|
|
| daily menu » rate the banner | guess the city | one on one |
|
|
#1 |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
TUNIS | Radés-Tunis Bridge | 260m | Completed
Render:
![]() ![]() ![]() ![]() ![]() ![]() In the Grand Tunis region around Tunis, the capital of Tunisia, there live 3million people, almost a third of the Tunisian population, and it is also the center of economic activities in this country. Presently, the Grand Tunis region is divided into southern and northern areas by the Tunis Lake Canal, and the traffic between the two areas depends on either routes passing through the urban area of Tunis or ferryboats connecting Rades and La Goulette ports. The ferryboats, however, are limited in service time and number of vehicles to be carried, and most of the south-north traffic concentrates on the routes passing through the urban area of Tunis, causing traffic congestion and environmental deterioration in the city. In the future, as the economic activities in this region are activated, the tourist demand increases, and by the general development of the Tunis Lake proceeds, the traffic volume is expected to increase and it is desired to relieve the traffic congestion and improve the environment in the urban area of Tunis. (2) Description of the Project This is to construct a bridge (extradosed bridge) as an important portion of the metropolitan ringroad crossing the Tunis Lake Canal and connecting the southern and northern areas of the Grand Tunis region to connect Rades on the north side and La Goulette on the south side. The project details are as follows. 1. Main Bridge : length of bridge about 260m (double shaft type) 2. Approach bridge and approach roads on Rades (southern) side Approach bridge: about 400m, approach road : about 2,190m 3. Interchange and Ramp way road on La Goulette (north) side 4. North extention road: about 2,300m Completion : 2009 [IMG] [/IMG]
__________________
Last edited by Tounsi; August 11th, 2008 at 09:45 PM. |
|
|
|
|
|
#2 |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
October 2007 ![]() March 2008 ![]() ![]() August 2008
__________________
|
|
|
|
|
|
#3 |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
Finally Tunis will have it s own bridge we`ve been waiting for this one for a looooooooooooooooong time .
Goind From La Marsa to the south shore and to the south coast will be much easier !!!!! Also this will help to clear a lot of the traffic in Tunis downtown ! can`t wait to cross this bridge ![]() a beauty by the way very aesthetic!!!!!!!!!!!!!!!!!!!!!!!!!
__________________
|
|
|
|
|
|
#4 |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
Le Pont de Radés : Ouverture au premier trimestre 2009 Le pont structurant traversant le Lac Sud de Tunis et lancé en 2004 a atteint un stade d’avancement de plus de 80%. En effet, il est prévu qu'il sera ouvert à la circulation pour le premier trimestre de l'année 2009. C'est dans ce cadre que s'inscrit la visite d'inspection du Mme Samira Khayach Belhaj, ministre de l'Equipement, de l'habitat et de l'aménagement du territoire. Elle a visité, hier le site du chantier du pont la Goulette-Radès pour vérifier l'avancement de la deuxième tranche (LOT 2) de ce projet. ![]() ![]() A rappeler que les travaux de ce chantier sont réalisés par l'entreprise égyptienne d'entrepreneurs arabes (Arab Contractors) en collaboration avec deux entreprises japonaises. ![]() ![]()
__________________
|
|
|
|
|
|
#5 |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
We can clearly see the bridge on this areal picture . it gives us an idea of the scale of this Bridge !
__________________
|
|
|
|
|
|
#6 |
|
Registered User
Join Date: Mar 2007
Posts: 1,771
Likes (Received): 0
|
View from Rades:
![]() View from "La Goulette"
|
|
|
|
|
|
#7 |
|
Registered User
Join Date: Jul 2008
Posts: 82
Likes (Received): 1
|
Avancement des travaux de construction du pont La Goulette/Radès
Mr Slaheddine Malouche, ministre de l'Equipement, de l'Habitat et de l'Aménagement du territoire, a effectué, mercredi 3 septembre, une visite de terrain pour s'informer de l'avancement des travaux du projet présidentiel de construction du pont la Goulette/Radès. Le ministre qui était accompagné de l'ambassadeur du Japon en Tunisie, a pris connaissance des différentes composantes et de l'avancement des travaux. Mr Malouche a mis l'accent sur la nécessité de respecter les délais d'exécution de ce projet. La deuxième tranche de ce projet présidentiel comporte la réalisation d'un pont au niveau du canal du lac sud sur une longueur de 180 mètres, d'une route de 2 kilomètres de route express en 2x2 voies avec T.P.C et d'un viaduc constituant la rampe d'accès au pont principal sur une longueur de 400 mètres. Source : http://www.investir-en-tunisie.net/n...le.php?id=5262 |
|
|
|
|
|
#8 |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
Dorra tu es de retour !!!
il nous Amrouchelexus ..Il passe de longues vacances à Tunis ca fait un mois qu'il a disparu du forum !
__________________
|
|
|
|
|
|
#9 |
|
Registered User
Join Date: Jul 2008
Posts: 82
Likes (Received): 1
|
Oui je suis là Tounsi
![]() J'ai encore eu le temps de prendre des photos mais promis j'essaye cette semaine
|
|
|
|
|
|
#10 |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
Pas de probleme Dorra prends ton temps
![]() Tu es au courant pour Sama Dubai c'est ce Jeudi que le projet sera présenté ;-) sa7a chribték!!!!! ( mé ra8ou mich 7aja okhra )
__________________
|
|
|
|
|
|
#11 |
|
Registered User
Join Date: Jul 2008
Posts: 82
Likes (Received): 1
|
Yatik essaha !!! aaah oui ca fait du bien de
surtout avec cette chaleur ![]() J'essayerai de prendre des photos demain du ICC ou du moins du pont parce que ca avance bien et c'est le seul projet que je vois en ce moment vu que c'est boulot - maison
|
|
|
|
|
|
#12 | |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
Quote:
est-ce que tu as remarqué des avancées au niveau du pont Normalement le pont devrait être complété il ne reste que les troncons de raccordements ....pour le iCC belle8i a3mel talla fil sales offices pour avoir une idée de ce à quoi ce centre aura l'air il tawa on ne sait pas.. Sérieux les promoteurs tunisiens doivent consacrer un plus gros budget à la promotion sur le web de leurs projets!!!!!!!!!
__________________
|
|
|
|
|
|
|
#13 |
|
Registered User
Join Date: Jul 2008
Posts: 82
Likes (Received): 1
|
Moi personnellement je ne suis passée du côté du pont de Radès mais une amie m'a confirmé que ca avait bien avancé mais je n'ai pas d'autres infos à part le post plus haut.
Pour l'ICC, je vais essayer de passer voir la maquette en espérant qu'on me laisse prendre des photos...s'ils sont de bonne humeur
|
|
|
|
|
|
#14 | |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
Quote:
![]()
__________________
|
|
|
|
|
|
|
#15 |
|
Luxus Sama
Join Date: May 2008
Location: Montreal - Tunis
Posts: 464
Likes (Received): 0
|
It mus be the case...in fact, according to the newspaper here, the works are supposed to be finished in the 1st quarter of 2009...some new pics taken last July/August (2008)
![]() ![]()
|
|
|
|
|
|
#16 |
|
Luxus Sama
Join Date: May 2008
Location: Montreal - Tunis
Posts: 464
Likes (Received): 0
|
Btw, the 2 parts of the bridge have been linked last August (if I recall well...)
|
|
|
|
|
|
#17 | |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
Quote:
__________________
|
|
|
|
|
|
|
#18 |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
Yeah we clearly see it in your pics it s almost compte now and the crossroads and almost finish too !!!
__________________
|
|
|
|
|
|
#19 |
|
TUNISIAN MODERATOR
Join Date: Feb 2008
Posts: 3,363
Likes (Received): 0
|
Slaheddine Malouche, ministre de l'équipement, de l'habitat et de l'aménagement du territoire a effectué, vendredi, une visite au projet présidentiel, le pont la Goulette-Rades.
Le ministre a pris connaissance, en compagnie du PDG de la société "Arab Contractors" (les entrepreneurs arabes), chargée de la réalisation de la 2ème tranche de ce projet, de l'avancement de la liaison sud sur 2,6 KM entre la route régionale (MC33) du côté de Radès et l'ouvrage principal. Lors de la séance de travail qui a suivi cette visite, et compte tenu du retard relatif enregistré au niveau de ce lot, le ministre a souligné la nécessité de donner l'impulsion nécessaire à cette réalisation et de terminer les travaux avant la fin du mois d'octobre prochain,( zaama a3lech fin Octobre ech famma debut Novembre yekhi?? ) mettant l'accent sur l'importance de respecter les délais et d'assurer la qualité requise conformément aux normes internationales. La 2éme tranche de ce projet a pour composantes essentielles, la construction, sur 2 kms, d'une route à deux voies dans les deux sens et un pont sur le lac long de 180 mètres constitué de deux tabliers juxtaposés et une rampe d'accés au pont principal sur une longueur de 400 m.
__________________
|
|
|
|
|
|
#20 |
|
Luxus Sama
Join Date: May 2008
Location: Montreal - Tunis
Posts: 464
Likes (Received): 0
|
...I heard somethnig similar in the news and read about it in the newspaper...I hope it could have been ready for septembre...oh well as long as it finish...
|
|
|
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|