Old April 15th, 2016, 01:49 PM   #581
Swede
forumer #29
 
Swede's Avatar
 
Join Date: Aug 2002
Location: sol.III.eu.se.08
Posts: 4,215
Likes (Received): 1663

Hold on!
THAT render was made by rail fans?
Seriously well made. I just assumed it was an official one.
__________________
Forumers met so far:
Huopa, Nightsky, Jo, wolkenkrabber, ThisSideofSteinway, jacksom, New Jack City, LeCom, Ellatur, Jan, Dennis, Ace, Bardamu, AtlanticaC5, Ringil, Dysfunctional, stacey, karakhal, ch1le, Hviid, staff, kjetilab, Þróndeimr, queetz, FREKI, sander, Blue Viking, nomels, Mantas, ristov, Rafal_T, khaan, Chilenofuturista, Jonte Myra, safta20, AW, Pas, Jarmo K, IceCheese, Sideshow_Bob, sk, Ingenioren, Ayreonaut, Silver Creations, Hasse78, Svartmetall

Codename B liked this post
Swede no está en línea   Reply With Quote

Sponsored Links
Old April 16th, 2016, 10:03 AM   #582
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15607

This is their Facebook fan page: https://www.facebook.com/RenderThailand/?fref=nf
__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old April 18th, 2016, 02:20 PM   #583
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532

Here is more details on Surat Thani - Hatyai - Songkla (324 km) double tracking - the actual double tracking is 321 km - which is to be split into 2 sections

1. Surat Thani - Hat Yai - 291 km - 58 stations and stops - Surat Thani station major renovation excluded as it has become a part Chumporn - Surat Thani double tracking

2. Hat Yai - Songkla - 29 km - - there will be at grade section on km 928 + 643 to km 930 + 900 (Songkla line) and km 941+ 600 (Songkla line) - km 952 + 500 (Songkla line) with station at Talad Phawong and Nam Krachai

becoming elevated track from km 930 + 900 to km 941+ 600 (Songkla line) and km 952 + 500 (Songkla line) to the EOL at km 957 + 860 (Songkla line) due to the urban encroachment ... with elevated stations at Klong Hae (near Klong Hae floating market), Ban Koh Mee, Thung Yai, Khao Roob Chang and Songkla terminus at the western end of the old Songkla terminus building which has been preserved

http://www.songkhlastation.com/pdf/s...oc-group-2.pdf
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old April 18th, 2016, 08:52 PM   #584
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532

Quote:
Originally Posted by STN
Any plans to double track the Hat Yai Junction - Yala - Sungai Golok and Hat Yai Junction - Padang Besar (Malaysia) sections as well ?
At least, the government has to come up with electrified double tracking for the section from Hatyai to Padang besar to allow KTMB EMUs to reach Hat Yai even though this project means 12


The starting point km 928+750 (hat Yai station yard)
the Ending Point km 973+345 (border Pole)

Curve correcting from km 966+000 – km.967+300 - the old section closed once this curve correcting section has been opened.

3 elevated tracks section
1) km. 932 + 200 (before the level crossing with Highway 4) to km 935+500 (Ban Phru Halt)
2) km. 951+300 (before reaching Klong Ngae station) to km. 953+000
3) km. 954+500 – km.955+200
http://www.hatyai-padangdoubletrack....%E0%B8%A22.pdf
http://www.hatyai-padangdoubletrack....-9-58-edit.pdf
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old April 18th, 2016, 09:28 PM   #585
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15607

A good summary by khun Appleich of the infrastructure projects in Thailand, which includes double track rail lines.

Quote:
Originally Posted by Appleich View Post
Summary of Thailand's ongoing infrastructure projects

as of April 2016

Under Construction
Bangkok and vicinity areas
  • Metro rail : MRT Purple Line (23 km., THB 130 billion)
  • Metro rail : MRT Light Green Line - South extension (12.8 km., THB 16.49 billion*)
  • Metro rail : MRT Blue Line extension (27 km., THB 53.83 bilion*)
  • Metro rail : MRT Light Green Line - North extension (18.4 km., THB 28.89 billion*)
  • Commuter rail : SRT Dark Red Line + Bang Sue Central Station (26 km., THB 83.46 billion)
  • Commuter rail : SRT Light Red Line (15 km., THB 8.75 billion)
  • Expressway : Si Rat - Western Outer Ring Road (16.7 km., THB 27.02 billion)

    * Figure yet to be finalized; Additional costs are to be determined.
Elsewhere
  • Double track railway : Thanon Chira Junction - Khon Kaen (185 km., THB 26 billion)
  • Double track railway : Kaeng Khoi Junction - Khlong Sip Kao Junction - Chachoengsao Junction (106 km., THB 10.5 billion)
  • Motorway : Pattaya - Map Ta Phut (32 km., THB 20 billion)
  • Airport : Utapao International Airport expansion (THB 300 million)
  • Airport : Phuket International Airport expansion (THB 5.15 billion)
  • Seaport : Laem Chabang Port A (THB 1.86 billion)

Under Bidding
  • Motorway : Bang Pa-in - Nakhon Ratchasima (196 km., THB 84.6 billion)
  • Airport : Suvarnabhumi Airport - 2nd Phase (THB 51.6 billion)
  • Railway : Laem Chabang Port's Single Rail Transfer Operator - 1st Phase (THB 2 billion)

Cabinet Approved
  • Monorail : MRT Pink Line (34.5 km., THB 53.4 billion)
  • Monorail : MRT Yellow Line (29.1 km., THB 51 billion)

Under Ministerial Review
  • High speed rail : Bangkok - Hua Hin (211 km., THB 94.6 billion)*
  • High speed rail : Bangkok - Rayong (193.5 km., THB 152 billion)*
  • Commuter rail : SRT Dark and Light Red Line extension (the Missing Link; 25.9 km., THB 44.16 billion)^
  • Commuter rail : Airport Rail Link extension (ARLex; 22 km., THB 22 billion)^

    * To be submitted to State Enterprise Policy Office for a review under PPP process.
    ^ To be submitted for Cabinet's approval and to undergo PPP process.

Board of Directors Approved
  • Double track railway : Map Kabao - Thanon Chira Junction (132 km., THB 29.8 billion)
  • Double track railway : Lop Buri - Pak Nam Pho (148 km., THB 24.8 billion)
  • Double track railway : Prachuap Khiri Khan - Chumphon (167 km., THB 17.2 billion)
  • New double track railway : Den Chai - Chiang Rai - Chiang Khong (363 km., THB 76.98 billion)
  • New double track railway : ฺBan Phai - Nakhon Phanom (355 km., THB 60.35 billion)
  • Metro rail : MRT Orange Line (21 km., THB 110 billion)

Under Environmental Impact Assessment (EIA)
  • Motorway : Bang Yai - Kanchanaburi (96 km., THB 55.6 billion)*
  • Double track railway : Nakhon Pathom - Hua Hin (165 km., THB 20 billion)
  • Metro rail : MRT Purple Line - South extension (23.6 km., THB 131 billion)

    * Approved by the cabinet but currently undergoing EIA reassessment. Once the reassessment is completed, the project is to be bid out around July.

Under Planing and Proposed
  • High speed rail : Bangkok - Nakhon Rathchasima (250 km., THB 170 billion)
  • Metro rail : MRT Light Green Line - 2nd South extension (Samut Prakarn - Bang Pu; 7 km., THB 13 billion)
  • Metro rail : MRT Light Green Line - 2nd North extension (Khu Khot - Lam Luk Ka; 7 km., THB 19 billion)


References :
__________________
-Noblesse Oblige-

dimlys1994 liked this post
Codename B no está en línea   Reply With Quote
Old April 25th, 2016, 09:43 AM   #586
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532

the first 2 sets (13 carriages/set) for the new aircon carriages from CNR Changchun will be delivered to Laem Chabang deep sea port on 10 July 2016 and commissioned to run Nakhon Phing express in August 2016 - existing carriages will be refurbish with purple and yellow livery with major renovation of toilets at 200000 Baht per carriage - with the first 148 third class carriages first and then the other carriages from 2015 to 2017 with first phase to be done in September 2016

the 308 BCFs from Er Shi will be commissioned once the first 150 BCFs delivered in September 2016 and the other 158 BCFs delivered in November 2016 to be assigned for the lucrative Lad Krabang ICD - Laem Chabang route

4 VIP Reserve saloons will be renovated to make money for special trains

Even though the bidding for 50 new carriages have to be cancelled, they will draft better TORs for the second bidding while they consider leasing 20 new locos to deal with loco shortages
http://www.thansettakij.com/2016/04/25/45561
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old April 27th, 2016, 12:23 PM   #587
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532





Plan for bidding of double tracking of 2 sections of Southern line after the cabinet has approved the 167 km Prachuab Khirikhan -Chumporn double tracking at 17,249.90 Million Baht which is to be on bidding in May - August 2016 and contract signed in September 2016

1. the 165 km Nakhon Pathom - Hua Hin at 20,145.03 Million Baht - to be on bidding in May 2016 and contract signed in October 2016
2. the 90 km Hua Hin - Prachuab Khirikhan at 10,301.95 Million Baht - to be on bidding in May 2016 and contract signed in October 2016

the other 2 lines pending for approval of EIA

1. the 132 km Map Krabao - Thanon Jira at 29,667.66 Million Baht - to be on bidding in June - September 2016 and contract signed in October 2016 to be done in 2020
2. the 148 km Lopburi -Paknampho at 24,940.96 Million Baht - to be on bidding in June - September 2016 and contract signed in October 2016 to be done in 2020 - but need cabinet approval on 10 May 2016

The progress on double tracking projects to be done in 2019:
1. the 106 km Kaeng Khoi - Klong 19 - Chachoengsao at 10,549.97 Million Baht - 0.45%

2. the 185 km Thanon Jira - Khon Kaen at 24,075.90 Million Baht - 0.62%

the 25.9 km Red line commuter extension from Bangsue Central to Hua Mark and Bangsue Central to Hua Lamphong at 44,157.76 Million Baht just passes EIA but need NESDB approval though
http://www.matichon.co.th/news/119256
http://www.ryt9.com/s/iq05/2410286
https://www.youtube.com/v/Z6Re13Fwa9c
https://www.youtube.com/v/xrIHk96AXmw
http://news.thaipbs.or.th/content/251961
http://www.prachachat.net/news_detai...sid=1461664540
http://www.ryt9.com/s/iq03/2410366
https://www.youtube.com/watch?v=ei_H26F-UfE


Before the end of Makkasan Factory of SRT
https://www.youtube.com/watch?v=QrKZW0nnteU
http://www.prachachat.net/news_detai...sid=1461679323

Activities around railway market of Mae Klong
http://manager.co.th/Travel/ViewNews...=9590000033448
__________________
BKK Mass Transit Expert

dimlys1994 liked this post

Last edited by Wisarut; April 27th, 2016 at 03:01 PM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old April 28th, 2016, 05:31 AM   #588
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532


Here are CNR Changchun aircon carriages to be delivered at Laem Chabang Deep Sea Port in June 2016 before reaching Laem Chabang deep sea port on 10 July 2016
https://www.facebook.com/permalink.p...22323771159492
__________________
BKK Mass Transit Expert

dimlys1994 liked this post
Wisarut no está en línea   Reply With Quote
Old April 28th, 2016, 07:10 PM   #589
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15607

115 Sleeper Passenger Coach Set

The 115 Sleeper Passenger Coach Set by CNR Changchun Railway Vehicles that was ordered are being assembled and the first three carriages will be arriving in July,
where it will be used on the route Bangkok - Chiang Mai on August 5.

All 115 carriages can handle a speed up to 120 km/h and will all arrive in December, where it will be used for the following main lines.

Bangkok - Chiang Mai
Bangkok - Ubon Ratchathani
Bangkok - Nong Khai
Bangkok - Hat Yai

















https://www.facebook.com/permalink.p...22323771159492
https://www.facebook.com/permalink.p...22323771159492
__________________
-Noblesse Oblige-

dimlys1994, tjrgx, stingstingsting liked this post
Codename B no está en línea   Reply With Quote
Old April 28th, 2016, 08:38 PM   #590
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15607

Bang Sue Grand Station
Thailand's main train hub for mass transit, commuter rail, regional train and high speed train - Biggest station in South East Asia - Opens in 2019






April 22









Credit: Khun Watthana Saen-u-dom

__________________
-Noblesse Oblige-
Codename B no está en línea   Reply With Quote
Old April 30th, 2016, 11:30 AM   #591
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532




Modifying 8 BCFs + the old Break Van carriages which generally being attached behind the cargo trains for railway men who control cargo trains to have solar power sets with 160 W per set + 2 sets of 160 AH Gel Lead Acid Battery of VRLA Deep cycle model so as to run electricity to add more comforts to those railway men including LED marker light, illuminating light and electric fans + USB Smart Phone battery chargers

it takes 10 - 15 hours for fully charged for the normal daylight and it will take 3 days to spend the electric power if you run the fan - 7 days if not running the fan

Credit: Photographs and Information by Mr Umnuay Poosawat
https://www.facebook.com/trafficsrt/...33467026770812
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old May 3rd, 2016, 06:58 AM   #592
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532


Station yards for Prachuab Khirikhan - Chumporn double tracking
https://www.facebook.com/media/set/?...7963886&type=3


Small stations for Prachuab Khirikhan - Chumporn double tracking - following Hua Hin station as the basic idea
https://www.facebook.com/ThaiRailNew...type=3&theater


Medium size stations for Prachuab Khirikhan - Chumporn double tracking - following Hua Hin station as the basic idea
https://www.facebook.com/ThaiRailNew...type=3&theater


Large stations for Prachuab Khirikhan - Chumporn double tracking - following Hua Hin station as the basic idea
https://www.facebook.com/ThaiRailNew...type=3&theater


Station yards for Thanon Jira - Khon Kaen double tracking - Khon Kaen has to be elevated station
https://www.facebook.com/media/set/?...7963886&type=3
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old May 3rd, 2016, 09:44 PM   #593
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532

More information for electrified double tracking from hat Yai to Padang Besar
https://www.facebook.com/media/set/?...7963886&type=3

More information for Denchai - Chiang Mai double tracking
1. Denchai - Lampang going to follow the new route with max speed of 160 kph speed
2. Lampang - Chiang Mai going to follow much of the existing route - just curve widening to allow 120 kph max speed so as to pass EIA without trouble.
https://www.facebook.com/media/set/?...7963886&type=3

Initial Plan for Nationwide CTC

N1 Bangkok 1 -> BKK - Lopburi and Mae Klong
N2 Nakhon Sawan -> Lopburi - Sawankhalok
N3 Denchai -> Ban Dara Junction - Chiang Mai
NE1 Nakhon Ratchasima -> Ban Phachi - Ubon, Kaeng Khoi - Bua Yai - Thanon Jira - Bua Yai
NE2 Khon Kaen -> Bua Yai - Nong Khai
E1 Chachoengsao -> Both Aranyaprathet line, Sattahip Line, Map Taphut Line, and Kaeng Khoi - Klong 19 Bypass
S1 Bangkok 2 -> BKK - Nakhon Pathom - Suphanburi, Nakhon Pathom - Phetburi, Nong Pladuek - Nam Tok
S2 Prachub Khirikhan -> Phetburi - Chumporn
S3 Surat Thani -> Chumporn - Kantang including Khirirat Nikhom
S4 hat Yai -> Thung Song - Sugei Golok, Nakhon Srithammarat Line, Padang besar, and Songkla

Updated plan :
Now, SRT Board agrees that CTC system must be truly centralized to ONE PLACE for the whole NATION - Chiang Rak
https://www.facebook.com/ThaiRailNew...type=3&theater


Plan for development on Bangkok terminus at Hua Lamphong - once SRT HQ has been moved to Bangsue central - and red line commuter being extended to Bangkok terminus at Hua Lamphong - Old HQ become Metropolitan Hotel (AKA Rajdhani Hotel)
https://www.facebook.com/ThaiRailNew...07907949291197
__________________
BKK Mass Transit Expert

Last edited by Wisarut; May 3rd, 2016 at 10:05 PM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old May 7th, 2016, 11:27 PM   #594
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15607

Thailand Double Track Railway Projects

Max passenger train speed: 160 km/h
Max freight train speed: 90 km/h


Under Construction
  • Double track railway : Jira Junction - Khon Kaen (185 km) - 0.62%
  • Double track railway : Kaeng Khoi - Khlong Sip Kao - Chachoengsao (106 km) - 0.45%

Approved by Board of Directors
  • Double track railway : Map Kabao - Thanon Chira Junction (132 km) - Construction in October
  • Double track railway : Lop Buri - Pak Nam Pho (148 km) - Construction in October
  • Double track railway : Prachuap Khiri Khan - Chumphon (167 km) - Construction in July
  • New double track railway : Den Chai - Chiang Rai - Chiang Khong (363 km)
  • New double track railway : Ban Phai - Nakhon Phanom (355 km)

Under Environmental Impact Assessment (EIA)
  • Double track railway : Nakhon Pathom - Hua Hin (165 km)
  • Double track railway : Hua Hin - Prachuab Khiri khan (90 km) - Construction in July
  • Double track railway : Jira Junction - Ubon Ratchathani - (309 km)
  • Double track railway : Khon Kaen - Nong Khai - (174 km)
  • Double track railway : Chumporn - Surat Thani - (167 km)
  • Double track railway : Surat Thani - Hatyai - Songkla - (339 km)
  • Double track railway : Denchai - Chiang Mai - (217 km)
  • Electrified Double track railway : Hatyai - Padang besar - (45 km)
__________________
-Noblesse Oblige-

Last edited by Codename B; May 8th, 2016 at 12:28 AM.
Codename B no está en línea   Reply With Quote
Old May 7th, 2016, 11:29 PM   #595
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15607

Double track railway : Jira Junction - Khon Kaen (185 km) - 0.62%




April 30, 2016











By Khun มารุต พานิชชาติ
https://www.facebook.com/ThaiRailNew...09776692437656
__________________
-Noblesse Oblige-

Last edited by Codename B; May 7th, 2016 at 11:53 PM.
Codename B no está en línea   Reply With Quote
Old May 8th, 2016, 12:04 AM   #596
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,823
Likes (Received): 15607

Double track railway : Kaeng Khoi - Khlong Sip Kao - Chachoengsao (106 km) - 0.45%




April 30, 2016











By Khun มารุต พานิชชาติ
http://www.skyscrapercity.com/showth...1071979&page=8
__________________
-Noblesse Oblige-

dimlys1994 liked this post
Codename B no está en línea   Reply With Quote
Old May 9th, 2016, 07:18 PM   #597
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532

Future of Bangkok terminus at Hua Lamphong as Railway Museum and Hotel?
http://km.mrta.co.th/MRTA_KM/downloa...evelopment.pdf
http://news.voicetv.co.th/thailand/304068.html
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old May 10th, 2016, 08:48 PM   #598
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532

In response to the termination of Peninsular express (Hatyai - JB Sentral) on 18 May 2016, those SRT passengers will have to reasjust the way to travel according to the following schemes until further notice:
1. In case of travelling from Hat Yai to Butterworth, it will go through the following process:
1.1 taking Shuttle 949 departed from Hatyai 13.05 to arrive at Padang besar at 15.00
1.2 taking commuter to Butterworth on the following trains:
- Depart Padang besar 15.30 to Butterworth 17.15
- Depart Padang besar 18.30 to Butterworth 20.38
- Depart Padang besar 20.40 to Butterworth 22.25
1.3 Alternatively, taking ETS to Butterworth in the following train
- Depart Padang besar 16.15 to Butterworth 17.58
- Depart Padang besar 17.15 to Butterworth 19.08
2. In case of travelling from Hat Yai to KL Sentral, it will go through the following process:
2.1 taking Shuttle 949 departed from Hatyai 13.05 to arrive at Padang besar at 15.00
2.2 taking ETS to KL Sentral in the following train
- Depart Padang besar 16.15 to KL Sentral 21.50
- Depart Padang besar 17.15 to KL Sentral 23.05
3. In case of travelling from Hat Yai to JB Sentral, it will go through the following process:
3.1 taking Shuttle 949 departed from Hatyai 13.05 to arrive at Padang besar at 15.00
3.2 taking ETS to Gemas in the following train
- Depart Padang besar 20.00 to Gemas 03.40 AM (next day)
3.3 taking ES45 from Gemas to JB Sentral
- Depart Gemas 04.10 AM to JB Sentral 08.10 AM
4. the alternative route is to follow this plan:
4.1 take IE 35 all the way to Padang Besar - departed from Bangkok 14.45 to arrive at Padang besar at 08.55 AM (Next Day) - with high risk not to reach ETS that depart at 09.55 AM
4.2 take ETS at 09.55 AM to reach KL Sentral 14.35
5. the other alternative route is to follow this plan
5.1 take SP 37 to Sugei Golok and then take a bus or taxi from Rantau Panjang to Pasir Mas
5.2 take Eastern Rakyat (AKA Express Timuran) depart from Pasir Mas 20.04 to reach JB Sentral 11.50 AM
https://www.facebook.com/Thaitrainst...53448588116721
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old May 11th, 2016, 12:39 PM   #599
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532

Now, I just got the report from Thai railfans that IE 35/36 de facto being shortened to Padang besar and Utara commuter will fill the job to head to Butterworth due to the fact that YDM4 being returned to India after the end of the lease.
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old May 20th, 2016, 08:37 PM   #600
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,565
Likes (Received): 2532

China [CRRC], Malaysia [ERL] and Singapore [SMRT] competing for major repair of Airporrt link rolling stocks at 385 Million Baht with the mean price of 300 Million Baht to be on bidding in June 2016 - Siemens declines to bidding
http://www.manager.co.th/iBizChannel...=9590000050754


Double tracking from Denchai to Chiang Mai - using the 4th choice 189 km - passing 4 provinces, 10 districts, 30 communes with 18 stations
the at grade section 128.35 km
the elevated section 45.68 km through national park, and reserved forests
tunnel 14.97 km
total cost 61,220 Million Baht

Denchai - Lampang - Hang Chai will follow the same old route with the curve correcting to ensure max speed of 120 kph
Hang Chat - Chiang Mai will follow the new route until it reaches Sala Phalat with max speed of 160 kph

the list of 18 stations
1. Pak Pan station - renovated and expanded as small station
2. Kaeng Luang station - Built anew as small station
3. Huay Mae Ta halt
4. Ban Pin station - Built anew as a Large station
5. Pha Khan station - Built anew as small and elevated station as it is within forest area
6. Pang Puay station - Built anew as small station
7. Mae Chang - renovated and expanded as small station
8. mae Moh station - built anew at the new place - Mid size station
9. Sala Pha Lad station - Built anew as small station
10. Mae Tha station - renovated and expanded as small station
11. Nong Wua Thao station - Southern suburb of Lampang city - Built anew as small station
12. Nakhon Lampang - Specially Large station - by Major renovation to accommodate both existing railway and High Speed train
13. Hang Chat station - Built anew as small station Container Yard near Highway 1039
14. Sala Mae Tha station - Built anew as small and elevated station
15. Lam Phun station - Built anew as a Large station to accommodate both existing railway and High Speed train
16. Pa Sao station - Built anew as small and elevated station since it is flood prone area
17. Saraphi station - Southern Suburb of Chiang Mai city - renovated and expanded as small station - with Container yard near Highway 121 with access to Hgih way 11 to reach Northern Industrial estate in Lamphun - Locomotive depot and maintainance center
18. Chiang Mai station - terminus - Specially Large station - by Major renovation to accommodate both existing railway and High Speed train

Those station are more of the renovated stations rather than built anew

There will be no station between Hang Chat station - Sala Mae Tha station and Sala Mae Tha station - Lamphun station since it has been built on the new route

the old route is for tourists

Locotive Depot and maintainace center at Saraphi
Container yard at Hang Chat (Northern suburb of Lampang City) and Saraphi (Southern Suburb of Chiang mai city)
https://www.facebook.com/photo.php?f...type=3&theater
https://www.youtube.com/watch?v=dY-YxSnuYIc
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 10:11 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium