Old October 25th, 2008, 10:05 AM   #1
bevepi
Team Pacquiao
 
bevepi's Avatar
 
Join Date: Sep 2005
Location: Galleria
Posts: 1,706
Likes (Received): 5

BGC | Fifth Avenue Place | 38F | 123mm

Shots were taken last Thursday..









===================================================================================

Fifth Avenue Place

Surrounded by lush garden and wide-open spaces, Fifth Avenue Place offers a comfortable area to relax, run, play and have fun with your family and friends. Apart from well-planned amenities that suit active lifestyles, Fifth Avenue Place has easy access to the trendiest restaurants, fashionable shopping spots, world-class hospitals and reputable schools around the Global City.

Principal Architect: W.V. Coscolluela & Associates

Structural Engineers: AROMIN & SY + Associates, Inc.

Structural Consultant: OVE ARUP Intl.

Sanitary Engineers: NBF Consulting Engineers

Mechanical Engineers: L.R. Punzalan and Associates

Electrical Engineers: Mar Alix and Associates

Link to the old thread HERE.
__________________
"Life is hard, it's harder if you're stupid"


Robinsonspremier
Area Manager
Robinsons Land Corporation
International Marketing Dept.
North America

Last edited by -TC-; January 25th, 2009 at 03:35 PM.
bevepi no está en línea   Reply With Quote

Sponsored Links
 
Old October 26th, 2008, 02:36 PM   #2
Prinsesa8
Registered User
 
Join Date: Jul 2008
Posts: 61
Likes (Received): 0

Hey agwe23. sorry to hear your plight... here's the turn over team's number

6836100 loc 105. I looked that up in the net. and then made kulit all the departments to get me through the turn over team.

you may want to follow up also with the financing dept to ask if they have sent the deed of sale to the bank (and other docs) in order for the bank to release the loan proceeds (if and when it's still not released). if it's released na, you may ask the financing dept to route the approval to the turn over team. you may ask laurice corpuz to transfer your call to the financing dept. you really should have your unit by now...

you can also ask your bank if they have released the loan na just to double check.

hope this little info helps :-) whatever your bank is, it should not be a problem really... and you deserve not to be given the run-around. God bless!

Last edited by Prinsesa8; October 26th, 2008 at 04:49 PM. Reason: added info
Prinsesa8 no está en línea   Reply With Quote
Old October 27th, 2008, 04:51 AM   #3
agwe23
Registered User
 
Join Date: Apr 2008
Posts: 25
Likes (Received): 0

talked to adel this morning.

jeez.

ok here's the next part of the story.

the check from bdo is with robinsons already, but bdo has yet to issue clearance for the release of funds because the deed of sale has yet to be issued.

we paid all the misc and transfer fees first half of sept (sept 15 i think), and for them to release the deed of sale they need 2 SIGNATURES. 2 SIGNATURES, and up to now, the deed of sale HAS NOT BEEN SIGNED YET.

2 signatures for 6 weeks???? how hard could that be?
agwe23 no está en línea   Reply With Quote
Old October 27th, 2008, 04:53 AM   #4
agwe23
Registered User
 
Join Date: Apr 2008
Posts: 25
Likes (Received): 0

thanks prinsesa8
agwe23 no está en línea   Reply With Quote
Old November 1st, 2008, 07:30 AM   #5
-TC-
TC in the OC
 
-TC-'s Avatar
 
Join Date: Nov 2006
Posts: 2,885
Likes (Received): 0

Quote:
Originally Posted by c0kelitr0 View Post
http://www.skyscrapercity.com/showthread.php?t=339704

i also suggest na ilipat yung mga threads of completed projects from Projects on the Rise section to this section and have a poll added. i think kaya to ng powers ng mga mods hehehehe.

pwede na ata ilipat dito ang SOMA, Fairways, Fifth Avenue
Hi mods and FAP owners!

Is FAP still under construction? Like the sentiment of @cokelitro above, I know that this project is finished and only the individual units are being renovated by their owners now. And because it is finished, this project should already be moved to the completed projects section. Many other very good projects have graduated from u/c to that section so why not FAP? You should all be happy to graduate right?

And by moving this thread there, I do hope the mods can move the whole thread or at least some of the last few posts so that owners and friends can continue posting there.
__________________
www.OneCentral.com.ph
-TC- no está en línea   Reply With Quote
Old November 1st, 2008, 10:11 PM   #6
AkafloresToo
Registered User
 
Join Date: Aug 2005
Posts: 164
Likes (Received): 0

The project is not completed yet. The lower floors are just starting turnover and the upper floors are just completing construction.
AkafloresToo no está en línea   Reply With Quote
Old November 2nd, 2008, 04:59 AM   #7
bevepi
Team Pacquiao
 
bevepi's Avatar
 
Join Date: Sep 2005
Location: Galleria
Posts: 1,706
Likes (Received): 5

Quote:
Originally Posted by AkafloresToo View Post
The project is not completed yet. The lower floors are just starting turnover and the upper floors are just completing construction.
FYI..There are 12 unit owners occupying their respective units on low floor.
__________________
"Life is hard, it's harder if you're stupid"


Robinsonspremier
Area Manager
Robinsons Land Corporation
International Marketing Dept.
North America
bevepi no está en línea   Reply With Quote
Old November 5th, 2008, 12:04 AM   #8
AkafloresToo
Registered User
 
Join Date: Aug 2005
Posts: 164
Likes (Received): 0

Barcat & others who have done walkthrough,

My cousin has just completed walkthrough of our unit. The unit did look good and with NO more major flaws. However, hope you can help me with these issues:
1) He said the tubing for washer is in the restroom. Is this usual and also the same in your units?
2) Did you have electricity and running water when you did your walkthrough?
3) How long did it take to repair all your issues?

Thanks for your response.

Last edited by AkafloresToo; November 5th, 2008 at 05:37 AM.
AkafloresToo no está en línea   Reply With Quote
Old November 5th, 2008, 03:17 AM   #9
Prinsesa8
Registered User
 
Join Date: Jul 2008
Posts: 61
Likes (Received): 0

hey akaflores!

1. yes, the tubing of the washer is in the restroom kasi i think that's where it was planned to be placed. the bathroom is actually spacious enough to accommodate the washer and dryer if you wish to place one.

2. yes, i had electricity and running water during my walkthrough. tested the sink, flushes and shower.

3. i had minor issues like the sockets were not aligned, there were some scratches of paint etc. they repaired it quickly naman like a week or two. the engineer who oversees the walkthrough is also very helpful and accommodating.

hope this helps!
Prinsesa8 no está en línea   Reply With Quote
Old November 5th, 2008, 05:40 AM   #10
AkafloresToo
Registered User
 
Join Date: Aug 2005
Posts: 164
Likes (Received): 0

thanks Prinsesa8.

fyi, someone asked for the final payment. Below is our final payment for a 85 sq. meter 2BR (P5M)

Retention Fee (30% balloon payment)= 1,634,864.25
Miscellaneous Fees = 37,008.70
Transfer Tax = 151,300.90

Hope this helps too.
AkafloresToo no está en línea   Reply With Quote
Old November 5th, 2008, 03:54 PM   #11
barcat
Napa wino
 
Join Date: Jul 2004
Location: American Canyon
Posts: 31
Likes (Received): 0

AkaFlores - My architect already accepted mine last friday. The unit was in pretty good shape with minor things that RLC promised they would rectify even when the unit was accepted. RLC is really very flexible and works quick with any issues I had. Based on the pics I was sent there is elctricity and water in the my unit. My contractor is starting soon on the retrofit work. I will be flying home next week hopefully they are half way complete by then and baka matirhan ko pa on my last week in PI.

cheers!
barcat no está en línea   Reply With Quote
Old November 5th, 2008, 07:25 PM   #12
AkafloresToo
Registered User
 
Join Date: Aug 2005
Posts: 164
Likes (Received): 0

Thanks Prinsesa8 and Barcat. Our initial walkthrough is ok as well, sabi ng pinsan. Just like you, only minor issues. Yung nga lang we didn't have water, so we cannot test leaks.
I would ask them the same promise they gave barcat in fixing our unit even after signoff.

I will send pix later. Thanks again.
AkafloresToo no está en línea   Reply With Quote
Old November 6th, 2008, 04:41 AM   #13
3cr
Atenista sa Frisco
 
Join Date: Sep 2005
Location: San Andreas Fault
Posts: 6,339
Likes (Received): 142

Bong when will you be in Manila? I'm Manila bound mid-Nov. and just wondering if you're homebound too that time. Kitakits na lang tayo sa BGC in case our schedules match.
3cr no está en línea   Reply With Quote
Old November 6th, 2008, 05:25 AM   #14
AkafloresToo
Registered User
 
Join Date: Aug 2005
Posts: 164
Likes (Received): 0

Boe sarap mo naman...kakainggit... Si misis lang ang uuwi sa Dec. walang atik. Maybe next year.
AkafloresToo no está en línea   Reply With Quote
Old November 6th, 2008, 10:29 AM   #15
bevepi
Team Pacquiao
 
bevepi's Avatar
 
Join Date: Sep 2005
Location: Galleria
Posts: 1,706
Likes (Received): 5

Quote:
Originally Posted by 3cr View Post
Bong when will you be in Manila? I'm Manila bound mid-Nov. and just wondering if you're homebound too that time. Kitakits na lang tayo sa BGC in case our schedules match.
Sama ko ko sa meet & greet..Ikot ko kayo sa mga project sites..
__________________
"Life is hard, it's harder if you're stupid"


Robinsonspremier
Area Manager
Robinsons Land Corporation
International Marketing Dept.
North America
bevepi no está en línea   Reply With Quote
Old November 6th, 2008, 04:06 PM   #16
barcat
Napa wino
 
Join Date: Jul 2004
Location: American Canyon
Posts: 31
Likes (Received): 0

Just got feed back from my contractor that there is insufficient electrical capacity at the units. For example the lighing is just limited to 500 watts which according to my contractor is very unusual and substandard. The range can only be a 2-burner. The space provided in the kitchen is for a free standing range/oven. It just does not make sense. Cant imagine what the resticted loading fot he Ac units are. Can any one now in the philippines verify this so we can prepare for the appliances.
barcat no está en línea   Reply With Quote
Old November 6th, 2008, 07:09 PM   #17
AkafloresToo
Registered User
 
Join Date: Aug 2005
Posts: 164
Likes (Received): 0

wow bummer Anthony. Is it just a wiring problem in your unit or is this their standard for all the units? Maybe you can ask your contractor to ask RLC's engineer to accompany him to the occupied units and see if they have any electrical problems so far, ie. does air-con work without tripping their system.

Best of luck barcat. Keep us posted. Thanks.
AkafloresToo no está en línea   Reply With Quote
Old November 6th, 2008, 09:03 PM   #18
barcat
Napa wino
 
Join Date: Jul 2004
Location: American Canyon
Posts: 31
Likes (Received): 0

It is for all units. Parang may design problem. I even asked Jeannie and she said yung maga nag turnover na clients niya cook top lang ang binili. Pangit yung. Parang promdi style. I hope RLC rectifies this issue.
barcat no está en línea   Reply With Quote
Old November 7th, 2008, 12:58 AM   #19
[dx]
Ahead of the Curve
 
[dx]'s Avatar
 
Join Date: Oct 2004
Location: Legazpi y Pasig
Posts: 1,782
Likes (Received): 45

Fifth Avenue Place | BGC | 38F | ?m

image hosted on flickr

by imago2007
__________________
Dios Marhay na Albay!
[dx] no está en línea   Reply With Quote
Old November 7th, 2008, 03:07 AM   #20
Prinsesa8
Registered User
 
Join Date: Jul 2008
Posts: 61
Likes (Received): 0

Quote:
Originally Posted by barcat View Post
Just got feed back from my contractor that there is insufficient electrical capacity at the units. For example the lighing is just limited to 500 watts which according to my contractor is very unusual and substandard. The range can only be a 2-burner. The space provided in the kitchen is for a free standing range/oven. It just does not make sense. Cant imagine what the resticted loading fot he Ac units are. Can any one now in the philippines verify this so we can prepare for the appliances.
this can indeed be a problem. my uncle is now handling my unit. he said yesterday na he will submit an approved electrical plan for our permit. will keep you guys posted on this.

i remember that the rlc engineer gave a list of the allowable appliances to be placed. i have a jr. 1 bed. so 1 hp aircon in the living and dining and then .75 in the bedroom. i will get back to you on elecrical loading of elec unit (60 amps i think). i will also show you the electrical plan...

enjoy your day!

Last edited by Prinsesa8; November 7th, 2008 at 03:21 AM.
Prinsesa8 no está en línea   Reply With Quote


Reply

Tags
fap, fifth avenue place

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 08:23 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 21.43%)

SkyscraperCity ☆ High there, what's up!

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu