Old June 29th, 2017, 03:25 PM   #2101
chaodeknoi2016
Registered User
 
chaodeknoi2016's Avatar
 
Join Date: Jan 2016
Location: bangkok
Posts: 33
Likes (Received): 39

"Next Station Tao Poon" ท่านผู้โดยสารสามารถเปลี่ยนเส้นทางได้ที่สถานีนี้
รฟม. นำภาพการทดสอบระบบรถไฟฟ้าสายสีน้ำเงิน ระหว่างสถานีบางซื่อ - เตาปูน มาให้ได้ชมกัน ก่อนเปิดให้บริการในเดือนสิงหาคม 2560












Last edited by chaodeknoi2016; June 30th, 2017 at 12:31 PM.
chaodeknoi2016 no está en línea   Reply With Quote

Sponsored Links
Old June 29th, 2017, 04:28 PM   #2102
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558



คุณ chaodeknoi2016 ย่อภาพลงได้ไหมครับ มันใหญ่เกินไป
__________________
-Noblesse Oblige-

CNXWORLD liked this post
Codename B no está en línea   Reply With Quote
Old June 30th, 2017, 02:13 AM   #2103
In Fra Structure
Registered User
 
Join Date: Oct 2015
Posts: 83
Likes (Received): 51

Quote:
Originally Posted by Wisarut View Post
Construction on MRTA Orange line started on 10 July 2017 while the construction of Yellow Monorail (30.4 km at 52 billion Baht) will start on Sri Nakharin road near Wat Sri Iam Interchange in August - September 2017 - after the settlement with Highway Dept on the issue of using the area around Wat Sri Iam Interchange for depot along with park and ride.

However, Highway Dept telling MRTA and BSR about the new drainage trench along the footpaths as they are going to convert the drainage trench along Sri Nakharin road into Island before erecting pillars

For the case of pink monorail (34.5 km at 54 billion Baht), Highway Dept allow MRTA and BSR to use Laksi Highway Office to construct Laksi station but they have to redesign to minimize the usage of the highway dept land.

After the construction of Orange line from Minburi to Thailand cultural center along with Pink monorail from Kae Rai to Minburi and Yellow monorail from Lad Phrao to Samrong, the next on the line is the Western extension of Orange line MRT from Thailand Cultural Center to Bang Khun Nont - 16.4 km at 110 billion Baht and Southern extension of Purple line MRT from Tao Poon to Krunai (Kanchanaphisek ring) via Rat Boorana - 23.6 km at 131,171 Million Baht.

For the case of Orange line MRT, the construction started in front of Mistine company in Saphan SOong district on 10 July 2017

However, MRTA will have to ensure that the underwater tunnel across chao Phraya section of Orange line would not harm the structure of Phra Pinklao Bridge while the underwater tunnel across chao Phraya section of Purple line would not harm the structure of Phra Pokklao Bridge and the underground section of Purple line near Mahaisawan intersection would not harm Rama 3 Bridge

MRTA now asking cabinet to approve a quick land exappropriation within 60 days instead of waiting for Land exappropriation act which takes 2 years to finish.

https://www.khaosod.co.th/economics/news_419837



Orange Line Construction given above as "Started 10th July 2017" and today is only the 30th June. I know from CK that they already started design and some ground works in May 2017. Should this read "will start 10th July"? or should it read 'has started 10th June 2017'? I guess they meant 10th June 2017 as an official start date.
In Fra Structure no está en línea   Reply With Quote
Old June 30th, 2017, 07:14 AM   #2104
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Quote:
Originally Posted by In Fra Structure View Post
Orange Line Construction given above as "Started 10th July 2017" and today is only the 30th June. I know from CK that they already started design and some ground works in May 2017. Should this read "will start 10th July"? or should it read 'has started 10th June 2017'? I guess they meant 10th June 2017 as an official start date.
the contractors who work on the elevated track near Mistine Intersection are going to do first though
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old June 30th, 2017, 08:45 AM   #2105
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Quote:
Originally Posted by In Fra Structure View Post
Orange Line Construction given above as "Started 10th July 2017" and today is only the 30th June. I know from CK that they already started design and some ground works in May 2017. Should this read "will start 10th July"? or should it read 'has started 10th June 2017'? I guess they meant 10th June 2017 as an official start date.
Construction work will start on July 10 (pilling test pile etc.). Currently the progress for the line is 0,29% (site clearance, soil testing etc.).
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old June 30th, 2017, 08:51 AM   #2106
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Construction of red line commuter and Bangsue Central delayed until the end of 2019 and ready to be opened in June 2020 due to obstacles from slum dwellers as well as oil pipelines at Bangsue station yard along with issue of compensation
http://www.prachachat.net/news_detai...sid=1498639110
__________________
BKK Mass Transit Expert

zntfdr liked this post
Wisarut no está en línea   Reply With Quote
Old June 30th, 2017, 09:14 AM   #2107
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Project that will start construction this year
MRT Orange line | 22.57 km - U/C: 0.29% - Construction work will begin on July 10. Currently doing soil testing.
MRT Pink line | 34.5 km - U/C - Construction work will begin in August. Currently doing soil testing.
MRT Yellow line | 30.4 km - U/C - Construction work will begin in August. Currently doing soil testing.
SRT Red line Missing Link extension | 25.5 km - is under the State Railway of Thailand (SRT). Currently reviewing the TOR price.

7 more projects are preparing to be presented to the Cabinet for approval this year includes:

1. MRT Purple line extension | 23.6 km - Tao Poon - Rat Burana
2. MRT Blue line west extension | 8 km - Bang Khae - Phutthamonthon Sai 4
3. MRT Sukhumvit line Second South extension | 7 km - Samut Prakan - Bang Pu
4. MRT Sukhumvit line Second North extension | 9 km - Khu Khot - Lam Luk Ka
5. MRT Orange line extension | 16.4 km - Taling Chan - Thai Cultural Center
6. SRT Dark Red line North extension | 10 km - Rangsit - Thammasat University
7. SRT Light Red line West extension | 14.8 km - Taling Chan - Salaya

Regional Mass Transit System

Phuket LRT | 41.7 km

The results of the study on the suitability, design and analysis of environmental impacts of the Phuket Mass Transit System for the light rail transit (Tramway) was completed on May 2017. The route of the project will be from the Phuket International Airport to the Chalong Intersection valued at 30,154 million baht with the total distance of 41.7 km. The project is included in the PPP Fast Track of the Ministry of Transport's 2017 PPA. The MRTA will be responsible for the implementation of the PPP project.

Khon Khaen LRT | 22.8 km

The progress of the public transport development plan in four provinces in Khon Kaen, Chiang Mai, Nakhon Ratchasima, and Hat Yai, Songkhla province are expected to be completed this year and starting the project in 2018.
For Khon Kaen, OTP is in the process of preparing a detailed master plan for public transport and environmental impact for the north-south route. (Samran - Tha Phra) The distance is about 22.8 km and is the most appropriate route to develop a pilot project by using light rail transit (LRT)

Chiang Mai LRT | 36 km

For Chiang Mai, OTP is studying and preparing a master plan. Currently undergoing comparative analysis to select the route in the urban area between the alternative route running on the ground and underground. There are 3 lines in total of 36 km with 35 stations, the study progress is 90% complete, and will accelerate to be completed this August.

Nakhon Ratchasima LRT | 54.4 km

Nakhon Ratchasima LRT is under study and is currently defining three public transit routes, the study will be completed in August.

Hat Yai Monorail | 12.54 km

For Hat Yai, the Songkhla Provincial Administrative Organization had studied the appropriate route, which is a 12.54 km long monorail system with 12 stations and a total investment capital of 16,100 million baht. Currently the environmental impact report is being revised.

http://www.prachachat.net/news_detai...sid=1498727956
__________________
-Noblesse Oblige-

Last edited by Codename B; July 3rd, 2017 at 10:32 PM.
Codename B no está en línea   Reply With Quote
Old June 30th, 2017, 09:23 AM   #2108
chaodeknoi2016
Registered User
 
chaodeknoi2016's Avatar
 
Join Date: Jan 2016
Location: bangkok
Posts: 33
Likes (Received): 39

ป้ายในขบวนรถ ไปเตาปูนแล้ว EMU 04 ครับ



__________________

dimlys1994 liked this post

Last edited by chaodeknoi2016; June 30th, 2017 at 12:31 PM.
chaodeknoi2016 no está en línea   Reply With Quote
Old June 30th, 2017, 02:12 PM   #2109
atom
De omnibus dubitandum est
 
atom's Avatar
 
Join Date: Dec 2003
Location: N/A
Posts: 14,144
Likes (Received): 4366

Quote:
Originally Posted by chaodeknoi2016 View Post
ป้ายในขบวนรถ ไปเตาปูนแล้ว EMU 04 ครับ



Please to give credit for all pics posted.
__________________

Codename B liked this post
atom no está en línea   Reply With Quote
Old July 1st, 2017, 11:41 AM   #2110
chaodeknoi2016
Registered User
 
chaodeknoi2016's Avatar
 
Join Date: Jan 2016
Location: bangkok
Posts: 33
Likes (Received): 39

Train to Tao Poon


__________________

dimlys1994 liked this post
chaodeknoi2016 no está en línea   Reply With Quote
Old July 2nd, 2017, 03:21 PM   #2111
chaodeknoi2016
Registered User
 
chaodeknoi2016's Avatar
 
Join Date: Jan 2016
Location: bangkok
Posts: 33
Likes (Received): 39

มีภาพสถานีบางหว้าส่งมาให้ชมทางหลังไมค์ ขอบคุณเจ้าของภาพด้วยครับ
บริเวณนี้คืนผิวจราจรแล้ว เกาะกลางกว้างมาก ของเดิมก่อนสร้างรถไฟฟ้ากว้างเท่านี้ไหมครับ










__________________

dimlys1994 liked this post
chaodeknoi2016 no está en línea   Reply With Quote
Old July 2nd, 2017, 04:19 PM   #2112
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558



To Mod, those pictures were stolen from https://www.facebook.com/RenderThail...58744884385732 with no credits given, even the sentences are copied.
In fact all his posts and pictures are copied and stolen from users of Thai Facebook Group: ชมรมรถไฟฟ้าไทย Thailand Electrified Train Club
__________________
-Noblesse Oblige-

CNXWORLD liked this post

Last edited by Codename B; July 2nd, 2017 at 06:29 PM.
Codename B no está en línea   Reply With Quote
Old July 2nd, 2017, 06:03 PM   #2113
Yellow Fever
City Of Rain
 
Yellow Fever's Avatar
 
Join Date: Jan 2008
Location: Hongcouver/Raincouver
Posts: 60,951
Likes (Received): 56024

In deed, all images should be sourced.
__________________
Yellow Fever no está en línea   Reply With Quote
Old July 3rd, 2017, 02:14 PM   #2114
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Bang Sue Grand Station

Main Entrance Archs are being set up.


By Render Thailand

Quote:
Originally Posted by Sakesin View Post
July 1, 2017
Photo by me.



__________________
-Noblesse Oblige-

wwc234, dimlys1994, Munwon, dida888, Xephiroth liked this post
Codename B no está en línea   Reply With Quote
Old July 4th, 2017, 03:42 PM   #2115
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Second arch being set up.

Quote:
Originally Posted by CNXWORLD View Post
ตัวที่2ก็มา

By khun Sirimongkhon Nilpai




By khun Chalitta Ketthongma
__________________
-Noblesse Oblige-

wwc234, CNXWORLD, Magman, Munwon, dimlys1994 and 3 others liked this post
Codename B no está en línea   Reply With Quote
Old July 5th, 2017, 09:09 AM   #2116
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

There are a few canals in Bangkok that have regular boat services within the canals
1. Saen Saeb canal from Phadung Krung Kasem canal (Mahanak intersection) to Nongchok - 45.45 km - with boat service that go along Saen Saeb canal and Mahanak canal from Phan Fah bridge to Pratoo Nam, Pratoo Nam Wat Sribunrueng and Wat Sribunrueang to Minburi - connect with Ram Khamhaeng station of Airport link and Phetburi subway station / Makkasan station of Airport Link - and of course Ratchathwee station / National stadium station - even though it is quite far away
2. Phra Khanong canal from Phra Khanong to Iam Sombut - 9 km - connecting with Onnut station and Phra Khanong station - but a little too far away
3. Phasee Charoen canal - from Wat Paknam Phaseecharoen to Phetkasem 69 but we hope that it will eventually extend all the way to Wat Nong Khaem (end of BKK city limit) and Rachinee Pier to connect with Sanam Chai station
https://www.dailynews.co.th/bangkok/583586
__________________
BKK Mass Transit Expert

Magman liked this post
Wisarut no está en línea   Reply With Quote
Old July 5th, 2017, 03:23 PM   #2117
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Blue line will connect with Purple line at Tao Poon station this August.

Tao Poon Interchange Station


By Bangkok Pulse By Pisut Jarintippitack


Free charger at Hua Mak ARL station




By Khun Anwar De-ae
__________________
-Noblesse Oblige-

wwc234, Xephiroth liked this post

Last edited by Codename B; July 5th, 2017 at 03:30 PM.
Codename B no está en línea   Reply With Quote
Old July 5th, 2017, 07:02 PM   #2118
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

MRT Blue line extension | 27 km - U/C: 93.17%

First Glimse of Itsarapap Underground Station

Quote:
Originally Posted by gologoso View Post
__________________
-Noblesse Oblige-

wwc234, Mo_Hy, Xephiroth, Jeelee, metro-world liked this post
Codename B no está en línea   Reply With Quote
Old July 6th, 2017, 05:39 PM   #2119
IsaanUSA
Registered User
 
Join Date: Jan 2013
Posts: 37
Likes (Received): 10

A bit cliche, no? It looks nice and at least it's not a generic subway. I guess the Hong is better than advertisements. The Chinatown station though, wow!
IsaanUSA no está en línea   Reply With Quote
Old July 7th, 2017, 11:50 AM   #2120
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Quote:
Originally Posted by IsaanUSA View Post
A bit cliche, no? It looks nice and at least it's not a generic subway. I guess the Hong is better than advertisements. The Chinatown station though, wow!
this is due to the requirement from Rattanakosin Island Board though - and of course Yaowaraj area has the northern limit at Wat Mungkorn Kamalawat - and Issaraphab station has used Hong theme since it is closed to Wat Hong

Oh, BTW, MRTA has made a settlement with BMA on several issues if they want Pink monorail, Yellow Monorail, Orange line MRT to construct without troubles:

1. Yellow line - demolition of the old Bang Kapi flyover to allow the construction of yellow line Monorail and Bang Kapi station with connection to the Mall Bang Kapi and build the new one to replace the old flyover

2. Orange line MRT - MRTA and BMA agree in principal that both BMA elevated way from Lam Salee to Klong Bang Chan which passed Lam Salee and Klong Ban Mah subway station will have to be build at the same time and the elevated section of Orange line will have to go up by 8 more meters - need at least 250 million Baht to do so

3. for the case of Pink Monorail, Consul Dept, Administration court and Custom Dept (those who rent Government complex) have raised the issue of the Government Complex station that obstruct the front - harming their building fengshui - need to make a real change by moving closer to DSI building
https://www.dailynews.co.th/economic/583990
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote


Reply

Tags
bangkok

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:06 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium