Old April 4th, 2012, 09:37 PM   #1801
Otie
Researcher
 
Otie's Avatar
 
Join Date: Dec 2010
Posts: 3,117
Likes (Received): 2186

From PA's Monthly Newsletter
Otie no está en línea   Reply With Quote

Sponsored Links
Old April 4th, 2012, 10:02 PM   #1802
Otie
Researcher
 
Otie's Avatar
 
Join Date: Dec 2010
Posts: 3,117
Likes (Received): 2186

From March 29, 2012 Board Minutes

WORLD TRADE CENTER STREETS, UTILITIES AND RELATED
INFRASTRUCTURE PROGRAM – PHASE II, PACKAGE II – FINAL STREETS
AND SIDEWALK SURFACES, STREETSCAPE ELEMENTS AND OPEN
SPACES – TOWER 2 – AWARD OF CONTRACT


Quote:
It was recommended that the Board authorize the Executive Director to award Contract
WTC-324.359.02, through construction manager Tishman Construction Corporation (Tishman),
to Paul J. Scariano, Inc., the lowest bidder pursuant to a publicly advertised/low-bid process, for
the installation of final streets and sidewalk surfaces, streetscape elements and open spaces
adjacent to Tower 2, along Vesey, Greenwich, Fulton and Church Streets
, as part of Phase II of
the World Trade Center (WTC) Streets, Utilities and Related Infrastructure Program (WTC
Streets Program), at an estimated cost of $5,315,706, inclusive of net cost work and an eightpercent allowance for extra work.

At its meeting of October 22, 2009, the Board authorized Phase II of the WTC Streets
Program, which includes the final design and construction of street and sidewalk surface
finishes, trees, paving, bollards and streetscape furniture, at an estimated cost of $140 million,
including the provision of expert professional architectural and engineering services by
Downtown Streetscape Partners, in an estimated amount of $5 million. Via a related action at
that meeting, the Board also authorized the retention of Tishman to provide construction
management services to support the WTC Streets Program and other projects at the WTC site.
The scope of work for Contract WTC-324.359.02 supports the areas surrounding Tower
2, including Vesey, Greenwich, Fulton and Church Streets, and includes the installation of
concrete sidewalks, granite curbing, bollards, street lights, traffic signals, concrete foundations,
asphalt surfaces, trees and streetscape furniture on Church and Vesey Streets, interim asphalt
paving on Fulton Street, as well as the installation of utilities on Fulton and Greenwich Streets.

The pre-purchase of granite curb materials to be installed under the proposed contract was
authorized previously by the Board. The pre-purchase of bollard covers to be installed was
authorized previously by the Executive Director.

Pursuant to the foregoing report, the Committee on Operations, acting for and on behalf
of the Board pursuant to delegated authority, adopted the following resolution, with
Commissioners Bauer, Moerdler, Pocino, Rechler, Samson, Schuber and Steiner voting in favor;
Commissioner Sartor recused and did not participate in the consideration of, or vote on, this
item. General Counsel confirmed that sufficient affirmative votes were cast for the action to be
taken, a quorum of the Committee being present.

Last edited by Otie; April 4th, 2012 at 10:28 PM.
Otie no está en línea   Reply With Quote
Old April 4th, 2012, 11:06 PM   #1803
Eric Offereins
The only way is up
 
Eric Offereins's Avatar
 
Join Date: Jan 2004
Location: Rotterdam
Posts: 68,593
Likes (Received): 28160

Thanks for that info. Looks good.
It would be good to start with the public space around WTC2 and not wait for its completion.
Eric Offereins no está en línea   Reply With Quote
Old April 4th, 2012, 11:23 PM   #1804
spectre000
Moderator
 
spectre000's Avatar
 
Join Date: Jul 2008
Location: St. Paul
Posts: 7,904
Likes (Received): 5170

$140 million! That's crazy. They might as well make the streets out of gold while there at it.
spectre000 no está en línea   Reply With Quote
Old April 5th, 2012, 08:32 PM   #1805
GerFok
Gerard F
 
Join Date: Nov 2010
Location: Leeuwarden
Posts: 210
Likes (Received): 44

Quote:
Originally Posted by spectre000 View Post
$140 million! That's crazy. They might as well make the streets out of gold while there at it.
I presume the 140m is for the whole remaining wtc construction area that needs streetscaping?! Just this 5.4m is for the area marked in red around WTC 2.

Though, that is what I presume it is, because otherwise it would be far to much for a few yards of stone, benches and a tree!
GerFok no está en línea   Reply With Quote
Old April 5th, 2012, 08:38 PM   #1806
spectre000
Moderator
 
spectre000's Avatar
 
Join Date: Jul 2008
Location: St. Paul
Posts: 7,904
Likes (Received): 5170

Quote:
Originally Posted by GerFok View Post
I presume the 140m is for the whole remaining wtc construction area that needs streetscaping?! Just this 5.4m is for the area marked in red around WTC 2.

Though, that is what I presume it is, because otherwise it would be far to much for a few yards of stone, benches and a tree!
Of course the 140m is for the entire WTC site. That's still a ton of money if you ask me. We're talking about sidewalks, bollards, tree planters, asphalt, benches, streetlights, etc. $140,000,000 for just that?
spectre000 no está en línea   Reply With Quote
Old April 5th, 2012, 09:28 PM   #1807
DinoVabec
Worldwide
 
DinoVabec's Avatar
 
Join Date: Nov 2007
Location: In the clouds
Posts: 5,900
Likes (Received): 752

Quote:
Originally Posted by spectre000 View Post
Of course the 140m is for the entire WTC site. That's still a ton of money if you ask me. We're talking about sidewalks, bollards, tree planters, asphalt, benches, streetlights, etc. $140,000,000 for just that?
Well, add here workers, probably a lot of them, machines, work hours and area which has to be done, it sounds a little bit more possible..But still a lot of money..
__________________
There are two rules for success:
1. Never tell everything you know.
-Roger H. Lincoln
DinoVabec no está en línea   Reply With Quote
Old April 6th, 2012, 03:10 AM   #1808
600West218
Registered User
 
Join Date: Aug 2010
Posts: 2,734
Likes (Received): 1574

Quote:
Originally Posted by spectre000 View Post
Of course the 140m is for the entire WTC site. That's still a ton of money if you ask me. We're talking about sidewalks, bollards, tree planters, asphalt, benches, streetlights, etc. $140,000,000 for just that?
Welcome to New York.

I just found out how much it cost to make a "dog run" (a fenced area in a park where dogs can run off leash). It consists of putting up 4 foot high chain link fencing, putting in a gravel base, and a couple park benches for seating. The total area covered is maybe a third of a foot ball field.

Cost? $600,000.

Nothing is cheap here.
600West218 no está en línea   Reply With Quote
Old April 7th, 2012, 10:21 PM   #1809
babybackribs2314
Registered User
 
Join Date: Jan 2008
Location: New York
Posts: 560
Likes (Received): 545

It really looks pathetic, but hopefully they secure a tenant soon...

Two days ago & full update: http://newyorkyimby.blogspot.com/201...rld-trade.html

babybackribs2314 no está en línea   Reply With Quote
Old April 7th, 2012, 11:03 PM   #1810
metsfan
Photographer
 
metsfan's Avatar
 
Join Date: Apr 2008
Location: Newtown, PA
Posts: 661
Likes (Received): 42

I still think the footprint looks like a coffin.
__________________
Lets Go Mets!
metsfan no está en línea   Reply With Quote
Old April 8th, 2012, 11:24 PM   #1811
DarkShadows1966
Construction Updater
 
DarkShadows1966's Avatar
 
Join Date: Jun 2010
Location: Santo Domingo
Posts: 3,222
Likes (Received): 460

The whole thing from the air (if it gets finished) will have the coffin shape
__________________
©Desde 1997! DarkShadows1966
Todos los derechos reservados


------------------------------------------------------
ROCK ME AMADEUS -Falco
Vote here: https://goo.gl/CbXQB7
DarkShadows1966 no está en línea   Reply With Quote
Old April 15th, 2012, 05:18 PM   #1812
Otie
Researcher
 
Otie's Avatar
 
Join Date: Dec 2010
Posts: 3,117
Likes (Received): 2186

Manufacturing of the glass for the mockup at the shop.



9 1/2" stainless steel fins that will protrude from the glass.


Mock-up

All pics by Tommaso Fantoni
Otie no está en línea   Reply With Quote
Old April 15th, 2012, 08:01 PM   #1813
charger1966
Registered User
 
Join Date: Aug 2007
Location: Amsterdam, New York
Posts: 120
Likes (Received): 10

Renders

Has anyone got any renders of T2 &T3 in their Stump formation? Just curious I guess
charger1966 no está en línea   Reply With Quote
Old April 15th, 2012, 11:38 PM   #1814
ThatOneGuy
Psst! Check my signature!
 
ThatOneGuy's Avatar
 
Join Date: Jan 2012
Location: Toronto - Bucharest - Freeport
Posts: 21,482

Awesome cladding!
ThatOneGuy no está en línea   Reply With Quote
Old April 16th, 2012, 04:22 AM   #1815
Draegen
I LIKE SKYSCRAPERS
 
Draegen's Avatar
 
Join Date: Mar 2010
Location: New York, NY
Posts: 466
Likes (Received): 44

It would really suck if they removed the fins to save money.
Draegen no está en línea   Reply With Quote
Old April 27th, 2012, 09:35 PM   #1816
fooddude
BANNED
 
Join Date: Feb 2007
Location: SF, NYC
Posts: 289
Likes (Received): 15

bump...

...so what exactly is going on? Construction halted to make way for the surrounding street/sidewalk area correct? Will construction commence once the street/sidewalks/surrounding areas are completed? ...or will it be halted until they find tenants?
fooddude no está en línea   Reply With Quote
Old April 27th, 2012, 10:25 PM   #1817
MrSlippery519
Registered User
 
Join Date: Mar 2012
Posts: 179
Likes (Received): 36

Quote:
Originally Posted by fooddude View Post
bump...

...so what exactly is going on? Construction halted to make way for the surrounding street/sidewalk area correct? Will construction commence once the street/sidewalks/surrounding areas are completed? ...or will it be halted until they find tenants?
It has been said I hundred times in the this thread, the tower will not rise anymore until a specific number of sq-ft is leased. For now it wont rise anymore and the area around the tower will be finished.
MrSlippery519 no está en línea   Reply With Quote
Old April 28th, 2012, 12:32 AM   #1818
spectre000
Moderator
 
spectre000's Avatar
 
Join Date: Jul 2008
Location: St. Paul
Posts: 7,904
Likes (Received): 5170

Quote:
Originally Posted by MrSlippery519 View Post
It has been said I hundred times in the this thread, the tower will not rise anymore until a specific number of sq-ft is leased. For now it wont rise anymore and the area around the tower will be finished.
I think you're thinking of 3WTC. This tower isn't going to restart for several years at least IMO. Not till T4 and T3 are leased up. And by the looks of it, that's gonna be awhile.
spectre000 no está en línea   Reply With Quote
Old April 28th, 2012, 01:07 AM   #1819
Mercenary
Registered User
 
Mercenary's Avatar
 
Join Date: Feb 2007
Location: Toronto
Posts: 1,781
Likes (Received): 201

yup, the whole project with T2, T3, and T5 wont finish construction till 2020 at the earliest
Mercenary no está en línea   Reply With Quote
Old April 30th, 2012, 03:29 AM   #1820
600West218
Registered User
 
Join Date: Aug 2010
Posts: 2,734
Likes (Received): 1574

Street level view of WTC 2 today April, 29:

image hosted on flickr

pic 11 4 30 by 600West218, on Flickr

image hosted on flickr

pic 12 4 30 by 600West218, on Flickr

image hosted on flickr

pic 13 4 30 by 600West218, on Flickr
600West218 no está en línea   Reply With Quote


Reply

Tags
200 greenwich st., 2wtc, foster and partners, lower manhattan, new york, nyc, silverstein, supertall, world trade center

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 08:46 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu