Old May 18th, 2010, 03:59 PM   #641
ceeznic pirate
Racine, WI
 
ceeznic pirate's Avatar
 
Join Date: Dec 2009
Location: Chennai
Posts: 2,869
Likes (Received): 3323



can u pls post the source for the above data?
ceeznic pirate no está en línea   Reply With Quote

Sponsored Links
 
Old May 18th, 2010, 04:57 PM   #642
geico2000
Mission Peace
 
geico2000's Avatar
 
Join Date: Aug 2008
Location: Vellore/Madurai
Posts: 3,280
Likes (Received): 1785

Vellore - Villupuram BG Inspection

Quote:
Originally Posted by thillai_selvan View Post
Thanks Thillai Selvan for this post. Was waiting for this good news for a long time. I have posted your message in Vellore forum.
geico2000 no está en línea   Reply With Quote
Old May 18th, 2010, 05:03 PM   #643
chidambaram_mech04
Registered User
 
chidambaram_mech04's Avatar
 
Join Date: Dec 2007
Location: COIMBATORE/MANGALORE/CHENNAI
Posts: 836
Likes (Received): 17

Quote:
Originally Posted by ceeznic pirate View Post


can u pls post the source for the above data?
I got this information through Right to Information Act.
__________________
bye,
Chidambaram, Coimbatore.
chidambaram_mech04 no está en línea   Reply With Quote
Old May 18th, 2010, 06:05 PM   #644
dhandapanik
Registered User
 
dhandapanik's Avatar
 
Join Date: Jan 2008
Location: TN41-TN37-TN58
Posts: 5,836
Likes (Received): 2125

Quote:
Originally Posted by chidambaram_mech04 View Post
TOP 10 Revenue Yeiling Railway Stations in TamilNadu(FROM Apr'09-Jan'10)

1. CHENNAI CENTRAL 425 cr
2. CHENNAI EGMORE 187 cr
3. COIMBATORE JN 87 cr
4. MADURAI JN 57 cr
5. TRICHY JN 39 cr
6. SALEM JN 34.3 cr
7. TIRUNELVELI JN 33.9 cr
8. ERODE JN 33 cr
9. TIRUPPUR 20 cr
10. KATPADI JN 17 cr
Chidambaram,
Great piece of information. do u have the overall SR data? we will know the revenue of TVM central, Palakkad, Ernakulam also.
__________________
----------------------------------------------------
Blogs:- TNSTC Blog || tnstcblog.in || TNSTC Blog @ Facebook
My Albums:- 1 || 2 || Flickr
City Bus Routes:- Madurai || Coimbatore || Erode || Tuticorin
dhandapanik no está en línea   Reply With Quote
Old May 19th, 2010, 05:12 PM   #645
shekar
Registered User
 
shekar's Avatar
 
Join Date: Jun 2009
Posts: 279
Likes (Received): 3


Packing work in progress on the Velankanni-Nagapattinam railway track at Velankanni on Tuesday.

The 10-km Velankanni-Nagapattinam rail line is nearing completion with penultimate works, focussing on safety, in progress.

As part of the works, Southern Railway has commissioned an additional packing machine to ensure firm embedment of sleepers on to the ballasts. It would be put to use soon for expediting the works.

The packing machines would provide firmly laid sleepers over ballasts to prevent relative movement of the sleeper after the line is commissioned. Nandakumar, Deputy Chief Engineer, Southern Railway, told The Hindu: “The purpose is to make the track stable, as the primary concern of Railways is passenger safety.”

The station building at Velankanni, constructed three years ago, is being overhauled and provision provided for additional platforms and shelters. Works on platform surface, approach roads, VIP siding and VIP lounge and retiring are under way. The station works will entail expenditure Rs.10 crore to Rs.12 crore. According to Mr. Nandakumar, some minor works would be taken up at the Nagapattinam station too, before the line is opened.

Loco trial run was conducted on the stretch in early February after the track was laid. The ballasts remained to be laid then. Since the line passed through loose earth, additional protection is required for bridges and embankments and those works are in progress, Mr. Nandakumar said.

Source:www.thehindu.com
shekar no está en línea   Reply With Quote
Old May 24th, 2010, 11:11 PM   #646
ChennaiIndian
Registered User
 
ChennaiIndian's Avatar
 
Join Date: Dec 2009
Location: Chicago
Posts: 4,448
Likes (Received): 82

Thumbs up Dindigul–Coimbatore gauge conversion to be over by 2011

http://www.hindu.com/2010/05/25/stor...2552610500.htm

Pollachi: Dindigul–Pollachi–Coimbatore and Pollachi–Palakkad gauge conversion work would be competed by 2011, said Southern Railway Chief Administrative Officer (Construction) R. Ramanathan on Friday.

Mr. Ramanathan was talking to reporters after inspecting the rail overbridge construction work on Pollachi–Kottur Road at Makkinampatti and Vadugapalayam besides other gauge conversion work along with Pollachi MP K. Sugumar and MLAs V. Jayaraman and S. Damodaran.

Mr. Ramanathan said the gauge conversion work from Coimbatore to Dindigul via Podanur and Pollachi and Pollachi to Palakkad had been divided into four packages and the work was progressing. The total distance is 225 km and the total cost of the works is expected to be Rs. 900 crore.

Fifty per cent of the work in the area from Dindigul to Palani (58 km) had been completed and it would be completed by March 2011. Work between Palani and Pollachi (58 km) and from Pollachi to Palakkad (55 km) would be completed by June 2011. Work in the Pollachi-Podanur sector covering 40 km would be completed by December 2011. During 2009-10 Rs. 31 crore was allotted to broadgauge conversion work whereas the actual expenditure was Rs. 140 core. In the fiscal 2010-2011, the allotment was Rs. 60 crore whereas the allotment sought was Rs. 175 crore. Contractors have been assigned for the work in the entire distance and it has gained momentum now. Mr. Ramanathan said 246 bridges from Dindigul to Pollachi, 166 bridges from Pollachi to Palakkad and 85 from Pollachi to Podanur were being rebuilt.

During the last fiscal Rs. 238 crore was allocated for conversion of meter gauge to broad gauge whereas the expenditure incurred was Rs. 554 crore. In the current year the demand placed was for Rs. 550 crore whereas the allocation was Rs. 311 crore, he said. The demand for these works during 2010 was Rs. 200 crore and 2011 for completion requirement would be Rs 250 crore. All stations in the Dindigul–Pollachi–Coimbatore and Pollachi–Palakkad sectors numbering around 16 were being upgraded, Mr. Ramanathan said.

...
ChennaiIndian no está en línea   Reply With Quote
Old May 25th, 2010, 01:25 PM   #647
arun82
Registered User
 
arun82's Avatar
 
Join Date: Dec 2009
Posts: 3,636
Likes (Received): 1486

Any update on Tambaram termius work...last 6 months there is no progress in the station work. There were discussions on making it a third terminal in chennai. TBM has a very good potential for being a third terminal . There are around 9 platforms ..huge space for maintenance shed . Hero honda bikes for chennai and surrounding areas are unloaded here.
arun82 no está en línea   Reply With Quote
Old May 26th, 2010, 03:54 PM   #648
Arul Murugan
Registered User
 
Join Date: Jun 2006
Location: Salem-Chennai
Posts: 16,953
Likes (Received): 3322

Quote:
Originally Posted by chidambaram_mech04 View Post
TOP 10 Revenue Yeiling Railway Stations in TamilNadu(FROM Apr'09-Jan'10)

1. CHENNAI CENTRAL 425 cr
2. CHENNAI EGMORE 187 cr
3. COIMBATORE JN 87 cr
4. MADURAI JN 57 cr
5. TRICHY JN 39 cr
6. SALEM JN 34.3 cr
7. TIRUNELVELI JN 33.9 cr
8. ERODE JN 33 cr
9. TIRUPPUR 20 cr
10. KATPADI JN 17 cr
6 of this top 10 station falls on Central-Coimbatore corridor. Very useful information. Thanks Chidambaram.
__________________
Click on---->



அருள் முருகன்
தமிழ்நாடு/இந்தியா
Arul Murugan no está en línea   Reply With Quote
Old May 27th, 2010, 12:34 PM   #649
KSRaj
Registered User
 
Join Date: Jun 2008
Posts: 699
Likes (Received): 229

Quote:
Originally Posted by Arul Murugan View Post
6 of this top 10 station falls on Central-Coimbatore corridor. Very useful information. Thanks Chidambaram.
Chennai Central cannot be counted only as part of Chennai-Coimbatore sector

Excluding Chennai, 5 out of top 10 is from Chennai-Coimbatore and remaining 3 from Chennai-Tirunelveli corridors.

Cheers,
Raj

Last edited by KSRaj; May 27th, 2010 at 12:47 PM.
KSRaj no está en línea   Reply With Quote
Old May 28th, 2010, 06:31 AM   #650
karthikarthik
Registered User
 
karthikarthik's Avatar
 
Join Date: Mar 2007
Location: CBE/TEN/CLT/ERN/TPJ/MDU/MAS/SBC
Posts: 1,079
Likes (Received): 118

Nice info Chidambaram Mech. Keep up the good work...

My view:

Revenue from CBE will increase drastically if trains diverted via Podanur-Irugur passes through CBE and the Line from Podanur to Dindugal is restored(Good for MDU). More services in the CBE-MTP or introduction of suburban trains to satellite towns of Tirupur, MTP, Pollachi and Palghat will make a bigger impact to the revenue(for every 5 min there is a bus service to all these towns from CBE). Time to consider another terminal for CBE(Podanur).

With the introduction of new line between SA-Namakkal-Karur, Salem will also see improvement in revenue collection in the coming year. This may be a loss for the Erode. Erode has to wait for the new palani line. I feel the line between Salem and Viridhachalam is underutilized.

Same will be the case with Katpadi b'cos of the new line to VPM.

With main line being completely operational and if doubling between MDU-Trichy-Chengalput(The most important project for the whole corridor as this will remove the bottleneck prevailing now) is completed we can see a drastic improvement in Trichy's and MDU revenue.
__________________
Great minds discuss ideas; average minds discuss events; small minds discuss people
karthikarthik no está en línea   Reply With Quote
Old June 3rd, 2010, 04:38 PM   #651
chennaivaasi123
Registered User
 
Join Date: Apr 2010
Posts: 123
Likes (Received): 0

BG conversions

Can someone throw some light on the status of the following lines
1) Nagapattinam - Velankanni
2) Villupuram - Katpadi
chennaivaasi123 no está en línea   Reply With Quote
Old June 4th, 2010, 12:10 PM   #652
smile1234
Registered User
 
Join Date: Oct 2008
Location: Villupuram,Chennai,Houston
Posts: 50
Likes (Received): 0

Quote:
Originally Posted by chennaivaasi123 View Post
Can someone throw some light on the status of the following lines
1) Nagapattinam - Velankanni
2) Villupuram - Katpadi

Check this link

http://indianrailways.informe.com/fo...dates-df6.html
smile1234 no está en línea   Reply With Quote
Old June 10th, 2010, 12:17 PM   #653
chennaivaasi123
Registered User
 
Join Date: Apr 2010
Posts: 123
Likes (Received): 0

Quote:
Originally Posted by smile1234 View Post
Hey!
Thnx for the update;
I'm a member there too.
good to hear that trains may start running in Vellore-Villupuram section from End July-10.
Happy.
chennaivaasi123 no está en línea   Reply With Quote
Old June 11th, 2010, 07:30 AM   #654
ajithv
BANNED
 
Join Date: Jan 2007
Location: Thiruvananthapuram
Posts: 10,649
Likes (Received): 328

Karur-Salem Railway work progressing

SALEM: Work on the Salem-Namakkal-Karur broadgauge line, a link for southern districts with western Tamil Nadu, is progressing fast. The project, initiated in 1996-97, was mired in legal wrangles related to land acquisition and other issues before it took off three years ago. With DMK in the State and PMK at the Centre and a goodwill between them, the project then received a fillip and a steady flow of funds. The legal issues of land attachment were sorted out thanks to the efforts of the then Union Minister of State for Railways R. Velu.

A senior official with the Salem Railway Division said almost 80 per cent of earth works had been completed in the 85-km-long project being executed in two phases – Salem-Namakkal and Namakkal-Karur.

Works on many culverts, bridges and rail overbridges are on the verge of completion. Work on the Vangal bridge across river Cauvery, near Karur, is on. Similarly the massive overbridges on Trichy Road in Namakkal town, Senthamangalam and also one near Mohanur are nearing completion.

Buildings for stations in Rasipuram, Namakkal and Mohanur are yet to be completed. There are six major bridges, including the 800-metre long Vangal bridge, 12 minor bridges, 25 rail overbridges and underbridges on this 85-kilometre stretch. Railway sources said traffic between the Salem and Namakkal sector would be possible next year.

Source
ajithv no está en línea   Reply With Quote
Old June 11th, 2010, 09:16 AM   #655
karthikarthik
Registered User
 
karthikarthik's Avatar
 
Join Date: Mar 2007
Location: CBE/TEN/CLT/ERN/TPJ/MDU/MAS/SBC
Posts: 1,079
Likes (Received): 118

Quote:
World Class Chennai Central Railway Station - Suggestions Invited
Ministry of Railways have decided to undertake redevolopment and modernization of Chennai Central station into World Class station. In this conneciton, it is proposed to prepare feasibility report and master plan through global consultancy contact.

In order to formulate the terms of reference, the views/suggestions of the ultimate users about the short-comings at the existing station, improvements required and facilities envisaged will be of immense value.

It is requested that the views/suggestions may please be send to E-Mail id chennaicentral.southernrailway@yahoo.com

The views/suggestions can also be sent by post or in person to
Chief Engireer,
Metropolitan Trasport Project (Railways),
Southern Railway,
Egmore, Chennai - 600 008.
Telephone No. 044-26610435.
Not sure whether this came in the forum. Any one interested can send their view

http://southernrailway.gov.in/sr/world_class.jsp
__________________
Great minds discuss ideas; average minds discuss events; small minds discuss people

Last edited by karthikarthik; June 11th, 2010 at 09:31 AM.
karthikarthik no está en línea   Reply With Quote
Old June 11th, 2010, 10:59 AM   #656
naga2007
Registered User
 
Join Date: Jan 2010
Posts: 120
Likes (Received): 0

Red face Status of Manamadurai - Virudhunagar GC Work

அகலரயில் பாதைக்கான பாலங்கள் கட்டும் பணி மந்தம்... விருதுநகர்-மானாமதுரை இடையே ரயில் ஓடுவது எப்போது?

திருச்சுழி: திருச்சுழி - மானாமதுரை பகுதியில் அகல ரயில் பாதைக்கான பாலங்கள் கட்டும் பணி மந்த கதியில் நடந்து வருகிறது. விருதுநகர் - மானாமதுரை இடையே 67 கிலோ மீட்டர் தூரமுள்ள மீட்டர் கேஜ் ரயில் பாதையை, அகல ரயில் பாதையாக மாற்றும் பணிகள் கடந்த மூன்று ஆண்டுகளாக நடந்து வருகிறது. இதற்காக அருப்புக்கோட்டை, திருச்சுழி, நரிக்குடி ரயில்வே ஸ்டேஷன்கள் மூடப்பட்டன. இந்த வழியாக செல்லும் ரயில்களும் நிறுத்தப்பட்டன. ஒரு கிலோ மீட்டருக்கு 3 கோடி ரூபாய் செலவினம் வீதம் பணிகள் நடந்து வருகிறது. இதில் திருச்சுழி - மானாமதுரை இடையே குண்டாறு பகுதியில் ஐந்து பெரிய மற்றும் சிறிய பாலங்கள் கட்ட வேண்டியுள்ளது. திருச்சுழி ஆற்றின் குறுக்கே சுமார் 400 அடி நீளத்திற்கு பாலம் கட்டும் பணிகள் மிகவும் மந்த கதியில் நடந்து வருகிறது. மற்ற பாலங்களின் பணிகளும் மெதுவாகத்தான் நடக்கிறது. விருதுநகர் - அருப்புக்கோட்டை வரையில் தண்டவாளம் அமைக்கும் பணி முடிவடையும் தருவாயில் உள்ளது. திருச்சுழி - மானாமதுரை வரை பாலங்கள் கட்டி முடிக்கப்பட்ட பின்னர் தான் தண்டவாளம் அமைக்கும் பணி நடக்கும். தற்போது அருப்புக்கோட்டை, திருச்சுழி, நரிக்குடியில் ஸ்டேஷன்கள் கட்டும் பணி நடந்து வருகிறது. பாலங்களின் பணிகள் முடிய குறைந்தது ஒரு ஆண்டு ஆகும். மொத்த பணிகளும் 30 மாதத்தில் முடிவடையும் என ரயில்வே அதிகாரிகள் கூறினர்.

GC between Manamadurai and Virudhunagar may be completed in 30 months (planned to be completed in 18 months). Laying track between Virudhunagar and Aruppukottai is nearing completion while between Aruppukottai and Manamadurai is delayed because of delay in construction of bridge work. The work was started before three years (just 67 Kmts).

Source: Dinamalar dt 11 June 2010.
naga2007 no está en línea   Reply With Quote
Old June 14th, 2010, 11:29 PM   #657
ChennaiIndian
Registered User
 
ChennaiIndian's Avatar
 
Join Date: Dec 2009
Location: Chicago
Posts: 4,448
Likes (Received): 82

Railways to try out digital track monitoring

http://timesofindia.indiatimes.com/c...ow/6045022.cms

CHENNAI: To improve safety on rails, Southern Railway will try out a digital track monitoring system (DTMS). The pilot project is expected to be carried out in Salem division soon before being expanded to other divisions.
The system will enable officials at the Railway Board, zones, divisions and those on the field to monitor the condition of tracks through computer screens. Indian Railways has selected six railway divisions across the country for a pilot project. Salem is one among them.

Salem division has railway tracks extending to 1,233 km. “Preliminary works like distribution of digital notebooks and feeding on track information into the computer system have begun to put the digital track monitoring in place. It is expected to be commissioned in a month,” a senior railway official said.

“Under the web-based automated system, railway officials will use digital notebooks to enter details of track conditions and flaws that they find during inspections. The information will be immediately updated to the database and can be accessed by senior officials to monitor and recommend changes or corrective steps,” said a senior engineer of Southern Railway.

At present, junior engineers and section engineers manually inspect tracks and enter such information into a register. It is estimated that more than six lakh registers are maintained across Indian Railways for recording track information. Retrieving relevant information from this voluminous hard copy is often impossible. (Do they know what a computer is? ***holes )

Centre for Railway Information System will develop the software and support services like storage and retrieval of data for the new DTMS. Automation will be done initially so that flaws could be detected quicker and corrective steps could be suggested by engineers — from the junior most to the senior most — depending on their experience and expertise.

...
ChennaiIndian no está en línea   Reply With Quote
Old June 17th, 2010, 07:38 AM   #658
nagamoney
nagamoneyh
 
nagamoney's Avatar
 
Join Date: Dec 2008
Location: kanyakumari
Posts: 45
Likes (Received): 0

Now it seems that Kanyakumari chennai double line is put on slow track,
nagamoney no está en línea   Reply With Quote
Old June 17th, 2010, 07:48 AM   #659
thillai_selvan
Registered User
 
thillai_selvan's Avatar
 
Join Date: Mar 2010
Location: 600024
Posts: 5,188
Likes (Received): 533

Even the electrification works too.....
thillai_selvan no está en línea   Reply With Quote
Old June 17th, 2010, 08:04 AM   #660
anujkb
Man at work!
 
anujkb's Avatar
 
Join Date: May 2010
Location: Mumbai
Posts: 535
Likes (Received): 12

On completion of chennai-kanniyakumari doubline we can expect a superfast or a Garib rath type train which can do chennai-trivendrum via madurai in 12 hr 30 mins. brief scheule of train maybe this way:

MAS 16:30
CGL 17:15
VM 18:45
VRI 19:20
TPJ 21:15
Dindigul 22:30
MDU 23:45
TPJ 21:15
Virudhnagar 00:15
TEN 02:30
NCJ 03:30 dep 3:45
TVC 05:00
anujkb no está en línea   Reply With Quote


Reply

Tags
thanjavur

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 10:08 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu