daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old April 3rd, 2015, 02:14 PM   #1161
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Green Line extension contracts signed
3 Apr 2015 at 16:26
WRITER: ONLINE REPORTERS

The Mass Rapid Transit Authority of Thailand (MRTA) on Friday signed four contracts worth combined 27.786 billion baht for the construction of the extension of the Green Line from Mor Chit to Saphan Mai and Khu Kot in Pathum Thani.

The construction contracts for the extension to the BTS skytrain system were signed with:

• Italian-Thai Development Plc, for the 15.269-billion-baht civil engineering of the 12-kilometre route between Mor Chit and Saphan Mai in Don Muang district.

• The UN-SH-CH Joint Venture (Unique Engineering and Construction Plc, Sinohydro Corporation Ltd and China Habour Engineering Co Ltd), for the 6.657-billion-baht contract to build the 7.5km Saphan Mai to Khu Kot track in Lam Luk Ka district of Pathum Thani.

• STEC-AS Joint Venture (Sino-Thai Engineering and Construction Plc and A.S. Associate Engineering (1964) Ltd, for the construction of the depot and park-and-ride building for 4.019 billion baht, and for the design and construction of the track for 2.841 billion baht.

Construction will start in June with completion scheduled in 2020. There will be 16 stations on this 19km extension of the BTS system.

MRTA board chairman Yodyuth Boonyatikarn said the extension of the Green Line would help reduce traffic congestion on Phahon Yothin road, where there are many government offices, shopping centres and housing communities.

Extending the city's mass transit system would better serve residents in suburban areas. The line would provide a convenient means for commuters to travel between Pathum Thani, into and through the city, and Samut Prakan at the other end of the BTS line.

http://www.bangkokpost.com/news/gene...ntracts-signed
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote

Sponsored Links
Old April 4th, 2015, 01:12 AM   #1162
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

MRTA expect that the cabinet will approve 3 mass transit lines in December:

Blue line: Bang Khae - Phuttamonthon Sai 4 extension - (8 km)
Blue line: Phuttamonthon Sai 4 - Om Noi extension - (3 km)
Brown line: Kaerai - Lam Samlee - (21.6 km)

Design studies for these lines will be completed in August and given to Cabinet for approval in September, so that they can approve the construction in December. Construction will then begin in 2017 and be completed in 2021.
__________________
-Noblesse Oblige-

Last edited by Codename B; April 4th, 2015 at 01:59 AM.
Codename B no está en línea   Reply With Quote
Old April 7th, 2015, 05:56 AM   #1163
Oasis-Bangkok
From Zero to Hero !!
 
Oasis-Bangkok's Avatar
 
Join Date: Apr 2009
Location: Bangkok
Posts: 15,939
Likes (Received): 51957



MRT station Sukhumvit, Thailand by Gösta Knochenhauer, on Flickr

Bangkok MRT Station
__________________

Zaz965 liked this post
Oasis-Bangkok está en línea ahora   Reply With Quote
Old April 14th, 2015, 10:29 AM   #1164
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

BTS and MRT handing out blankets for passenger to stay dry during Thai New Year Songkran Festival

__________________
-Noblesse Oblige-

dimlys1994 liked this post
Codename B no está en línea   Reply With Quote
Old April 16th, 2015, 02:32 PM   #1165
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

First phase of BMA Grey Line Monorail - (16.25 km)'

Status: Waiting for EIA, which will take 6 months, after that it will given to the cabinet for approval and construction will begin late 2016.

Location of the stations along the lines.













https://www.facebook.com/Homebuyersf...=page_internal
__________________
-Noblesse Oblige-

dimlys1994, mrsmartman, exxzite, Bkk3657 liked this post
Codename B no está en línea   Reply With Quote
Old April 18th, 2015, 02:02 PM   #1166
exxzite
Registered User
 
Join Date: Dec 2010
Posts: 1,080
Likes (Received): 1208

BANGKOK, THAILAND

MRT ORANGE LINE (Taling Chan - Min Buri)

30.6 km. | 30 stations | completed in 2019
23 underground stations and 7 elevated stations.




















Cr. http://ongsa.co.th/
__________________
exxzite no está en línea   Reply With Quote
Old April 22nd, 2015, 02:59 PM   #1167
exxzite
Registered User
 
Join Date: Dec 2010
Posts: 1,080
Likes (Received): 1208

BANGKOK, NONTHABURI - THAILAND

BTS Light Green Line and MRT Pink Line

BTS Light Green Line Extension (Mo Chit - Saphanmai) | 16 Elevated Stations | 19 km. | Completed in 2018
MRT Pink Line (Khae Rai - Min Buri) | 30 Elevated Stations | 35.5 km.


BTS Light Green Line (Wat Phrasimahatat Station) interchanges with MRT Pink Line (Wong Wian Laksi Station)


MRT Pink Line


Cr. https://www.facebook.com/pages/การรถ...#3607;ย/
__________________

Codename B, dimlys1994 liked this post
exxzite no está en línea   Reply With Quote
Old April 22nd, 2015, 04:44 PM   #1168
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Ministry of Transport will present five lines in the coming months to the Cabinet for approval:

1) MRT Pink line Monorail - (34.5 km) 56,725 million baht
  • Will be presented to the cabinet in May and is scheduled for completion in November 2020
2) MRT Yellow line Monorail - (30.4 km) 54,768.45 million baht
  • Will be presented to the cabinet in May and is scheduled for completion in November 2020
3) SRT Airport Rail link extension - (21.8 km) 31,139 million baht
  • Construction will take 48 months
4) MRT Orange line - (20 km) 110,325.76 million baht (12 km underground, 9 km elevated)
  • Will be presented to the Cabinet in May and is scheduled for completion in August 2020
5) MRT Purple line extension - (19.8 km)
  • Is still under feasibility study and detailed design. Will be presented to the Cabinet in June and bidding will take place mid 2015

Meanwhile design study for the MRT Blue line Phuttamonthon Sai 4 extension - (8 km) is expected to be completed in August, and will begin construction in late 2016 and scheduled to open in April 2019.

Projects that are being considered by the cabinet right now are: SRT Light & Dark Red line extension - Construction Q4 2015 - (25.5 km) 44,157.76 million baht. They are scheduled for completion in 2018.

http://www.ryt9.com/s/iq03/2142912
__________________
-Noblesse Oblige-

exxzite, dida888 liked this post

Last edited by Codename B; April 22nd, 2015 at 04:58 PM.
Codename B no está en línea   Reply With Quote
Old April 24th, 2015, 01:54 PM   #1169
exxzite
Registered User
 
Join Date: Dec 2010
Posts: 1,080
Likes (Received): 1208

MRT Blue Line

Quote:
Originally Posted by lovesickme View Post
BANGKOK MRT Subway Blue Line (since 2004)

Pra Ram IX Station (Interchange with MRT Orange Line)


Ticket Floor







Subway Walk Way


Platform




Train


Escalator to ground floor


Shopping Mall in Pra Ram IX Station


Lawson shop in Station


Escalator to Ticket Floor


And now , MRT Blue Line Extension is under construction more than 50%.
__________________

Codename B liked this post
exxzite no está en línea   Reply With Quote
Old April 26th, 2015, 03:25 PM   #1170
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

BTS Light Green line extension (Bearing-Samut Prakan) - 51.51% - (12.8 km)

Quote:
Originally Posted by wwc234 View Post
แบริ่ง สมุทปราการเดือน มีนาคม 2558














...

http://www.mrta-greenline.net/Index.php?page_id=5031
__________________
-Noblesse Oblige-

exxzite liked this post
Codename B no está en línea   Reply With Quote
Old April 26th, 2015, 03:31 PM   #1171
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

MRT Blue line extension - 60.19% - (27 km)


Empty Street in Bangkok during Songkran festival by RataJIT, on Flickr
__________________
-Noblesse Oblige-

exxzite liked this post
Codename B no está en línea   Reply With Quote
Old May 1st, 2015, 12:19 PM   #1172
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

MRT Blue Line Extension

การรถไฟฟ้าขนส่งมวลชนแห่งประเทศไทย











__________________
-Noblesse Oblige-

dimlys1994 liked this post
Codename B no está en línea   Reply With Quote
Old May 1st, 2015, 07:52 PM   #1173
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

BTS Skytrain

Quote:
Originally Posted by lovesickme View Post
BANGKOK BTS Skytrain

Silom intersection




BTS platform screen door (PSD) with advertising screen




Advertising on platform screen door will match with each train advertisement.



Siam Station Platform




__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old May 1st, 2015, 07:53 PM   #1174
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Bangkok | Phrom Phong BTS Station (The Em District)

Quote:
Originally Posted by jack1970 View Post
วันนี้วันหยุดเลยไปเดินเล่นเอ็มควอเทียร์มาถ่ายรูปมาอัพเดต

เพดานสถานีก็เสร็จแล้ว



สวยหรูดูดี

Quote:
Originally Posted by thanabank View Post
ฺฮ่า รูปผมเอง
เอามาแปะเพิ่มให้
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old May 6th, 2015, 11:28 PM   #1175
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

BMA Gold line Monorail

Monorail for the ICONSIAM project

Quote:
Originally Posted by samson1475 View Post


http://www.bangkok.go.th/khlongsarn/...อง
__________________
-Noblesse Oblige-

exxzite liked this post
Codename B no está en línea   Reply With Quote
Old May 7th, 2015, 02:47 PM   #1176
exxzite
Registered User
 
Join Date: Dec 2010
Posts: 1,080
Likes (Received): 1208

BANGKOK, THAILAND

BTS Skytrain Light Green Line (South Bangkok Extension) | Bearing - Samut Prakarn | 54.95% in process

















Cr. https://www.facebook.com/pages/%E0%B...09174012632662
__________________

Codename B, dimlys1994, knrOctober liked this post
exxzite no está en línea   Reply With Quote
Old May 8th, 2015, 07:46 AM   #1177
exxzite
Registered User
 
Join Date: Dec 2010
Posts: 1,080
Likes (Received): 1208

BANGKOK, THAILAND

MRT Purple Line (Bang Sue - Bang Yai) Update
Testing run in 2015 | Completed in 2016


















Cr. https://www.facebook.com/permalink.p...09174012632662
__________________
exxzite no está en línea   Reply With Quote
Old May 8th, 2015, 05:35 PM   #1178
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

SRT Dark Red line - 19.16% - (26 km)

__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old May 8th, 2015, 10:57 PM   #1179
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old May 12th, 2015, 07:27 PM   #1180
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Bangkok Metropolitan Region Mass Transit
01/06/2015

Current lines : 102.05 km
Under Constructions : 122.2 km
Pending : 215.05 km

Design Study : 99.6 km
Planned : 90.16 km

Master Plan : 14 lines - 629.08 km


https://www.youtube.com/channel/UCHY...Ze9gpQKyMfGA7Q

----------Current---------
BTS Light Green line - (22.25 km)
BTS Dark Green line - (14.5 km)
MRT Blue line - (20.8 km)
SRT Airport Rail Link - (28 km)
BMA Bangkok BRT - (16.5 km)
----------------U/C----------------
SRT Light Red line - (15 km) - 100%
MRT Purple line - (23 km) - 99.40%
MRT Blue line extension - (27 km) - 62.18%
BTS Light Green line Samut Prakan extension - (12.8 km) - 54.95%
SRT Dark Red line - (26 km) - 38.71%
BTS Light Green line Ku Kot extension - (18.4 km) - Construction begins 1st of June
-------------Pending---------------
SRT Light Red line Hua Lamphong extension - (11 km) - Construction Q4 2015
SRT Dark Red line Hua Mak extension - (14.5 km) - Construction Q4 2015
SRT Dark Red line Thammasat extension - (10 km) - Construction Q4 2015
SRT Airport Rail link extension - (21.8 km) - Construction Q4 2015
MRT Pink line Monorail - (34.5 km) - Preparing for cabinet approval
MRT Yellow line Monorail - (30.4 km) - Preparing for cabinet approval
MRT Purple line extension - (19.8 km) - Preparing for cabinet approval - Construction begins Sep 2016
MRT Orange line - (21 km) - Preparing for cabinet approval
MRT Orange line extension - (17.5 km) - In the process of choosing the optimal route
BMA Grey line Monorail Phase I - (16.25 km) - Undergoing EIA, construction in Q4 2016
BMA Bang Na LRT - (18.3 km) - EIA completed, preparing for cabinet approval
------------Design-Study----------
MRT Blue line Phuttamonthon Sai 4 extension - (8 km) - Design study to be completed in August
MRT Blue line Om Noi extension - (3 km) - Design study to be completed in August
MRT Brown line - (21.6 km) - Design study to be completed in August
BTS Dark Green line Talling Chan extension - (7 km) - Design study to be completed this year
SRT Dark Red line Ban Pachi extension - (60 km) - Design study has begun
--------------Planned-------------
BMA Grey line Monorail Phase II - (12.17 km)
BMA Grey line Monorail Phase III - (11.49 km)
BTS Light Green line Bang Pue extension - (7 km)
BTS Light Green line Lam Lukka extension - (6.5 km)
BTS Dark Green line Yotse extension - (1 km)
SRT Light Red line Salaya extension - (14 km)
SRT Dark Red line Maha Chai extension - (38 km)

====================

(*Technically construction of the SRT Light Red line is done 100%, however it is still missing the stretch to Bang Sue Grand Station, which is still U/C,
and setting up of electrification and procurement of electric train, which is in contract 3 of the Dark Red Line. So the Light Red Line will have to wait
for the Dark Red Line to finish construction in 2018 to be fully usable)


http://www.prachachat.net/news_detai...sid=1427953392
http://www.ryt9.com/s/iq05/2110363

====================

Thai Common Ticket will be ready February 2016. It can be used with BTS, MRT, ARL and BRT, while NGV Buses, Expressways and Boats will be ready at the end of 2016.

http://www.thanonline.com/index.php?...8#.VVH_UPmqqko


https://twitter.com/khaanoon
__________________
-Noblesse Oblige-

exxzite, dida888 liked this post

Last edited by Codename B; May 31st, 2015 at 11:56 PM.
Codename B no está en línea   Reply With Quote


Reply

Tags
bangkok

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:07 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium