DAMMAM + JEDDAH l U/C l Saudi Landbridge Project.

Saudi Landbridge Project



The Saudi government plans to extend this existing network by constructing a 950-kilometre railway line between Riyadh and Jeddah, allowing cargo to be transported directly to and from Jeddah to Dammam and onwards to other countries such as the UAE, Kuwait, Qatar, Bahrain and Iran.

The entire project scope includes:

- Construction of a 115-kilometre line between Dammam and Jubail.

- Upgrading about 450 kilometres of the existing rail link between Riyadh and Dammam.

- A connection to the new Riyadh-Jeddah and Dammam-Jubail lines.

- Construction of a 610-kilometre railway line between Riyadh and Hudaitha at the border post with Jordan.

- Integration of new lines with Jeddah Islamic Port, King Abdul Aziz Port, Dammam and Riyadh Dry Port.

- On completion, the Saudi Landbridge railway will connect the port cities of Jeddah, Dammam and Jubail.

- It will pass through Riyadh and serve its dry port.

- The entire Saudi Landbridge project is expected to boost cargo volume by 19.5 per cent to 30 million tonnes and transport 23 million passengers a year.

- Lines will carry both passengers and freight.

- The freight trains will operate at speeds of up to 120 kilometres an hour.

- The passenger trains operating speed will be up to 220 kilometres an hour.

- Estimated project value: $5bn.

Last edited by thefreestyler; September 23rd, 2008 at 07:49 PM.
thefreestyler no está en línea   Reply With Quote

Sponsored Links
 
Old September 23rd, 2008, 07:52 PM   #2
thefreestyler
Registered User
 
thefreestyler's Avatar
 
Join Date: Jul 2008
Location: Jeddah
Posts: 654
Likes (Received): 1

Saudi Railways signs $163m rolling stock contract

Saudi Arabia has agreed a $163m contract to buy high-class rolling stock from the Spanish group CAF.

The Saudi Railways Organisation (SRO) will buy locomotives and carriages from the Spanish company. The first will be delivered in four years' time.

The SRO will receive eight train sets in total, each comprising a locomotive and five carriages. They will be able to run at speeds of 200 kilometres per hour, and withstand temperatures of 55°C.

CAF will also build and supply facilities for maintenance of the trains.

The purchase is intended to address a rapid increase in the number of rail passengers in the kingdom as the country's rail network expands.

thefreestyler no está en línea   Reply With Quote
Old September 24th, 2008, 12:20 AM   #3
MTF
Registered User
 
MTF's Avatar
 
Join Date: May 2007
Posts: 2,026
Likes (Received): 19

I am surprised that they aren't connecting Yanbu to the network.
__________________
There is no excellent beauty that hath not some strangeness in the proportion - Francis Bacon
MTF no está en línea   Reply With Quote
Old October 14th, 2008, 06:00 PM   #4
thefreestyler
Registered User
 
thefreestyler's Avatar
 
Join Date: Jul 2008
Location: Jeddah
Posts: 654
Likes (Received): 1

Saudi rail projects begin to move ahead

While Saudi Arabia's ambitious plan to build a national railway system is moving ahead at a more cautious pace than initially planned there are hopes that further major contracts will be announced by the end of 2008.

A new regulatory authority is to have overall control of the planned system with the current state-owned Saudi Railways Organisation wound up.

The authority will be answerable to the Finance Ministry and manage future contract awards for national railway development.

The regulator will assume responsibility for projects under way, or planned, including the North-South minerals railway, the East-West track linking Jeddah and Dammam ports, and the Haramain project involving a high-speed rail link between Makkah and Medina as well as the planned monorail to connect Makkah to other holy sites.

A contract is expected to be awarded for work on the first phase of the latter project soon after this year's Haj pilgrimage, according to Habib Zain Al-Abidine, deputy minister for municipal and rural affairs. The project comprises an elevated 22-kilometre light railway system linking Makkah with Mina, Muzdalifah and Arafat.

The $4bn development is designed to ease congestion for the 3 million pilgrimage visitors and reduce the number of buses currently plying between the sites.


Saudi rail development and funding
The monorail is expected to be developed in parallel with the planned $6bn Hamarain high-speed rail link between Makkah and Medina connecting with new lines from Jeddah to both cities. First tenders for the Hamarain project are expected to be issued within the next three months.

These will cover civil works on the 450km route, building of railway stations and communications, signalling, track and rolling stock as well as operations and maintenance.

In another major development, The Ministry of Finance's Public Investment Fund says it has received interest from 18 international groups for the 480km passenger line between Al-Zabirah junction and Riyadh's King Khaled International Airport and hopes to make a decision by the end of the year.

An award had been thought to have gone to Russian Railways, but the $800m contract was re-tendered by the Finance Ministry in August.

This delay is not expected to affect work on the main north-south railway designed to carry phosphate and bauxite from mines in the north to Ras Az Zour on the coast.

A 576km section between Al-Zabirah and Ras Az Zour is already being developed by Saudi Binladen Group. A further 440km section is being built from Al-Zabirah to the Al-Nafud desert by the Saudi Al-Suwaiket Group with China railways while Japan's Mitsui and Australia's Barclay-Mowlem is developing a 782km section from Al-Nafud to mines at Al-Jalamid and Qurayyat.

Meanwhile, work continues on acquiring land for the east-west 'Landbridge' track planned to connect Jeddah and Dammam. According to SRO president Abdulaziz al-Hokail agreement for most of the land required has been obtained. The successful consortium is expected to be confirmed within months.


The government is already considering additional spur lines from the Landbridge to connect Jeddah with Abha as well as links to Jubail and to the new King Abdullah Economic City.
thefreestyler no está en línea   Reply With Quote
Old December 22nd, 2008, 06:57 PM   #5
thefreestyler
Registered User
 
thefreestyler's Avatar
 
Join Date: Jul 2008
Location: Jeddah
Posts: 654
Likes (Received): 1

Transport Ministry identifies rail track locations in Jeddah

JEDDAH: The Ministry of Transport has identified locations in Jeddah through which a proposed rail track connecting Jeddah with the Riyadh-Dammam rail line will be laid, Al-Eqtisadiah newspaper reported.

“The ministry has determined the route of the railway that would link Jeddah Islamic Port to Dammam,” said Ibrahim Kutubkhana, undersecretary for projects at the Jeddah Municipality.

In order to minimize loss or inconvenience to local citizens and private property owners, the railway will pass through public properties and unused spaces as much as possible, said a source at the Ministry of Transport.

“The project includes a railway station at the Jeddah Islamic Port and another in the city that would also serve as a junction linking King Abdul Aziz International Airport with the Makkah-Madinah line and the Dammam line,” Kutubkhana added.
The line will also be connected with Yanbu and Jubail.

The municipal official hinted that the city station would be at the Old Airport where bullet trains and hanging trains will be in service.

The project would make use of open areas including the floodwater drainage canals and government properties in the city and its suburbs, the officials said. The project is expected to ease road traffic in the three regions of Riyadh, Makkah and Eastern Province where 70 percent of the Saudi population is concentrated, besides promoting overall industrial and commercial activities in the Kingdom.

The project involves the construction of 950 km of new railway tracks between Riyadh and Jeddah, and another 115 km line between Dammam and Jubail. It is the cornerstone of a massive multibillion-riyal railway expansion project and will be the first rail link between the Red Sea and the Gulf. Four consortia — Agility PWC Logistics Consortium, Mada Consortium, Saudi Binladin Consortium and Al-Muhaidib/ACWA (Tarabot) Consortium — have presented their financial and technical offers to undertake the project. Transport Minister Jabara Al-Seraisry said on an earlier occasion that the land bridge project would be completed in four years.

Abdul Aziz Al-Hoqail, president of the Saudi Railway Organization (SRO), said the winner of the contract would be announced this year. The consortium that wins the project will have an 80 percent stake in the company, with the government holding 20 percent.

In order to speed up the completion and operation of the railway project the government licensed the establishment of Saudi Land Bridge Company in July.
thefreestyler no está en línea   Reply With Quote
Old January 19th, 2009, 08:16 PM   #6
thefreestyler
Registered User
 
thefreestyler's Avatar
 
Join Date: Jul 2008
Location: Jeddah
Posts: 654
Likes (Received): 1

SRO invites revised bids

JEDDAH: has decided to invite revised bids to compete for the contract to construct a railway project linking the Red Sea port city of Jeddah with Dammam on the Arabian Gulf, according to Al-Riyadh newspaper yesterday.

"The last date for receiving new quotations for the project to be constructed on build, operate and transfer system is 31st of this month," a knowledgeable source said. The total cost of the project is estimated at SR30 billion though it was estimated initially at SR19 billion, Hassan Al-Salami, a contractor with close links to SROSROLoading... said.

To speed up the completion and operation of the railway project the government licensed the establishment of Saudi Land Bridge Company in July. The consortium that wins the project will have an 80 percent stake in the company, with the government holding 20 percent, Abdul Aziz Al-Hoqail, president of the SROSROLoading..., said on an earlier occasion.

The project involves the construction of 950 km of new railway tracks between Riyadh and Jeddah, and another 115 km line between Dammam and Jubail. It is the cornerstone of a massive multibillion-riyal railway expansion project and will be the first rail link between the Red Sea and the Gulf.
thefreestyler no está en línea   Reply With Quote
Old January 25th, 2009, 10:38 PM   #7
mmyymm
Registered User
 
Join Date: Apr 2007
Posts: 150
Likes (Received): 16

Binladin wins North-South Railway signalling contract

Saudi Binladin Group, in a joint venture with France's Thales, has been awarded a SR2bn ($534m) contract from the state Public Investment Fund (PIF) for signalling and telecoms networks on the North-South Railway project.
mmyymm no está en línea   Reply With Quote
Old February 3rd, 2009, 09:17 PM   #8
mmyymm
Registered User
 
Join Date: Apr 2007
Posts: 150
Likes (Received): 16

Three bid for re-tendered Saudi Landbridge project

All three expected consortiums met the 31 January deadline for bids to build the Saudi Landbridge rail project, including a joint submission between the two former leading groups.
Sources close to the project have indicated they expect a winner to be announced by early-March at the latest.

The Tarabot and Tracc consortiums, led by the local Acwa Power and Saudi Binladin Group respectively, succeeded in filing their joint bid to secure the $7bn rail project. The two had previously been preferred and reserve bidders on the project, but chose to join forces days before the deadline when refreshed financial bids were requested, as revealed in MEED (MEED 25:1:09).

The Agility and Mada consortiums also submitted new entries, despite having to rapidly reassemble their bid teams when the contract was re-tendered late last year by the Saudi Railways Organisation (SRO) MEED 21:12:08).
mmyymm no está en línea   Reply With Quote
Old April 7th, 2009, 05:26 PM   #9
mmyymm
Registered User
 
Join Date: Apr 2007
Posts: 150
Likes (Received): 16

وزير المالية يوقع 3 عقود لمشروع سكة حديد " الشمال - الجنوب " بقيمة 2.4 مليار ريال

واس 07/04/2009

وقع معالي وزير المالية رئيس مجلس إدارة صندوق الاستثمارات العامة الدكتور إبراهيم بن عبدالعزيز العساف في مكتبه بالوزارة اليوم ثلاثة عقود للشركة السعودية للخطوط الحديدية ( سار) بقيمة إجمالية قدرها (2.390.000.000) ريال تمثل عقد نُظم الاتصالات وإشارات التحكم وعقد توريد القاطرات وعقد توريد العربات المقطورات وذلك لمشروع سكة حديد " الشمال - الجنوب " الممتد من حزم الجلاميد والحديثة شمال المملكة إلى رأس الزور شمال الجبيل مروراً بالجوف وحائل والقصيم والرياض والبالغ طوله 2400 كيلومتر.

وتبلغ قيمة عقد نُظم الاتصالات وإشارات التحكم المُوقع مع تحالف شركة تاليس الفرنسية بالتضامن مع مجموعة بن لادن السعودية (1.710.000.000) ريال ومدة تنفيذه خمس سنوات ويشتمل على تأسيس شبكة الإشارات والتحكم وأنظمه الاتصالات المراقبة والأمن باستخدام نظام التحكم الأوروبي .

كما يشتمل على إنشاء مركز التشغيل والمراقبة وأنظمة التذاكر ومعلومات المسافرين والانترنت داخل محطات القطار إضافة إلى ربط الطريق بشبكة من الألياف البصرية .

وفي إطار حرص صندوق الاستثمارات العامة على مشاركة الشركات الوطنية لنقل وتوطين تقنية السكة الحديدية بالمملكة فقد تم توقيع مذكرة تفاهم بين الشركة المنفذة لهذا العقد وشركة الالكترونيات المتقدمة (وهي إحدى شركات برنامج التوازن الاقتصادي) يتضمن مشاركة المهندسين والفنيين السعوديين في مراحل تنفيذ هذا العقد بما في ذلك التشغيل والصيانة وتصنيع قطع الغيار اللازمة .

وفيما يخص عقد القاطرات الموقع مع الشركة الأمريكية إلكتروموتف ديزل فتبلغ قيمته ( 337.794.487 ) ريالاً ويشتمل على تصميم وتصنيع وتوريد 25 قاطرة بقوة 4300 حصان تستخدم لقطارات معدن الفوسفات بطول 3 كيلومتر بمعدل 160 عربة لكل قطار وبحمولة تصل إلى 16000 طناً للقطار الواحد كما تستخدم أيضا للنقل العام كما يتضمن العقد توفير الدعم الفني من قبل الشركة لمدة سنتين بعد التوريد .

وتبلغ قيمة العقد الثالث الموقع مع الشركة الصينية الجنوبية للقاطرات والمقطورات المحدودة لتصنيع وتوريد عربات شحن المعادن والشحن العام (342.299.074) ريالاً ويشتمل على تصميم وتصنيع وتوريد 668 عربة منها 524 عربة لنقل معدن الفوسفات بحمولة مائة طن لكل عربة و144 عربة مسطحة وصهاريج وحاويات للنقل العام والمنتجات البترولية ويتضمن العقد توفير الدعم الفني من قبل الشركة لمدة سنتين بعد التوريد .

وكان الصندوق قد تعاقد في وقت سابق على تنفيذ عدد من المراحل الأولية لهذا المشروع وهي الخاصة بالأعمال الأرضية بمنطقة النفود والأعمال المدنية ومنها تنفيذ أكثر من 500 مليون متراً مكعباً من الأعمال الأرضية وتشييد عدد من الجسور والعبارات ومعابر الجمال وإنتاج أكثر من 4 ملايين من العوارض الخرسانية وربط 280 ألف طن من القضبان الحديدية .

ويأتي هذا المشروع ضمن برنامج تنموي استراتيجي يهدف إلى تعزيز وسائل النقل والمواصلات واستغلال مناطق الثروة المعدنية في المملكة وذلك وفقاً لقرار مجلس الوزراء في 4 / 3 / 1424هـ الذي أناط بالصندوق إقامة هذا المشروع بهدف نقل خامات الفوسفات والبوكسابت من شمال ووسط البلاد إلى منشآت المعالجة والتعدين برأس الزور على الخليج العربي .

وأوضح معالي وزير المالية الدكتور إبراهيم العساف أن قيمة العقود الموقعة في مشروعات السكك الحديدية بلغ أكثر من ( 12) مليار ريال بما في ذلك تسوية الأرض وفتح طرق في النفود وكذلك وضع سكة الحديد نفسها .

وقال // عقود اليوم لتأمين القاطرات والمقطورات وأنظمة الاتصالات والتحكم وقد قطعنا شوطاً كبيراً في هذا المجال وبقي بعض الأمور مثل المحطات// .

وأكد في تصريح صحفي عقب التوقيع أن المشروع يسير وفق ما خطط له وستكون انتهائه متزامناً مع انتهاء المنشآت التي تتعامل مع الفوسفات والبوكسايت في رأس الزور مشيراً إلى أن بدء انطلاق قطار التعدين عام 2010م وسيكون متزامناً مع انتهاء المنشآت في رأس الزور .

وبخصوص الكادر الهندسي أفاد معاليه أنهم اشترطوا على الشركة الرئيسة التي ستنفذ أنظمة الاتصال والتحكم أن تتعاون مع شركة سعودية في مستوى ممتاز هي شركة الالكترونيات المتقدمة لتصنيع بعض الأجزاء الخاصة في المشروع .

وقال // سنحاول ربط جميع أجزاء المشروع مع صناعات أو أبحاث محلية في مجال القطارات وتطوير صناعة النقل في سكة الحديد سواء فيما يتعلق بالتصنيع أو بالإدارة داخل المملكة // .

وأشار الدكتور العساف في هذا الصدد إلى عدة مشاريع مثل مشروع قطار الحرمين الذي وقع قبل عدة أسابيع وكذلك مشروع الجسر البري الذي يربط جده بالرياض وهناك بحث آخر في مراحل ابتدائية وهو ربط دول مجلس التعاون بسكة حديد .

وقال // إن هذا المشروع لازال يبحث التكاليف وتفاصيل المشروع وهناك موافقة مبدئية من أصحاب السمو والجلالة قادة دول مجلس التعاون لإنشائه وفي النهاية القرار يعتمد على الجدوى الاقتصادية له

translated By google

Minister of Finance to sign 3 contracts for the railway project "North - South" worth 2.4 billion riyals

SPA 07/04/2009

His Excellency the Minister of Finance and Chairman of the Board of the Public Investment Fund, Dr. Ibrahim bin Abdulaziz Al-Assaf in his ministry today, three decades of the Saudi Railways (SAR) the total value of $ (2.390.000.000) Real are held communication systems and control signals and a supply contract for the supply of locomotives and wagons Trailers and the railway project "North - South" extending from the packages and modern boulders to the north north of Ras Al-Zour and Jubail via Paljov Hail, Qassim and Riyadh and the length of 2400 km.

The contract value of communication systems and signals to control the site with the Alliance of French company Thales in solidarity with the Saudi Bin Laden Group (1.710.000.000) Real and the duration of a period of five years and includes the establishment of a network signal, control and communications systems control and security control system using the Union.

It also includes the establishment of the Center for the operating and control systems and ticketing and passenger information and the Internet in the train stations in addition to linking the network of fiber optics.

In the framework of the Public Investment Fund's participation at the national firms for the transfer and resettlement of the UK rail technology has been the signing of a memorandum of understanding between the company executing this contract, the company developed the electronics (which is one of the economic balance) include the participation of Saudi engineers and technicians in the stages of the implementation of this contract, including the operation, maintenance and spare parts required.

Concerning the site of locomotives with the American company amounts to Iketromotv Diesel (337.794.487) SAR includes the design, manufacture and supply of the engine 25 hp 4300 force used to train the metal phosphate at a length of 160 km 3 per vehicle and a train load of up to 16000 tons per train and are also used public transport also includes the provision of technical support by the company for two years after delivery.

The value of the third contract signed with the company of China Southern Locomotive and trailers, Ltd. to manufacture and supply of wagons and freight General Minerals (342.299.074) SAR includes the design, manufacture and supply of 668 vehicles, including 524 vehicles for the transport of the metal phosphate load one hundred tons per vehicle and a flat and 144 tanks and containers for public transport and petroleum products and the contract includes the provision of technical support by the company for two years after delivery.

The Fund had earlier contracted to implement a number of the initial stages of this project, a business area of influence of land and civil works, including the implementation of more than 500 million cubic meters of the land and the construction of a number of bridges and ferry crossings and the beauty and the production of more than 4 million concrete sleepers and link 280 thousand tons of iron bars.

Such a project comes within the strategic development program aims to strengthen the means of transportation and the exploitation of the mineral wealth in the Kingdom in accordance with the decision of the Council of Ministers on 3-4 / 1424, which mandated the establishment of the fund this project in order to transfer the phosphate ore and Albuqsapt from the north and center of the country to the mining and processing facilities with Zor on the Arabian Gulf.

His Excellency the Minister of Finance Dr. Ibrahim Al-Assaf, the value of contracts signed in the railway projects amounted to more than (12) billion riyals, including the settlement of the land and the opening of roads in the giving as well as the development of the railway itself.

The / / today to secure contracts locomotives, trailers, communications systems and control has come a long way in this area and left some things such as stations / /.

He told a news briefing after the signing that the project is proceeding as planned and will be concurrent with the end of the voting facilities that deal with the phosphate and bauxite in the Ras Al-Zour, pointing out that the commencement of mining a train starting in 2010 and will coincide with the end of facilities at Ras Al-Zour.

On the engineering staff reported that they Ma'aleh condition of the company president, who will implement the communication and control systems to cooperate with the Saudi company in the excellent company of advanced electronics manufacturing some parts of the project.

He said / / we will try to link all parts of the project with the local industries or research in the field of rail transport industry and the development of the railway in terms of both manufacturing and management within the UK / /.

Al-Assaf noted in this regard to several projects such as train-Haramain, which occurred several weeks ago as well as the land bridge project linking Jeddah and Riyadh, there is another search in the primary stages of linking the GCC railway.

The / / This project is still considering the costs and details of the project and there is preliminary approval of the Majesty and Their Highnesses the leaders of the Cooperation Council for the establishment and in the end, the resolution depends on the economic feasibility is
mmyymm no está en línea   Reply With Quote
Old May 18th, 2009, 03:45 AM   #10
Rody69
Registered User
 
Rody69's Avatar
 
Join Date: Jun 2007
Location: Jeddah-London
Posts: 2,107
Likes (Received): 207


outline:
The companies which are working on the Saudi Land Bridge have started marking
the required Properties in Jeddah which will be demolished for the project.(they have started in Old Makkah road area)
and they have left Notifications for the owners asking them to contact or visit the company office with the ownership documents to determine their Properties prices to start working on the project.
Rody69 no está en línea   Reply With Quote
Old August 23rd, 2009, 03:46 PM   #11
mmyymm
Registered User
 
Join Date: Apr 2007
Posts: 150
Likes (Received): 16

Riyadh set to bankroll $7bn Landbridge

After months of speculation, Saudi rail authorities confirm they are retendering coast-to-coast rail link.

SURCE
mmyymm no está en línea   Reply With Quote
Old February 23rd, 2012, 01:53 PM   #12
Ahmad Rashid Ahmad
Sapphire
 
Ahmad Rashid Ahmad's Avatar
 
Join Date: Oct 2008
Location: Madinah - Lahore
Posts: 13,433
Likes (Received): 684

Saudi to invite designs for Landbridge project

A tender targeting local contractors for the Landbridge rail project in Saudi Arabia is imminent.

Saudi Arabia's state-owned Public Investment Fund (PIF), and its unit Saudi Railway Company, is to invite local and international consultants to prepare designs for the Landbridge rail project next week. This will reportedly take place next week, according to Jeddah-based daily newspaper Okaz.

"After the appointment of the project manager, a tender will be launched targeting local contractors, who will form consortia with international companies to implement the project," said Al Maiman.

The $7bn mega-project was approved by Saudi Arabia's Council of Ministers in October 2011. It involves construction of 950km of line between Riyadh and Jeddah, plus another 115km between Dammam and Jubail. The project also covers the expansion if the existing Riyadh to Dammam railway.

Once completed, the nation’s first link between the Red Sea and Arabian Gulf will see freight speed between Jeddah and the King Abdul Aziz Port in Dammam.

Transport Minister Jabara Al-Seraisry said: “The Landbridge project, along with the North-South Railway and the Haramain Railway, will have a big impact on the social and economic development of the country.”
Ahmad Rashid Ahmad no está en línea   Reply With Quote
Old March 17th, 2012, 04:04 PM   #13
Rody69
Registered User
 
Rody69's Avatar
 
Join Date: Jun 2007
Location: Jeddah-London
Posts: 2,107
Likes (Received): 207

by الخثعمي
Quote:
Originally Posted by الخثعمي View Post
الرميح: تلقينا طلبات من قرى بإنشاء محطات للقطار

الميمان: بدء أعمال مشروع الجسر البري الرابط بين الرياض وجدة والتشغيل في منتصف 2014


الميمان يتوسط الرميح وممثل شركة CAF الإسبانية(الشرق)

الرياضإبراهيم العقيلي
كشف لـ»الشرق» أمين عام صندوق الاستثمارات العامة ورئيس مجلس إدارة الشركة السعودية للخطوط الحديدية منصور بن صالح الميمان أن العمل قد بدأ فعليا في مشروع الجسر البري، الذي سيربط العاصمة الرياض بجدة. وقال الميمان الذي كان يتحدث بمناسبة توقيع الشركة السعودية للخطوط الحديدية (SAR) أمس الأربعاء عقداً مع شركة كاف الإسبانية، لتصميم وتصنيع وتوريد قطارات الركاب لمشروع قطار «سار» بقيمة تجاوزت 553 مليون ريال، أن الخط الحديدي الذي يطلق عليه (الجسر البري) صمم ليسير بسرعة 350 كيلو مترا وسيكون مزدوجا، مشيرا إلى أن هذا المشروع سيكمل منظومة الخطوط الحديدية السعودية. وأضاف الميمان أنه تم إنشاء هيئة لتنظيم النقل في الخطوط الحديدية، وسيكون لهذه الهيئة صلاحية تحديد أسعار التذاكر لكل خط سير وفق التكاليف، موضحا أن شركة «سار» تشرفت بتكليفها من المقام السامي بدراسة ربط رأس الخير بكل من الجبيل والدمام، مشيرا إلى أنه ستتم ترسية المشروع وأن هدف هذه الشبكة نقل المنتجات البترولية والبتروكيماوية. وبين الميمان أن قطار سار للركاب من شمال المملكة إلى الرياض سيكون بسرعة مائتي كيلو متر، موضحا أنها سرعة مناسبة للمدن التي سيمر بها القطار ولجغرافية المناطق التي سيعبرها، مضيفا أن محطة الرياض تمت ترسيتها أخيرا وسيبدأ تنفيذها قريبا وتقع بقرب مطار الملك خالد الدولي، مشيرا إلى أنه سيتم ربط محطة قطار سار بالرياض بمحطة القطار التابعة للمؤسسة العامة للخطوط الحديدية، كما يجري التخطيط لدى الهيئة العليا لتطوير مدينة الرياض لربط مترو طريق الملك عبدالله بمحطة قطار سار بالرياض لنقل الركاب من الرياض إلى المحطة بالقرب من مطار الملك خالد الدولي، مؤكدا أن ربط المحطة بالمحطة القائمة حاليا والتابعة لمؤسسة الخطوط الحديدية يهدف إلى ربط كافة شبكات القطارات سواء قطار «سار» من الشمال إلى وسط المملكة أو قطار الجسر البري الواصل بين الرياض وجدة أو قطار الحرمين. وأوضح الميمان خلال الحفل أن العقد مع شركة (CAF) الإسبانية يتضمن تصميم وتصنيع وتوريد خمسة قطارات للركاب بقيمة إجمالية تجاوزت 553 مليون ريال سيتم توريدها خلال 24 شهراً.
وأشار الميمان إلى أن توقيع عقد قطارات الركاب يأتي بالتزامن مع عقود محطات الركاب التي تم توقيعها مطلع هذا العام لإنشاء ست محطات للركاب في كل من الرياض، المجمعة، القصيم، حائل، الجوف والقريات، مبينا أنه سيتم تشغيل المشروع في النصف الثاني من عام 2014 بإذن الله.
وأكد منصور الميمان أن شركة «سار» تسعى إلى جعل قطاراتها إنجازاً وطنياً رائداً على صعيد وسائل النقل في المملكة، مبيناُ أن هذه المجموعة من القطارات تعتبر الدفعة الأولى لقطارات ركاب شركة سار مع إمكانية زيادة عدد القطارات مستقبلاً مع زيادة الحجم التشغيلي لخدمة نقل الركاب. من جانبه، أوضح الرئيس التنفيذي لشركة (سار) الدكتور رميح بن محمد الرميح أن السرعة التشغيلية لتلك القطارات تبلغ مائتي كيلومتر في الساعة الواحدة، وتمتاز باستيفائها المواصفات العالمية بهدف منح كل راكب أعلى درجات الراحة والرفاهية، وحول الطاقة الاستيعابية للقطارات أشار الدكتور الرميح إلى أن القطار الواحد يتسع لـ 514 راكبا للمسافات المتوسطة التي تمتد من الرياض إلى حائل مروراً بالمجمعة والقصيم، أما في الرحلات الطويلة، والتي تمتد من الرياض إلى القريات مروراً بالجوف فيوجد فيها مقصورات مخصصة للنوم وتبلغ الطاقة الاستيعابية للقطار 390 راكبا. وردا على سؤال بشأن إنشاء محطة لقطار سار في محافظة الزلفي حيث يطالب أهالي تلك المحافظة بإيجاد محطة توقف للقطار فيها، أوضح لـ «الشرق» الرميح أن مطالبة أهالي الزلفي ليست الوحيدة، بل أن الشركة تلقت مطالبات من عدة قرى، كي يتوقف القطار عندها، مشيرا إلى أن الخط الحديدي يمر بقرب الزلفي وليس عبرها، مؤكدا أنه حتى الآن لم يتم إقرار وضع محطة توقف لقطار سار في محافظة الزلفي، متوقعا أن يكون هناك تفرعات للقطار لخدمة بعض المحافظات والمراكز. وفيما يتعلق بحوادث القطارات عالميا وما اتخذ لتجنبها محليا، أوضح الدكتور رميح أن السلامة والأمان كان نقطة ارتكاز رئيسة في كافة مراحل التخطيط والتنفيذ لسكة قطار سار من أقصى شمال المملكة إلى العاصمة الرياض، مبينا أن الخط سيكون مسيجا وأن أية تقاطعات أرضية وأي انتقال من نقطة إلى أخرى سيكون عبر جسر فوق خط القطار أو عبر نفق تحت الخط.

http://www.alsharq.net.sa/2012/03/15/165887
__________________
The more we think,,The less we know
Rody69 no está en línea   Reply With Quote
Old March 17th, 2012, 04:06 PM   #14
Rody69
Registered User
 
Rody69's Avatar
 
Join Date: Jun 2007
Location: Jeddah-London
Posts: 2,107
Likes (Received): 207

@SG..
which land bridge thread shall we use?
__________________
The more we think,,The less we know
Rody69 no está en línea   Reply With Quote
Old March 18th, 2012, 02:50 AM   #15
Saudi guy
Moderator
 
Saudi guy's Avatar
 
Join Date: Sep 2005
Location: Tampa,Fl
Posts: 4,712
Likes (Received): 62

ask thewolf434. I thought it's just one thread but thanks for letting me know!
__________________
Jeddah Disaster 25/11/2009 - We will not forget flood victims
Saudi guy no está en línea   Reply With Quote
Old June 11th, 2012, 05:33 PM   #16
Naif Saudi
Registered User
 
Naif Saudi's Avatar
 
Join Date: Mar 2011
Location: JEDDAH
Posts: 5,843
Likes (Received): 1188

Quote:
بدء أعمال مشروع الجسر البري الرابط بين الرياض وجدة والتشغيل في منتصف 2014
Congratulations

So now start work

To l U/C l

I read there will be a station for passengers in Taif and Mecca and then to Jeddah and vice to riyadh
__________________
Tomorrow will be better only optimism
︷︸
Naif Saudi no está en línea   Reply With Quote
Old August 10th, 2012, 05:16 AM   #17
the supervisor
Registered User
 
the supervisor's Avatar
 
Join Date: Nov 2011
Posts: 44
Likes (Received): 0

الرئيس التنفيذي للخطوط الحديدية لـ«عكاظ» :

استلام عروض 9 ائتلافات لإعداد تصاميم قطار الجسر البري





كشف لـ «عكاظ» الرئيس التنفيذي للشركة السعودية للخطوط الحديدية الدكتور رميح بن محمد الرميح عن استلام عروض من تسعة ائتلافات متنافسة على مشروع الجسر البري الذي سيربط ميناء جدة الإسلامي بمدينة الرياض المرتبطة مع ميناء الدمام من خلال القطار.
وقال الدكتور الرميح لقد تقدمت للمهام الاستشارية للمشروع خمسة ائتلافات، وأربعة ائتلافات لإعداد تصاميم مسار القطار، وأن هذه العروض خاضعة حاليا للدراسة من قبل الشركة لتقييمها من النواحي الفنية والمالية ومن ثم ترسيتها.
وأكد الرئيس التنفيذي للخطوط الحديدية أن ذلك يأتي تمشيا مع صدور توجيهات خادم الحرمين الشريفين بتنفيذ الجسر البري الذي يربط ميناء جدة بمدينة الرياض المرتبط مع ميناء الدمام من خلال القطار. مؤكدا ترسية المشروع على شركات متخصصة للتنفيذ خلال الأشهر المقبلة. مشيرا إلى أن شركة سار تعمل على ربط الموانئ في الخليج العربي بشبكة القطارات.
وبين الرميح أن الشركة أرست مشروع إنشاء محطة الركاب والمقر الرئيسي للشركة وورشة صيانة قطارات الركاب. بالإضافة لمحطة التزود بالوقود ضمن مشاريع الشركة لمنطقة الرياض بمساحات إجمالية بلغت 750 ألف متر مربع تقريبا، بقيمة 672 مليون ريال وذلك بعد أن تم طرح المنافسة على أحد عشر تحالفا تم تأهيلهم مسبقا للمشروع.
وتبلغ مدة التنفيذ 24 شهرا، حيث من المقرر أن تدخل المحطة حيز التشغيل خلال النصف الثاني من 2014 م بالتزامن مع اكتمال باقي عناصر المشروع التي تشمل مد السكة الحديدية وتصنيع و توريد قطارات الركاب.
وأكد أن الشركة حرصت عند إعداد تصاميم المحطة الجمع بين جمال التصميم، وكفاءة التشغيل. وتبلغ مساحة مبنى المحطة 49 ألف متر مربع، ويتكون المشروع من صالتين منفصلتين لكل من الوصول والمغادرة، تم تجهيز الأولى في منطقة لاستقبال شحن حقائب وأمتعة المسافرين والأخرى بأحزمة متحركة لاستلامها عند الوصول. ويحوي المبنى ساحة للمطاعم ومنطقة خدمات تضم مجموعة من المحال التجارية ومكاتب للخدمات السياحية، وتأجير السيارات ومكتبا للبريد ، كما يوجد بالمحطة رصيفان للركاب بمساحة 20 ألف متر مربع ومسجد يتسع لـ 300 مصل. ويقع مقر المحطة في الجنوب الشرقي لمطار الملك خالد الدولي. حيث تم تحديد الموقع بالتنسيق مع مقام إمارة منطقة الرياض، وهيئة الطيران المدني والجهات ذات العلاقة. ويشمل مبنى المقر الرئيسي للشركة المكون من ثلاثة طوابق جميع الأقسام الفنية والإدارية و المركز الرئيسي للإشارات والتحكم لكامل الشبكة الحديدية.
وتكون محطة الرياض المحطة الرئيسية لخط الركاب في السكة الحديد، الممتد من القريات شمال المملكة إلى الرياض.
وكان وزير المالية رئيس مجلس إدارة صندوق الاستثمارات العامة الدكتور إبراهيم بن عبد العزيز العساف وقع في وقت سابق عقودا لإنشاء خمس محطات في كل من القريات والجوف وحائل والقصيم والمجمعة.
وقال الرميح إن القطار سيشكل عند تشغيله وسيلة نقل مريحة وآمنة للمواطنين و المقيمين إضافة إلى إسهامه المباشر والفعال في تخفيف العبء على الطرق بين المدن وخفض استهلاك الوقود. منوها بأن الشركة تسعى إلى إنجاز مشروع يعتبر بكامل أجزائه أكبر شبكة للخطوط الحديدية في المنطقة يبلغ مجموع طولها 2،750 كم تمر بست مناطق إدارية.
وقال إن ترسية إنشاء سكة حديد رأس الخير ــ الجبيل بخط يبلغ طوله 85 كم ضمن مشروع مدة تنفيذه 30 شهرا، وبقيمة 665 مليون ريال بعد أن تم طرح المنافسة على عشرة تحالفات تم تأهيلها مسبقا للمشروع. تأتي إنفاذا لتوجيه خادم الحرمين الشريفين بقرار المجلس الاقتصادي الأعلى الصادر في شهر ربيع الأول من العام الماضي 1432هـ ، المتضمن تكليف (سار) بتنفيذ الوصلة التي تربط رأس الخير بمدينة الجبيل الصناعية وبالمؤانى وبمدينة الدمام ضمن مشروع شبكتها للخطوط الحديدية .
وقامت الشركة في نفس سياق القرار بطرح إنشاء خط الجبيل ـ الدمام وترسية إعداد تصاميم الشبكة الداخلية للجبيل الصناعية على شركة SNC Lavalin، حيث تمهد حاليا لطرح مشروع إنشائها عند اكتمال اعتماد التصاميم.
ونوه الرميح بالعوائد المنتظرة من إنشاء هذه الشبكة بين كل من رأس الخير والجبيل باعتبارهما مناطق الصناعات التعدينية و البتروكيماوية في المملكة، وما سيحققه ربطهما بموانئ الجبيل والدمام لأغراض التصدير والاستيراد، إضافة إلى دعم الصناعات الوطنية. حيث سيسهل الربط بالخط الحديدي التابع للمؤسسة العامة للخطوط الحديدية وصول منتجات الشركات من المواد الأولية في هاتين المدينتين إلى باقي المدن الاقتصادية والصناعية في مختلف مناطق المملكة من جهة، ومن جهة أخرى فتح أسواق جديدة لمنتجات القطاع الصناعي في مختلف المناطق، ما يزيد في قيمة الناتج المحلي الإجمالي.
the supervisor no está en línea   Reply With Quote
Old August 10th, 2012, 07:02 AM   #18
messi al3mead
Registered User
 
messi al3mead's Avatar
 
Join Date: Apr 2012
Location: madinah
Posts: 281
Likes (Received): 0



مدة البناء 24 شهر !؟

قطار الحرمين نص المسافة والبناء أكثر من 4 سنين

مضيعين
__________________
** وطن لا ( نبنيه ) .. لا نستحق العيش فيه **

Follow me on Twitter : @3bdoo1
messi al3mead no está en línea   Reply With Quote
Old August 10th, 2012, 10:08 AM   #19
the supervisor
Registered User
 
the supervisor's Avatar
 
Join Date: Nov 2011
Posts: 44
Likes (Received): 0

اخوي في فرق كبير بين قطار الحرمين و قطار الجسر البري قطار الحرمين قطار كهربائ وهذا النوع يحتاج بناء محطات كهربائية ملازمة للمشروع و هو اكثر تكلفة ماليه و تفاصيل تقنية اكثر تعقيد من النوع الثاني من القطارات الى هي قطارات الديزل وهذا النوع اقل تعقيدا و اسرع في البناء واقل تكلفة والافضل في حالات نقل البضائع تحياتي
the supervisor no está en línea   Reply With Quote
Old August 10th, 2012, 02:25 PM   #20
압둘라-爱- LOVE
Registered User
 
압둘라-爱- LOVE's Avatar
 
Join Date: May 2012
Posts: 293
Likes (Received): 136

Quote:
Originally Posted by the supervisor View Post
اخوي في فرق كبير بين قطار الحرمين و قطار الجسر البري قطار الحرمين قطار كهربائ وهذا النوع يحتاج بناء محطات كهربائية ملازمة للمشروع و هو اكثر تكلفة ماليه و تفاصيل تقنية اكثر تعقيد من النوع الثاني من القطارات الى هي قطارات الديزل وهذا النوع اقل تعقيدا و اسرع في البناء واقل تكلفة والافضل في حالات نقل البضائع تحياتي
الافضل للركاب هو القطار الكهربائي اكيد بلا شك

وعلى ما اظن ان قطار الجسر البري للركاب رح يكون كهربائي
لان في احد التقارير سمعت ان قطار الجسر البري رح يكون سرعته ٣٥٠

وللمعلوميه ان اقصى سرعه لقطارات الديزل هو ٢٠٠ مثل ماهو معمول في قطار الشمال جنوب و الدمام الرياض

ودائما اسرع القطارات في العالم تكون بالكهرباء

ولكن متى سيبدا مشروع الركاب باضبط!

هذا والله اعلم

Last edited by 압둘라-爱- LOVE; August 10th, 2012 at 02:43 PM.
압둘라-爱- LOVE no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 10:54 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 25.00%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu