daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old October 5th, 2016, 09:07 AM   #1801
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,564
Likes (Received): 2532

Quote:
Originally Posted by CNXWORLD View Post
ช่วยทำรูปแบบให้มันน่าสนใจหน่อยสิคับบางอย่างที่เขียนก็ใส่อารมณ์ เขียนซะเวอร์ มีการเมืองด้วย
ฝรั่งที่เข้ามาอ่านใครเค้าจะget ถ้าเป็นแบบนี้บ่อยๆคงไม่มีสมาชิกคนไทยหรือฝรั่งกดเข้ามาอ่านห้องรถไฟไทยหรือกรุงเทพอีกเลย
No need to do that unless the readers badly want to get the idea and the need to know exactly what I'm referring to about the region along the route that pink line monorail is going to pass from Kae Rai to Minburi via Tiwanont road, Chaeng Watthana road, and Ram Indra road, main street of Minburi and of ource Suwinthawongse road (AKA Highway 304).
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote

Sponsored Links
Old October 5th, 2016, 01:26 PM   #1802
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,564
Likes (Received): 2532

the latest news about Phadung Krung Kasem boat service:

Effective on 5 october 2016, Phadung Krung Kasem boat service has been extended to Thewarat Market Pier which allow the connections to the following boat services:

1. Chao Phraya Express Boat of every type since Thewet Pier is a major pier which all Chao Phraya Express Boat have to stop

2. Thewet pier - Wat Boworn Mongkhon ferry
3. Thewet pier - Wat Kharuehabodee ferry



Hua Lamphong Pier of Phadung Krung Kasem boat service


Map Route of Phadung Krung Kasem boat service


Thewet pier near K-Bank and Bus Route 53 terminus


Thewarat Market Pier when it was not done yet
For those who want to how Phadung Krung Kasem boat service will be looked like, take a look here:
http://portal.rotfaithai.com/modules...ewtopic&t=6893
__________________
BKK Mass Transit Expert

dimlys1994 liked this post

Last edited by Wisarut; October 5th, 2016 at 01:27 PM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old October 5th, 2016, 04:35 PM   #1803
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,564
Likes (Received): 2532

the way Airport Link has modified Airport Express to Airport city line to meet the rising demands by boosting the capacity to handle the passengers from 340 passengers to 740 passengers per set - as the number of passengers to be able to handle the daily number of passengers 61,500 passengers a day to 72,000 passengers a day
http://manager.co.th/UpToDate/ViewNe...=9590000100127
http://www.dailynews.co.th/economic/528144
http://www.krobkruakao.com/%E0%B8%82...%E0%B8%81.html
https://www.facebook.com/AirportRail...43070805714554

After the major modification of Airport express to Airport city line, the next on the line is to start the plan to purchase 7 new set of Airport city line to meet the demands - started in May 2017 and delivered in 2018
http://www.manager.co.th/iBizChannel...=9590000100232
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old October 6th, 2016, 02:37 PM   #1804
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

How did this thread become so dry? Like reading a boring newspaper

-------------------------------------------------------------------------------

MRT Sukhumvit line south extension | 12.8 km - 97.79%

The extension in Samut Prakan City, south of Bangkok.


https://www.facebook.com/Bangkokpuls...type=3&theater


https://www.facebook.com/Bangkokpuls...type=3&theater


http://thinkofliving.com/2016/09/17/...y-river-ocean/


http://thinkofliving.com/2016/09/17/...y-river-ocean/
__________________
-Noblesse Oblige-

Last edited by Codename B; October 14th, 2016 at 11:10 AM.
Codename B no está en línea   Reply With Quote
Old October 6th, 2016, 02:49 PM   #1805
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

SRT Dark Red line | 26 km - 74.17%

Don Muang Station connecting to Don Muang Airport.







Credit: https://www.facebook.com/RenderThail...31514603775428
__________________
-Noblesse Oblige-

Last edited by Codename B; October 14th, 2016 at 11:14 AM.
Codename B no está en línea   Reply With Quote
Old October 7th, 2016, 03:01 PM   #1806
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

MRT Purple line | 23 km

Taking the train from Nonthaburi city to Bangkok.








By Khun Anwar De-ae‎


By Khun Ham Harit
__________________
-Noblesse Oblige-

dimlys1994, oscaldd liked this post

Last edited by Codename B; October 14th, 2016 at 12:19 PM.
Codename B no está en línea   Reply With Quote
Old October 7th, 2016, 03:23 PM   #1807
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,564
Likes (Received): 2532

Quote:
Originally Posted by Codename B View Post
How did this thread become so dry? Like reading a boring newspaper
Yah - it has caused your boring that bother you but so long I have churned out the information from Thai sources - it does not matter and I'm going to provide more info and photographs ONLY when there are special request from readers.
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old October 8th, 2016, 04:40 PM   #1808
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

SRT Dark Red line | 26 km - 74.17%

New released clip showing progress and info of SRT Dark Red line and Bang Sue Grand Station.



-------------------------------------

Rangsit Station










https://www.facebook.com/19157658319...type=3&theater

Tung Song Hong Station






https://www.facebook.com/Thaitrainst...type=3&theater
__________________
-Noblesse Oblige-

dimlys1994, dida888 liked this post

Last edited by Codename B; October 14th, 2016 at 11:20 AM.
Codename B no está en línea   Reply With Quote
Old October 14th, 2016, 09:42 AM   #1809
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,564
Likes (Received): 2532

Setting up the joint ticket company ready to work in Mid 2017
http://www.thaipost.net/?q=%E0%B9%80...B8%A7%E0%B8%A1

Progress on red line commuter contract 1 - Bangsue central - Chatuchak station September 2016
http://www.bangsue-rangsitredline.co...e3-09-59-1.php
Progress on red line commuter contract 2 - Samian Naree - Rangsit -September 2016
http://www.bangsue-rangsitredline.co...e3-09-59-2.php
__________________
BKK Mass Transit Expert

dimlys1994 liked this post
Wisarut no está en línea   Reply With Quote
Old October 14th, 2016, 11:26 AM   #1810
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Bang Sue Grand Station | 50.49%


By Khun Azman Srisuriya

Main Entrance



Tracks on the southern side of the station







Depot





By Khun Pichet Chamneam
__________________
-Noblesse Oblige-

dimlys1994, dida888 liked this post
Codename B no está en línea   Reply With Quote
Old October 14th, 2016, 11:37 AM   #1811
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

MRT Blue line extension | (27 km) - 83.91%

















https://www.facebook.com/permalink.p...09174012632662
https://www.facebook.com/permalink.p...09174012632662
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old October 20th, 2016, 07:30 AM   #1812
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,564
Likes (Received): 2532


Orange line MRT has become a big headache for real estate developers due to the small land strip between Saen Saeb canal and Ram Khamhaeng road on the Northern section and Ramkhamhaeng University along with Hua Mark stadium on the Southern section - need to demolish the old commercial rows to make the way for further development as condominiums.

For the section from Lam Salee Intersection to Suwinthawong, the land restriction by BMA has made high rise development impossible. Real estate developers now lobbying and appealing to BMA City Planning to make the real changes of land restriction.

The following 5 stations would not allow condo with the total area more than 10000 square meters.
1. Sri Boorapha - subway
2. Ban Mah canal - subway
3. Summakorn (in front of Summakorn village) - skytrain
4. Nom Klao (Triam Udom Nomklao high school) - skytrain
5. Rat Phatthana (near Mistine) - skytrain
http://www.prachachat.net/news_detai...sid=1476684890
__________________
BKK Mass Transit Expert

dimlys1994, In Fra Structure liked this post
Wisarut no está en línea   Reply With Quote
Old October 20th, 2016, 09:32 PM   #1813
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15603

Tenders for the MRT Orange line - (21 km) will be called on Oct 31.



MRT Purple line south extension - (23.6 km) will be proposed to the cabinet for approval in November.



MRT Pink line Monorail - (34.5 km) and MRT Yellow line Monorail - (30.4 km) bid forms will be available on November 7 and bidding will open early next year.





http://www.bangkokpost.com/news/gene...-go-to-cabinet
__________________
-Noblesse Oblige-

dimlys1994 liked this post

Last edited by Codename B; October 21st, 2016 at 12:43 PM.
Codename B no está en línea   Reply With Quote
Old October 21st, 2016, 09:04 AM   #1814
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,564
Likes (Received): 2532

^
Thai version:
Clear point from Thai government - the following projects must go on:
1. 3 Double tracking Projects with total price tag of 55,179.02 Million Baht - waiting for cabinet approval to finance the project including
1.1 Nakhon Pathom - Hua Hin 165 km at 20,036.53*Million Baht including the new elevated station at Hua Hin
1.2 Lopburi - Paknam Pho 148 km at 24,840.54*Million Baht including 30 km Tha Wung bypass
1.3 Hua Hin - Prachuab Khirikhan 90 km at 10,301.95*Million Baht

2. High Speed train as JV with private sectors including:
2.1 BKK (Lad Krabang) - Rayong - 193.5 km at *152,528*Million Baht - connecting with Airport Link station at Lad Krabang
2.2 BKK (Bangsue Central) - Hua Hin at Bo Fai (Northern suburb of Hua Hin near Klaikangwon Palace) - 221 km*at 94,673 Million Baht -

3. MRT and feeder Monorail
3.1 Southern extension of Purple line MRT (Tao Poon - Rat Booratna - Kanchanaphisek ring at Krunai) - 23.6 km at 131,000*Million Baht - waiting until November 2016
3.2 Orange line MRT (Minburi - Thailand Cultural Center) - 21.2 km at 82907*Million Baht - bidding started on 31 October 2016
3.3 Pink Monorail (Kae Rai - Minburi) - 34.5 km at 53,490*Million Baht - bidding form sold on 7 November 2016 - bidding started early 2017
3.4 Yellow Monorai (Lad Phrao - Samrong) - 29.1 km at 51,810*Million Baht - bidding form sold on 7 November 2016 - bidding started early 2017

Blue ring extension from Hua Lamphong to Bang Khae and Bangsue - Tha Phra along with Orange line MRT extension from Thailand cultural center to Talingchan (16km) still go on
http://www.dailynews.co.th/economic/531297
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old October 22nd, 2016, 01:09 PM   #1815
In Fra Structure
Registered User
 
Join Date: Oct 2015
Posts: 83
Likes (Received): 51

I am confused since the bidders who picked up the packages for the Orange Line were published on 3rd August and bids were supposed to be handed in on November 7th. Was this for different packages or just prequalification?
In Fra Structure no está en línea   Reply With Quote
Old October 25th, 2016, 05:51 AM   #1816
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,564
Likes (Received): 2532

Quote:
Originally Posted by In Fra Structure View Post
I am confused since the bidders who picked up the packages for the Orange Line were published on 3rd August and bids were supposed to be handed in on November 7th. Was this for different packages or just prequalification?
For the case of 23-km Orange line MRT (Minburi - Thailand cultural center) with a price tag of 82907 Million Baht, bidders to submit the bidding form on 31 October 2016.

On the other hand, 7 November 2016 is the day for bidders to submit the bidding forms for
1. Yellow monorail (Lad Phrao - Samrong) - 30.4 km with a price tag of 51810 Million Baht and
2. Pink Monorail (Kae Rai - Minburi) - 34.5 km with a price tag of 53490 Million Baht

For the 1km from Bangsue to Taopoon, the negotiation with BEM still goes on with some hope that the installation can be started and ready for the opening of the section in March 2017
//---------------------------
After that, the following lines will need to be started in 2017 after getting the cabinet approvals

1. Southern section of purple line (Tao Poon - Rat Boorana - Krunai) - 23.6 km at 101,112 Million Baht

2. Blue ring extension (Lak Song - Phutthamonthon Sai 4 [BKK border]) - 8 km 14,790 Million Baht

3. Orange line extension (Thailand cultural center - Talingchan) - 17.5 km - the details are almost done - need cabinet approval so the construction can be started in 4th quarter of 2017
http://www.thairath.co.th/content/763412
__________________
BKK Mass Transit Expert

In Fra Structure liked this post

Last edited by Wisarut; October 25th, 2016 at 05:57 AM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old October 28th, 2016, 10:59 AM   #1817
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,564
Likes (Received): 2532

Need to improve the piers along Phadung Krung Kasem canal to be able to handle senior citizens and the handicapped who need wheelchairs due to the rising popularity of Phadung Krung Kasem canal boat service - 29511 passengers from 5-30 September 2016 and 35366 passengers from 1 - 25 October 2016 - BMA need to spend at least 19 million Baht to be able to handle senior citizens and the handicapped who need wheelchairs though
http://www.dailynews.co.th/bangkok/532647
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old November 3rd, 2016, 05:41 AM   #1818
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,564
Likes (Received): 2532

BMA city council asking BMA governor on the way to deal with loss ridden BRT - 200 Million Baht loss a year and the concession will be expired on 10 April 2017 - no more populist policy on 5 Baht flat rate - need to make BRT money maker - 10 - 19 Baht should be the right price - May need to extend to either Windmill road or Surawongse road (the starting point of Narathiwat Ratchanakharin road) though
http://www.matichon.co.th/news/345104

Airport Rail Link now increasing the frequency for weekend services from 15 minutes to 12 minutes interval
http://www.manager.co.th/iBizChannel...=9590000109703
__________________
BKK Mass Transit Expert

In Fra Structure liked this post
Wisarut no está en línea   Reply With Quote
Old November 3rd, 2016, 11:36 AM   #1819
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,564
Likes (Received): 2532

BTSC and Bangkok Land (both owned by Kanchanaphak family) said if BTSC has gotten the concession for Pink monorail, Bangkok Land is going to invest 1250 Million Baht for Branch Line Monorail to allow the connection between Mueangthong Thani and Pink Monorail - One station is at IMPACT - Challenger Hall and the other is at Mueangthong Thani Lake.
http://www.posttoday.com/economy/stock/463396
http://www.matichon.co.th/news/345947
http://www.bangkokbiznews.com/news/detail/725717
__________________
BKK Mass Transit Expert

In Fra Structure, dimlys1994 liked this post
Wisarut no está en línea   Reply With Quote
Old November 7th, 2016, 11:42 PM   #1820
In Fra Structure
Registered User
 
Join Date: Oct 2015
Posts: 83
Likes (Received): 51

“BSR Joint Venture”, a Joint Venture between the Company, Sino-Thai Engineering & Construction PCL (“STEC”) and Ratchaburi Electricity Generating Holding PCL (“RATCH”), submitted a tender offer on November 7th for the Pink line (Khae Rai to Min Buri; 34.5km, 30 stations) and Yellow line (Lad Prao to Sam Rong; 30.4km, 23 stations). These projects are under the Public Private Partnership (PPP) framework. The bid envelope opening date is set as the 17 November 2016 and the winning bidders are expected to be announced in early 2017.
In Fra Structure no está en línea   Reply With Quote


Reply

Tags
bangkok

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 04:44 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium