Old June 25th, 2016, 06:03 PM   #681
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

Video about the Banja Luka - Doboj motorway, published by Granit of FYROM, which along with local Serb Republic firm Integral is carrying out construction on the 72km long motorway:

CrazySerb no está en línea   Reply With Quote

Sponsored Links
Old June 25th, 2016, 08:10 PM   #682
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

"Bratoljub", new Drina river bridge connecting Serb Republic & Serbia:


CrazySerb no está en línea   Reply With Quote
Old July 2nd, 2016, 04:21 PM   #683
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,403
Likes (Received): 2081

Quote:
Originally Posted by celevac View Post
http://www.autoputevirs.com/aprs/Doc...ng=cir&txt=245

and

https://www.youtube.com/watch?v=-ONWBj34QpA

News report from February 2016:

Prnjavor - Johovac is expected to open already in May or early June this year, thanks to good weather conditions during the winter - delays caused by the floods in 2014 are now eliminated and they are back on schedule
Is there any new expected opening date of Prnjavor - Johovac?
__________________

Which new motorways are currently under construction?
Which new motorways will be opened next?

See 'New motorway projects' thread

** Please help completing and updating of the list **

Been/driven: A, AND, B, CDN, CH, CZ, D, DK, E, EST, F, FIN, FL, GB, H, I, L, LV, LT, N, NL, P, PL, RO, S, SLO, USA (My cumulative travel mapping)
MichiH no está en línea   Reply With Quote
Old July 11th, 2016, 03:36 PM   #684
CDTI
Registered User
 
Join Date: Feb 2015
Posts: 87
Likes (Received): 25

Opening of the Highway from Doboj to Prnjavor soon

President of the National Assembly of RS, Nedeljko Cubrilovic, said that he is satisfied with the dynamics of works on the section of the highway Doboj-Prnjavor, adding that it should be open to traffic in the summer.

“I hope that this section will accelerate the economic development of the entire region and prove its importance, as it showed for the overall development of the region, both RS and BiH,” said Cubrilovic to reporters in Johovac, near Doboj, after a tour of the works together with the Minister of Transport and Communications of RS, Nedjo Trninic, and director of “Motorways of RS”, Dusan Topic.

[...]


More info: Sarajevo Times
CDTI no está en línea   Reply With Quote
Old July 15th, 2016, 07:23 PM   #685
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

Banja Luka - Doboj motorway from space:

__________________

Krajinac, SRC_100 liked this post
CrazySerb no está en línea   Reply With Quote
Old July 28th, 2016, 06:38 PM   #686
CDTI
Registered User
 
Join Date: Feb 2015
Posts: 87
Likes (Received): 25

Translated with Google Translate:

Tomorrow presentation highway to Banja Luka and Novi Grad and the fast road to Jasenovac

Minister of Transport and Communications Nedjo Trninić and Director of Public Enterprise "Highways of the Republic of Serbian" Dusan Topic attend tomorrow presentation of the project of the highway Banja Luka - Prijedor - Novi Grad, it was announced today from the Ministry of Transport and Communications of the Republic of Serbian.
This route is part of the Spatial Plan of the Republic of Serbian, and it is a share of the total length of 80 kilometers, of which the first phase is 50 kilometers from Banja Luka to Prijedor.

In addition, it is planned to build an expressway from Prijedor to Kozarska Dubica and further to Donja Gradina, which is also included in the Spatial Plan of the Republic of Serbian.

[...]


More info (in BCS): Prijedor 24h
CDTI no está en línea   Reply With Quote
Old July 28th, 2016, 08:59 PM   #687
tooljan
Registered User
 
tooljan's Avatar
 
Join Date: Aug 2008
Location: Бања Лука
Posts: 1,826
Likes (Received): 902

Quote:
The European Union wants a bridge near Gradiska The European Union wants a bridge near Gradiska Dejan Šajinović 28/07/2016 16:48 73 Dijeljenje

BANJA LUKA - The European Union called on BiH. side and Croatia to redouble efforts to achieve a timely final readiness for the project to build the bridge on the Sava River in Gradiska, after which the EU could allocate funds.

As we said Jamila Milovic-Halilovic, a spokesman for the EU Delegation and EU Special Representative in BiH, before the final readiness is necessary to clarify the accompanying questions regarding the study of the environmental impact and complete funding.

The Ministry of Physical Planning, Civil Engineering and Ecology yesterday we were informed that the aforementioned environmental study, which Croatia has forwarded to BiH. site of today is on public display to citizens for 60 days.

"The deadline of 60 days is a condition set by the EU in order to allocate resources because it is a European standards and common procedures for such projects", explained to us in the ministry.

As we reported a few days ago, Igor Pejic, Secretary of the Ministry of Transport and Communications, said that if a tender to select a contractor not been announced by the end of this year, Bosnia and Herzegovina, and the Republic of Slovenia (? Srpska!) will lose 6.8 million EU grant.

Judging, however, according to the response from the "Croatian Roads", which we had previously reported, due to the procedure for the aforementioned environmental permit, it will not be possible to meet the deadline to the end of the year.

The Ministry of Transport and Communications the day before said they did not know why the Croatia-mentioned study completed in January, and sent only in June, and why is the Ministry of Transport and Communications waited a month before it is forwarded to Banja Luka.

"Croatian Roads" have us in their letter yesterday clarified that the procedure lasted for six months because they were introduced two changes in March and April, and specified that the final version was completed in April and sent to Bosnia and Herzegovina in June 2016.

"All the above shows that the study is not held back, nor is there any reason to hand the Croatian to the process in any part of slowing down," explained those.

Dusan Topic, however, the director of "Highways RS", points out that the RS version submitted studies which carries the January date, and that it is not clear that, even with the changes, it was necessary to pass this time.

Topic points out that the procedure of public inspection of two months must comply with the request of the EU, but argues that this is not an obstacle to tender for contractors call.

"It's just another excuse to not announce the tender if you do not have a building permit, it will supposedly be some changes. That is, with the approval of the European Commission, which should give consent, can be overcome.

But I always say - just if there is good will on the other hand, "Topic said. What is important, however, is a topic note that trying to organize a meeting of representatives of the EU, Croatian and Bosnia and Herzegovina, in order to speed up the procedure and that BiH would not lose EU funds, and to tender for contractors issued as soon as possible.

The EU yesterday we unequivocally confirmed commitment to the construction of the bridge, pointing out the conclusions of the Western Balkans summit in Vienna in August 2015, which were also approved funds for the construction of the said bridge.

"One of the projects under the Agenda for connectivity that is designed for co-financing from EU funds, by means of Western Balkans Investment Framework, the cross-border bridge in Gradiska, including the construction of a modern and efficient border crossing," said Milovic-Halilovic.
/by Google Translate/

https://translate.googleusercontent....Gl_Wj2j-n5E-nA
__________________
You've just been Quattroed!
tooljan no está en línea   Reply With Quote
Old July 28th, 2016, 09:03 PM   #688
tooljan
Registered User
 
tooljan's Avatar
 
Join Date: Aug 2008
Location: Бања Лука
Posts: 1,826
Likes (Received): 902

Quote:
Trninić: Croatia obstructed the construction of the bridge near Gradiska

Trninić: Croatia obstructed the construction of the bridge near Gradiska agency 28/07/2016 19:20

Minister of Transport and Communications of the Republic of Serbian Nedjo Trninić said that Croatia obstructed the realization of the project of construction of the bridge on the Sava River near Gradiska, and that it makes a political Sarajevo, because this project is not considered a priority.

"The border crossing in Gradiska in BiH, which is the busiest and has 1.5 million vehicles during the year, obstruct and bridge is not built, it is regrettable," said Trninić.

He noted that some progress has been made, because there was a study on the impact on the environment, and the Ministry of Physical Planning, Civil Engineering and Ecology Serbian for 60 days, after considering the Gradiska Municipality, issued an environmental permit.

"Will remove all the shortcomings, even though we all have previously done and when we do something to stop that, too," said Trninić.

He added that there is no explanation why the project of construction of the bridge on the Sava in the silk starts to work for two years, and this in Gradiska yet.

Trninić emphasizes that any when he talked about infrastructure projects did not avoid to mention the problem of the bridge in Gradiska.

"Unfortunately, what I was saying last year and this year, it turned out to be true, and that is to obstruct the project, which is a priority to us in relation to all infrastructural projects," said Trninić.

He points out that the position of the ministry of transport strategy, which was unanimously adopted by the Council of Ministers, accurate, since it was shown that the Republic of Serbian did not have the ability to determine their own priorities, but someone else is trying to determine.
/by Google Translate/

https://translate.googleusercontent....G2J1tLw8lHrxOA
__________________
You've just been Quattroed!
tooljan no está en línea   Reply With Quote
Old July 28th, 2016, 09:07 PM   #689
tooljan
Registered User
 
tooljan's Avatar
 
Join Date: Aug 2008
Location: Бања Лука
Posts: 1,826
Likes (Received): 902

Quote:
Three variants of the highway Banjaluka-Prijedor-Novi Grad, the start of construction for two years
Three variants of the highway Banjaluka-Prijedor-Novi Grad, the start of construction for two years NN 28/07/2016 13:14 136 Dijeljenje

PRIJEDOR - Representatives of the Traffic Institute CIP from Belgrade presented today in Prijedor general design of the highway Banjaluka-Prijedor-Novi Grad.

General Director CIP Milutin Ignjatovic said that the team of this institute, after a year and a half of research field, withdrew three possible variants.

He says that the CIP for the one that is adopted to create a cheap-shot, and 3D model to people who are not in the profession see how and where the survey lines, and where tunnels, bridges, culverts, predusjeci and slopes.

"Thereafter, the elaboration of a preliminary project where field work, geodetic surveys, geological exploration works ...

Once the conceptual design, going audits, detailed design, and technical control.

According to us, within the next two years could not start construction of the highway, "said Ignjatovic told reporters in Prijedor.

Mayor of Prijedor, Marko Pavic said that the development of the economy is impossible without transport infrastructure.

"In Prijedor, we recognized long ago and it was our desire to develop road infrastructure, and the railway.

That's why we insisted for years that the Spatial Plan of the Republic of Serbian enter highway Banjaluka-Prijedor-Novi Grad, but also the fast road Prijedor- Kozarska Dubica-Donja Gradina-Jasenovac, because it is extremely important, and this cross-access to the highway Belgrade - Zagreb and finally realized that our idea, "said Pavic in the general presentation of the project.

He stated that the work, which is a town of Prijedor began with the Ministry of Transport and Communications and "RS Motorways" and the question of how to concretize the company emerged from China that is willing to participate in the implementation of this very important project.

"This is practically the same company began to negotiate and reconstruction of the railway from Banja Luka via Prijedor to Dobrljin the highway Banja Luka-Prijedor-Novi Grad, the first phase of the Prijedor-Banja Luka," said Pavic.

Director of the "Serbian Republic of Highways" Dušan Topić said that this is justified and necessary project.

"The basic set of documents is done. These initial documents were necessary to even enter into negotiations with a Chinese partner and the Chinese partner starts to search for and provide funds for this project," said Topic.

According to the general design of the CIP, the first variant is 78.6 kilometers long and would cost 850.7 million euros, the second of the 74.3 kilometer would cost 728.3 million euros, a third of the 83.8 kilometers would cost 938.2 million.

The presentation was attended by the Minister of Transport and Communications of the Republic of Serbian Nedjo Trninić, Minister of Public Administration and Local Self-Government of the Republic of Serbian Lejla Rešić, directors 'Republic of Serbian Railways "and" Republic of Serbian Roads "Dragan Nesic Nenad Savanovic and representatives of Chinese companies' Tea Sadong International has ekonomik end Tehnikal kooperejšen "and numerous representatives of public life in the Prijedor region.
/by Google Translate/

https://translate.googleusercontent....lH9DoxZVQ7EmUg
__________________
You've just been Quattroed!
tooljan no está en línea   Reply With Quote
Old July 30th, 2016, 05:50 PM   #690
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668


"Increasingly imminent construction of Banja Luka - Prijedor motorway:"


Last edited by CrazySerb; July 30th, 2016 at 05:58 PM.
CrazySerb no está en línea   Reply With Quote
Old August 14th, 2016, 06:17 PM   #691
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

Prnjavor-Doboj(~37km) , first section of Banja Luka - Belgrade motorway in service next month

__________________

Singidunum, Krajinac, SRC_100 liked this post
CrazySerb no está en línea   Reply With Quote
Old August 14th, 2016, 09:56 PM   #692
Eulanthe
Registered User
 
Join Date: Dec 2006
Posts: 1,228
Likes (Received): 411

Probably no chance of it happening, but it would be nice if this section could be integrated into a Banja Luka-Doboj-Tuzla-Bijeljina-Belgrade route. It would connect in nicely to the border crossing at Gradiska and provide a nice route for both RS and FBiH traffic to the 'full' border crossing at Gradiska.
Eulanthe no está en línea   Reply With Quote
Old August 21st, 2016, 08:20 PM   #693
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,403
Likes (Received): 2081

Quote:
Originally Posted by CrazySerb View Post
Prnjavor-Doboj(~37km) , first section of Banja Luka - Belgrade motorway in service next month

Is there any estimated opening date or just "September"?

There's a sign at 2:22 in the video. There are 2 placeholders for road numbering but no number on the sign yet. I guess that there's still no number asigned to the new motorway. I think the left placeholder on the sign begins with E and the right one with A though
__________________

Which new motorways are currently under construction?
Which new motorways will be opened next?

See 'New motorway projects' thread

** Please help completing and updating of the list **

Been/driven: A, AND, B, CDN, CH, CZ, D, DK, E, EST, F, FIN, FL, GB, H, I, L, LV, LT, N, NL, P, PL, RO, S, SLO, USA (My cumulative travel mapping)
MichiH no está en línea   Reply With Quote
Old September 4th, 2016, 04:51 AM   #694
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668



Here, its opening on 9/11 ...

Quote:
Highway to be named after RS Day; Vucic to attend?

The Banja Luka-Doboj highway will be named "January 9", the public broadcaster of the Serb entity (RS) in Bosnia-Herzegovina has reported.

Source: Tanjug Wednesday, August 31, 2016 | 12:05

RTRS said the ceremony will be held two weeks before the upcoming referendum on RS Day. RS Day is marked on January 9.

Nedjo Trninic, a minister in the RS government, said the highway will receive this name because it is the date when the Assembly of the Serb People in Bosnia-Herzegovina decided to establish the RS.

The first stretch of the highway from Doboj to Prnjavor will be opened on September 11, RTRS is reporting on Wednesday, adding that beside the entity's top officials, the ceremony will also be attended by Serbian Prime Minister Aleksandar Vucic.

Trninic added that he hoped a large number of citizens would also turn out, along with the heads of the five municipalities that the highway passes through.

"This highway represents yet more proof that the RS is investing in infrastructure," said the minister, who is in charge of transport in the RS government.
__________________

MichiH, ChrisZwolle liked this post

Last edited by CrazySerb; September 4th, 2016 at 05:06 AM.
CrazySerb no está en línea   Reply With Quote
Old September 4th, 2016, 04:55 AM   #695
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

Some footage from the newest stretch of RS motorways....



CrazySerb no está en línea   Reply With Quote
Old September 4th, 2016, 05:02 AM   #696
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668


Something one has to notice, motorway construction has been undertaken way more seriously in Serb Republic than in Serbia.
Highway are opening on budget & on time, everything is seemingly more transparent, etc.
Great job in all
CrazySerb no está en línea   Reply With Quote
Old September 4th, 2016, 08:32 AM   #697
YU-AMC
Aviation/Travel Nerd
 
YU-AMC's Avatar
 
Join Date: Jan 2008
Location: Whitchurch, Ontario, Canada
Posts: 9,243
Likes (Received): 1036

Quote:
Originally Posted by CrazySerb View Post

Something one has to notice, motorway construction has been undertaken way more seriously in Serb Republic than in Serbia.
Highway are opening on budget & on time, everything is seemingly more transparent, etc.
Great job in all
That's what I had on mind.
YU-AMC no está en línea   Reply With Quote
Old September 4th, 2016, 11:04 AM   #698
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,403
Likes (Received): 2081

Quote:
Originally Posted by CrazySerb View Post


Here, its opening on 9/11 ...
1/9 will be opened on 9/11...

Will the road really be called "January 9"? What's the "correct" Serbian translation, "9. јануар"?
Will this name or any other numbering be signed in the field? Could see any on the video...
__________________

Which new motorways are currently under construction?
Which new motorways will be opened next?

See 'New motorway projects' thread

** Please help completing and updating of the list **

Been/driven: A, AND, B, CDN, CH, CZ, D, DK, E, EST, F, FIN, FL, GB, H, I, L, LV, LT, N, NL, P, PL, RO, S, SLO, USA (My cumulative travel mapping)

darko06 liked this post
MichiH no está en línea   Reply With Quote
Old September 7th, 2016, 04:28 AM   #699
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

Indeed

Vrbas bridge, Incremental Launching Techniques

CrazySerb no está en línea   Reply With Quote
Old September 7th, 2016, 08:56 PM   #700
celevac
Registered User
 
celevac's Avatar
 
Join Date: Dec 2012
Location: Zadar
Posts: 132
Likes (Received): 90

Quote:
Originally Posted by MichiH View Post
Will the road really be called "January 9"? What's the "correct" Serbian translation, "9. јануар"?
Will this name or any other numbering be signed in the field? Could see any on the video...
It's all about dirty nationalist politics!

I don't know why they can't agree on A-road numbers for motorways and call them A2, A3, etc. just like existing A1. Oh, I forgot, they want to have their own A1...
__________________
Been to / driven in: A AL B BIH CAN CVA CZ D DK E F FIN FL GR L H HR I IRL M MC MK MNE NL PL RKS RO RSM RUS SLO SK SRB UK USA

darko06 liked this post
celevac no está en línea   Reply With Quote


Reply

Tags
bosnia and herzegovina, republic of srpska, republika srpska

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 05:29 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium