Old August 29th, 2016, 09:23 AM   #661
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523


First time when SDA-3 loco coming to Bangkok railway terminus at Hua Lamphong and PM Prayut coming to test the new carriages from CNR Changchun
https://www.youtube.com/watch?v=mt_o8w-4kVo
http://www.manager.co.th/Politics/Vi...=9590000086326

Here is the official - IE35/36 are now shortened to Padang besar effective on 1 September 2016 - any further extension is to pass the immigration and then purchasing ETS Tickets of KTMB
http://www.manager.co.th/iBizChannel...=9590000085793
__________________
BKK Mass Transit Expert

dimlys1994 liked this post
Wisarut está en línea ahora   Reply With Quote

Sponsored Links
Old August 29th, 2016, 09:01 PM   #662
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

Test run of CNR Changchun from Bangkok to Nakhon Pathom before running from Bangkok to Chiang Mai in October 2016 with following rates to be applied as a promotion

BKK - Chiang Mai First class Aircon Sleeper Lower bed 1453 Baht
BKK - Chiang Mai First class Aircon Sleeper Upper bed 1253 Baht
BKK - Chiang Mai Second class Aircon Sleeper Lower bed 881 Baht
BKK - Chiang Mai Second class Aircon Sleeper Upper bed 791 Baht
http://manager.co.th/iBizChannel/Vie...=9590000086425

MoT said the electric traction will be applied into the following routes
1. Bangkok - Nakhon Pathom (definitely red line commuter extension),
2. Bangkok - Ayutthaya (Definitely red line commuter extension)
3. Bangkok - Chachoengsao (Definitely red line commuter extension -even though I wish to see red line commuter extension to pataya)
4. Hatyai - Padang Besar (thank to ETS Service of KTMB that put the pressure on Thai government to come up with electric traction on that Hatyai - Padang besar)
http://www.thansettakij.com/2016/08/29/91451
__________________
BKK Mass Transit Expert
Wisarut está en línea ahora   Reply With Quote
Old August 29th, 2016, 09:03 PM   #663
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,817
Likes (Received): 15531

Electrified Double Track Railway Projects



Mr. Arkom Termpittayapaisith, Minister of Transport announced the development of railway progress under the management of the State Railway of Thailand (SRT) that there are four routes to push to the Council of Ministers (cabinet) in the year 2017.

The plan includes four existing rail lines that will be electrified:
  1. Bangkok - Nakhon Pathom (43 km)
  2. Bangkok - Ayutthaya (60 km)
  3. Bangkok - Chachoengsao (60 km)
  4. Hat Yai - Padang Besar (48 km)
https://www.thansettakij.com/2016/08/29/91451

Currently two electrified commuter lines are under construction:
- SRT Light Red line - (15 km) - 100%
- SRT Dark Red line - (26 km) - 64.27%

And SRT Red line Missing Link extension - (25.5 km) will be under construction next year.

The electrified commuter lines is a meter gauge railway and can handle a speed up to 160 km/h.

Commuter Train for the SRT Light Red line and Dark Red line ordered from Hitachi that will arrive in 2019.


__________________
-Noblesse Oblige-

Last edited by Codename B; August 29th, 2016 at 09:12 PM.
Codename B no está en línea   Reply With Quote
Old August 30th, 2016, 05:46 AM   #664
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

Quote:
Originally Posted by Codename B View Post
Electrified Double Track Railway Projects



The plan includes four existing rail lines that will be electrified:
  1. Bangkok - Nakhon Pathom (43 km)
  2. Bangkok - Ayutthaya (60 km)
  3. Bangkok - Chachoengsao (60 km)
  4. Hat Yai - Padang Besar (48 km)
https://www.thansettakij.com/2016/08/29/91451
After Opening red line commuter from Bangsue central to Rangsit and Taling Chan has been opened around 2019-2020, the section to be electrified will be as follows to fit the plan mentioned by MoT Akhom:

1. Taling Chan Junction (km 6.08 from Thonburi railway terminus at Bangkok Noy) to Nakhon Pathom (km 48.12 from Thonburi railway terminus at Bangkok Noy) - and of course the 6 km section from Taling Chan Junction (km 6.08 from Thonburi railway terminus at Bangkok Noy) to the new Thonburi station which will be renamed as Siriraj

2. Hua Mark (km 15.18 from Bangkok railway terminus at Hua Lamphong) - Chacheongsao Junction (km 60.99 from Bangkok railway terminus at Hua Lamphong)

3. Rangsit (km 30.347 from Bangkok railway terminus at Hua Lamphong) - Ayutthaya (km 71.08 from Bangkok railway terminus at Hua Lamphong) - Ban Pachi (km 89.95 from Bangkok railway terminus at Hua Lamphong)

4. Hatyai - Padang Besar -started from km 928.860 to km 973.300
http://www.hatyai-padangdoubletrack....%E0%B8%A22.pdf
__________________
BKK Mass Transit Expert
Wisarut está en línea ahora   Reply With Quote
Old August 30th, 2016, 01:05 PM   #665
dixiadetie
Registered User
 
Join Date: Aug 2015
Location: GuangZhou
Posts: 218
Likes (Received): 798

So the red line will including two parts as follows ?
1.Newly built elevated section in Bangkok urban area .
2.Existing rail section in suburbs area .
dixiadetie no está en línea   Reply With Quote
Old August 30th, 2016, 01:21 PM   #666
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

Quote:
Originally Posted by dixiadetie View Post
So the red line will including two parts as follows ?
1.Newly built elevated section in Bangkok urban area .
2.Existing rail section in suburbs area .
Yah - after all, these 2 sections are a part of Bangkok commuter networks - I wish that the red line commuter networks will be extended to

1. Lopburi (km 132.81 from Bangkok railway terminus at Hua Lamphong - Northern end of Bangkok commuter networks),

2. Kaeng Khoi (km 125.10 from Bangkok railway terminus at Hua Lamphong - Northeastern end of Bangkok commuter networks),

3. Rajburi (km 117.36 from Bangkok railway terminus at Hua Lamphong) even though it is possible to be extended to Pak Thon (km 134.67 from Bangkok railway terminus at Hua Lamphong) - the main dropping point from the Southern line to Mae Klong line - with a possible connection to allow Maeklong line to connect with the main Southern line -

Nevertheless, the extension of electric traction to Hua Hin (km 229.04 from Bangkok railway terminus at Hua Lamphong) along with Pataya (km 155.14 from Bangkok railway terminus at Hua Lamphong) to support tourism would be great.

Electrified Branch line to Kanchanaburi (km 133.09655 from Bangkok railway terminus at Hua Lamphong) and Suphanburi (km 157.65 from Bangkok railway terminus at Hua Lamphong) to support tourism would be great.
__________________
BKK Mass Transit Expert
Wisarut está en línea ahora   Reply With Quote
Old August 31st, 2016, 08:57 AM   #667
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

3 more double tracking projects in 2017
http://www.thansettakij.com/2016/08/26/88453

CNR Changchun aircon carriages look fine - Big Too impressed
http://www.thairath.co.th/content/705619
http://www.thairath.co.th/content/705140
http://www.dailynews.co.th/article/520226

Slum dwellers along Thanon Jira - Khon Kaen route complaining about the massive demolition of their neighborhoods despite of the fact they have been built on railway land without consent from SRT - not to mention about the compensation which has been considered too little for them
http://www.khonkaenlink.info/home/news/2716.html

Issue of Southern line double tracking from Surat Thani to hatyai with the revival of Hatyai - Songkla line - 88.03% supporting the project while the protest from from those slum dwellers and those who encroach the railway land along hatyai - Songkla line
http://www.manager.co.th/South/ViewN...=9590000086600
__________________
BKK Mass Transit Expert

dimlys1994 liked this post
Wisarut está en línea ahora   Reply With Quote
Old September 5th, 2016, 03:15 PM   #668
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

Note on the New CRRC Changchun carriages: they will use on the new train which will use the schedule of SP1/2 but with the new code as SP 9/10 while the SP1/2 train will use the schedule of SP 13/14 - and the SP/13/14 will be dissolved so those JR West carriage will be use in Express 51/52 which will use schedule of Rapid 107/108 while Rapid 107/108 will be the last Northern train - this is the way to meet the greater demand for the Northern trains but cannot come early to catch SP 1/2 which depart at 6 PM.

Now, the upcoming special express train to Ubon will be ready in November 2016 and the upcoming special express train to Nong Khai will be ready in December 2016 - with the stops the following stations:

New Ubon special express 23/24 will stop at Bangkok, Samsen, Bangsue, Bangkhen, Laksi, Donmueng, Rangsit, Ayutthaya, Nakhon Ratchasima, Buriram, Surin, Sisaket, and Ubon

New Nong Khai special express 25/26 will stop at Bangkok, Samsen, Bangsue, Bangkhen, Laksi, Donmueng, Rangsit, Ayutthaya, Khon Kaen, Udonthani, and Nong Khai

However, we better wait until the final schedule has been issued though.
__________________
BKK Mass Transit Expert

tjrgx liked this post
Wisarut está en línea ahora   Reply With Quote
Old September 5th, 2016, 03:44 PM   #669
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

the latest news, it would take another 12 months to make a settlement on Hatyai - Padang besar shuttle in the way to connect with the trains to Sugei Golok - not just for Hatyai alone due to the demands from those from Sugei Golok and those from Kelantan http://www.khaosod.co.th/view_newson...sid=1473076195
__________________
BKK Mass Transit Expert
Wisarut está en línea ahora   Reply With Quote
Old September 6th, 2016, 09:59 AM   #670
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

For the new Special Express 45/46 from BKK to to Hatyai using CNR Changchun carriages, it will stop for passengers at Bangkok, Samsen, Bangsue, Salaya, Nakhon Pathom, Hua Hin Chumporn, Surat Thani, Thung Song, Phatthalung, and Hatyai though
__________________
BKK Mass Transit Expert

Last edited by Wisarut; September 7th, 2016 at 06:27 PM. Reason: Addendum
Wisarut está en línea ahora   Reply With Quote
Old September 6th, 2016, 07:37 PM   #671
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,817
Likes (Received): 15531

Thailand launches new inter-city trains
Written by Keith Barrow



STATE Railway of Thailand (SRT) launched its first new passenger vehicles for more than 20 years on August 29, when a rake of inter-city coaches supplied by CRRC Corporation, China, made an inaugural run from Bangkok Hua Lamphong to Nakhon Pathom.

SRT awarded CNR Changchun Rail Vehicles (now part of CRRC Corporation) a Baht 5bn ($US 143m) contract in October 2014 to supply 115 of the stainless steel-bodied coaches, including nine first-class and 88 second-class sleeping cars, nine restaurant cars, and nine generator cars.

The vehicles are equipped with air-conditioning and retention toilets, while some of the sleeping vehicles are fitted with lifting platforms to improve access for passengers with disabilities.

The first batch of 39 vehicles was handed over to SRT on July 14 and trial runs began last month. The remaining coaches are due to be delivered by October, when the fleet will make its passenger debut on the Bangkok - Chiang Mai route.

The coaches will also be introduced on services from Bangkok to Ubon Ratchathani, Nong Khai, and Butterworth (Malaysia) next year.

http://www.railjournal.com/index.php...ty-trains.html


Second Class



First Class



Dining Car

__________________
-Noblesse Oblige-

tjrgx, dimlys1994 liked this post

Last edited by Codename B; September 6th, 2016 at 07:44 PM.
Codename B no está en línea   Reply With Quote
Old September 11th, 2016, 07:41 PM   #672
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

Here is more details on hatyai - Padang besar electrified double tracking project


The starting point km 928+860 (Southern section of Hat Yai station yard)
Hatyai Junction km 928+580
Ban Phru Stop km 936+925
Sala Thunglung station km 944 + 887
Klong Ngae station km 952 + 625
Klong Ram Stop km 961 + 100
Ban Tha Khoi Stop km 968+450
Padang besar 2 station km 972 + 900
the Ending Point km 973+306.550 (border Pole)

total price tag 13,341 Million Baht
Economic Internal Rate of Return : EIRR) 18.78%
Financial Inter Rate of Return : FIRR 0.30%

Need to construct 6 elevated U-turns + 15 road tunnels at the level crossing + 10 railway bridge across the level crossing.
Daily passenger in 2021 (first year of opening the electrified line) 4,732 passengers a day

Need land exappropriation : 21 Rai 3 Ngan 91 Sq. Wah (3.5164 hectares)

http://www.thansettakij.com/2016/09/10/94456
__________________
BKK Mass Transit Expert

dimlys1994 liked this post
Wisarut está en línea ahora   Reply With Quote
Old September 12th, 2016, 09:28 AM   #673
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

903 km Massive double trackings without electrification financed by Government bonds at 118,025.78 Million Baht
Thanon Jira (km 260) - Khon Kaen (km 449) - 26004.90 Million Baht
Map Krabao (km 135) - Thanon Jira (km 260) - 29835.18 Million Baht - including 4 new tunnels and via ducts
Nakhon Pathom (km 64) - Hua Hin (km 229) - 20036.53 Million Baht
Prachuab Khirikhan (km 319) - Chumporn (km 464) - 17290.63 Million Baht
Lopburi (km 133) - Pak Nam Pho (km 252) - 24840.54 Million Baht. - including 30 km bypass to Tha Wung district of Lopburi

Next on the line after 903 km double tracking is 1495 km double tracking of the main line at 311,470 Million Baht
1. Pak Nampho - Denchai - 285 km at 64,921 Million Baht
2.Thanon Jira - Ubon 309 km at 49,951 Million Baht
3.Khon kaen - Nongkhai 174 km at 23,727 Million Baht
4.Chumporn - Surat Thani -167 km at 34,726 Million Baht
5. Surat Thani - Hatyai and Hatyai - Songkla - 323 km at 51,065 Million Baht
6.Hatyai - Padang besar electrified double tracking 48 km at 23,727 Million Baht (13,341 Million Baht for construction alone)
7.Denchai - Chiang Mai 189 km at 63,353 Million Baht
http://www.prachachat.net/news_detai...sid=1466588885
http://www.thansettakij.com/2016/09/10/94456
__________________
BKK Mass Transit Expert

tjrgx, dimlys1994 liked this post

Last edited by Wisarut; September 12th, 2016 at 09:30 AM. Reason: Addendum
Wisarut está en línea ahora   Reply With Quote
Old September 13th, 2016, 06:35 AM   #674
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

Red line commuter station from Bangsue Central to Rangsit - Bangsue Central is the biggest one (300000 sq m of space) since it must be able to deal with red line commuter, intercity trains, Airport link extension and high speed train - and Donmueang is the second biggest (25000 sq m of space) while Lak Hok is for commuter (7800sq m.) and Rangsit is the third largest (21000 sq. m.) for commuter and intercity - while Chatuchak, Samian Naree, Bangkhen, Thung Songhong, Laksi, Karn Keha are for commuter so it has just 7200 sq. m. space.

Red line commuter will be opened in 2020 though with the cost overrun from 59,888 Million Baht to 93,950 Million Baht - red line commuter expect to carry 306,608 passengers a day
http://www.prachachat.net/news_detai...sid=1473659981


Progress on 185 km Thanon Jira - Khon Kaen double tracking - going to open the first 55 km from Thanon Jira - Mueang Khong in October 2017 even though the progress is just 6% (1% behind the schedule). The old station building of Khon Kaen will have to be demolished to make the way for the new elevated station though.

On the other hand, the progress of 106 km double tracking from Chacheongsao to Kaeng Khoi via Klong 19 is that the government is going open 43 km section of double tracking (Chachoengsong - Klong 19 (24 km) and Kaeng Khoi - Bu Yai (19 km) ) in October 2017 as well.
http://manager.co.th/iBizChannel/Vie...=9590000091921
__________________
BKK Mass Transit Expert

Last edited by Wisarut; September 13th, 2016 at 06:42 AM. Reason: Addendum
Wisarut está en línea ahora   Reply With Quote
Old September 13th, 2016, 06:49 AM   #675
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

Thai version of the news about the improvement of bogie third class carriages for 120th anniversary of Thai Railway on 26 March 2017 including:
Rapid 109/102: BKK - Chiang Mai
Rapid 171/170: BKK - Sugei Golok
Rapid 133/134: BKK - Nong Khai
Rapid 145/146: BKK - Ubon

164 commuter train trains (82 pairs)

http://manager.co.th/iBizChannel/Vie...=9590000091673
__________________
BKK Mass Transit Expert
Wisarut está en línea ahora   Reply With Quote
Old September 13th, 2016, 08:07 AM   #676
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

SRT going to speed up the bidding for survey and construction on 3 double tracking lines. the consultant will be picked in November 2016 and contract for survey will be signed in December 2016 to start the survey in early 2017

1. Prachuab Khirikhan - Chumporn - 167 km with construction cost of 17290.63 Million Baht - need land exappropriation of 199 Rai 2 Ngan 92 Sq. Wah (31.9568 hectares) for curve correcting, the new station building with a clock tower for Chumporn station

2. Nakhon Pathom - Hua Hin - 165 km with construction cost of 20036.53 Million Baht - need land exappropriation from 11-105 meter wide for curve correcting and 28 stations including the construction of the new elevated station building for Hua Hin station - this section has Net Present Value : NPV) 143,268 Million Baht, Benefit/Cost Ratio (B/C Ratio) at 1.96 and Economic Internal rate of return: EIRR at 23.41%

3. Lopburi - Paknampho - 148 km with construction cost of 24840.54 Million Baht need land exappropriation for 32 km Tha Wung bypass route (western suburb of Lopburi city) - with the width of land strips by exappropriation from 40 meters to 200 meters (total 375 Rai - [60 hectares])with a payment of 163 million Baht with Financial Internal Rate of Return : FIRR) 5.59% and EIRR 20.21%
along with expected number of passengers at 33,880 men a day on the first year of operation along with 25,910 tons of cargo a day including rice, LPG, Oil and economic benefit of 13.39%

4. Map Krabao - Thanon Jira 132 km at 29835.18 Million Baht - including 4 new tunnels, via ducts, and the new station building for Nakhon Ratchasima with the width of land strips by exappropriation from 40 meters to 230 meters with a payment of 114 million Baht

However, the section from Map Krabao to Thanon Jira still waiting for royal decree of land exappropriation before starting the survey - need cabinet approval in the next 2 weeks
https://www.thansettakij.com/2016/09/13/95688
__________________
BKK Mass Transit Expert

tjrgx liked this post
Wisarut está en línea ahora   Reply With Quote
Old September 14th, 2016, 06:09 AM   #677
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523


Project of MoT in Year 2017 with 721,753 Million Baht investment including
1. Pak Nampho - Denchai - 285 km at 56,056.80 Million Baht
2.Thanon Jira - Ubon 309 km at 35,836.23 Million Baht
3.Khon kaen - Nongkhai 174 km at 26,057.89 Million Baht
4.Chumporn - Surat Thani -167 km at 23,379.05 Million Baht
5. Surat Thani - Hatyai and Hatyai - Songkla - 323 km at 51,818.83 Million Baht
6.Hatyai - Padang besar electrified double tracking 48 km at 7940.20 Million Baht
7.Denchai - Chiang Mai 189 km at 59,916.79 Million Baht
8. Hua Hin - Prachuab Khirikhan - 90 km at 10,301.95 Million Baht
9. Denchai - Chiang Rai - Chiang Khong - 323.1 km at 76980.32 Million Baht - New Line
10. Ban Phai - Nakhon Phanom - 354 km at 60353.41 Million Baht - New Line
...

http://www.prachachat.net/news_detai...sid=1473658646
__________________
BKK Mass Transit Expert
Wisarut está en línea ahora   Reply With Quote
Old September 14th, 2016, 07:31 AM   #678
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523





the Elevated Khon Kaen station with elegant design by Tor Tong of CK PCL (Contractor for Thanon Jira - Khon kaen double tracking) - still has an issue to be concerned when the rainstorm is hitting Khon Kaen city - and the old traditional design of station which many new generation boo on the design
https://www.facebook.com/KhonKaenCit...93418377347127
__________________
BKK Mass Transit Expert
Wisarut está en línea ahora   Reply With Quote
Old September 14th, 2016, 11:11 AM   #679
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523

When SRT is going to introduce CNR Changchun to Special express trains, the following trains will have to be changed for a good reason
1. No more Rapid 107 BKK - Denchai
2. No more Rapid 108 Denchai - BKK
3. No more Express 73 BKK - Sikhoraphum
4. No more Express 74 Sisaket - BKK
5. No more Special Express 37 BKK - Sugei Golok
6. No more Special Express 38 Sugei Golok - BKK
7. Express 71 BKK - Sisaket extended to become Express 71 BKK - Ubon
8. Express 72 Sikhoraphum- BKK extended to become Express 72 Ubon - BKK
9. Special Express 35 BKK - Padang Besar become BKK - Sugei Golok
10. Special Express 36 Padang Besar - BKK become Sugei Golok - BKK
11. Shuttle trains Hatyai - Padang Besar will be the one that cross the border after changing in SP 35/36
12. there is still a big headache for dealing with BKK - Nong Khai to gain more passengers
__________________
BKK Mass Transit Expert
Wisarut está en línea ahora   Reply With Quote
Old September 14th, 2016, 04:55 PM   #680
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,542
Likes (Received): 2523


Test run of CNR Changchun carriages from BKK to Ubon - depart at 7.05 PM of 15 September 2016 to arrive Ubon at 04.30 AM of 16 September 2016 and the train will go back to reach BKK at 08.30 Pm of 16 September 2016 - Photo by Phichak Rerkvised
https://www.facebook.com/22232377115...type=3&theater
__________________
BKK Mass Transit Expert

tjrgx liked this post
Wisarut está en línea ahora   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 09:47 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium