Old March 14th, 2016, 09:36 AM   #561
bertashton
Registered User
 
Join Date: Mar 2015
Location: Melbourne
Posts: 1
Likes (Received): 0

Completely superb design....
bertashton no está en línea   Reply With Quote

Sponsored Links
Old March 15th, 2016, 04:45 PM   #562
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,579
Likes (Received): 2532

Public Hearing on 168.20 km Chumporn - Surat Thani double tracking with a price tag of 33,513.90 Million Baht including the need for 167.94 rai of land exappropriation with benefits of 4309 million Baht a year benefit with a hope to start the project in 2018 and done in 2022
http://www.manager.co.th/iBizChannel...=9590000026894
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old March 15th, 2016, 05:57 PM   #563
thangmayhocnv
Registered User
 
Join Date: Mar 2016
Location: - Chọn -
Posts: 1
Likes (Received): 0

Thai Princess Maha Chakri Sirindhorn

Quote:
Originally Posted by hkskyline View Post
Thailand and Laos open first rail link: officials
4 March 2009
Agence France Presse

Thailand and Laos on Thursday officially opened the first rail link connecting the two counties over a bridge spanning the Mekong River, a step towards a regional dream of connecting Asia by rail.

Thai Princess Maha Chakri Sirindhorn presided over the launch ceremony, boarding the first train from the Thai border town of Nong Khai which travels along 3.5 kilometres (2.1 miles) of track to Thanaleng in Laos.

From Thanaleng it is still another nine kilometres to the Laotian capital Vientiane but both sides hailed the inauguration as a key step towards opening up a regional route ferrying goods and passengers.

"The inauguration of this train link today (Thursday) will enhance transportation with our neighbouring country," Thai Prime Minister Abhisit Vejjajiva said in the opening speech.

The track over the Friendship Bridge took 20 months to complete and was funded by Thailand at a cost of about 197 million baht (5.5 million dollars). Two passenger trains will run the 30-minute return trip each day.

Laos foreign affairs spokesman Khenthong Nuanthasing said the track was the first rail link connecting landlocked Laos with the outside world.

"The railway is very important for the country," he said a day ahead of the ceremony. "As a way out of the country in the past there were only trucks, which are very expensive for exports. The cost of transportation will be less."

The link is part of a plan conceived in the 1960s to connect Asia with a continuous railway stretching west to Turkey and Russia and east to Vietnam and South Korea.

Decades of conflict and poverty stalled the plan but the breakup of the Soviet Union and the opening up of China have revived the dream, and in November 2006, 18 Asian nations agreed to integrate the continent by rail.

The UN-backed Trans-Asian Railway route now has nearly 74,700 kilometres of functioning track serving 29 countries, and United Nations officials have said they hope to complete the railway in 10 to 15 years.
From Thanaleng it is still another nine kilometres to the Laotian capital Vientiane but both sides hailed the inauguration as a key step towards opening up a regional route ferrying goods and passengers.
thangmayhocnv no está en línea   Reply With Quote
Old March 15th, 2016, 06:44 PM   #564
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,579
Likes (Received): 2532

Here is the schedule for the section from Ban Laem to Mae Klong - effective 1 April 2016

Depart Mae Klong - 06.20 AM, 09.00 AM, 11.30 AM and 03.00 PM
Depart Ban Laem - 08.30 AM, 11.10 AM, 02.30 PM, and 05.40 PM

There are 14 stations (2 real stations at Ban Laem and Mae Klong and 12 halts) including
1. Mae Klong
2. Lad Yai
3. Khet Mueang
4. Ban Nakhok
5. Ban Na Kwang
6. Ban Ka Long
7. Ban Bang Tho Rat
8. Ban Bo
9. Bang Krajao
10. Bang Sikhot
11. Klong Nok Lek
12. Ban Chee Pha Khao
13. Tha Chalom
14. Ban Laem

the travelling time is 1 hour with the speed limit of 60 kph - Ticket price - 3 to 10 Baht for foreigner and free for Thai citizens
http://www.matichon.co.th/news/71717
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old March 16th, 2016, 07:04 AM   #565
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,579
Likes (Received): 2532


Chumporn - Surat Thani double tracking
https://www.youtube.com/watch?v=5z6B6Z8QrQ4
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old March 16th, 2016, 10:09 AM   #566
George W. Bush
Look at that parking lot!
 
George W. Bush's Avatar
 
Join Date: Mar 2005
Posts: 6,579
Likes (Received): 5082

Quote:
Originally Posted by Wisarut View Post
the travelling time is 1 hour with the speed limit of 60 kph - Ticket price - 3 to 10 Baht for foreigner and free for Thai citizens
http://www.matichon.co.th/news/71717
WTF? 3-10 baht (= 10-30 cents) is already a joke, but free rides for Thai citizens?? Doesn't SRT ever want to stop being a cash bleeder?
__________________
"That's all Folks!"
George W. Bush está en línea ahora   Reply With Quote
Old March 16th, 2016, 12:30 PM   #567
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,579
Likes (Received): 2532

Quote:
Originally Posted by George W. Bush View Post
WTF? 3-10 baht (= 10-30 cents) is already a joke, but free rides for Thai citizens?? Doesn't SRT ever want to stop being a cash bleeder?
All third class - not being raised since 1985 - If you want to raise third class fare, expect the protest from those lumpen proletariat (social dregs including the ones with white collars)
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old March 16th, 2016, 06:12 PM   #568
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,579
Likes (Received): 2532

Clear Determination from Big Too - the railways in Thailand must be increased from the current 4000 km to 7000 km within 5 years (Year 2022) - This implied that the following railway lines must become a reality

1. Denchai - Chiang Rai - Chiang Khong
2. Surat Thani - Khirirat Nikhom - Tha Nun
3. Ban Phai - Maha Sarakham - Roy Ed - Mukdahan - Nakhon Phanom
4. Thai China Railways (Bangsue Central - Khorat - Nong Khai)
5. Thai Japan Railways (Bangsue Central - Phitsanuloke - Chiang Mai)
6. 900 km massive double tracking
http://www.now26.tv/view/72075
http://www.matichon.co.th/news/72343

SRT governor insisting that Denchai - Chiang Rai - Chiang Khong railway has to be started in 2017 along with Ban Phai - Mukdahan - Nakhon Phanom which has been started at the same time and both Denchai - Chiang Rai - Chiang Khong and Denchai - Chiang Rai - Chiang Khong are to be done in 2022
http://daily.khaosod.co.th/view_news...dNeTB4Tmc9PQ==


the Federation of Thai Industry appealing to Big Too to postpone Railway construction to focus on the irrigation to deal with the drought of 2016 as well as the future flood which can become a nightmare like the flood of 2011
http://www.tnamcot.com/content/425671
http://www.manager.co.th/iBizChannel...=9590000027559
__________________
BKK Mass Transit Expert

Last edited by Wisarut; March 16th, 2016 at 06:58 PM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old March 17th, 2016, 10:03 PM   #569
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,579
Likes (Received): 2532

SRT responses to the demands of Big Too by asking to speed up the following 7 double tracking by the end of 2016 as the way of economic stimulation at 240,000 Million Baht after Thanon Jira - Khon Kaen double tracking and Kaeng Khoi - Klong 19 - Chachoengsao double tracking are now under construction

1. Nakhon Pathom - Hua Hin (165 km) at 20,306.53 Million Baht - Almost getting EIA Clearance - wait for final decision from Environmental Board
2. Lopburi - Paknampho (148 km inclding 30 km bypass) at 24,840.54 Million Baht - Almost getting EIA Clearance - wait for final decision from Environmental Board
3. Hua Hin - Prachuab Khirikhan (90 km) at 9,437 Million Baht still drafting EIA
4. Ban Phai - Mahasarakham - Roy Ed - Mukdahan - Nakhon Phanom (347 km) at 66000 Million Baht - New line EIA drafting - and Article 44 to speed up EIA applied here
5. Denchai - Chiang Rai - Chiang Khong (326 km) at 77486 Million Baht - New line EIA drafting - and Article 44 to speed up EIA applied here
6. Map Krabao - Nakhon Ratchasima - Thanon Jira (132 km with the 4 tunnels + via ducts) at 29,853 Million Baht - waiting the approval of bidding result in the next 3 months before sigining the contract
7.Prachuab Khirikhan - Chumporn (167 km - including the new station building for Chumporn North of existing station building) at 17,290 Million Baht - waiting the approval of bidding result in the next 3 months before sigining the contract


Still drafting TOR for PPP on the fillowing High Speed line to be done in April 2016
1. BKK (Lad Krabang) - Pataya - Rayong - 193.5 km at 152,000 Million Baht - the route the owner CP All badly wants
2. BKK (Bangsue Central) - Hua Hin - 211 km at 94,600 Million Baht - the route the owner of Thai Bev badly wants

By the end of March 2016, the 3rd contract of red line commuter (electromechanic + EMUs) on both Bangsue - Rangsit and Bangsue - Talingchan with MITSUBISHI Heavy Industrial Ltd - Hitachi - Sumitomo Corporation at 32,339 Million Baht will be signed

SRT government hope that the first 2 sets of CNR Changchun aircon carriages (13 carriages per set - totally 115 carriages at 4,668.89 Million Baht) will be delivered in May 2016 - to be run for SP 1/2 (BKK - Chiang Mai), SP 35/36 (BKK - Hatyai section), EXP 67/68 (BKK - Ubon), EXP 69/70 (BKK - Nong Khai) to get 1.073 million Passenger with revenue of 1250.9 million Baht

while they bidding for the new 50 Diesel electric locomotives + 120 leased Diesel electric locomotives will be executed soon while 308 BCFs will boost the cargo services despite of economic hard time.
SO far, ONLY CSR Qishuyan are the one who purchase the bidding form for 50 Diesel electric locomotives ... while the 120 leased locomotives are the temporary solution before the massive electrification of the main trunk lines nationwide with a hope to be done within 15 years
http://www.ryt9.com/s/iq05/2385037
http://www.banmuang.co.th/news/economy/43221
http://www.bangkokbiznews.com/news/detail/691096
http://www.ryt9.com/s/iq05/2384917
http://www.prachachat.net/news_detai...sid=1458214882
http://nwnt.prd.go.th/centerweb/news...O5903170010034
http://www.manager.co.th/iBizChannel...=9590000028097

SRT appealing to cabinet to lift the cabinet resolution on 28 July 1998 which limit the new recruits to 5 new railway men to 100 retired railway men to cut down the personnel and human resource expenditure including pension funds
Now, there is 11000 railway men left despite of the demand for 16000 railway men .... or even 17000 railway men - need 5-6000 new locomotive drivers and civil work engineers.

Note: I expect Ministry of Finance to oppose the appeal from SRT to recruit more railway men to the bitter end as MoF (creditors) wants more efficient to the point that 1 railway men must accomplish the things that need 20 railway men to do the same job. So, there should be just 850 railway men to do something like 17000 railway men have done.
http://www.thaiday.com/Home/ViewNews...=9590000027938

on the issue of Chumporn - Surat Thani double tracking, here is the way the stations building must be changed:
1. Renovating 9 Small stations
1.1 Changing the structure and material for the single floor station building (Saeng Daed, Thung Kha, Klong Khanan, Khanthulee, Maluan, and Ban Thung Pho Junction)
1.2 Changing the structure and material for the double floor station building (Khao Suan Thurian)
1.3 Repainting - Lamae and Tha Chang)
2. rebuilding the new station buildings for small stations - Wisai, Thung Tako, Pak Tako, Kuan Hin Mui, Ban Duad, Don Thoob, Khao Phanom Baek, Klong Sai
3. rebuilding the new station buildings for middle size stations - Sawee station and Tha Chana station
4. rebuilding the new station buildings for Large stations at grade - Lang Suan station
5. rebuilding the new station buildings for Large stations as elevated station - Chaiya station
6. partial renovating and partial rebuilding of Large station - Surat Thani station

https://www.facebook.com/ChaiyaStati...70141369819862

Here is how the coupling of the 115 aircon carriage will be in use so it cannot be interchanged with other carriage for sure as it would not use the AAR Type E coupling but using Semi Permanent coupling just like BTS Skytrain - MRTA Subway and Airport Link AAR Type E will be at the Aircon Power car and the end of First Class Aircon - If something gone wrong in one carriage, the whole set has to be cut
https://www.facebook.com/groups/metr...4730507645696/
__________________
BKK Mass Transit Expert

dimlys1994 liked this post

Last edited by Wisarut; March 17th, 2016 at 10:14 PM. Reason: corrrecting
Wisarut no está en línea   Reply With Quote
Old March 18th, 2016, 09:40 PM   #570
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,828
Likes (Received): 15603

SRT proposes seven rail projects
18 Mar 2016 at 08:10 WRITER: AMORNRAT MAHITTHIROOK

The State Railway of Thailand (SRT) will propose seven dual-track railway routes to the cabinet for its approval this month.

SRT Governor Wutthichart Kalayanamitr yesterday said the seven double-track rail lines will be submitted to the Transport Ministry before being forwarded to the cabinet.

If the submissions are approved, bidding for the seven rail routes will be held.

The SRT planned to propose the seven railway projects after Prime Minister Prayut Chan-o-cha exercised Section 44 of the interim charter to fast-track them.

Under the order, the bidding and the environmental impact assessment (EIA) are able to be carried out simultaneously.

Of the seven proposed railways, three routes which passed EIAs were
  1. Map Kabao-Thanon Chira Junction (132km) worth 29.8 billion baht;
  2. Nakhon Pathom-Hua Hin (165km) valued at 20 billion baht;
  3. Prachuap Khiri Khan to Chumphon (167km) at a cost of 17.2 billion baht.

The four other routes which remained under the EIA process were
  1. Lop Buri-Pak Nam Pho (148km) worth 24.8 billion baht;
  2. Hua Hin-Prachuap Khiri Khan (90km) costing 9.43 billion baht;
  3. Ban Phai-Nakhon Phanom (347km) worth 60 billion baht;
  4. Den Chai-Chiang Rai-Chiang Khong (326km) valued at 77 billion baht.

"The bidding will be held for all seven projects after being approved by the cabinet," Mr Wutthichart said.

"However, only three routes will be constructed as they already underwent EIAs."

As for the other four lines, the bidding and the EIAs will be carried out at the same time in a bid to shorten the duration. Contractors will be finalised before the EIA results come out.


Mr Wutthichart, however, insisted that every project must undergo an EIA before it is signed off.

Commenting on the progress of the Red Line railway linking Bangkok to Pathum Thani, the SRT governor said the agency will also sign a contract with the MHSC Consortium, which is contracted to supply the electrical and mechanical system and train carriages for the route, this month.

The rail projects are divided into two sections: Bang Sue-Rangsit and Bang Sue-Taling Chan.

He said the SRT is in the process of setting the date for a contract signing ceremony.

For two high-speed trains from Bangkok-Hua Hin (211km) worth 94.6 billion baht and Bangkok-Pattaya-Rayong (193.5km), Mr Wutthichart said the projects will be constructed under Public-Private Partnerships (PPPs).

The agency is working on the projects' details which were expected to be completed next month.

The issue will be then forwarded to the State Enterprise Policy Office to set up a PPP committee to oversee the projects.

Meanwhile, Pakpoom Srichamni, president of Sino-Thai Engineering and Construction PCL, said bidding for the seven dual-track railway routes was regarded as a good opportunity for the construction investment sector.

"If the state is able to launch those projects in accordance with their frameworks, it will give the government more credibility. More private firms will invest in the state's projects," Mr Pakpoom said.

http://www.bangkokpost.com/news/gene...-rail-projects

__________________
-Noblesse Oblige-

dimlys1994 liked this post

Last edited by Codename B; March 18th, 2016 at 09:57 PM.
Codename B no está en línea   Reply With Quote
Old March 23rd, 2016, 06:25 PM   #571
wwc234
Registered User
 
wwc234's Avatar
 
Join Date: Apr 2013
Posts: 22,263
Likes (Received): 5115

SRT Double track Jira - Khon Kaen double tracking 187km khonkaen station

Quote:
Originally Posted by CNXWORLD View Post

Quote:
Originally Posted by offgaga View Post
สถานีขอนแก่น
https://www.facebook.com/Khonkaen-Sk...43118/?fref=ts





https://www.facebook.com/KhonKaenCit...77442358944730

Last edited by wwc234; March 24th, 2016 at 07:26 AM.
wwc234 está en línea ahora   Reply With Quote
Old March 24th, 2016, 06:47 AM   #572
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,579
Likes (Received): 2532

Final settlement for Thai - China Railway - Thailand (Bangsue Central- Nakhon Ratchasima) will invest by itself - Mainland China better supply loan as needed after learning about the plan to "invest" on land strip along the line (Read: Railway land along the route as almost all the land strip in question belong to SRT) -

After all, Nakhon Ratchasima is the home of Big Too so this section of Thai - China railway will have to be done at all cost but it should not stir the anti foreigner sentiment of Thai nationalists which have a real and lethal potential to become political time bombs.
http://www.dailynews.co.th/politics/387468
http://www.prachachat.net/news_detai...sid=1458733915
http://manager.co.th/Home/ViewNews.a...=9590000030354
http://www.naewna.com/business/208381
//--------------------------------------

Chumporn - Surat Thani double tracking with the max speed of 160 kph and distance of 168.20 km and 21 stations with the investment of 33,513.90 Million Baht. This double track will be constructed in 2018 and done in 2021 - need to appropriate the land of 167.94 Rai for 13 curve corrections - 97 Rai at Mueang district of Chumporn, 5.52 Rai at Sawee district of Chumporn, 0.78 Rai at Sawee district of Chumporn, 23.23 Rai at Sawee district of Chumporn and 32.96 Rai at Lamae district of Chumporn. This will cut the travel time from 3 hours to 1 hours and 30 minutes as it has to deal with 108 level crossings ... EIRR is at 12.80 % and economic benefits of 4,309 Million Baht - the passenger will be 1,749,100 men a year and 883,500 tons of cargo a year in 2022.

http://www.prachachat.net/news_detai...sid=1458535088










307.7 km Double Thanon Jira - Ubon double tracking with a price tag of 48,480.93 Million Baht with 34 stations excluding Thanon Jira Junction - This will cut the travel time from 5 hours 30 Minutes to 3 hours and 15 minutes as it has to deal with 131 level crossings to allow 160 kph

There will be 4 container yards

Ban Tako Stop in Buriram at km 382 + 152.401
Bu Rusee station in Surin (a station after Surin) at km 430 + 619.238
Nong Waeng station in Sisaket (a station after Sisaket) at km 529 + 213.415
Bung Wai station in Ubon (a station before reaching Ubon terminus) at km 568 + 302.340

Starting point at km 270 + 000
EOL at km 577 + 700
land exappropriation will be at Nong Waeng station for constructing the access roads to Container Yard to connect with Highway 226

Economic benefit of 6122.8 Million baht a year in 2022 with expected number of passenger at 7.22 million Baht a year and 860,200 tons of cargo a year - EIRR is at 14.22%

Station designs

Specially large stations (Station class 1 with status as provincial stations) - 4 stations - Buriram, Surin Sisaket (elevated station) and Ubon terminus
large stations (Station class 1 at district stations) - 3 stations - Lam Plaimas, Sikhoraphum - Uthumpornphisai
middle stations (station class 2) - 8 stations Chakkarat, Hin Dat, Huay Thalaeng, Huay Rat, Krasang, Samrongthab, Huay Thubthan, Kanthararom
small stations (station class 3), Ban Phanao, Tha Chang, Nong Manorom, Ban Hin Khone, Nong Kating, Thamenchai, Ban Salaengphan, Ban Nongtat, Nong Teng, Lamchee, Bu Ruesee, Mueang Thee, Kradon Klaw, Ban Kalan, Ban Niam, Nong Waeng, Ban Klow, Huay Khayung, Bung Wai
Halts - 7 halts Ban Phra Phut, ban Tako, Nong Khaen, Ban Tae, Chaloem Karn Collage, Ban None Phueng, Ban Thon
http://www.chira-ubonrailway.com/file/board3.pdf
http://www.chira-ubonrailway.com/file/board3.pdf
http://manager.co.th/Local/ViewNews....=9590000029879
http://www.brighttv.co.th/th/news/%E...B9%88%E0%B8%87
http://region2.prd.go.th/ewt_news.ph...filename=index





Construction of Thanon Jira - Khon kaen station started by constructing the elevated station at Khon Kaen first
https://www.facebook.com/permalink.p...51084665143118
https://www.youtube.com/watch?v=MArwG_T89M0
__________________
BKK Mass Transit Expert

Last edited by Wisarut; March 24th, 2016 at 07:31 AM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old March 24th, 2016, 04:56 PM   #573
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,828
Likes (Received): 15603

RAIL PROJECTS (u/c & on-going)

MASS TRANSIT
BANGKOK - NONTHABURI - SAMUT PRAKAN
  1. MRT Light Green line South extension - (12.8 km) - 79.31%
  2. MRT Light Green line North extension - (18.4 km) - 4.66%
  3. MRT Blue line extension - (27 km) - 73.37%
  4. SRT Light Red line - (15 km) - 100%
  5. MRT Purple line - (23 km) - 100%
  6. SRT Dark Red line - (26 km) - 57%
  7. MRT Orange line - (21 km) - Bidding in April
  8. MRT Pink line Monorail - (34.5 km) - Bidding in May
  9. MRT Yellow line Monorail - (30.4 km) - Bidding in May
  10. MRT Purple line extension - (19.8 km) - Bidding in August
  11. SRT Dark Red line extension - (10 km) - Bidding mid 2016
  12. SRT Airport Rail link extension - (21.8 km) - Construction in September
  13. SRT Red line Missing Link extension - (25.5 km) - Construction in September
  14. BMA Gold line AGT - (2.7 km) - Construction in 2017
  15. BTS Light Green line Second South extension - (7 km) - Waiting for cabinet approval
  16. BTS Light Green line Second North extension - (6.5 km) - Waiting for cabinet approval
  17. BTS Dark Green line extension - (7.5 km) - Waiting for cabinet approval
  18. MRT Blue line West extension - (8 km) - Waiting for cabinet approval
  19. MRT Orange line West extension - (17.5 km) - Waiting for EIA
  20. BMA Grey line Monorail - (16.25 km) - Waiting for EIA
  21. BMA Light Rail Transit - (19.2 km) - Waiting for EIA

PHUKET
  • Light Rail Transit - (60 km) - Construction in 2017

KHON KAEN
  • Light Rail Transit - (26 km) - Construction in 2017

HAT YAI
  • Monorail - (12.54 km) - Waiting for EIA

NATIONWIDE DOUBLE TRACKING RAILWAY
  1. Kaeng Khoi - Klong 19 - Chachoengsao (106 km) - U/C
  2. Thanon Jira - Khon Kaen (185 km) - U/C
  3. Prachuab Khirikhan - Chumporn (167 km) - Construction in July
  4. Lopburi - Pak Nam Pho (148 km) - Construction in October
  5. Map Krabao - Thanon Jira (132 km) - Construction in October
  6. Hua Hin - Prachuab Khirikhan (90 km) - Construction in July
  7. Ban Phai - Nakhon Phanom (347 km) - Construction in 2017
  8. Den Chai - Chiang Rai - Chiang Khong (326 km) - Construction in 2017
  9. Khon Kaen - Nong Khai (174 km) - Waiting for EIA
  10. Thanon Jira - Ubon Ratchatani (309 km) - Waiting for EIA
  11. Chumporn - Surat Thani (167 km) - Waiting for EIA
  12. Surat Thani - Hatyai - Songkla (324 km) - Waiting for EIA

HIGH-SPEED RAIL
  1. Sino HSR Bangkok - Nongkhai (873 km) - Construction of first phase in August-September
  2. Joint Thai-Japanese HSR Bangkok - Chiang Mai (672 km) - Cabinet approval in June
  3. Public Private Partnership HSR Bangkok - Pattaya - Rayong (194 km) - Bidding Mid 2016
  4. Public Private Partnership HSR Bangkok - Hua Hin (211 km) - Bidding Mid 2016
__________________
-Noblesse Oblige-

Last edited by Codename B; March 28th, 2016 at 07:48 PM.
Codename B no está en línea   Reply With Quote
Old March 28th, 2016, 07:00 PM   #574
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,828
Likes (Received): 15603

115 Sleeper Passenger Coach Set

The 115 Sleeper Passenger Coach Set by CNR Changchun Railway Vehicles that was ordered are being assembled and the first three carriages will be arriving in July, where it will be used on the route Bangkok - Chiang Mai on August 5.

All 115 carriages can handle a speed up to 120 km/h and will all arrive in December, where it will be used for the following main lines.
  • Bangkok - Chiang Mai
  • Bangkok - Ubon Ratchathani
  • Bangkok - Nong Khai
  • Bangkok - Hat Yai









Credit: https://twitter.com/hamzterzkub/stat...65543735439361





Pics by https://www.facebook.com/Trainlism/?fref=ts
__________________
-Noblesse Oblige-

dimlys1994 liked this post
Codename B no está en línea   Reply With Quote
Old March 30th, 2016, 02:22 PM   #575
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,579
Likes (Received): 2532

Finally, the 3rd contract for electrification and EMUs for red line commuter has been signed between SRT and Mtisubishi Heavy Industry - Hitachi - Sumitomo Corps with a price tag of 32,399,999,699 Baht (112,000 Million Yen) to be done in 48 months - around 2019-20
http://www.manager.co.th/iBizChannel...=9590000032840
http://www.thairath.co.th/content/598447
http://www.prachachat.net/news_detai...sid=1459334848
https://www.facebook.com/pr.railway/...98967340118134

Even Japanese starting to talk about the 3rd contract for electrification and EMUs for red line commuter has been signed between SRT and Mtisubishi Heavy Industry - Hitachi - Sumitomo Corps with a price tag of 32,399,999,699 Baht (112,000 Million Yen)
http://www.thaich.net/news/20160330z.htm



Contract signing ceremony for the 3rd contract for electrification and EMUs with Mitsubishi Heavy Industry - Hitachi - Sumitomo corps
https://www.youtube.com/watch?featur...&v=G-TeZBbyIAI
__________________
BKK Mass Transit Expert

dimlys1994 liked this post

Last edited by Wisarut; April 1st, 2016 at 04:28 PM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old April 1st, 2016, 04:19 PM   #576
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,579
Likes (Received): 2532




Reopening Ban Laem - Maeklong railway line after major repairs at 09.09AM of 1 April 2016
http://www.krobkruakao.com/%E0%B8%82...%E0%B8%A1.html
https://www.youtube.com/watch?featur...&v=1cBuUcwYCO4
http://www.thairath.co.th/content/599620
http://www.now26.tv/view/73604
http://www.dailynews.co.th/regional/389155
https://www.youtube.com/watch?featur...&v=r_vrnBka2G8
https://www.youtube.com/watch?v=nqJtcn8XYTk
http://www.manager.co.th/iBizChannel...=9590000033706
__________________
BKK Mass Transit Expert

dimlys1994, stingstingsting liked this post
Wisarut no está en línea   Reply With Quote
Old April 4th, 2016, 03:20 PM   #577
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,579
Likes (Received): 2532


the main reason why Bangsue central - Makkasan of red line commuter has to be underground - Chitladda Palace and Chitladda Royal station
https://www.facebook.com/RenderThail...453899/?type=3
https://www.facebook.com/RenderThail...type=3&theater
__________________
BKK Mass Transit Expert

dimlys1994, Swede liked this post
Wisarut no está en línea   Reply With Quote
Old April 14th, 2016, 09:55 AM   #578
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,579
Likes (Received): 2532

Summary of NATIONWIDE DOUBLE TRACKING

Phase 1 construction

1. 1. Kaeng Khoi - Klong 19 - Chachoengsao (106 km - km 61 + 190 at the Bifurcation point 10 km 167 + 800 at the western end of kaeng Khoi Junction ) original cost at 11348.4 Million Baht - the actual bidding is 10232.86 Million Baht

Contract 1 by STECON at 9825.81 Million Baht to deal with almost all sections (97 km) and three chord lines to bypass Ban Phachi Junction (km.92 + 000 km 93 +600 to connect Northern line with Northeastern line), Kaeng Khoi Junction (km. 163+350 to km.167+400 ), and Chachoengsao Junction (km.61+190 km 62 +600 to connect Aranyaprathet line with Sattahip line) + + Phai Na Bun station at km 162 + 819 except Phra Phutthachai tunnel and Bu Yai station yard to be done in Feb 2019

Contract 2 by Right Tunneling at 407.05 Million Baht to deal with 1.2 km Phra Phutthachai tunnel (km.147+100 to km. 148+307) and Bu yai station yard (9 km) to be done in April 2018


2. Thanon Jira - Khon Kaen (185 km - including the new elevated station at Khon Kaen and 3 container yard at Ban kradone, Bua Yai and Tha Phra - CY at Ban Kradone is to replace Ban Koh Container yard due to the urban expansion of Ban Koh town [Suburb of Khorat city]) original cost at 26,152.70 Million Baht before being cut down to 26004.90 Million Baht - the actual bidding is 23430 Million Baht by CKCH (Ch. Karnchang and Ch. Thawee Construction) to be done in Feb 2019


3. Prachuab Khirikhan - Chumporn (167 km - including the new station building at Prachuab Khirikhan and Chumporn + 5 halts along with the removal of the main building of 14 stations) original cost at 17,452.53 Million Baht - the reduced cost is 17290.63 Million Baht and construction cost 16704.70 Million Baht - waiting for cabinet approval after EIA has been done so as to start the bidding in May 2016 and contract signed in October 2016


4. Lopburi - Pak Nam Pho (148 km - including 30 km bypass route at Tha Wung) - original cost at 24,918.74 Million Baht the reduced cost 24840.54 Million Baht - the construction cost is 24091.91 Million Baht - waiting for cabinet approval after EIA has been done so as to start the bidding in May 2016 and contract signed in September 2016 so the construction can be started in October 2016

there will be 2 contracts for this double tracking
'
4.1 32 km Tha Wung bypass - started at km 121 + 250 (Ban Klab station) - following the old route for 4 km before turning left to become elevated track and follow Highway 311 until it has reach Tha Wung intersection to turn right to the northern end of Khok krathiam station before reaching Tha Khae station
4.2 116 km from Tha Khae station to Pak Nam Pho station


5. Map Krabao - Thanon Jira (132 km - including 4 new tunnels, new station buildings and new via ducts to pass through Dong Phraya Yen and Lam Takhong reservoir) - original cost at 29,968.62 Million Baht the reduced cost is 29853.18 Million Baht the construction cost is now 28991.81 Million Baht - waiting for cabinet approval after EIA has been done so as to start the bidding in May 2016 and contract signed in September 2016 so the construction can be started in October 2016 - there will be 2 contracts

5.1 Map Krabao to Pang Asoke - km 134+250 to km 165+199.639 including 2 new railway tunnel - Hin Lap tunnel between km 136+250 and km 141+800 and Muak lek tunnel between km 144+850 to km 145+100 and elevated track between km.147+800 to km. 152+650

5.2 Pan Asoke to Thanon Jira junction - km 165+199.639 to km 270+000 including Lam Takong tunnel between km 198+400 to km 199+550



6. Nakhon Pathom-Hua Hin (165km from km 47+700 to km 217+700 - including the new elevated station at Hua Hin due to the elevated track from km 211+582.900 to km.215+872.900) original cost at 20,145.59 Million Baht - the reduced cost is 20036.53 Million Baht with construction cost of 19163.34 Million Baht - waiting for cabinet approval after EIA has been done so as to start the bidding in May 2016 and contract signed in September 2016 so the construction can be started in October 2016


Phase 2 construction

7. Hua Hin - Prachuab Khirikhan (90 km) original cost at 8729 Million Baht - the reduced cost is 8516 Million Baht - Need EIA Clearance which is to be done in July 2016 cabinet approval in August 2016

8. Pak Nam Pho - Denchai (285 km) - design to be done by the end of April 2016 - Waiting for EIA

9. Thanon Jira - Ubon Ratchatani (309 km) - - design to be done by the end of April 2016 - Waiting for EIA

10. Khon Kaen - Nong Khai (174 km) - design to be done by the end of April 2016 - Waiting for EIA

11. Chumporn - Surat Thani (167 km) - design to be done by the end of April 2016 - Waiting for EIA

12. Surat Thani - Hatyai - Songkla (324 km) - design to be done by the end of July 2016 - Waiting for EIA

New Lines which just has been approved for investment by SRT Board just before Sonkran 2016:
1. Den Chai - Chiang Rai - Chiang Khong (323 km) original cost at 77484.14 Million Baht - the reduced cost is 76,980 Million Baht (Construction cost is 71696.34 Million Baht)- need to wait for NESDB approval in May 2016 and cabinet approval in June 2016 before drafting the TOR for bidding in August - September 2016 - so as to call a bidding in October 2016 - January 2017 ... However, EIA will be done by the end of June 2018 so the construction will be actually started at the end of 2018 even though there is a plan for preliminary construction at the less problematic sections in Mid 2017 - and it will take 48 months to be done so this line will be opened in December 2022 - with a hope to get the passengers at 4811 passengers a day + 859 tons of cargo since this line has economic benefit of 13.31% and financial benefit of 1.02%

2. Ban Phai - Nakhon Phanom (355 km) - original cost at 30510.60 Million Baht at 347 km but the cost overrun due to the pressing demands by local people has to move the starting point from Bang Phai station to the new station 2-3 km North of Ban Phai station so as to get enough space for the yard along with the demands from those in Loeng Nok Tha district of Yasothon so as to make Loeng Nok Tha to become the main dropping point for Yasothon and Amnart Charoen so the new cost is 60,353 Million Baht (construction cost 54226.86 Million Baht) - need to wait for NESDB approval in May 2016 and cabinet approval in June 2016 before drafting the TOR for bidding in August - September 2016 - so as to call a bidding in October 2016 - January 2017 ... However, EIA will be done by the end of June 2018 so the construction will be actually started at the end of 2018 even though there is a plan for preliminary construction at the less problematic sections in Mid 2017 - and it will take 48 months to be done so this line will be opened in December 2022 - with a hope to get 8628 passengers a day and 1713 tons of cargo a day since this line has economic benefit of 12.04% and financial benefit of 1.49%


While the connection between Bangsue and Tao Poon has not been opened yet, SRT is going to run 3 km shuttle from Bangsue Junction all the way to Bang son station to allow the connection between Blue ring subway and purple line MRT
http://www.realist.co.th/blog/%E0%B8...8%B2%E0%B8%A2/
http://www.thairath.co.th/content/603212
http://www.posttoday.com/biz/gov/426411
http://www.thairath.co.th/content/604661
http://www.prachachat.net/news_detai...sid=1460534748
http://www.realist.co.th/blog/%E0%B8...8%97%E0%B8%A2/
__________________
BKK Mass Transit Expert

Codename B, tjrgx liked this post

Last edited by Wisarut; April 16th, 2016 at 08:45 PM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old April 14th, 2016, 11:16 AM   #579
Swede
forumer #29
 
Swede's Avatar
 
Join Date: Aug 2002
Location: sol.III.eu.se.08
Posts: 4,213
Likes (Received): 1663

Quote:
Originally Posted by Wisarut View Post
https://scontent.fbkk10-1.fna.fbcdn....97901003_o.jpg
the main reason why Bangsue central - Makkasan of red line commuter has to be underground - Chitladda Palace and Chitladda Royal station
https://www.facebook.com/RenderThail...453899/?type=3
https://www.facebook.com/RenderThail...type=3&theater
Those trains in the double-stacked tunnel? They sure look a lot like Stockholm's commuter trains.
Not just the type of train but also the paint-job: http://www.jarnvag.net/images/bild/v...bild/DT966.jpg
__________________
Forumers met so far:
Huopa, Nightsky, Jo, wolkenkrabber, ThisSideofSteinway, jacksom, New Jack City, LeCom, Ellatur, Jan, Dennis, Ace, Bardamu, AtlanticaC5, Ringil, Dysfunctional, stacey, karakhal, ch1le, Hviid, staff, kjetilab, Ūrķndeimr, queetz, FREKI, sander, Blue Viking, nomels, Mantas, ristov, Rafal_T, khaan, Chilenofuturista, Jonte Myra, safta20, AW, Pas, Jarmo K, IceCheese, Sideshow_Bob, sk, Ingenioren, Ayreonaut, Silver Creations, Hasse78, Svartmetall
Swede no está en línea   Reply With Quote
Old April 14th, 2016, 11:31 AM   #580
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,828
Likes (Received): 15603

That was just a render done by rail fans. The real train that was recently ordered from Japan's MHSC Consortium (Mitsubishi, Hitachi and Sumitomo) will look like this

Hitachi train

__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 03:05 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium