|
|
| daily menu » rate the banner | guess the city | one on one |
|
|||||||
| Istra, Primorje i Gorska Hrvatska Istria, Kvarner, Mountainous region: Rijeka, Pula, etc. |
![]() |
|
|
Thread Tools |
Rating:
|
Display Modes |
|
|
#1 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
[Rijeka] - Construction Update (ENGLISH)
![]() ![]() Plz post in English only, so that non-Croats can join in and comment. [Rijeka] Updates & Construction (English Version Only) COMPLETED
UNDER CONSTRUCTION
ANNOUNCED
ANNOUNCED PROJECTS OF MAJOR IMPORTANCE FOR RIJEKA
here are Rijeka's projects that were finished in last couple of years and ones that are going to be build in near future ![]() ![]() in the first map which covers east part of Rijeka we can see massive achievement in road infrastructure. there is completely new east bypass of Rijeka, which streches from Orehovica to St. Kuzam, opened in dec 2006. there is also national road D404 which connects city center and east bypass. this part will be opened in copule of months. and you can see Rijeka's bypass which is being widened so it will be 2x2 profiled in all it's length. ![]() blue line is city railroad system which is going to be some sort of a metro in the future 1. Tower center (shopping center worth 150 mil EUR, opened in nov 2006) 2. Brajdica container terminal (part of Rijeka Gateway project) 3. Trsat university campus (phase I - 70 mil EUR, expectred in sep 2009) 4. Sušak university hospital (300 mil EUR, expected by 2020) 5. Sv. Križ Planetarium and Astronomical center (1.75 mil EUR, opened in apr 2009) 6. Trsat Pastoral Episcopate Centre "The Hall of Pope John Paul II" (1.6 mil €, june 2008) 33. gas station Donja Vežica 39. underground garage on square of Mažuranić brothers 40. underground garage Vojak, near Paris 44. marina Pećine ![]() this is the map of city center. the roads taht are being built are bypass of Rijeka (widened to 2x2), national road D404 which will connect Zagreb quay and the bypass (it will be built in 4 years period), and county road Ž5025 which connects Rijeka and Viškovo blue line is city railroad system which is going to be some sort of a metro in the future 7. Zagreb quay container terminal (33 mil EUR, expected in 2013) 8. cruise ship passenger terminal (expected in may 2009) 9. Delta complex - Rijeka waterfront project 10. Porto Baroš megayachts marina 11. West Žabica bus terminal (40 mil EUR) 12. West Trade Center (ZTC) 13. Zagrad 1 (20 mil EUR, 2008) 14. Zagrad 2 (6 mil EUR, 2010/11) 15. Gomila complex - archaeological park and underground garage (70 mil EUR) 16. City library (12 mil EUR, starts in 2010) 17. ‘Superator’ project Agatic, Intelligent Building (7.5 mil EUR, dec 2008) 18. Business-Apartment complex Novi Belveder 19. Rujevica secundary city center (Minakovo) 20. residential area Rujevica POS - phase 1 (11.5 mil EUR, jul 2008) - phase 2 (4.7 mil EUR, 2010) 21. fish stock market (FishLog project) 22. Modern and Contemporary Arts Museum in Rikard Benčić (over 20 mil EUR) 23. Rjecina bank and Hartera reconstruction 24. Školjić rehabilitation and recreation complex 35. Kvarner Vista project (intelligent buildings Lovor and Lavanda in Krnjevo) 41. undergorund garage and commercial area Brajda 42. business building on the corner of Pomerio and Prvomajska 43. Refinery shut down – new business complex in rafinery area 46. future city goverment's building (baroque sugar rafinery palace) ![]() the west most part of the bypass is shown in this map. and road 233 (Rijeka-Kastav) 25. Kantrida swimming pool complex (35 mil EUR, july 2008) 26. Kantrida athletic gymnasium 27. Zamet center and Zamet sport hall (21.2 mil EUR, may 2009) 28. Kantrida marina and hotel (21 mil EUR) 29. Martinkovac-Diracje 1000 new apartments (150 mil EUR, start in 2009, expected in 2012) 30. Kastav Trade Center (200 mil EUR, start in 2009) 34. reconstruction of church in Srdoči 36. Plodine trade center in Srdoči 37. baptist church/temple 38. Mosque and Islamic center (4-5 mil €, 2010) 45. garage base of Autotrolej 47. Rujevica city stadium and Rujevica indoor arena ![]() 31. Preluka hotel complex 32. Costabela tourism area ![]() Rijeka bypass Last edited by ivan_ri; October 29th, 2011 at 03:54 PM. |
|
|
|
|
|
#2 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
so let's start
Tower Center Rijeka this project was 150 mil € big. the construction was finished in november 2006 (the shopping center was opened in 2006, but tower wasn't opened at the same time. actually the tower itself isn't opened yet, but it is in final phase of development) area of entire center is 62.292 m2 main shopping area is 11.376 m2 shopping area is 5 levels above ground parking area is 53.724 m2 parking area is consisted of 3 levels underground and 7 levels above no. of parking spaces - 2100 total area of center is 127.824 m2 tower is 15 levels above highest shopping level (60m high) tower area is 11.800 m2 ![]() ![]() ![]() ![]() ![]() ![]()
|
|
|
|
|
|
#3 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
Kantrida swimming pool complex (35 mil €, july 2008)
this complex is first sport venue built in Rijeka in last 20 years. it was financed by the city of Rijeka. it is built for european swiming championship which is going to take place by the end of 2008. the complex consists of two olimpic size swiming pools (an old one that isn't covered, and a new one with movable rooftop), one small pool which is going to be used for warming up, and new pool for jumps which is going to be built in 2009. there is also a car garage for 200 vehicels, an fitness centre, restaurant and cafee bar on top of the complex. below pools there is a new town beach which is going to be finished for the summer of 2009. ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
Last edited by ivan_ri; August 19th, 2008 at 04:27 PM. |
|
|
|
|
|
#4 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
zabica bus terminal
it is going to be built in next couple of years. Rijeka needs this terminal because we don't have appropriate bus station. ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Last edited by ivan_ri; March 18th, 2009 at 11:55 PM. |
|
|
|
|
|
#5 |
|
Disenfranchised
Join Date: May 2005
Location: Oakland (USA) // Split (CRO)
Posts: 7,461
Likes (Received): 1
|
ivan i beautified your opening post a bit
![]()
|
|
|
|
|
|
#6 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
|
|
|
|
|
|
#7 |
|
I come in peace \V/
Join Date: Feb 2005
Location: London
Posts: 11,116
Likes (Received): 0
|
super stuff Ivan
__________________
"They that can give up essential liberty to obtain a little temporary safety deserve neither liberty nor safety" Benjamin Franklin "All that is required for evil to prevail is for good men to do nothing." Edmund Burke "Religion leads to anger, anger leads to hate, hate leads to bigotry, bigotry leads to suffering!!!" Mic of Orion Last edited by OettingerCroat; August 20th, 2008 at 02:37 AM. Reason: lapis lapsus |
|
|
|
|
|
#8 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
Next big project announced in Rijeka is project Waterfront (Delta complex). it is probably the biggest project in Rijeka since the beginning of 20th century. Waterfront project resolves issue of opening city centre to the sea. It is going to be built on the Delta area which lies betwin Rječina river and Mrtvi kanal (Dead channel). This is going to be very expensive project. the calculations say it is going to cost over 300 mil €.
![]() ![]() ![]() ![]() ![]() ![]() Potentials
Three dimensions of the project Recreational Park Life
![]() ![]() ![]() ![]() Major landmarks and public spaces ![]() ![]() Proposed logidtic structure ![]() Pedestrian network ![]() Phases of the project ![]() Existing conditions Delta North
![]() Existing Conditions Delta South
![]() ![]() Current Conditions Port of Baros
![]() ![]() The schedule for developing the area is highly dependent on how the identified constraints are handled.
![]() The first phase can be planned from two tactics:
![]() This is how it could look when it's done ![]()
Last edited by ivan_ri; August 20th, 2008 at 08:25 PM. |
|
|
|
|
|
#9 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
University campus Rijeka (Trsat) - part 1
University campus Rijeka:
This is very important project for the city. It is being built from scratch on the nearby hill of Trsat, historical core of the city with medieval castle and pilgrim centar. This is considered to be the turning point in transformation from the industrial city to the city of knowledge. That is the reason why city of Rijeka invested a lot of money (20 mil €) and infrastructure to abandoned military complex, which was dispossessed in 2003. Complex was given to city's disposition in exchange for very attractive building in the centre of Rijeka. First phase of the campus will be finished by the end of 2009. Investments for this phase were provided by croatian goverment and it is around 70 mil €. Plan of construction for this phase:
![]() ![]() ![]() ![]() ![]() ![]() Academy of applied arts The building in which this academy is situated is actually renovated central building of old military complex. It was originally built in 1926. and renovated and reopened 3rd of november 2006. Now this building hosts not only the Academy, but also Psichology section of Faculty of Philosophy, student council centre, campus coordination centre, office for students with special needs and Art History Institute (artistic topography of Croatia centre). Object is situated in the lower southern part of new Campus. Total area of the building is 8200 m2 ![]() ![]() ![]() ![]() ![]() ![]()
Last edited by ivan_ri; August 21st, 2008 at 02:28 AM. |
|
|
|
|
|
#10 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
University Campus Rijeka (Trsat) - part 2
for start - big thanks to gorgoroth for the pictures from the construction site of the new Campus
![]() Dormitory and Canteen Dormitory and Canteen are necessary fro this new city of knowledge on Trsat. Canteen object is going to be built soon, in fall of 2008, for cost of 8 mil €. Object is consisted of a restourant and big kitchen (4500 meals/day), cake shop and coffee bar, dorm management with reception. The restaurant itself is going to be in glass with an view of entire Kvarner bay. There is also an underground garage for 100 vehicels. Area of entire object is 7300 m2. Dormitory will be built next year. Construction will start in november 0f 2008. ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() University sections
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Social and Cultural centre (DKC) The construction of this object will start in 2009 and it should be done by the ned of 2009. A) Hall with supporting content
![]()
|
|
|
|
|
|
#11 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
University Campus Rijeka (Trsat) - part 3
again thanks to gorg for the photos
![]() Faculty of Philosophy This will be an building for needs of Faculty of Philosophy and Faculty of Schoolmaster/Teachers with student consulting centre and underground garage for 200 vehicles. Area of the object is 21015 m2. This object will be situated in lower west part of Campus. It is going to be finished in february 2009 for 22 mil €. ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Faculty of Civil engineering This will be an building for needs of Faculty of Civil engineering and underground garage for 200 vehicles. Area of the object is 14260 m2. This object will be situated in upper central part of Campus. It is going to be finished in august 2009 for 16 mil €. ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() this is all that is going to be built in phase one of this Campus. There is a second phase planned for the period after 2010, and third phase which is going to be announced after this two phases.
|
|
|
|
|
|
#12 |
|
SuperMod
Join Date: Dec 2006
Location: Zagreb
Posts: 16,927
|
wow..really cool projects for Rijeka!
|
|
|
|
|
|
#13 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
Zamet Centre - part 1
Zamet center and Zamet sport hall - 21.2 mil €, may 2009
webcam http://www.gp-krk.hr/kamere/kamera1.jpg Zamet centre is new project which is going to improve life quality in Rijeka West area. This, 21.2 mil € project, is built by S Immorent. After this centre is done it is going to be leased by Rijekasport for 25 years. Preliminary activities for the project were made by the end of 2007, during which there was over 100.000 m3 of stones and dirt. This is an complex project consisted of an sports hall, garage, public square, section of public library, local committee Zamet and commercial area. There will be used 10.000 m3 of concrete and 800 t of iron. the roof construction will be 750 t heavy. Modern design of this centre was made by 3LHD Studio. Sport Hall Capacity
Area
|
|
|
|
|
|
#14 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
Zamet Centre - part 2
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() gorgoroth's photos ![]() ![]() ![]() ![]() ![]() ![]()
|
|
|
|
|
|
#15 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
Clinical Hospital Center Rijeka - part 1
![]() The Clinical Hospital Center Rijeka (CHCR) is an academic medical center located at 3 different hospital sites in Rijeka, providing education, research and a full range of specialty patient care to nearly 500,000 people living in the Primorsko-Goranska and the surrounding counties. CHCR is staffed with highest level of academic and clinical excellence, 1200 nurses and 450 physicians who are full- or part-time faculty members of the University of Rijeka School of Medicine. It offers the most advanced specialty care in: world-class heart surgery, transplantation, reproductive and infertility and other programs; six referral centers for kidney transplants, demyelinization diseases, posttraumatic stress syndrome, psoriasis, pediatric lung diseases and epilepsy and convulsive disease of the early age; ambulatory-care with the full spectrum of preventive, diagnostic and treatment functions in state-of-the-art facilities. Medical and surgical intensive care units with the most technologically advanced equipment are staffed by physicians and nurses who specialized in caring for critically ill adults. Teams of specialists, nurses, biochemists, pharmacists, biologists, chemists, physicists, psychologists, and others use advanced diagnostics and medical technology to provide the highest quality of comprehensive, compassionate and accessible healthcare including 24-hour emergency services to patients of all ages. The Board, administration and staff of the Clinical Hospital Center Rijeka are committed to excellence in continuing medical education and aspire to become a more efficient, cost-effective and customer friendly institution. General information Employees: 3000 Beds: 1191 Sites: 3 (Rijeka, Sušak, Kantrida) Current status The Clinical Hospital Center Rijeka (KBC Rijeka) is one of two Clinical Hospital Centers in Croatia and central medical facility of this part of Croatia. It was founded on march 1st 1982. by merging 3 independent hospitals, Children hospital'Kantrida', General hospital 'Braće dr. Sobol' and General hospital 'dr. Zdravka Kučića'. So there are 3 remote sites which are functioning as one hospital ![]() Site Kantrida ![]() Site Rijeka ![]() Site Sušak
|
|
|
|
|
|
#16 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
Clinical Hospital Center Rijeka - part 2
300 mil € is going to be invested into new Clinical Hospital Center Rijeka. In ideal conditions (political will and enough money) this project should be finished as late as 2020.
New Clinical Hospital Center will be built on Trsat hill betwin new Campus and existing hospital site Sušak. There is going to be built 9 new objects on 240.000 m2 area.
This Clinical Hospital Center is planned for accommodation of cca 1000 patients. There will be polyclinic organization, diagnostics and therapeutic content. New daycare Hospital with daily surgery is anticipated. There is going to be built Central OP Unit with 12 OP halls and 9 separate OP halls (in apart facilities), Central Intensive Care Unit, Emergency and Lab Diagnostics. ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
|
|
|
|
|
|
#17 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
Clinical Hospital Center Rijeka - part 3
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Haemodialysis facility - under construction ![]() ![]() ![]()
|
|
|
|
|
|
#18 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
Rijeka Gateway
Port of Rijeka - the Adriatic Gateway to Europe
Rijeka, Croatia, March, 3 2006 - By 2009, Rijeka*, the third largest city in Croatia and Croatia’s largest port, will look more like Barcelona or Baltimore. Its new facilities will accomodate cruisers of up to 500 passengers and other passenger ships. The central part of the Rijeka basin will be opened up for commercial use, while local citizens and visitors will be able to access the coastal area, creating an attractive Mediterranean port city. The reconstruction of the Rijeka seaway, known as the Rijeka Gateway, was initiated by the Croatian Government in cooperation with the World Bank. This project will change the face of the city and help increase the competitiveness of the Croatian economy by improving the international traffic sector in Rijeka for cargo and passenger transport, modernizing the connections between the harbor and road networks and revitalizing the harbor business activities through better road and bridge maintenance. The works A loan of $156.6 million will go towards financing major improvements and transformations including: -the reconstruction of the harbor's infrastructure; -the replacement of equipment used for handling heavy cargo; -the development of the border area between the harbor and the city; -improvement of management and security of the harbor traffic and environmental protection; -finishing up the western part of the Rijeka roundabout and construction of a connection road for the harbor; -as well as reconstruction of the Krk Island bridge. The extension of Rijeka's Zagreb Pier, which should be completed by January 2009, will help Rjieka take in large vessels. By then, Rijeka should have a completely modernized container terminal in the eastern part of the city and a new, modern cargo terminal in the western part of the city. The central part of the harbor will also be drastically changed. The new passenger terminal situated in the centre of the city will have all necessary facilities intended for passengers and cruiseships and will become the centerpoint of the new Rijeka waterfront. A part of the port known as Delta will be transformed into a hotel and commercial area along the sea with attractive public spaces. In an area of the old harbor called Porto Baroš, a marina will also be built. Jobs for the city and region “The development of the port that has already begun and the future increase in commercial activities in Delta and Porto Baroš, should bring significant benefits to the community," said Executive Director of the Port Authority Mr. Bojan Hlaca. "According to our consultants, it is expected that 2,000 jobs will be created in Rijeka and another 1,000 in the region," Hlaca added. "Most of the work will be sea related, and some will be related to tourism. By the year 2020, the budget of the Republic of Croatia should receive an average $18.5 million from taxes on profit realized throught business activities in Rijeka." "It is estimated that by the year 2025, the business activity in the region will be worth more than €200 million from visitors spending in the area of the project and that €350 million of added value in the region will be created through the spending of foreign tourists and domestic visitors. “ A major traffic route and gateway to Europe Rijeka Gateway project will create a dominant traffic route in Croatia, connecting seaways with European road and railway corridors. Already, because of established road transport through the corridor V, the port of Rijeka generates around 40% of its cargo traffic with Hungary, Austria, Slovakia and the Czech Republic. Traffic growth should make Rijeka one of the main ports in the Central and Eastern Europe. In the long run, once Croatia is a member of the European Union (EU), the Croatian economy and its transport system will become an integral part of the EU transportation network. The growth of the Rijeka Port will depend on the role and importance of the transit traffic which Croatia will be capable of attracting as a member country. |
|
|
|
|
|
#19 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
Rijeka Gateway Project
The overall objective of the Rijeka Gateway Project is to increase Croatia's trade competitiveness by improving the international transport chain through the Rijeka Gateway for both freight and passengers traffic through modernizing the port and road network connections, and privatizing port operations. Specific objectives include: (i) increasing efficiency and improving financial, social and environmental conditions at Rijeka Port, rehabilitating infrastructure and replacing equipment; (ii) preparing to redevelop part of Rijeka Port for urban purposes; and (iii) improving international road connections linked to the Rijeka gateway, and the administration of the road sector. The project includes three components: (a) port restructuring and modernization; (b) port/city interface redevelopment; and (c) international road improvements. To allow smooth transfer of the operations related to the handling of woods and timber the first component will include (i) infrastructure rehabilitation works at the western port area: demolition of outdated multi-storied warehouses that restrict open storage space and port performance, with the exception of two which will be rehabilitated for their historical value; (ii) superstructure works would be designed to facilitate terminal lease concessions; (iii) rehabilitation of Becko (Vienna) berth and repaving and rehabilitation of utility networks; and (iv) restoration and protection along the Zagrebacko berth (includes construction of a berthing capacity of a minimum 250 m length to allow vessels of 15 m draft and more to service the port of Rijeka), and backlog rehabilitation works needed in various part of the port to complement the above works. The second component aims at the development of a waterfront area open to business and commercial activities. The project will finance preparation works at the Delta and Porto Baros areas, as well as the construction of a passenger terminal along the breakwater. The third component will finance HC (Croatian Roads Company) management capacity improvements, such as technical assistance and training and supervision services for civil works and equipment installation for both HC and HAC (Croatian motorways Company) road/bridge works components. Implementation of the pavement and bridge management systems (PMSBMS) was initially supported under the Bank's Highway Sector Project. Small equipment. PMS/BMS software upgrade, and technical assistance/training will be financed under the project, including software to improve HC's ability to administer the road network. Preparation of an axle load study to develop a strategy for enforcement and eventual adoption of the European Union standard; and prevention of excessive damage to the national roads network through pilot fixed scale installation will be also included under the project.
|
|
|
|
|
|
#20 |
|
rekreativac
Join Date: Jun 2007
Location: Rijeka/Flumen Sancti Viti
Posts: 11,679
Likes (Received): 2
|
Rijeka Gateway
![]() ![]() Brajdica ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
Last edited by ivan_ri; September 6th, 2008 at 01:03 AM. |
|
|
|
![]() |
| Tags |
| rijeka |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|