Old April 19th, 2012, 10:17 PM   #741
Falubaz
Registered User
 
Falubaz's Avatar
 
Join Date: Nov 2004
Location: Zielona Gora, Polska
Posts: 14,799
Likes (Received): 2940

Quote:
Originally Posted by Codename B View Post
From this scheme it looks like there wont be any interchange station between the new monorail and the skytrain - green line. If it's true so, then it doesnt seem smart.
__________________
Zielona Góra - Ziemia Lubuska

₪₪₪Zielona Góra moim okiem₪₪₪ Zielonogórskie autobusy₪₪₪Port Lotniczy ZIElona Góra₪₪₪ BRT₪₪₪ścieżki rowerowe w ZG
₪₪₪[Świat] „Przebłyski pamięci”₪₪₪Moja Ameryka - nie tylko Stany
Falubaz no está en línea   Reply With Quote

Sponsored Links
Old April 19th, 2012, 10:48 PM   #742
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603



That green line on the picture is an extension and it hasn't been built yet. Same thing with the Red line on the pic.
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old April 19th, 2012, 11:17 PM   #743
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Integrated Ticketing System (Rabbit Card) coming this april 23!

Quote:
Originally Posted by Wisarut View Post

The New rabbit card which can be used for both Subway and Sky is coming soon on 23 April 2012
BTS will stop issuing the 30 Day pass on 23 April 2012 and stop issuing the store value cards on 1 May 2012 so you better exchange for the Rabbit card NOW
http://www.bts.co.th/CollectFair_BTS.html
http://www.thanonline.com/index.php?...176&Itemid=524
https://www.facebook.com/photo.php?f...&type=1&ref=nf
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old April 20th, 2012, 03:51 PM   #744
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Forgot to post this one..

---------------------------

On March 31, 2012 the SRT Airport Rail Link extension (Don Mueang Airport - Bangsue - Phaya Thai) - 21.8 km got the green light by EIA. Bidding will begin this year or at the latest early next year.

Quote:
Originally Posted by napoleon View Post
pic by Design Concept



















---------------------------------------------------------
__________________
-Noblesse Oblige-

Last edited by Codename B; April 20th, 2012 at 05:44 PM.
Codename B no está en línea   Reply With Quote
Old April 20th, 2012, 05:44 PM   #745
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Quote:
SRT Dark Red line (Bang Sue - Rangsit) 26 km.
Can't start yet, because the bid winner, SU Joint Venture, quoted the cost at 31 billion baht while the cabinet had allocated only 27.17 billion baht for the project. A committee would be set up to discuss the issue.
The total cost for this projects will be sent to the Ministry of Transport after the conclusion of the meeting on april 18. A new meeting will be held on 20-23 april for the conclusion of this project.

--------------------------------------------------------------

SRT Dark Red line (Bang Sue - Rangsit) - 26 km














http://www.railway.co.th/resultproje....asp?redline=3
__________________
-Noblesse Oblige-

Last edited by Codename B; April 20th, 2012 at 06:41 PM.
Codename B no está en línea   Reply With Quote
Old April 20th, 2012, 05:45 PM   #746
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Current lines & Lines under construction in Bangkok Metropolitan Area.

__________________
-Noblesse Oblige-

Last edited by Codename B; April 30th, 2012 at 10:20 AM.
Codename B no está en línea   Reply With Quote
Old April 23rd, 2012, 08:56 PM   #747
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

SRT Light Red line (Bangsue - Talling Chan) - 15 km construction update

Quote:
Originally Posted by marut View Post
สถานีบางบำหรุ

Layout สถานีครับ (จำจากความทรงจำนะครับ อาจจะคลาดเคลื่อนบ้าง)


จากบนสะพานลอย ข้างทางตัดถนนบางกรวย-ไทยน้อย มองไปทางสะพานข้ามคลองบางกอกน้อย


สะพานข้ามคลองบางกอกน้อย


ชานชาลาสถานีบางบำหรุครับ


ชานชาลารถไฟทางไกล




รางยังไม่ได้เชื่อมเลย


ชานชาลาทั้งหมด


ด้านนอก บริเวณอาคารสถานีครับ






__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old April 23rd, 2012, 08:57 PM   #748
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Cont.

Quote:
Originally Posted by marut View Post
บรรยากาศโดยรวมครับ




ทางขวามือ คือช่องจำหน่ายตั๋ว


ส่วนทางเข้ารถไฟฟ้าชานเมืองจะอยู่ทางซ้ายมือ


หันขวามือก็จะเจอทางลงหลัก มีบันไดเลื่อนด้วย


หันซ้าย เดินตรงไปสุดทาง จะมีทางเดินไปทางลอดใต้ชานชาลาครับ


บรรยากาศรวมๆ




ทางเข้าหลักรถไฟทางไกล อยู่ติฝั่งเดียวกับห้องขายตั๋ว


ห้องรับฝากของครับ


เดินเข้ามาข้างใน ฝั่งขวามือจะเป็นทางลาด สำหรับพวกรถเข็น หรือคนที่มีกระเป๋าลาก (จะไปโผล่บริเวณที่รถนอนชั้น 2 หรือรถชั้น 1 จอดพอดี)




เดินตรงไปทางซ้าย จะเจอบันไดเลื่อนทางลงไปชานชาลารถไฟทางไกล


ทางลงอีกจุด ตรงสุดปลายทางเดินครับ


สถานีบางบำหรุมีชั้นลอยด้วย ขึ้นไปดูกันครับ


ข้างบนไม่มีอะไรมาก เป็นชั้นลอยเฉยๆ น่าจะเป็นแค่ที่พักผู้โดยสาร หรือร้านค้าต่างๆ เหมือนที่หัวลำโพง


วิวจากข้างบนครับ




ปิดท้ายด้วย วิวจากบนชานชาลารถไฟชานเมือง
..
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old April 23rd, 2012, 08:58 PM   #749
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Cont.

Quote:
Originally Posted by marut View Post
สถานีชุมทางตลิ่งชัน


ชานชาลาสถานี มองจากมุมไกลครับ


บริเวณลานจอดรถด้านหลังสถานี มีการจำลองอาคารสถานีหลังเก่ามาไว้ด้วย โดยวัสดุบางอย่างก็นำมาจากอาคารเดิมที่รื้อถอนออกไปนั่นเอง






อาคารหลังใหม่








ภายในอาคารไม่ซับซ้อนมากครับ เดินเข้ามา ซ้ายมือจะเป็นช่องขายตั๋ว และทางเข้าสู่ชานชาลา




เดินตรงเข้ามา ขวามือก็จะเป็นบันไดเลื่อนลงไปทางลอด


ส่วนซ้ายมือจะเป็นบันไดธรรมดาครับ


ในทางลอด


วิวบนชานชาลา


รางวิ่งผ่าน






หมดแล้วครับ ขอบคุณสำหรับคำติชมนะครับ ไว้เจอกันคราวหน้าครับ
Thanks to khun Marut for taking these pictures.
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old April 27th, 2012, 03:11 PM   #750
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Progress for the first phase of all 10 mass transit lines is out, and they can be summarized as follows.


http://www.prachachat.net/news_detai...tid=&subcatid=

---------
  1. Light Red line (Bangsue - Talling Chan) - 15 km
    • Almost 100% complete and will be operational in May.

  2. Purple line (Bansue - Bang Yai) - 23 km
    • 41% complete and will be operational in 2015.

  3. Blue line (Bangsue - Ta Phra & Hualamphong - Bang Kae) - 27 km
    • 12% complete and will be operational in 2016.

  4. Light Green line extension (Bearing - Samut Prakan) - 12.8 km
    • Construction begun this year and will be operational in 2016.

  5. Dark Red line (Bangsue - Rangsit) - 26 km
    • Open for bidding and will be operational in 2015.

  6. Dark Green line extension (Mo Chit - Sapan Mai) - 11.4 km
    • In the process of adjusting the plan. Bidding will begin this year and it will be operational in 2016.

  7. Pink line (Kaerai - Minburi) - 34.5 km
    • In the process of reviewing the plan. Bidding will begin this year and it will be operational in 2016.

  8. Orange line (Talling Chan - Thailand Cultural Center - Minburi) - 37.5 km
    • In the process of studying and designing the plan. Bidding will begin this year. The Thailand Cultural Center - Minburi part will get a priority.

  9. Airport Rail Link Extension (Don Muang Airport - Bang Sue - Phayathai) - 21.8 km
    • Waiting for EIA. Bidding will begin in 2013.

  10. Yellow line (Lad Phrao - Pattanakarn - Samrong) - 30.4 km
    • In the process of reviewing details of the plan.

Total = 239.4 km
__________________
-Noblesse Oblige-

Last edited by Codename B; April 28th, 2012 at 10:41 AM.
Codename B no está en línea   Reply With Quote
Old April 27th, 2012, 05:33 PM   #751
BTS2MRT
Connecting your real life
 
Join Date: Apr 2012
Posts: 1,111
Likes (Received): 347

Quote:
Originally Posted by Codename B View Post
Current lines & Lines under construction in Bangkok Metropolitan Area.

Picture
I like it.
BTS2MRT no está en línea   Reply With Quote
Old April 30th, 2012, 10:57 AM   #752
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

ขอบคุณครับ ผมจะอัพเดทมันเรื่อยๆ

-------------------------------

Rabbit Card is finally here. Thanks khun totomaru for the pics.

Quote:
Originally Posted by totomaru View Post


เพิ่งมาถึง 1 ใบ เมื่อสักช่วงเที่ยงตรงวันนี้ ครับ ขาดอีก 2 ใบ ที่ต้องรอทางไปรษณีย์มาส่ง กับ อีก 1 ใบ ตามสิทธิ์พนักงาน ที่ต้องรอทางบริษัท ครับ
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old April 30th, 2012, 11:50 AM   #753
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Siam Station

image hosted on flickr

Siam Square Urban Street SSUS by yago1.com February 19, 2012

Asoke BTS Station

image hosted on flickr

Bangkok Asok Skytrain by yago1.com February 13, 2012

Airport Rail Link & BTS Skytrain Interchange

image hosted on flickr

http://www.flickr.com/photos/[email protected]/6219807955/ October 2, 2011

image hosted on flickr

DSCN0215 by luckyxrea April 26, 2012

BTS Skytrain & BRT Interchange

image hosted on flickr

Junction of Light by weerakarn April 28, 2012
__________________
-Noblesse Oblige-

Last edited by Codename B; April 30th, 2012 at 12:09 PM.
Codename B no está en línea   Reply With Quote
Old May 2nd, 2012, 08:27 PM   #754
napoleon
Liberty, Equality, Frate
 
napoleon's Avatar
 
Join Date: Apr 2006
Posts: 75,389
Likes (Received): 4463

Airport Link may see new share structure as Don Mueang made No 2 facility

The Nation May 3, 2012 1:00 am

The government is considering adjusting the shareholding structure of the Airport Rail Link by inviting the private sector and Airports of Thailand (AOT) to hold stakes in the project so as to smooth the policy to use Don Mueang as Bangkok's second airport, said Virabongsa Ramakura, chairman of the Strategic Committee for Reconstruction and Future Development.

Virabongsa said during a keynote speech titled "The Strategy of Thailand after 2015" during a seminar held by the Federation of Thai Industries that congestion at Suvarnabhumi Airport was very serious. Annual passenger numbers are as high as 48 million, so the government cannot avoid using Don Mueang Airport as the capital's second aviation facility.

However, he said problems related to the Airport Rail Link might be an obstacle to providing efficient transport between Suvarnabhumi and Don Mueang. The service is a state enterprise under the State Railway of Thailand, so its management may not be flexible.

"The government therefore is thinking of adjusting the shareholding structure of the Airport Rail Link. AOT and private firms may be the new shareholders. If we can do this, we will extend the route from Phaya Thai to Don Mueang Airport. Construction may take three years," he said.

Virabongsa added that Thai AirAsia, the country's largest budget airline, had been asked to move its operations from Suvarnabhumi to Don Mueang. It is likely to accept the idea, but is asking for the firm commitment of the government not to change its airport policy in the future. The government may have to offer incentives to these budget airlines.

He said that if the government can use Don Mueang as the second Bangkok airport officially, it expected 12 million passengers to move to that facility annually, easing the congestion at Suvarnabhumi.

In a separate matter, Virabongsa said he expected the economy to continue its recovery in the second half of the year. The government is forecast to collect more value-added tax thanks to increased consumer spending. But the downside to the improved economy is that it will aggravate the labour shortage. Meanwhile, alien workers from Myanmar are likely to move back to their own country as its economy grows.

http://www.nationmultimedia.com/busi...-30181155.html
napoleon no está en línea   Reply With Quote
Old May 15th, 2012, 10:51 PM   #755
Yappofloyd
Registered User
 
Join Date: Jan 2005
Location: Bangkok & Melbourne
Posts: 972
Likes (Received): 49

Quote:
Originally Posted by Simon91 View Post
Took it in January. Great experience. Damn fast and spacious. The integration with MRT at Makkasan is quite bad though.
No one would disagree with you on that last sentence. Basically the money is allocated, the elevated link is basically designed after the initial design had problems but some other issues have held up the start of construction which was meant to be completed by June 2012.

Hopefully, by late this year or early next......obviously it should have been done originally but then that would have taken forethought.
Yappofloyd no está en línea   Reply With Quote
Old May 15th, 2012, 11:12 PM   #756
Pansori
planquadrat
 
Pansori's Avatar
 
Join Date: Apr 2006
Location: London - Vilnius
Posts: 9,973
Likes (Received): 6911

What are the fares of Express and regular service trains from Airport to Phaya Thai station? I'll have to use it in a few weeks time. Can't wait!
Pansori no está en línea   Reply With Quote
Old May 15th, 2012, 11:16 PM   #757
Yappofloyd
Registered User
 
Join Date: Jan 2005
Location: Bangkok & Melbourne
Posts: 972
Likes (Received): 49

Quote:
Originally Posted by Codename B View Post
Progress for the first phase of all 10 mass transit lines is out, and they can be summarized as follows.


http://www.prachachat.net/news_detai...tid=&subcatid=

---------
  1. Light Red line (Bangsue - Talling Chan) - 15 km
    • Almost 100% complete and will be operational in May.
    No it won't as it is not complete. Civil works not yet 100% done, 96.80% as at end of April (http://www.railway.co.th/resultproje...edline=5504201). Then systems & electricals to be completed. Then testing. Rolling Stock still not ordered so using old SRT DMUs. I am guessing mid 2013?
  2. Purple line (Bansue - Bang Yai) - 23 km
    • 41% complete and will be operational in 2015.
    Going well and on track (pardon the pun). Was 2014 but last years floods added significant delays
  3. Blue line (Bangsue - Ta Phra & Hualamphong - Bang Kae) - 27 km
    • 12% complete and will be operational in 2016.
    Plus 6 months due to last years floods so expect 2017
  4. Light Green line extension (Bearing - Samut Prakan) - 12.8 km
    • Construction begun this year and will be operational in 2016.
    Preliminary works had not yet begun as of end of April. Deadline still looks good if no delays but last 2 BTS exts have been delayed in opening by 2 years or more.
  5. Dark Red line (Bangsue - Rangsit) - 26 km
    • Open for bidding and will be operational in 2015.
    Given delays with the bid, 2015 looks highly unlikely.
  6. Dark Green line extension (Mo Chit - Sapan Mai) - 11.4 km
    • In the process of adjusting the plan. Bidding will begin this year and it will be operational in 2016.
    This ext was originally scheduled to open in 2008 and for the last 6 years it has been said work will commence "next year". Wait and see...

  7. Pink line (Kaerai - Minburi) - 34.5 km
    • In the process of reviewing the plan. Bidding will begin this year and it will be operational in 2016.
    Is considered a priority but still monorail unless another review changes it to heavy rail which would be the sensible option.
  8. Orange line (Talling Chan - Thailand Cultural Center - Minburi) - 37.5 km
    • In the process of studying and designing the plan. Bidding will begin this year. The Thailand Cultural Center - Minburi part will get a priority.
    Expect tender next year I would suggest?
  9. Airport Rail Link Extension (Don Muang Airport - Bang Sue - Phayathai) - 21.8 km
    • Waiting for EIA. Bidding will begin in 2013.
    Now an advanced timeline since the govt. changed to a 2 airport policy 2 months ago. Thus, they need the ext to DMK earlier than was planned.
  10. Yellow line (Lad Phrao - Pattanakarn - Samrong) - 30.4 km
    • In the process of reviewing details of the plan.
1st Phase Lat Phrao to Hua Mark by 2017-19??

Total = 239.4 km
Khun Codeman has kindly translated the Prachachat table. However, as with much of the thai press where reporters glibly report info without fact checking or doing much research there is some patently incorrect info given. The reality has been that every mass transit project in BKK in the last 10 years has been significantly delayed for a combination of reasons. Some of these projects are already delayed. I have added a few comments in bold.
Yappofloyd no está en línea   Reply With Quote
Old May 15th, 2012, 11:22 PM   #758
Yappofloyd
Registered User
 
Join Date: Jan 2005
Location: Bangkok & Melbourne
Posts: 972
Likes (Received): 49

Quote:
Originally Posted by Falubaz View Post
From this scheme it looks like there wont be any interchange station between the new monorail and the skytrain - green line. If it's true so, then it doesnt seem smart.
Not correct. An interchange has always been planned. The problem is that is occurs at Laksi Monument Circle (a large traffic roundabout at grade with an NS underpass and an EW overpass) and as both lines curve as this intersection - more so the pink line - in order to avoid the actual small Laksi monument. Thus, the planned interchange will involve a pedestrian link of some 600m or so.

All a bit silly as both lines could conceivably have direct interchange stations, one above the other, but there you go.
Yappofloyd no está en línea   Reply With Quote
Old May 16th, 2012, 08:21 AM   #759
Yappofloyd
Registered User
 
Join Date: Jan 2005
Location: Bangkok & Melbourne
Posts: 972
Likes (Received): 49

Quote:
Originally Posted by Pansori View Post
What are the fares of Express and regular service trains from Airport to Phaya Thai station? I'll have to use it in a few weeks time. Can't wait!
90 baht (US$3) & 45 baht (US$1.50), respectively. You can find info at http://airportraillink.railway.co.th/en/
Yappofloyd no está en línea   Reply With Quote
Old May 16th, 2012, 01:41 PM   #760
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Quote:
Originally Posted by Yappofloyd View Post
Khun Codeman has kindly translated the Prachachat table. However, as with much of the thai press where reporters glibly report info without fact checking or doing much research there is some patently incorrect info given. The reality has been that every mass transit project in BKK in the last 10 years has been significantly delayed for a combination of reasons. Some of these projects are already delayed. I have added a few comments in bold.
The table came out before news about the delays of Dark Red line, Dark Green line extension and the late update of the Light Red line from SRT. However the rest of the table is correct.

For the Blue line, the delays from the flood had already been taken into account. It is delayed from 2015 to 2016.

Same with Purple line. Delayed from the end of 2014 to the beginning of 2015.

For the Dark Green line extension, it is delayed by 6 months as it does not pass EIA.

For the Light Green line extension, I mixed up March and May as construction is set to begin in May this month, which is also what was witten in the table. My fault.

For the Dark Red line, the problem is set to be solved within this month.

And the Pink line is already set to be a monorail with 6 more stations added to the line.
__________________
-Noblesse Oblige-

Last edited by Codename B; May 17th, 2012 at 01:31 AM.
Codename B no está en línea   Reply With Quote


Reply

Tags
bangkok

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 04:35 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium