் அமைத்தல்,

சென்னை கோடம்பாக்கம் - ஸ்ரீபெரும்புதூர் சாலையில் 2 கோடி ரூபாய் செலவில் மூழ்கு பாலம் அமைத்தல், சென்னை கோடம்பாக்கம் - ஸ்ரீபெரும்புதூர் சாலையில் 1 கோடி ரூபாய் செலவில் மூழ்கு பாலம் அமைத்தல் என 8 இடங்களில் 30 கோடி ரூபாய் செலவில் பாலங்கள் அமைக்க முதல்வர் ஜெயலலிதா உத்தரவிட்டுள்ளார்.

அண்ணா சாலையில், சின்னமலை அருகில் 3 கோடியே 50 லட்சம் ரூபாய் செலவில் ஒரு சுரங்க நடைபாதை அமைத்தல், ஜி.எஸ்.டி. சாலையில், கிண்டி, எம்.கே.என். சாலை சந்திப்பு அருகில் 3 கோடியே 50 லட்சம் ரூபாய் செலவில் ஒரு சுரங்க நடைபாதை அமைத்தல், ஜவஹர்லால் நேரு சாலை, ஈக்காடுதாங்கல், மல்லாடி நிறுவனம் அருகில் 3 கோடியே 50 லட்சம் ரூபாய் செலவில் ஒரு சுரங்க நடைபாதை அமைத்தல்,

ஜவஹர்லால் நேரு சாலை, காசி திரை அரங்கம் அருகில் 3 கோடியே 50 லட்சம் ரூபாய் செலவில் சுரங்க நடைபாதை அமைத்தல், ஜவஹர்லால் நேரு சாலை, கோயம்பேடு புறநகர் பேருந்து நிலையம் அருகில் 5 கோடி ரூபாய் செலவில் சுரங்க நடைபாதை அமைத்தல் என மொத்தம் 19 கோடி ரூபாய் செலவில் 5 சுரங்க நடைபாதைகள் அமைக்கவும்,

ஈ.வெ.ரா. சாலையில் உள்ள சென்ட்ரல், பூங்கா மற்றும் பொது மருத்துவ மனை பகுதிகளை இணைத்து 20 கோடி ரூபாய் செலவில் ஆகாய நடைபாதை அமைக்கவும் முதல்வர் ஜெயலலிதா உத்தரவிட்டுள்ளார்.

இவ்வாறு 109 கோடி ரூபாய் மதிப்பில் மேம்பாலம், பாலங்கள், சுரங்க நடை பாதைகள், ஆகாய நடை பாதை ஆகியவற்றை அமைக்க முதல்வர் ஜெயலலிதா உத்தரவிட்டுள்ளதன் மூலம், போக்குவரத்து நெரிசல் குறையவும், குறிப்பிட்ட இடத்திற்கு விரைந்து செல்லவும் வழிவகை செய்யப்பட்டுள்ளது என்று கூறப்பட்டுள்ளது.
__________________
Ek Bharat, Shresht Bharat - ஒரே பாரதம் உன்னத பாரதம்! - Narendra Modi
krishnaswamy no está en línea   Reply With Quote
Old June 22nd, 2012, 10:19 AM   #4628
saysenthil
Registered User
 
Join Date: Sep 2009
Location: Kalpakkam / Hamburg
Posts: 2,948
Likes (Received): 1397

Projects worth Rs 109 crore for decongesting roads in Chennai

Quote:
With a view to decongesting roads in Chennai city and its suburbs, Tamil Nadu Chief Minister Jayalalithaa today allocated various projects including road-over-bridges and skywalk in and around the metropolis estimated at Rs 109 crore.

The projects include a Rs 40 crore flyover at Koyambedu, a bustling area from where inter and intra-state buses are operated, Rs 20 crore skywalk connecting Central, Park railway station and the Government General Hospital located there and a bridge across river Cooum at Rs eight crore, a state government release here said.

Besides, similar projects such as flyover, sub-ways and expansion of existing facilities are also covered under the Rs 109 crore allocation, the release said adding the measures will help in easing the traffic flow and ensure smoother passage to desired destinations.

Traffic snarls and long queues of vehicles on the arterial roads of Chennai have become common sight with speedening up of Metro Rail-related works which have resulted in traffic diversions and more roads being declared one-way.
saysenthil no está en línea   Reply With Quote
Old June 22nd, 2012, 10:24 AM   #4629
jaish
Jaishankar
 
jaish's Avatar
 
Join Date: Feb 2008
Location: Chennai / Qatar
Posts: 3,464
Likes (Received): 523

Seems to be good news. Where is mount poonamalee road.
__________________
மதம் மனிதனை மிருகம் ஆக்கும். சாதி அவனை சாக்கடையாக்கும்- ஈ வெ ரா
jaish no está en línea   Reply With Quote
Old June 22nd, 2012, 02:11 PM   #4630
wlbkng
Mama Biscothu
 
wlbkng's Avatar
 
Join Date: Jul 2010
Location: BRU <- SWI <- MAA
Posts: 3,650
Likes (Received): 842

Quote:
Originally Posted by jaish
Seems to be good news. Where is mount poonamalee road.
Kathipara to Poonamallee via Porur
__________________
Smile costs nothing :)
wlbkng no está en línea   Reply With Quote
Old June 22nd, 2012, 02:46 PM   #4631
mr_madras
Registered User
 
Join Date: Nov 2009
Location: Chennai/Dubai
Posts: 1,545
Likes (Received): 764

All subways proposed(Annasalai & 100ft road) are clearly comes under METRO line which will be good for all. hope they will finish these subways before METRO ready by 2013 end
mr_madras no está en línea   Reply With Quote
Old June 22nd, 2012, 02:49 PM   #4632
mr_madras
Registered User
 
Join Date: Nov 2009
Location: Chennai/Dubai
Posts: 1,545
Likes (Received): 764

Quote:
Originally Posted by krishnaswamy View Post

சென்னையில் மேலும் 8 மேம்பாலங்கள், 5 சுரங்கப் பாதைகள், ஆகாய நடை பாதை-ஜெ அறிவிப்பு

சென்னை: பெரியார் ஈ.வெ.ரா சாலையில், அமைந்தகரை அருகில் கூவம் ஆற்றின் குறுக்கே 8 கோடி ரூபாய் செலவில் கூடுதல் மூன்று வழித்தடப்பாலம் அமைத்தல்,
.
Where they mean? it is already done near ampa skywalk( old bridge + new bridge has almost 4+3 lane)
mr_madras no está en línea   Reply With Quote
Old June 22nd, 2012, 05:39 PM   #4633
vijayvmail
Registered User
 
Join Date: Nov 2007
Location: Chennai
Posts: 1,182
Likes (Received): 106

Quote:
Originally Posted by krishnaswamy View Post
[URL="http://tamil.oneindia.in/news/2012/06/22/business-jayalalithaa-sanctions-rs-109-cr-ne-156223.html"]
சென்னை கோடம்பாக்கம் - ஸ்ரீபெரும்புதூர் சாலையில் 2 கோடி ரூபாய் செலவில் மூழ்கு பாலம் அமைத்தல், சென்னை கோடம்பாக்கம் - ஸ்ரீபெரும்புதூர் சாலையில் 1 கோடி ரூபாய் செலவில் மூழ்கு பாலம் அமைத்தல் என 8 இடங்களில் 30 கோடி ரூபாய் செலவில் பாலங்கள் அமைக்க முதல்வர் ஜெயலலிதா உத்தரவிட்டுள்ளார்.
What is a 'Moozhgu Paalam'?

And what exactly is Kodambakkam - Sriperumpudur Road? Is it Arcot road?

Plus, they've specified the same road twice, but one with 2 crores and other with 1 crore ???
__________________
Vijayvmail
En sindhanai Alaigal - http://mythoughtwaves.blogspot.com
vijayvmail no está en línea   Reply With Quote
Old June 22nd, 2012, 06:22 PM   #4634
natarajan1986
social member
 
natarajan1986's Avatar
 
Join Date: Sep 2008
Location: Chennai
Posts: 2,347
Likes (Received): 607

Quote:
Originally Posted by mr_madras View Post
Where they mean? it is already done near ampa skywalk( old bridge + new bridge has almost 4+3 lane)
she is saying the existing one or new one going to come
natarajan1986 no está en línea   Reply With Quote
Old June 22nd, 2012, 07:45 PM   #4635
vinodgopal
Registered User
 
Join Date: Jul 2009
Location: Chennai
Posts: 2,243
Likes (Received): 248

Quote:
Originally Posted by natarajan1986 View Post
she is saying the existing one or new one going to come
dont count on new ones. just my $0.02
vinodgopal no está en línea   Reply With Quote
Old June 22nd, 2012, 07:56 PM   #4636
satchitananda
Registered User
 
Join Date: Nov 2007
Posts: 3,312
Likes (Received): 1108

Quote:
Originally Posted by vinodgopal View Post
dont count on new ones. just my $0.02
neenga kudutha athanai $0.02 ellam kuttina andhai bridge complete panni irukkalam
satchitananda no está en línea   Reply With Quote
Old June 22nd, 2012, 07:57 PM   #4637
murlee
ВANNED
 
murlee's Avatar
 
Join Date: Nov 2009
Location: Chennai/Faridabad
Posts: 10,567
Likes (Received): 4046

Quote:
Originally Posted by satchitananda View Post
neenga kudutha athanai $0.02 ellam kuttina andhai bridge complete panni irukkalam
murlee no está en línea   Reply With Quote
Old June 22nd, 2012, 08:01 PM   #4638
natarajan1986
social member
 
natarajan1986's Avatar
 
Join Date: Sep 2008
Location: Chennai
Posts: 2,347
Likes (Received): 607

Yes vinod u may be right because there is no space for expansion as on one side skywalk is there and they cant remove or even partially remove it

on other side it required lot of land to be acquired ,otherwise bridge is useless.

Even the newly built one is not usefull as at one end near skywalk exit and as usual traffic hits
natarajan1986 no está en línea   Reply With Quote
Old June 22nd, 2012, 08:07 PM   #4639
krishnaswamy
Krishna
 
krishnaswamy's Avatar
 
Join Date: Sep 2010
Location: Chennai/Thanjavur
Posts: 10,241
Likes (Received): 3154

need to explore chennai map.
meanwhile what happened to proposed flyover near pallavaram?
__________________
Ek Bharat, Shresht Bharat - ஒரே பாரதம் உன்னத பாரதம்! - Narendra Modi
krishnaswamy no está en línea   Reply With Quote
Old June 23rd, 2012, 12:20 AM   #4640
krishnaswamy
Krishna
 
krishnaswamy's Avatar
 
Join Date: Sep 2010
Location: Chennai/Thanjavur
Posts: 10,241
Likes (Received): 3154

First skywalk to link Chennai Central with GH
The first skywalk in Chennai will connect Chennai Central, Park Railway Station and Rajiv Gandhi Government General Hospital. It will come up at a cost of Rs.20 crore.

Chief Minister Jayalalithaa on Friday announced various infrastructure projects to be implemented at a cost of Rs.109 crore to improve traffic and transportation in Chennai.

According to a press release, a bridge at the Jawaharlal Nehru Salai-Kaliamman Koil Street intersection near the CMBT in Koyambedu will be constructed. An additional three-lane bridge across Cooum will be built on Poonamallee High Road near Aminjikarai.

A two-lane bridge and widening of a bridge on Mount-Poonamallee-Avadi Salai, additional bridge on Singaperumalkoil-Sriperumbudur-Tiruvallur-Red Hills Road, a bridge on Karanodai-Minjur Road, a causeway on Tambaram-Mudichur-Sriperumbudur Road and another causeway on Kodambakkam-Sriperumbudur Road will also be constructed.

Five subways are also scheduled to come up.
__________________
Ek Bharat, Shresht Bharat - ஒரே பாரதம் உன்னத பாரதம்! - Narendra Modi
krishnaswamy no está en línea   Reply With Quote


Reply

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 07:03 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu