daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old September 5th, 2014, 01:24 AM   #1021
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

BTS Light Green line extension - Bearing - Samut Prakan (12.6 km)

The progress is now 35.03% done.

Quote:
Originally Posted by Wisarut View Post

Bearing to Paknam to bring those in BKK and those in Paknam together with 9 stations from Samrong station all the way to Sai Luad be done in April 2017 - so far, it is 35.03% done - with a hope to be extended to Bang Poo

However, those in Pak Nam and Bang Poo areas asking for the price control of condo leasing as this extension will drive the price of leasing of apartment and condo upward to the point that it has become unaffordable for those workers.

http://shows.voicetv.co.th/voice-news/116461.html
https://www.facebook.com/VoiceTVonli...524848/?type=1
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote

Sponsored Links
Old September 6th, 2014, 01:16 PM   #1022
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Status for all lines
06/09/2014

Purple line (23km) : U/C, operational in 2016
Blue line extension (27km) : U/C, operational in 2017
Green line south extension (12.6km) : U/C, operational in 2017
Light Red line (15 km) : U/C waiting for the electric train and Bang Sue Grand station to finish construction, operational in 2017
Dark Red line (26 km) : U/C, operational in 2017

Purple line extension (23.6 km) - design study, bidding in 2015
Green line north extension (18.7km) - bidding september 19, construction begins 2015
Orange line (21.8km) : ready for the cabinet to approve the bidding
Pink line Monorail (34.6km) : ready for the cabinet to approve the bidding
Airport Rail link extension (21.8km) : ready for the cabinet to approve the bidding
Red line (missing link) extension (25.5km) : ready for the cabinet to approve the bidding
Yellow line Monorail (30.4km) : in the last phase of design study


http://www.thanonline.com/index.php?...9#.VArY62R_tFl
__________________
-Noblesse Oblige-

Bentown, _Night City Dream_ liked this post
Codename B no está en línea   Reply With Quote
Old September 15th, 2014, 08:13 AM   #1023
Jim856796
Registered User
 
Jim856796's Avatar
 
Join Date: Jun 2006
Location: Citizen of the World
Posts: 8,954
Likes (Received): 849

Station/platform length for BTS Skytrain - 130 metres
Station/platform length for Bangkok MRT - 180 metres
Station/platform length for Airport Rail Link - 210 metres

* Estimates
__________________
I honestly think all development projects must be sustainable and futureproof.

You support the good projects... and oppose the bad.
Jim856796 no está en línea   Reply With Quote
Old September 16th, 2014, 11:15 AM   #1024
_Night City Dream_
Registered User
 
_Night City Dream_'s Avatar
 
Join Date: Jan 2008
Posts: 19,163
Likes (Received): 101794

Quote:
Originally Posted by Codename B View Post
Status for all lines
06/09/2014

Purple line (23km) : U/C, operational in 2016
Blue line extension (27km) : U/C, operational in 2017
Green line south extension (12.6km) : U/C, operational in 2017
Light Red line (15 km) : U/C waiting for the electric train and Bang Sue Grand station to finish construction, operational in 2017
Dark Red line (26 km) : U/C, operational in 2017

Purple line extension (23.6 km) - design study, bidding in 2015
Green line north extension (18.7km) - bidding september 19, construction begins 2015
Orange line (21.8km) : ready for the cabinet to approve the bidding
Pink line Monorail (34.6km) : ready for the cabinet to approve the bidding
Airport Rail link extension (21.8km) : ready for the cabinet to approve the bidding
Red line (missing link) extension (25.5km) : ready for the cabinet to approve the bidding
Yellow line Monorail (30.4km) : in the last phase of design study


http://www.thanonline.com/index.php?...9#.VArY62R_tFl
Are all of these lines metro or BTS?

Will there be the unique system of urban rail mass transit upon completion or they'll carry on working as two different systems?
__________________
Big Cities is one of the major inventions by human beings

My Baku / Мой Баку / 我的巴库

_Night City Dream_ está en línea ahora   Reply With Quote
Old September 16th, 2014, 12:10 PM   #1025
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

The BTS, MRT and SRT stands for the company that operates the lines.

BTS skytrain lines are all elevated and refer to:
Green line and Dark green line

MRT refer to the metro (both underground & elevated):
Blue line, Purple line and Orange line.

However MRT will also operate two monorail lines:
Pink line and Yellow line.

SRT operates the commuter rail (elevated, at grade and underground in some stations):
Light red line, Dark red line and Airport Rail Link.

The process of integrated ticket system begins this month, September 2014 and will take 30 months to be done, while BTSC has promised that the integrated system will be installed in both mass transit system as well as expressway systems within 15 months and the testrun will begin in the 18th months.
__________________
-Noblesse Oblige-

_Night City Dream_ liked this post
Codename B no está en línea   Reply With Quote
Old September 21st, 2014, 10:44 PM   #1026
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

MRT Blue Line

Quote:
Originally Posted by BTS2MRT View Post
BKK MRT Review by Triptravelgang

__________________
-Noblesse Oblige-

Last edited by Codename B; October 13th, 2014 at 06:56 PM.
Codename B no está en línea   Reply With Quote
Old September 21st, 2014, 11:14 PM   #1027
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Bangkok Pink Line awaits government review
Written by Kevin Smith

THAILAND's Office of Transport and Transport Policy and Planning (OTP) says that the construction plan for the 34.5km Pink Line monorail in Bangkok is currently awaiting approval from the government ahead of a bidding process which it hopes will commence by the end of the year.

OTP director general Mr Peraphon Thawornsupacharoen says that if the government gives the Baht 58.3bn ($US ) project the green light and private firms bid as expected, construction, which will be managed by Mass Rapid Transit Authority of Thailand (MRTA), will take three years and the line could open in early 2019.

The Pink Line is described as a "feeder line" by MRTA, one of four for Bangkok, and the OTP says the monorail will be capable of transporting 80,000-200,000 passengers per day. It is expected to be implemented as a PPP operating concession.

http://www.railjournal.com/index.php...nt-review.html

----------------------------------

[IMG]http://i61.************/rb0ehl.jpg[/IMG]







__________________
-Noblesse Oblige-

melrocks50, exxzite liked this post

Last edited by Codename B; September 22nd, 2014 at 12:11 PM.
Codename B no está en línea   Reply With Quote
Old September 22nd, 2014, 12:15 PM   #1028
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

3 more lines will be open for bidding by the end of this year.

Quote:
Originally Posted by Wisarut View Post

By the end of year 2014, the following 3 routes of MRTA will be started for the construction to be opened in 2019 - 2020
1. Pink Monorail (kae rai - Pakkret - Government Complex - Lak Si - Wat Phra Sri - Ram Indra - Minburi)
2. Yellow Monorail - (Lad Phrao - Lam Salee - Hua Mark - Thepharak - Sri Nakharin - Samrong)
3. Orange subway (Minburi - La,m Salee - Thailand Cultural center)
http://www.youtube.com/watch?feature...&v=H8OkjVM76JE
http://www.now26.tv/view/22223/%E0%B...%E0%B8%B5.html

Orange line (20 km)




Pink line Monorail (34.6 km)

[IMG]http://i61.************/pm641.jpg[/IMG]


Yellow line Monorail (30.4 km)

[IMG]http://i62.************/2cx9cfa.jpg[/IMG]
__________________
-Noblesse Oblige-

knrOctober, exxzite liked this post

Last edited by Codename B; September 24th, 2014 at 02:00 PM.
Codename B no está en línea   Reply With Quote
Old September 23rd, 2014, 08:51 PM   #1029
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

First Sustina export order
23 Sep 2014



JAPAN: East Japan Railway train manufacturing subsidiary J-Trec has won an order to supply its Sustina design for the Purple Line in Bangkok. A fleet of 21 three-car sets will be delivered to Thailand in 2016 from the company’s factory in Yokohama, and JR East will set up a local business to provide a ‘comprehensive maintenance programme’ covering rolling stock and infrastructure for 10 years.

The trains have been developed following development and testing of a prototype in 2012-13. The Sustina design features laser-welded lightweight stainless steel car bodies that include an interior roll-bar at ceiling height to provide strength within the car body should a collision occur from the side.

J-Trec is also working on Sustina rolling stock designs for use by JR East.

http://www.railwaygazette.com/news/u...ort-order.html
__________________
-Noblesse Oblige-

Last edited by Codename B; September 23rd, 2014 at 08:57 PM.
Codename B no está en línea   Reply With Quote
Old September 29th, 2014, 05:28 AM   #1030
archstudent
not student anymore
 
archstudent's Avatar
 
Join Date: Aug 2003
Location: BKK
Posts: 3,711
Likes (Received): 2687

Quote:
Originally Posted by atom View Post
Bangkok MRT ranked one of the best among 18 international metro systems around the world
PTI New Delhi, September 28, 2014



According to a DMRC official, in the survey conducted among the commuters of those Metro systems by Global Metro Benchmarking Groups NOVA and CoMET, Bangkok MRT along with Delhi Metro and London DLR were the best three performers in the Net Promoters Score (NPS) category.

Under this category the survey analysed the likelihood of customers recommending the service to others on the basis of their satisfaction. More than 41,000 respondents gave their feedback worldwide in this survey conducted online through the websites and social media links of 18 major Metros of the world from April 28th to May 25th earlier this year. The Metro systems that participated in this survey apart from Delhi Metro were Hong Kong MTR, London Underground, Metro De Madrid, Paris RATP, Metro De Sandiago, Singapore SMRT, Barcelona TMB, Brussels STIB, Bangkok BMCL, London DLR, Istanbul Ulasim, Kualalumpur Rapid PL, Metropolitano De Lisboa, Montreal STM, Newcastle Nexus, Metro Rio and Toronto TTC. The NPS is calculated by the percentage of promoters minus the percentage of detractors (P-D = NPS).
http://www.hindustantimes.com/india-...-1269382.aspx?
__________________
Bangkok and metropolitan Integrated rail transit map
--------------------------------------------------------------------
Bangkok Skyscrapers Diagram | Pattaya Skyscrapers Diagram |
Si Racha Skyscrapers Diagram
archstudent no está en línea   Reply With Quote
Old October 9th, 2014, 06:49 PM   #1031
archstudent
not student anymore
 
archstudent's Avatar
 
Join Date: Aug 2003
Location: BKK
Posts: 3,711
Likes (Received): 2687

Blue Line Extension update.

Blue Line Extension 27 km with 19 Stations

from : http://www.mrta-blueline.com/

Wat Mangkon Kamalawat Sta.

Upper Platform Grid line 1-3/B-C


Upper Platform Grid line 4-5/A-B


Wang Burapha Sta.

tunnel boring machine has arrived at Wang Burapha Sta. on 1 oct 2014


Overall


(D-Wall) at Upper Platform Grid line 6-7/A-B


excavation work at Upper Platform Grid line 14-15/B-C


Sanam Chai Sta.

Steel Reinforcement Work


Overall



Itsaraphap Sta.

masonry work at entrance


stair works



electrical work


overall


Ventilation Shaft No.1



Ventilation Shaft No.2



Ventilation Shaft No.3



Transition Structure between Itsaraphap Sta.-Tha Phra Sta.




Phasi Charoen Sta.


Lak Song Sta.


other elevate stations and viaduct works



Depot



railway track laying
Installation Shear Connector

Installation Bottom Rebar

Laying Track Panel



Flash Butt Welding

__________________
Bangkok and metropolitan Integrated rail transit map
--------------------------------------------------------------------
Bangkok Skyscrapers Diagram | Pattaya Skyscrapers Diagram |
Si Racha Skyscrapers Diagram

Codename B liked this post
archstudent no está en línea   Reply With Quote
Old October 13th, 2014, 06:38 PM   #1032
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Dark Red line & Bang Sue Grand Station

Quote:
Originally Posted by Wisarut View Post





Big Jin coming to inspect the construction sites of Red line commuter - Hope to get it done in 2017 and opened for service in 2018 - after learning hard about the delay


Contract 1: Bangsue Central - to Chatuchak - 12.80% done delayed by 13.34% due to the removal of oil pipelines of FPT (4 March 2013 - 10 Feb 2017)
Contract 2: Track from Chatuchak to Rangsit - 21.10% done delayed by 41.52% due to slum dweller encroachments (4 March 2013 - 10 Feb 2017)
Contract 3: the problem on the price - even after Mitsubishi and Hitachi agree to cut down the price to 30 billion Baht, it is still well over 27 billion Baht limit

Nevertheless, Big Jin agree with SRT that SRT need 8.140 billion Baht to accommodate High Speed train as well as the 4th track.

Big Jin also asking Transportation to move much of their intercity to Rangsit.

First year passenger is 129,000 passengers a day in 2017-18 and 232,000 passengers a day in 2042
http://www.matichon.co.th/news_detai...id=03&catid=05
http://www.youtube.com/watch?v=x7fp_D6gLEk
http://news.voicetv.co.th/thailand/120676.html
https://www.facebook.com/pr.railway/...48200975194774
http://www.manager.co.th/iBizChannel...=9570000117807
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old October 16th, 2014, 09:44 AM   #1033
kitti
Registered User
 
kitti's Avatar
 
Join Date: Dec 2007
Location: @BKK
Posts: 2,587
Likes (Received): 263

...
__________________
C__U
kitti no está en línea   Reply With Quote
Old October 16th, 2014, 03:45 PM   #1034
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Model of the Yellow line Monorail (30.4 km)

Bidding will begin Q1/2015 with construction to follow in the same year.















https://www.facebook.com/media/set/?...3264435&type=1
__________________
-Noblesse Oblige-

Bentown liked this post

Last edited by Codename B; October 16th, 2014 at 03:58 PM.
Codename B no está en línea   Reply With Quote
Old October 19th, 2014, 01:09 PM   #1035
metro-world
Registered User
 
Join Date: Aug 2008
Location: Hannover
Posts: 97
Likes (Received): 32

bangkok long range plan

Quote:
Originally Posted by Codename B View Post
Bangkok Mass Transit Update

Current lines as of January 2013 (including BRT)

1. BTS Skytrain (Light Green Line) 22.25 km
2. BTS Skytrain (Dark Green Lines) 8.7 km
3. MRT Subway (Blue line) 20 km
4. SRT Airport Rail Link 28.6 km
5. BRT Bus Rapid Transit 16.5 km

Total = 96.05 km

--------------------------------------------------------------------------------------

Lines under constructions

1. BTS Dark Green line extension (Wongwian Yai - Bangwa) 5.3 km
  • 2 stations will be operational no later than the end of the year.
    The last station will have to wait for the MRT Blue Line extension to finish, as it interchange with MRT.
2. BTS Light Green line extension (Bearing - Samut Prakan) 12.6 km
  • 4% complete
3. SRT Light Red line (Bangsue - Talling Chan) 15 km
  • 100% complete - (Test run with diesel train, waiting for electric train)
4. SRT Dark Red line (Bangsue - Rangsit) 26.3 km
  • Construction will begin in march.
5. MRT Purple line (Bansue - Bang Yai) 23 km
  • 53% complete
6. MRT Blue line extension (Bangsue - Ta Phra & Hualamphong - Bang Kae) 27 km
  • 27% complete

Total : 109.2 km

*********************************************************

--------------------------------------------------------------------------

Bangkok Metropolis 10 Rail Lines Plan (2018) - 469 km (excluding BRT)


Posted by khun totomaru

>>>
do you can provide a exact English translation of the Thai map below showing all projects -it is not direct corresponding with that one above.

thans a lot
metro-world no está en línea   Reply With Quote
Old October 19th, 2014, 01:34 PM   #1036
ddes
Registered User
 
Join Date: Oct 2006
Posts: 7,469
Likes (Received): 934

Why didn't they just complete electrification on the SRT Red Line?
ddes no está en línea   Reply With Quote
Old October 19th, 2014, 06:43 PM   #1037
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

That's because the electrification and electric train of SRT light red line is in contract 3 of SRT dark red line. So the light red line have to wait for the dark red line and also Bang Sue grand station to finish.

Quote:
Originally Posted by metro-world View Post
>>>
do you can provide a exact English translation of the Thai map below showing all projects -it is not direct corresponding with that one above.

thans a lot
The plan in that map are a little bit outdated. Here's the updated plan and the status of all the lines.

Quote:
Current lines : 100.55km
BTS Light Green line - (22.25 km)
BTS Dark Green line - (14.5 km)
MRT Blue line - (20.8 km)
SRT Airport Rail Link - (28 km)
SRT Light Red line - (15 km)

Feeder line
BMA Bus Rapid Transit - (16.5 km)

Under constructions : 88.8km + 18.4km
MRT Purple line - Bang Sue - Khlong Bang Yai (23 km) : 95,35% - Test run Mid 2015, Operational in August, 2016
MRT Blue line extension - Bang Sue - Ta Phra & Hua Lamphong - Lak Song (27 km) : 60% - Operational in 2018
BTS Light Green line south extension - Bearing - Samut Prakan (12.8 km) : 41,84% - Operational in 2018
SRT Dark Red line - Bang Sue - Rangsit (26 km) : 16% - Operational in 2018

BTS Light Green line north extension - Mo Chit - Saphan Mai - Ku Kot (18.4 km) : Construction to begin in March, 2015

Projects in 2015 : 143.7km
MRT Orange line - Thai Cultural Center - Bang Kapi - Minburi (20 km) : Bidding Q1/2015
MRT Pink line Monorail - Kaerai - Pakkret - Minburi (36 km) : Bidding Q1/2015
MRT Yellow line Monorail - Lad Phrao - Samrong (30.4 km) : Bidding Q1/2015
SRT Airport Rail link extension - Phaya Thai - Don Mueang (21.8 km) : Bidding Q1/2015
SRT Red line Extension (missing link) - Bang Sue - Hua Lamphong - Hua Mak (25.5 km) : Bidding Q1/2015
SRT Dark Red line extension - Rangsit - Thammasat (10 km) : Bidding Q1/2015

Projects in 2016 : 58.3km
BTS Light Green line south extension - Samut Prakan - Bang Pue (7 km)
MRT Purple line extension - Bang Sue - Rat Burana (19.8 km)
MRT Orange line extension - Charabsanitwong - Phra Ram IX (17.5 km)
SRT Light Red line extension - Taling Chan - Salaya (14 km)

The next phase after 2019 : 53.5km
SRT Light Red line extension - Hua Lamphong - Bang Bon & Bang Bon - Maha Chai (38 km)
MRT Blue line extension - Bang Khae - Phuttamonthon Sai 4 (8 km)
BTS Light Green line extension - National Stadium - Yotse (1 km)
BTS Dark Green line extension - Khu Khot - Lam Lukka (6.5 km)

Under Design Study : 46.91km
BMA Grey line Monorail - Vatcharapol - Tha Phra (39.91 km)
BTS Dark Green line extension - Bang Wa - Talling Chan (7 km)

(Note: Technically construction of the SRT Light Red line is done 100%, however it is still missing the stretch to Bang Sue Grand Station, which is still U/C,
and the setting up of electrification and procurement of electric train, which is in contract 3 of SRT Dark red line.
So the SRT Light red line will have to wait for the SRT Dark red line and Bang Sue Grand station to finish construction in 2018 to be fully usable)
__________________
-Noblesse Oblige-

dida888 liked this post

Last edited by Codename B; December 4th, 2014 at 09:52 AM.
Codename B no está en línea   Reply With Quote
Old October 21st, 2014, 03:38 PM   #1038
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Bangkok Mass Transit Plan

The cabinet has just approved the strategic plan to develop transportation infrastructure of Thailand for the year 2015-2022.

This consist of the development of public transport network to address the traffic problem in Bangkok and vicinities consisting of 10 mass transit lines,
of which 5 projects will be put forward in 2015.

The lines are:
  1. Orange line (Thai Cultural Center - Bang Kapi - Minburi) 20 km
  2. Yellow line monorail (Lad Phrao - Samrong) 30.4 km
  3. Pink line monorail (Kaerai - Pakkret - Minburi) 36 km
  4. Red line extension (Bang Sue - Hua Lamphong - Hua Mak) 25.5 km
  5. Red line extension (Rangsit - Thammasat) 10 km
  • For the Airport Rail link extension (Phaya Thai - Don Muang) 21.8 km
    The bidding process will begin early next year.
  • For the Light Green line extension (Mo Chit - Saphan Mai - Ku Kot) 18.7 km
    5 bidders have qualified and successful bids will be announced by December. It is envisaged that construction will commence by early 2015.

The progress of mass transit lines currently under construction are as follows:
  1. Purple line (Bang Sue - Khlong Bang Yai) 23 km : 95%
  2. Blue line extension (Bang Sue - Ta Phra & Hua Lamphong - Lak Song) 27 km : 40%
  3. Light Green line extension (Bearing - Samut Prakan) 12.6 km : 40%
  4. Dark Red line (Bang Sue - Rangsit) 26 km : 16%
  5. Light Red line (Bangsue - Talling Chan) 15 km : 100% - waiting for the dark red line and Bang Sue grand station to finish to set up electrification.

Furthermore 3,189 NGV buses will be purchased to replace old ones, of which the first 489 buses will be delivered in January-March 2015.

Map showing under constructions lines, and lines which will begin bidding and construction next year.


http://www.bangkokbiznews.com/home/d...%E0%B8%A5.html
http://www.thanonline.com/index.php?...4#.VEY5d9zoR74
__________________
-Noblesse Oblige-

Last edited by Codename B; October 21st, 2014 at 07:53 PM.
Codename B no está en línea   Reply With Quote
Old October 21st, 2014, 05:24 PM   #1039
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Renovated Thonburi Railway Pier

Quote:
Originally Posted by trewut View Post
ท่ารถไฟธนบุรีปรับปรุงใหม่







__________________
-Noblesse Oblige-

Bentown, dida888 liked this post
Codename B no está en línea   Reply With Quote
Old October 22nd, 2014, 05:21 AM   #1040
wwc234
Registered User
 
wwc234's Avatar
 
Join Date: Apr 2013
Posts: 22,266
Likes (Received): 5115

BANGKOK METRO PURPLE LINE DEPOT
Quote:
Originally Posted by ChAiNaRaI View Post
วันที่ 21 ตุลาคม 2557
ชมรมคนรักรถไฟฟ้า ได้รับอนุญาติจาก รฟม. ให้เข้าติดตามความคืบหน้าการก่อสร้างศูนย์ซ่อมบำรุง รถไฟฟ้าสายสีม่วง บริเวณคลองบางไผ่

ทางยกระดับกลับรถเดิมมีการต่อเติมเป็นทางเข้าอาคารจอดรถ ซึ่งอยู่ใต้ Depot ครับ











































Quote:
Originally Posted by ChAiNaRaI View Post
BTS Light Green Lines Extension Bering-SamutPrakan
Quote:
Originally Posted by wwc234 View Post
.......

Last edited by wwc234; October 22nd, 2014 at 05:38 AM.
wwc234 está en línea ahora   Reply With Quote


Reply

Tags
bangkok

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 04:42 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium