Noi Bai T2 terminal

I am very curious about the design but can't find it anywhere , anyone can help ? And where the hell will the new Terminal be located ?

They will start construction on October/2008 ,
bigvinh no está en línea   Reply With Quote

Sponsored Links
 
Old September 8th, 2008, 12:08 AM   #2
HoiAn
Registered User
 
HoiAn's Avatar
 
Join Date: Jan 2008
Posts: 2,297
Likes (Received): 3

people found water leaks from the roof of T1 terminal. If you went to Noi Bai recently, you must see many plastic buckets in the terminal...hehehe
HoiAn no está en línea   Reply With Quote
Old September 8th, 2008, 08:15 AM   #3
bigvinh
Registered User
 
Join Date: Dec 2007
Posts: 194
Likes (Received): 0

Quote:
Originally Posted by HoiAn View Post
people found water leaks from the roof of T1 terminal. If you went to Noi Bai recently, you must see many plastic buckets in the terminal...hehehe
I saw that once , a few months ago , it was in front of the immigration area .

T1 is very ugly , that's one of the reason i hope they will build T2 soon , and hopefully T2 will be serparated from T1 with totally new design .

But no pics about T2 to be found yet .

Last edited by bigvinh; September 13th, 2008 at 08:51 PM.
bigvinh no está en línea   Reply With Quote
Old September 8th, 2008, 09:37 AM   #4
tuyennd
Registered User
 
Join Date: May 2007
Location: Hanoi
Posts: 3,083
Likes (Received): 424

Xây dựng Đài Kiểm soát không lưu Nội Bài

Sáng 7-9, tại sân bay Nội Bài (Hà Nội) Tổng Công ty Bảo đảm hoạt động bay Việt Nam (tên trước đây là Trung tâm Quản lư bay dân dụng Việt Nam) đă khởi công xây dựng Đài Kiểm soát không lưu mới tại Cảng Hàng không quốc tế Nội Bài. Công tŕnh có tổng mức đầu tư hơn 545 tỷ đồng.

Quy mô dự án bao gồm 1 Đài Kiểm soát không lưu (KSKL) cao 90m; 1 nhà kỹ thuật 4 tầng có tổng diện tích 2.600m². Sau khi hoàn thành đưa vào sử dụng dự kiến vào quư 4-2010, đây sẽ là Đài KSKL cao nhất Việt Nam và là một trong 3 Đài KSKL cao nhất trong khu vực Đông Nam Á.
tuyennd no está en línea   Reply With Quote
Old September 8th, 2008, 09:54 AM   #5
ThangLongCity
BANNED
 
Join Date: Sep 2008
Location: HANOI - PADOVA - RAVENNA
Posts: 933
Likes (Received): 68

Noi Bai Terminal 1 is one of the worst structure of its type in the world. Vietnam Construction Companies throughout of Vietnam cannot built such big scale projects. If you wanna it be good, please do not give any job to the local Contractor. They are in short of competence, poor ability, blind engineering eyes...

Say no to all: VINACONEX, LILAMA, LICOGI, HANOI CORP....They are all suck!
ThangLongCity no está en línea   Reply With Quote
Old September 8th, 2008, 03:09 PM   #6
HoiAn
Registered User
 
HoiAn's Avatar
 
Join Date: Jan 2008
Posts: 2,297
Likes (Received): 3

Quote:
Originally Posted by ThangLongCity View Post
Noi Bai Terminal 1 is one of the worst structure of its type in the world. Vietnam Construction Companies throughout of Vietnam cannot built such big scale projects. If you wanna it be good, please do not give any job to the local Contractor. They are in short of competence, poor ability, blind engineering eyes...

Say no to all: VINACONEX, LILAMA, LICOGI, HANOI CORP....They are all suck!
Yes, they all are state-owned companies, so they are definitely shit !
HoiAn no está en línea   Reply With Quote
Old September 13th, 2008, 08:19 PM   #7
bigvinh
Registered User
 
Join Date: Dec 2007
Posts: 194
Likes (Received): 0

I just read some stas about Vietnam's airport , here are what I remember so the numbers may not be 100% true but close to :

-- Noi Bai T1 cost about 75 millions USD to build , the cost of construction consultant and design about 700000 USD --very cheap because it was done by Vietnamese 100% . At the beginning , the Goverment consider hiring an international company to build T1 and they asked for about 170 millions for T1 and about 10 millions USD for themself for designing and consulting and so on ........ The Goverment chose the cheaper plan .

-- Tan Son Nhat International Airport cost 220 millions USD to build and 20 millions USD for foreigner for designing and consulting .......

-- Noi Bai T2 will need about 840 millions USD to build , 40 millions for foreigner for designing and consulting .........

Last edited by bigvinh; September 13th, 2008 at 08:53 PM.
bigvinh no está en línea   Reply With Quote
Old September 22nd, 2008, 04:30 PM   #8
bigvinh
Registered User
 
Join Date: Dec 2007
Posts: 194
Likes (Received): 0

Đưa kiến trúc Chùa Một Cột vào nhà ga T2


Nhà ga T1 - sân bay Nội Bài (nguồn: www.tathy.com).
(Dân trí) - Bộ Giao thông - Vân tải (GTVT) vừa yêu cầu Cụm cảng hàng không miền bắc chỉ đạo tư vấn nghiên cứu để đưa ư tưởng kiểu dáng Chùa Một Cột vào trong thiết kế nội thật nhà ga sau này.


Cụ thể, về phương án thiết kế sơ bộ, Bộ GTVT yêu cầu Cụm cảng hàng không miền bắc chỉ đạo tư vấn nghiên cứu h́nh dáng cột kèo truyến thống Việt Nam để điều chỉnh chi tiết đầu cột phương án 1 (Wing Complex) và phương án 3 (Silk Drape). Nghiên cứu để đưa ư tưởng kiểu dáng Chùa Một Cột vào trong thiết kế nội thất.

Về quy mô dự án, Bộ GTVT yêu cầu Cụm cảng chỉ đạo tư vấn hoàn chỉnh và tŕnh cả 2 phương án. Phương án 1: nhà ga công suất 10 triệu hành khách/năm. Phương án 2: nhà ga công suất 15 triệu hành khách/năm, phần 2 cánh công suất 10 triệu hành khách/năm để khai thác nhà ga với công suất 10 triệu hành khách/năm.

Giai đoạn 2 của phương án 2 sẽ hành chỉnh nốt phần 2 cánh. Như vậy, đơn vị thiết kế sẽ phải tính toán phương án đầu tư ngay công suất 15 triệu hành khách/năm và có báo cáo tổng thể các phương án để lănh đạo Bộ quyết định.

Về hệ thống cung cấp nhiên liệu, Bộ GTVT yêu cầu thiết kế hệ thống hoàn chỉnh bao gồm đường ống nằm dưới sân đỗ máy bay nhà ga T2 và kho cung cấp nhiên liệu. Chỉ đưa vào dự án chi phí giải phóng mặt bằng, chi phí đầu tư đường ống và chi phí tư vấn có liên quan. Chi phí đầu tư kho cung cấp nhiên liệu không đưa vào dự án này.

Dự kiến, cuối tháng 9/2008 các đơn vị hữu quan sẽ tŕnh Thủ tướng Chính phủ phê duyệt Phương án tài chính (sau khi có ư kiến của Bộ Tài chính và Bộ KH&ĐT). Tháng 10/2008 sẽ phê duyệt phương án thiết kế sơ bộ (sau khi có ư kiến của Bộ Xây dựng và UBND TP Hà Nội về kiến trúc mặt đứng nhà ga).

Về phương án tài chính: Thủ tướng đă có ư kiến tại văn bản số 254/TB-VPCP ngày 10/12/2007 cho phép dự án sử dụng nguồn vốn vay trong nước từ quỹ dự trữ ngoại tế. Tuy nhiên, theo Bộ GTVT: “Tại văn bản số 364/QĐ-TTg ngày 7/4/2008 của Văn pḥng Chính phủ chỉ phân bổ cho dự án là 420 tỷ đồng”.

Theo đó, Bộ GTVT yêu cầu Tổng Công ty Cảng hàng không miền bắc lập phương án tài chính theo điều kiện vay vốn của Ngân hàng phát triển Việt Nam tại văn bản số 41/NHPT-TDTW ngày 29/8/2008. Theo phương án này, nếu hiệu quả tài chính thấp sẽ xây dựng phương án có thể hoàn vốn với phần c̣n lại đề nghị Nhà nước hỗ trợ.
bigvinh no está en línea   Reply With Quote
Old September 22nd, 2008, 04:36 PM   #9
bigvinh
Registered User
 
Join Date: Dec 2007
Posts: 194
Likes (Received): 0

Chua Mot Cot again
bigvinh no está en línea   Reply With Quote
Old September 22nd, 2008, 10:29 PM   #10
nguyend
Registered User
 
Join Date: Dec 2006
Posts: 3,290
Likes (Received): 85

Quote:
Originally Posted by bigvinh View Post
I just read some stas about Vietnam's airport , here are what I remember so the numbers may not be 100% true but close to :

-- Noi Bai T1 cost about 75 millions USD to build , the cost of construction consultant and design about 700000 USD --very cheap because it was done by Vietnamese 100% . At the beginning , the Goverment consider hiring an international company to build T1 and they asked for about 170 millions for T1 and about 10 millions USD for themself for designing and consulting and so on ........ The Goverment chose the cheaper plan .

-- Tan Son Nhat International Airport cost 220 millions USD to build and 20 millions USD for foreigner for designing and consulting .......

-- Noi Bai T2 will need about 840 millions USD to build , 40 millions for foreigner for designing and consulting .........

So, do you think VCs are idiots or genious?
nguyend no está en línea   Reply With Quote
Old September 23rd, 2008, 11:43 AM   #11
chinatown
Wanderer/ Le voyaguer/ 浪子
 
chinatown's Avatar
 
Join Date: Nov 2005
Location: Midgar
Posts: 9,668
Likes (Received): 231

TSN New Terminal cost total $400m, not $220m as in the newspaper.
chinatown no está en línea   Reply With Quote
Old September 23rd, 2008, 12:25 PM   #12
bigvinh
Registered User
 
Join Date: Dec 2007
Posts: 194
Likes (Received): 0

Quote:
Originally Posted by chinatown View Post
TSN New Terminal cost total $400m, not $220m as in the newspaper.
Really , I checked Google and most sources said TSN International Terminal cost around 220 million$ ?
bigvinh no está en línea   Reply With Quote
Old September 23rd, 2008, 12:41 PM   #13
chinatown
Wanderer/ Le voyaguer/ 浪子
 
chinatown's Avatar
 
Join Date: Nov 2005
Location: Midgar
Posts: 9,668
Likes (Received): 231

my uncle is a veteran officer in TSN, he told me that the cost is actually $400m, he even show me 2 final master plans of Long Thanh airport (Phase 1), and believe me, it's really huge! Too bad it won't start before 2010, coz the government made Noi Bai 2 their first priority for investment at the moment.
chinatown no está en línea   Reply With Quote
Old September 23rd, 2008, 03:22 PM   #14
bigvinh
Registered User
 
Join Date: Dec 2007
Posts: 194
Likes (Received): 0

Quote:
Originally Posted by chinatown View Post
my uncle is a veteran officer in TSN, he told me that the cost is actually $400m, he even show me 2 final master plans of Long Thanh airport (Phase 1), and believe me, it's really huge! Too bad it won't start before 2010, coz the government made Noi Bai 2 their first priority for investment at the moment.


From 200 to 400 millions is a big difference and yet no offical confirm, the press doesn't know anything ? I found it very strange and hard to believe .

About Long Thanh , i don't think it was postponed because the goverment consider Noi Bai 2 first , remember the intital plan for Noi Bai 2 cost only 300 millions , why Long Thanh Phase 1 is about 3,5 billion $ .

Long Thanh will always costs 10 times as Noi Bai does . If Noi Bai cost around 1/2 Long Thanh , the goverment really has to chose between them , but here only 1/10 .

The more accurate reason maybe the fact that Long Thanh is simply too big for Viet Nam now while Tan Son Nhat new terminal still can run well in the next 10 years . So it was left until 2010.

Also Noi Bai 2 is very urgent indeed . T1 is nearly full now and in the next 3 years the passengers maybe double . If they don't build T2 from now , in the near future plande may not be able to land at the airport because it was packed .
bigvinh no está en línea   Reply With Quote
Old September 23rd, 2008, 03:53 PM   #15
chinatown
Wanderer/ Le voyaguer/ 浪子
 
chinatown's Avatar
 
Join Date: Nov 2005
Location: Midgar
Posts: 9,668
Likes (Received): 231

The current new terminal is just Phase 1, Phase 2 will commence in 2010 but previously was stated to be FINISHED by 2010. And $400m is for all of them.
chinatown no está en línea   Reply With Quote
Old September 23rd, 2008, 04:00 PM   #16
chinatown
Wanderer/ Le voyaguer/ 浪子
 
chinatown's Avatar
 
Join Date: Nov 2005
Location: Midgar
Posts: 9,668
Likes (Received): 231

This was taken from an article...9 years ago.

chinatown no está en línea   Reply With Quote
Old September 23rd, 2008, 07:12 PM   #17
Mynameischarlie
Mig-28 Pilot
 
Mynameischarlie's Avatar
 
Join Date: Apr 2008
Location: chasing Tomcats
Posts: 436
Likes (Received): 0

Don't they forecast 100 millions passengers per year for Long Thanh Airport?
I wonder where they get all those passengers, if a big airport like Atlanta only got 89 million?
Mynameischarlie no está en línea   Reply With Quote
Old September 24th, 2008, 05:00 AM   #18
Danieldong
Registered User
 
Danieldong's Avatar
 
Join Date: Sep 2008
Location: Lonely planet
Posts: 6,953
Likes (Received): 770

Long Thanh Airport project is divided into 3 phrases: before 2010: 20m, from 2010 to 2020: 40m, after 2020: estimate 80-100m.
Danieldong no está en línea   Reply With Quote
Old October 31st, 2008, 08:00 PM   #19
bigvinh
Registered User
 
Join Date: Dec 2007
Posts: 194
Likes (Received): 0

Noi Bai T2 terminal is delayed again , they said construction will star in October now October passed .
bigvinh no está en línea   Reply With Quote
Old October 31st, 2008, 08:18 PM   #20
Mynameischarlie
Mig-28 Pilot
 
Mynameischarlie's Avatar
 
Join Date: Apr 2008
Location: chasing Tomcats
Posts: 436
Likes (Received): 0

Have you noticed that currently we have a World Financial Crisis? The officials are maybe occupied with different tasks, because this project is surely under supervision by high levels.
Mynameischarlie no está en línea   Reply With Quote


Reply

Tags
hanoi, vietnam

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 11:22 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu