Old August 19th, 2017, 08:37 PM   #801
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523


cabinet going to approve Ban Phai - Nakhon Phanom railway project with the price tag of 65,738 Million Baht in October 2017. This line has passes through 6 Isan province including Khon Kaen, mahasarakham, Roy Ed, Yasothon, Mukdahan and nakhon Phanom with
32 stations and stops with 3 container yard, and the container center near 2nd friendship bridge and thrid Friendship bridge - even though the actual construction will be in early 2018 and done in 2024 - the delay is the limit of land exappropriation of be 80 meter wide along with request for the study
on land development along the route including the Treasury Dept land - not to mention about the route design to prevent from obstructing the water flow including the Bridge across Chee river as the Isan Flood of 2017 has given really hard lesson - the main cargo will be tapioca product, rice, sugar, and para rubber along with cement along with consumer goods with EIRR of 12.05%
the expected daily number of passengers will be 12365 passengers a day in 2023-4 and 26931 passengers a day in 2053

EIA on Ban Phai - Nakhon Phanom railway project is not done yet
https://www.youtube.com/watch?v=grXyZoAHDcM
http://www.posttoday.com/biz/gov/509855
https://www.khaosod.co.th/economics/news_478332
http://www.thaipost.net/?q=node/34152
http://www.nationtv.tv/main/content/...ess/378563305/
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote

Sponsored Links
Old August 20th, 2017, 08:27 PM   #802
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

ITD, CKC, and STECON are bidding for both 3 tunnels for Map Krabao - Thanon Jira double tracking with total length of 7.9 km (5.85 km + 0.65 km + 1.40 km) and the price tag of 9,399.46 Million Baht along with Contract 1 of Lopburi - Pak Nampho double tracking (32 km bypass from Ban Klab to Khok Krathiam with elevated tracks) with the price tag of 10,145.05 Million Baht.

Those who are qualified will be declared on 7 September 2017 at GPO in Bang Rak while the result of bidding will be held on 18-20 September 2017
https://www.prachachat.net/property/news-24740
http://www.manager.co.th/Business/Vi...=9600000084804
http://www.siamrath.co.th/n/21707
https://kaohoon.com/content/185496

the winner of Map Krabao - Thanon Jira will be held on September 2017 with a hope to get it done in 2021 - unless the extra works at Khorat city has dragged this project down by 18 months.
http://www.innnews.co.th/shownews/show?newscode=804746


84 km Hua Hin - Prachuab Khirikhan with a price tag of 7,305.26 Million Baht to improve logistics down South by container yard at Sam Roy yod and Thung Mamao
http://www.thansettakij.com/content/195515


Inspecting the progress on Thanon Jira - Khon Kaen double tracking including the new container yard at Ban Kradone, Bua Yai and Tha Phra
https://www.youtube.com/watch?v=4_z88W2CbwM
http://thainews.prd.go.th/website_th...O6008200010015

After the shenanigan by Mayor of Khorat city and voting banks who press the demand for elevated tracks within Khorat city (at least 4.8 km) which is going to delay Map Krabao - Thanon Jira by at least 18 months or worse, those hotel businessmen of Khorat now vent their angry voices against Mayor of Khorat city and voting banks along with the media who are the mouthpieces of Mayor of Khorat city and voting banks who create this delay and chaos at the first place
http://www.tnews.co.th/contents/349493
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old August 21st, 2017, 07:18 AM   #803
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523


Double tracking from Khon Kaen to Thanon jira is 35% done - and MoT seems to agree with the ideas from mayor of Khorat city and Governor of Khorat that they need 4.8 km elevated tracks within Khorat city along with the new station building in response to the 4.8 km elevated tracks even it means 3000 Million Baht cost overrun during the inspection of Container yard along with the new station building at Ban Kradone station, Nong Khai Nam commune, Mueang district of Nakhon Ratrchasima.
https://www.youtube.com/watch?v=VNlqGx1psvo
https://www.prachachat.net/property/news-25144
https://www.prachachat.net/round-up/news-25149
http://manager.co.th/Local/ViewNews....=9600000085287
http://www.workpointtv.com/news/47685

the latest progress on Thanon Jira - Khon Kaen double tracking


Phgonsongkram station



temporary station of Muang Khong
https://www.facebook.com/pr.railway/...16749531673243
__________________
BKK Mass Transit Expert

wwc234, Jobber liked this post
Wisarut no está en línea   Reply With Quote
Old August 22nd, 2017, 10:05 PM   #804
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

Ban Phai - Nakhon Phanom for cargo trains and passenger services
Than Setthajij
20 August 2017


Bidding for Ban Phai - Mahasarakham - Roy Ed - Mukdahan - nakhon Phanom project is now waiting for EIA clearance which takes 6 months to be done before asking cabinet approvals for budget by the end of 2017 or early 2018 - most section passing empty land, paddy field, sugar plantation, tapioca plantation without passing reserved forests so it is relatively easy to get land exappropriation for 8-0 meter wide landstrip - - with container station at the foot of 2nd Friendship bridge and 3rd Friendship bridge - stations are in suburbs though

the total distance is 354.783 km in 5 provinces including Khon Kaen, Mahasarakham - Roy Ed - Yasothon Mukdahan - nakhon Phanom - EIRR 12.3% passing Ban Phai, Kud Rang, Borabue, mahasarakham, Roy Ed, Chiang Kwan, Phone ^Thong, Nong Phok, Nikhom Khamsoy, Loeng Noktha, Mukdahan, Warn Yai, That Phanom, Renu Nakhon, and Nakhon Phanom

http://www.thansettakij.com/content/197034
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old August 28th, 2017, 09:06 AM   #805
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523


Plan for double tracking from Lopburi to Pak Nampho - with 10 stations renovated and 10 stations rebuilt - 2 contracts
1. Lopburi bypass with the total distance of 27.64 km (22.60 km elevated + 5.04 km at grade at 10147 million Baht - from 121+000 to km 141+000 with 3 station buildings including Lopburi 2 station at Tha Wung - 48 months to be done
2. Tha Khae - Pak nam Pho (km 136+341 - 252+225) - Container yard and CTC at Nakhon Sawan - 36 months to be done
http://www.thansettakij.com/content/200099
http://www.ratchakitcha.soc.go.th/DA...8/A/106/16.PDF
__________________
BKK Mass Transit Expert

Last edited by Wisarut; August 28th, 2017 at 09:11 AM. Reason: Correcting
Wisarut no está en línea   Reply With Quote
Old August 29th, 2017, 09:34 AM   #806
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

We just have learnt that the railway service to Poipet has to be postponed to 2018 since Cambodian Railways has just started to renovate Poipet station along with station yard
http://www.chaoprayanews.com/2017/08...8%B4%E0%B8%99/
https://www.prachachat.net/local-economy/news-29690
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old August 31st, 2017, 06:32 AM   #807
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

OTP has come up with Surat Thani - Donsak railway line using the right of the way of Highway 44 which passes through para rubber plantation as well as palm oil plantation with total distance of 77 km to cut down the land acquisition cost instead of shorter route (62.5 km) which is much closer to downtown Surat Thani (Ban Don) - Donsak is a terminus for ferry to Samui Island (favorite place for German and European tourists to have sunbath) though.
https://www.dailynews.co.th/economic/594972
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old September 3rd, 2017, 08:51 PM   #808
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

Quote:
Originally Posted by Wisarut View Post
Cabinet is going to push 354 km Ban Phai - Nakhon Phanom Railway line with a price tag of 65,738 Million Baht in October 2017 after clearing 3 controversies

1. Land Exappropriation to the minimum while taking the flood flow into account
2. Improving the database on economic benefits to meet the current situation
3. the real estate development along this new railway line since it has to set the sample for any new lines to follow

This will be pushed into the cabinet in October 2017 to start the construction in December 2018 and done in 2025-2026
http://www.innnews.co.th/show/807815...B8%95%E0%B8%84

Italian Thai Development PCL is the winner for 58-km Map Krabao - Klong Khanan Jit section of Map Krabao - Thanon Jira Junction double tracking with a price tag of 7,650 Million Baht, 160 Million Baht lower than the mean price after winning Hua hin - Prachuab Khirikhan double tracking with a price tag of 5807 million Baht and Nong Pla lai - Hua Hin section of Nakhon Pathom - Hua Hin double tracking with a price tag of 7520 million Baht while AS Associated 1964 PCL won the section from Nakhon Pathom to Nong Pla Lai

However, the second section from Klong Khanan Jit to Thanon Jira Junction (70 km at 6,869.61 Million Baht) has to be postponed due to the controversies on 4.8-5.1 km elevated track within Khorat city area which requires the remodeling of Nakhon Ratchasima station to enable to accommodate both regular trains and High Speed train as Nakhon Ratchasima has been assigned as the terminus for the first section and of course about 4000 million Baht cost overrun
https://www.prachachat.net/property/news-32500
__________________
BKK Mass Transit Expert

Last edited by Wisarut; September 3rd, 2017 at 09:11 PM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old September 5th, 2017, 04:25 PM   #809
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

Krungthon Engineering - 11th Bureau of China Railway won the bidding for 88-km Prachuab Khirikhan - Bang Saphan Noy double tracking at 6,465 Million Baht, 114 Million Baht below the mean price
STECON - Thai P-Con won the bidding for 80-km Bang Saphan Noy - Chumporn double tracking at 5,992 Million Baht, 74 Million Baht below the mean price
https://www.prachachat.net/property/news-34102

the issue of 5.1 km elevated tracks within Khorat city from km 256+900 to km 266+000 with the price tag of 2992 Million Baht and take 19 months to be done
This has started from Phoo Khao Lard to create 8 meter height elevated track + and the new design of Nakhon Ratchasima railway station with elevated platform
while Thanon Jira Junction will have 2 meter height elevated track - need to demolish the flyover at Sima Thani Hotel and construct 2 U-turn bridges

For the case of Si Kiw station, 2 elevated track with 93 million Baht budget and 17 month extra time - need cabinet approval for funds to handle this extra work
https://www.prachachat.net/property/news-31477


Unique Engineering PCL won the bidding for Tha Khae - Pak Nam Pho double tracking at 8,649 Million Baht, 164 Million Baht below the mean price
https://www.prachachat.net/property/news-33550
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old September 8th, 2017, 03:51 PM   #810
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

Quote:
Originally Posted by Codename B View Post
Yes, Thailand also have nationwide double tracking projects for the existing metre gauge going on right now.



For the first phase (green lines). Two double tracking lines are currently under contruction (nr. 1 & nr. 2), while the rest recently got their construction contractor and will begin construction soon.

Phase two (orange & blue lines) will begin the bidding process in 2018.
Big Too and Hun Sen talking about the resuming of cross border railway traffic all the way to Phnom Penh
https://mgronline.com/politics/detail/9600000091900

Conclusion of bidding for massive double tracking - with ONLY the section from Klong Khananjit to Thanon Jira has to be postponed due to the issue with 5.1 km elevated track within Khorat city


1. Hua Hin - Prachuab Khirikhan - ITD won at 5,807 Million Baht
2. Nakhon Pathom - Hua Hin Section 1 (Nakhon Pathom - Nong Pla Lai) - AS Associate Engineering (1964) won at 8,198 Million Baht
3. Nakhon Pathom - Hua Hin Section 2 (Nong Pla Lai - Hua Hin with the new elevated station at Hua Hin) - STECON won at 7,520 Million Baht
4. Map Krabao - Thanon Jita Section 1 (Map Krabao - Klong Khanant Jit) - ITD Won at 7,560 Million Baht

5. Lopburi - Pak Nampho Section 3 (Tha Khae - Pak Nampho) - Unique Engineering and Construction (UNIQ) PCL won at 8,649 Million Baht
6. Prachuab Khirikhan - Chumporn Section 1 (Prachuab Khirikhan - Bang Saphan Noy including the new station building at Prachuab Khirikhan) - Krung Thonburi - China Railway 11th Bureau won at 6,465 Million Baht
7. Prachuab Khirikhan - Chumporn Section 2 (Bang Saphan Noy - Chumporn including the new station building at Chumporn) - STECON - Thai P-Con (Producers of concrete sleepers in Saraburi) won at 5,992 Million Baht
8. Map Krabao - Thanon Jita Section 3 (Tunnel Section) - ITD - and Right Tunneling won at 9,290 Million Baht
9. Lopburi - Pak Nampho Section 1 (Ban Klub - Kho Krathiam - elevated track for bypass) - Unique Engineering and Construction (UNIQ) PCL - Sino Hydro Consortium won at 10,050 illion Baht

Conclusions:
1. ITD getting 3 contracts
2. CK PCL failed to win the contract at all
3. Chinese contractors have learnt that the only way they can get the contracts in Thailand is to form a partnership with the local contractors - unless the projects have been financed by Chinese loan.

Need Super Board approvals on 11 September 2017 though

Next on the line is 50 new loco of 16 ton axle load to replace GEKs and the leasing of 50 locomotives
http://www.nationtv.tv/main/content/...ess/378567707/
https://mgronline.com/business/detail/9600000092178
https://www.posttoday.com/biz/gov/513636
https://mgronline.com/uptodate/detail/9600000092380

Next on the lines in Year 2018 are
1. Chumporn - Surat Thani (167 km) at 23,384.91 Million Baht - expected to be 2 - 3 contracts
2. Surat Thani - Hatyai - Songkla(339 km) at 51,823.83 Million Baht - expected to be 5- 6 contracts including the parallel tunnel at Chong Khao and the new station building at Hatyai and elevated station at Songkla railway terminus
3. Hatyai - Padang Besar (45 km) at 7,941.80 Million Baht - ONE Contract including the elevated station at Klong Ngae
4. Pak Nampho - Denchai (285 km) at 56,066.25 Million Baht - expected to be 5- 6 contracts including the new tunnels to supersede Pang Toob Khob tunnel, and Khao Plueng Tunnel
5. Denchai - Chiang Mai (217 km) at 59,924.24 Million Baht - expected to be 5- 6 contracts including the new route and the new tunnels to supersede Khun Tan tunnel
6. Khon Kaen - Nong Khai (174 km) at 26,065.75 Million Baht - expected to be 3 contracts with a bone of contention on Container yard at Nong Takai vs the new branch line to Udonthani Industrial estate as requested by Industrial Estate of Thailand
7. Thanon Jira - Ubon Ratchathani (309 km) at 35,839.74 Million Baht - expected to be 3-4 contracts

New Lines
1. Denchai - Chiang Rai - Chiang Khong - 326 km at 76,978.82 Million Baht - expected to be 7-8 contracts
2. Ban Phai - Nakhon Phanom - 355 km at 60,351.91 Million Baht - expected to be 6-7 contracts
http://www.bangkokbiznews.com/news/detail/772075
__________________
BKK Mass Transit Expert

wwc234 liked this post
Wisarut no está en línea   Reply With Quote
Old September 9th, 2017, 07:57 PM   #811
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523


Signing the contract for Nakhon Pathom - Hua Hin double tracking including the new elevated station at Hua Hin to supersede the existing Hua Hin station in September 2017 so the contractor could start working by the end of 2017 and it takes 36 months to be done in December 2020 or early 2021 - using 60 meter wide landstrip - EIRR at 23.41% - max speed at 160 kph and boost number of cargo from 24 million metric ton to 8 million metric ton with expect number of passenger is going up to 24 million passengers within 20 years

Contract 1: Nakhon Pathom - Nong Pla Lai - 93 km (km 47+700 - km 140 + 700) with 17 stations at grade - AS Associated Engineering (1964) won at 8,198 million Baht
Contract 2: Nong Pla Lai - Hua Hin - 76 km (km 140 + 700 - km 217 + 008 including elevated track from km 211 + 407 - km 215 + 893 [some said km 211 + 582.9 - km 215+872.9 - 4.29 km]) - 9 stations at grade and 1 elevated station at Hua Hin - Sino Thai Engineering and Construction won at 7520 Million Baht

http://www.thansettakij.com/content/204774
__________________
BKK Mass Transit Expert

wwc234 liked this post
Wisarut no está en línea   Reply With Quote
Old September 11th, 2017, 12:14 PM   #812
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

^
Once Hua Hin High Speed train station near Hua Hin Airport at Bo fai has been opened, the revival of Bo fai station (closed in 1994) has to be realized to function as feeder to High Speed train system - while using existing Ban Khoo Bua station as station for feeder to Ratburi station of High speed train - Phetburi is a special case as it is not within the existing Southern railway line, so mass transit to connect the existing Phetburi station and Phetburi station of high speed train are in need.
__________________
BKK Mass Transit Expert

Last edited by Wisarut; September 11th, 2017 at 07:18 PM. Reason: corrrecting
Wisarut no está en línea   Reply With Quote
Old September 19th, 2017, 06:13 AM   #813
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523




MoT inspecting the progress on Nakhon Pathom - Hua Hin double tracking which has been separated into 2 contracts

Contract 1: Nakhon Pathom - Nong Pla Lai - 93 km (km 47+700 - km 140 + 700) with 17 stations at grade along with 80 Concrete bridge and Steel Bridge across Meklong river in parallel with existing Chulalongkorn Bridge - AS Associated Engineering (1964) won at 8,198 million Baht

Contract 2: Nong Pla Lai - Hua Hin - 76 km (km 140 + 700 - km 217 + 008 including elevated track from km 211 + 407 - km 215 + 893 [some said km 211 + 582.9 - km 215+872.9 - 4.29 km]) - 9 stations at grade and 1 elevated station at Hua Hin along with 92 concrete bridges - Sino Thai Engineering and Construction won at 7520 Million Baht

This double tracking is using UIC54 (AKA BS110) welded steel rails with monoblock concrete sleepers and thick ballast to allow 160 kph max

MoT telling SRT and contractors to work on improving the access roads to the stations and stops - First is to give him information about the existing access roads as well as the plan to improve the access roads to stations and stops during the construction and after the construction - with cooperation from Highway Dept, Rural Highway Dept, and local administrations - all to be done within a month so as to start the real construction in December 2017

Furthermore, SRT must come up with the plan to preserve the old station buildings in addition the facilities to allow better connection to and from the stations and the way to design the station using the famous local items - case to point is Jars of Ratburi, Nang Yai and so on

Governor of Ratburi also glad for this double tracking project as his province is going to get full benefits from this project and
http://www.naewna.com/business/292609
http://thainews.prd.go.th/website_th...L6009160010006
https://www.youtube.com/watch?v=5Z7peFSOgZ0
https://www.youtube.com/watch?v=h83rZQMLFJU
http://www.tnamcot.com/view/59bdeeb0e3f8e4a395380523
http://www.nationtv.tv/main/content/social/378569633/


SRT Board going to submit the results from bidding for 5 double trackings with a bone of contention on the section through Khorat city which is to be elevated double tracks along with the issue of borrowing money to finance the project after the procurement Board has ordered the split of 5 projects into 13 contracts to cut down the cost as well as to allow more participants for biddings - but SRT needs to secure loans before signing the contracts
http://www.thansettakij.com/content/208928


For the bidding of the constructions on 5 routes with 9 contracts, it has saved the government treasury by 2573 million Baht (the mean price is 72,104 Million Baht but the actual bidding is 69,531 Million Baht. If we take 5000 Million Baht saving of the reduced mean price into account the saving will be 7573 million Baht - so the contract will be signed in this September 2017 so as to start the construction in October - November 2017 and the constructions are expected to be done in 2020 -2021.

Expect the controversial section (Klong Khanantjit - Thanon Jira) that requires 5.1-km elevated tracks within Khorat city to have the contract split into 2 sections since the elevated section expect the cost overrun around 2 - 3000 million from the mean price of 7,060 Million Baht. This is due to the fact that the 5.1-km elevated track requires the NEW EIA to deal with but we need to get the work started immediately so the contract splitting has become necessary to solve this dilemma - but how to split the contract will need another 2 months to make a settlement so that all the contracts (other than 5.1 km elevated track within Khorat city) can be sign by the end of 2017 and started the construction in 2018.

On the issue of Signal Installation contracts - which to be on bidding in early 2018, right after the construction of massive double tracking has been started. These Signal Installation contracts - will be international bidding for CTC system of 5 contracts with total price tag of 12,921 Million Baht.

Here are 5 contracts which the winners would start their work 6-7 months after the construction has been started

1. Lopburi - Pak Nam Pho - 3 contracts along 145 km route at at 7,384 Million Baht
2. Nakhon Pathom - Chumporn - 1 contract along 421 km route at 7,384 Million Baht
3. Map Krabao - Thanon Jira - 1 contract along 128 km route at 2,549 Million Baht

Expect the fight to the bitter end from Siemens from Germany, Bombardier from Canada, LG from South Korea, Al Sado from Spain and Hitachi from Japan and China Railway from mainland China to get the contracts to install CTC. Bombardier has their systems installed along Ban Phachi - Lopburi, Ban Phachi - Map Krabao, and Makkasan - Chachoengsao. Siemens already won the bidding for CTC installation from Thanon Jira to Khon Kaen and LG already won the bidding for CTC installation from Kaeng Khoi to Chachoengsoa via Klong 19 Junction

https://www.prachachat.net/property/news-40954
__________________
BKK Mass Transit Expert

wwc234 liked this post
Wisarut no está en línea   Reply With Quote
Old September 22nd, 2017, 02:28 PM   #814
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523



38 Projects in Railway Masterplan
1. Urgent from 2017 to 2021 - the ongoing 13 projects
2. Mid range project from 2022 to 2026 - the next 13 projects
3. Long term project from 2027 to 2036 - the further 12 projects

1. Massive double trackings on existing lines - 16 projects with total distances of 2,777 km
1.1 the ongoing urgent 7 projects with total distance of 993 km (2017 - 2021)
- Chachoengsao - Klong 19 - Kaeng Khoi
- Thanon Jira - Khon Kaen
- Prachuab Khirikhan - Chumporn - bidding done - waiting the contract signing
- Lopburi - Pak Nam Pho - bidding done - waiting the contract signing
- Map Krabao - Thanon Jira - Bidding almost done with exception on Klong Khananjit - Thanon Jira
- Nakhon Pathom - Hua Hin - Bidding Done
- Hua Hin - Prachuab Khirikhan - Bidding Done

1.2 Mid range 7 projects with total distance of 1,392 km (2022 - 2026)
- Pak Nam Pho - Denchai - pending
- Khon Kaen - Nong Khai - pending
- Thanon Jira - Ubon Ratchathani - pending
- Chumporn - Surat Thani - pending
- Surat Thani - Hat Yai - Songkla - pending
- Hat Yai - Padang Besar - pending
- Sri Racha - Sattahip, Khao Chee Jan - Map Ta Phut - pending

1.3 Long term - 2 projects with total distance of 392 km (2027 - 2036)
- Denchai - Chiang Mai - pending
- Klong 19 - Aranyaprathet - pending - with connection to Cambodia

2. Meter gauge New lines - 14 projects with total distances of 2,352 km including
2.1 Urgent on 3 lines with total distance of 839 km (2017 - 2021)
- Denchai - Chiang Rai - Chiang Khong
- Ban Phai - Roy Ed - Mukdahan - Nakhon Phanom
- Surat Thani - Thanun

2.2 Mid range on 4 lines with total distance of 642 km (2022 - 2026)
- Nakhon Sawan - Kamphaeng Phet - Tak - Mae Sod
- Kanchanaburi - Ban Phachi -
- Songkla - Pak Bara
- Ban Phachi - Nakhon Luang - to the pier of CP in Nakhon Luang

2.3 long term on 7 lines with total distance of 871 km (2027 - 2036)
- Map Taphut - Rayong - Chanthaburi - Trat - to support Eastern Economic Corridor with connect to Cambodia around Pailin or so
- Ubon Ratchathani - Chong Mek (connect to Pakse - Champasak of Laos)
- Kanchanaburi - Ban Phu Namron (connect to Dawei of Burma)
- Nakhon Sawan - Ban Phai
- Thub Put - Krabi
- Surat Thani - Donsak
- Chumporn - Ranong


3. High Speed train networks (8 projects with the total distance of 2,457 km including
3.1 Urgent with 3 projects with total distances of 675 km (2017 - 2021)
- Bangsue Central - Rayong
- Bangsue Central - Nakhon Ratchasima
- Bangsue Central - Hua Hin

3.2 Mid term with 2 projects with total distance of 735 km (2022 - 2026)
- Bangsue Central - Phitsanuloke
- Nakhon Ratchgasima - Nong Khai

3.3 Long term with 3 projects with total distance of 1,047 km (2027 - 2036)
- Phitsanuloke - Chiang Mai
- Hua Hin - Surat Thani
- Surat Thani - Padang Besar


4. Construction of Container Yards (CY)
4.1 Urgent at 8 stations (2017 - 2021)
- Klong Luek at km 259.00
- Na Muang
- Ban Kradone
- Wah Koh
- Na Phak Kwuang
- Map Amarit
- Ban Sa Plee
- Nong Pla Duk Junction

4.2 Mid term at 9 stations (2022 - 2026)
- Container yard and Collection and Distribution Center at Natha (km 618)
- Ban Tako
- Bu Ruesee
- Nong Waeng
- Bung Wai
- Bang Krathum
- Wang Kraphi
- Bang Klam
- Sugei Golok

4.3 Long Term at 3 stations (2027 - 2036)
- Hang Chat
- Saraphee
- Nong Sang

5. Electrification of double track
5.1 Mid range on 2 lines with total distance of 307 km (2022 - 2026)
- Hatyai - Padang Besar - allowing KTMB to run cross border train to Hatyai
- Bangsue Central - Ban Phachi - Kaeng Khoi - Thanon Jira - after waiting since 1929 - basically Red line commuter extension

5.2 Long term 6 lines with total distance of 1,098 km (2027 - 2036)
- Bangsue Central - Nong Pladuk - Hua Hin - after waiting since 1929 - basically Red line commuter extension
- Ban Phachi - Pak Nampho - after waiting since 1929 - basically Red line commuter extension
- Bangsue Central - Makkasan - Chachoengsao - Pataya - to support Eastern Economic Corridor - basically Red line commuter extension
- Thanon Jira - Khon Kaen
- Pak Nam Pho - Phitsanuloke
- Hua Hin - Chumporn

The total cost for this master plan is 2,702,934 Million Baht including
1. Public Investment 1,973,851 Million Baht
2. Private Investment 729,083 Million Baht

the average annual investment 135,147 Million Baht including Public Investment 98,693 Million Baht Private Investment 36,454 Million Baht
Urgent Investment (2017 - 2021) 829,802 Million Baht including public investment of 642,802 Million Baht Private Investment 187,000 Million Baht
Mid Range investment (2022 - 2026) 897,568 Million Baht including public investment of 692,128 Million Baht Private Investment 205,441 Million Baht
Long term Investment (2027 - 2036) 975,564 Million Baht including public investment of 6638,922 Million Baht Private Investment 336,642 Million Baht

Economic benefit after the masterplan realized in 2037 is at 408,008.64 Million Baht a year including
saving for transportation cost at 158,138.90 Million Baht a year
Saving for cutting down the transportation time at 94,35160 Million Baht a year
Saving for cutting down the accident loss for land transport 17,258.41 Million Baht a year
Saving for cutting down the pollution and Green House Gases 138,259.73 Million Baht a year
http://www.thansettakij.com/content/211415
https://www.youtube.com/watch?v=n5JGfscqBag
https://www.khaosod.co.th/economics/news_523301
http://www.publicreport.opm.go.th/up...7070960_02.pdf
https://www.dailynews.co.th/economic/600035
__________________
BKK Mass Transit Expert

tjrgx, wwc234, aquaticko liked this post

Last edited by Wisarut; September 22nd, 2017 at 02:44 PM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old September 25th, 2017, 09:03 PM   #815
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

Further details on this 20 year masterplan

1. Urgent from 2017 to 2021 - the ongoing 13 projects
2. Mid range project from 2022 to 2026 - the next 13 projects
3. Long term project from 2027 to 2036 - the further 12 projects

1. Massive double trackings on existing lines - 16 projects with total distances of 2,777 km
1.1 the ongoing urgent 7 projects with total distance of 993 km (2017 - 2021) at 136,462 Million Baht including
- Chachoengsao - Klong 19 - Kaeng Khoi
- Thanon Jira - Khon Kaen
- Prachuab Khirikhan - Chumporn - bidding done - waiting the contract signing
- Lopburi - Pak Nam Pho - bidding done - waiting the contract signing
- Map Krabao - Thanon Jira - Bidding almost done with exception on Klong Khananjit - Thanon Jira
- Nakhon Pathom - Hua Hin - Bidding Done
- Hua Hin - Prachuab Khirikhan - Bidding Done

1.2 Mid range 7 projects with total distance of 1,392 km (2022 - 2026) at 209,256 Milllion Baht including
- Pak Nam Pho - Denchai - pending
- Khon Kaen - Nong Khai - pending
- Thanon Jira - Ubon Ratchathani - pending
- Chumporn - Surat Thani - pending
- Surat Thani - Hat Yai - Songkla - pending
- Hat Yai - Padang Besar - pending
- Sri Racha - Sattahip, Khao Chee Jan - Map Ta Phut - pending

1.3 Long term - 2 projects with total distance of 392 km (2027 - 2036) at 80,343 Milllion Baht including
- Denchai - Chiang Mai - pending
- Klong 19 - Aranyaprathet - pending - with connection to Cambodia

2. Meter gauge New lines - 14 projects with total distances of 2,352 km at 501,690 Milllion Baht including
2.1 Urgent (2017 - 2021) on 3 lines with total distance of 839 km at 167,761 Milllion Baht including
- Denchai - Chiang Rai - Chiang Khong
- Ban Phai - Roy Ed - Mukdahan - Nakhon Phanom
- Surat Thani - Thanun

2.2 Mid range (2022 - 2026) on 4 lines with total distance of 642 km at 184,746 Milllion Baht including
- Nakhon Sawan - Kamphaeng Phet - Tak - Mae Sod
- Kanchanaburi - Ban Phachi -
- Songkla - Pak Bara
- Ban Phachi - Nakhon Luang - to the pier of CP in Nakhon Luang

2.3 long term (2027 - 2036) on 7 lines with total distance of 871 km at 149,183 Milllion Baht including
- Map Taphut - Rayong - Chanthaburi - Trat - to support Eastern Economic Corridor with connect to Cambodia around Pailin or so
- Ubon Ratchathani - Chong Mek (connect to Pakse - Champasak of Laos)
- Kanchanaburi - Ban Phu Namron (connect to Dawei of Burma) - part of East - West corridor
- Nakhon Sawan - Ban Phai - part of East - West corridor
- Thub Put - Krabi
- Surat Thani - Donsak
- Chumporn - Ranong

3. High Speed train networks (8 projects with the total distance of 2,457 km at 1,497,554 Million Baht including
3.1 Urgent (2017 - 2021) with 3 projects with total distances of 675 km at 429,437 Milllion Baht including
- Bangsue Central - Rayong -
- Bangsue Central - Nakhon Ratchasima
- Bangsue Central - Hua Hin

3.2 Mid term (2022 - 2026) with 2 projects with total distance of 735 km at 421,783 Milllion Baht including
- Bangsue Central - Phitsanuloke
- Nakhon Ratchgasima - Nong Khai

3.3 Long term with 3 projects (2027 - 2036) with total distance of 1,047 km at 646,334 Milllion Baht including
- Phitsanuloke - Chiang Mai
- Hua Hin - Surat Thani
- Surat Thani - Padang Besar


4. Construction of Container Yards (CY)
4.1 Urgent at 8 stations (2017 - 2021)
- Klong Luek at km 259.00
- Na Muang
- Ban Kradone
- Wah Koh
- Na Phak Kwuang
- Map Amarit
- Ban Sa Plee
- Nong Pla Duk Junction

4.2 Mid term at 9 stations (2022 - 2026)
- Container yard and Collection and Distribution Center at Natha (km 618)
- Ban Tako
- Bu Ruesee
- Nong Waeng
- Bung Wai
- Bang Krathum
- Wang Kraphi
- Bang Klam
- Sugei Golok

4.3 Long Term at 3 stations (2027 - 2036)
- Hang Chat
- Saraphee
- Nong Sang

5. Electrification of double track at 87,152 Million Baht including
5.1 Urgent (2017 - 2021) - the studies on the route which should get electrification
5.1 Mid range (2022 - 2026) on 2 lines with total distance of 307 km at 31,999 Million Baht including
- Hatyai - Padang Besar - allowing KTMB to run cross border train to Hatyai
- Bangsue Central - Ban Phachi - Kaeng Khoi - Thanon Jira - after waiting since 1929 - basically Red line commuter extension

5.2 Long term (2027 - 2036) 6 lines with total distance of 1,098 km at 55,153 Million Baht including
- Bangsue Central - Nong Pladuk - Hua Hin - after waiting since 1929 - basically Red line commuter extension
- Ban Phachi - Pak Nampho - after waiting since 1929 - basically Red line commuter extension
- Bangsue Central - Makkasan - Chachoengsao - Pataya - to support Eastern Economic Corridor - basically Red line commuter extension
- Thanon Jira - Khon Kaen
- Pak Nam Pho - Phitsanuloke
- Hua Hin - Chumporn

6. New Locomotives and rolling stocks at 181,233 Million Baht including
6.1 416 new locomotives
6.2 1215 EMU/DMU carraiges
6.3 1242 new passenger carriages
6.4 3890 new cargo wagons
Expenditure on the Urgent period (2017-2021) is at 86,958 Million Baht

The total cost for this master plan is 2,702,934 Million Baht including
1. Public Investment 1,973,851 Million Baht
2. Private Investment 729,083 Million Baht

the average annual investment 135,147 Million Baht including Public Investment 98,693 Million Baht Private Investment 36,454 Million Baht
Urgent Investment (2017 - 2021) 829,802 Million Baht including public investment of 642,802 Million Baht Private Investment 187,000 Million Baht
Mid Range investment (2022 - 2026) 897,568 Million Baht including public investment of 692,128 Million Baht Private Investment 205,441 Million Baht
Long term Investment (2027 - 2036) 975,564 Million Baht including public investment of 6638,922 Million Baht Private Investment 336,642 Million Baht

According to the masterplan, Private sectors are the one who supply the new locomotives, carriages and rolling stock - with the expenditure of 178,172 Million Baht
Furthermore, private sector will be allowed to run electric trains by concession - and private sector are allowed to run High Speed train

Economic benefit after the masterplan realized in 2037 is at 408,008.64 Million Baht a year including
saving for transportation cost at 158,138.90 Million Baht a year
Saving for cutting down the transportation time at 94,35160 Million Baht a year
Saving for cutting down the accident loss for land transport 17,258.41 Million Baht a year
Saving for cutting down the pollution and Green House Gases 138,259.73 Million Baht a year

Further goals are to expand the railway network from 4,043 km that covers 47 provinces to 8,852 km with almost 90% as double tracking that covers 62 provinces along with High Speed train network of 2000 km and boost the competitiveness from 42nd to 37th

After the preliminary draft of 20-year masterplan has been issued, private sectors have their own viewpoints as follows:
1. Speed up High Speed train to Nong Khai as Lao - China Railway is now under construction which is to be done in 2021 by changing to the priority to First Priority (2017 to 2021) instead of Mid term (2022 - 2026)
2. Speed up East - West Corridor including Nakhon Sawan - Tak - Mae Sod along with Nakhon Sawan - Ban Phai and Ban Phai - Nakhon Phanom by changing to the priority to First Priority (2017 to 2021) instead of Mid term (2022 - 2026)
3. ICD at Tak along with Mukdahan, Hatyai and Sugei Golok as the first priorities according to regional demands
https://www.prachachat.net/property/news-44782
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old September 29th, 2017, 11:29 AM   #816
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523


4 Choices for Chumporn - Ranong Deep Sea Port to be decided on 11 October 2017 and the preliminary study is to be done in Feb 2018
Choice 1: Branching out at 2.3 km South of Chumporn station (km. 468.53) at the Northern end of Saeng Daed station (km 472.54) - Ranong Deep Sea port with total distance of 102.50 km with 9 stations including

1. Saeng Daed station - Chumporn
2. Khun Krathing station - Chumporn
3. Ban Na station - Chumporn
4. Wang Mai station - Chumporn
5. Pak Chan station - Kraburi district of Ranong
6. Kraburi station - Kraburi district of Ranong
7. Bang Yai station - Kraburi district of Ranong
8. La Un station - La Un district of Ranong
9. Ranong Deep Sea Port - Khao Nang Hong commune - Muang district of Ranong

Choice 2: Branching out at 0.4 km South of Wisai station (km 489.97) - Ranong Deep Sea port with total distance of 74.154 km with 5 stations including
1. Kron station at Kron Hong commune - Sawee district of Chumporn
2. Thung Raya at Sawee district of Chumporn
3. Khao Thalu at Khao Thalu commune Sawee district of Chumporn
4. La Un station - La Un district of Ranong
5. Ranong Deep Sea Port - Khao Nang Hong commune - Muang district of Ranong

Choice 3: Branching out at 1.5 km South of Khao Suan Thurian station (km . 508.51) - Ranong Deep Sea port with total distance of 74.706 km with 6 stations including

1. Khao Suan Thurian station - Na Pho commune, Sawee district of Chumporn
2. Na Sak station - Na Sak commune, Sawee district of Chumporn
3. Khao Khai station - Khao Khai commune, Sawee district of Chumporn
4. La Un Tai station - La Un Tai commune, La Un district of Ranong
5. La Un station - La Un district of Ranong
6. Ranong Deep Sea Port - Khao Nang Hong commune - Muang district of Ranong

Choice 4:Branching of Khun Hin Mui station (km. 526.08) Ranong Deep Sea port with total distance of 108.982 km with 6 stations including
1. Khun Hin Mui station - Na Kha commune Lang Suan district of Chumporn
2. Hard Yay station - Hard Yay commune Lang Suan district of Chumporn
3. Pha Toh station - Pha Toh district of Chumporn
4. Ranong Airport station - Muang district of Ranong
5. Ranong station - Muang district of Ranong
6. Ranong Deep Sea Port - Khao Nang Hong commune - Muang district of Ranong

https://www.facebook.com/photo.php?f...type=3&theater
https://www.facebook.com/photo.php?f...type=3&theater

Chumporn - Ranong railway project is here
http://chumphon-ranongrailway.com/

So far local people prefer Choice 1 (Saeng Daed - Ranong Deep Sea Port) and Choice 2 (Wisai - Ranong Deep Sea Port) over other choice
http://chumphon-ranongrailway.com/PDF/Sum_M1.pdf
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old October 2nd, 2017, 08:39 AM   #817
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

Signing the contracts to construct double tracking (9 sections at 70,104 Million Baht) by the end of October 2017 but the section from Klong Khanantchit to Thanon Jira including 5.1 km elevated track will call the bidding by the end of 2018 along with the bidding for CTC at 12,921 Million Baht
http://www.naewna.com/business/295206
https://www.posttoday.com/biz/gov/516873

Wider TOR for new 50 Diesel electric locomotives of 16 ton axle load with the mean price of 6240 Million Baht + the leasing of 50 locomotives for 15 years at 48,721 Baht a day per locomotive as the old TOR has allowed only one bidder which is totally unacceptable
https://mgronline.com/business/detail/9600000100460
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old October 3rd, 2017, 12:25 PM   #818
Appleich
Appleich
 
Appleich's Avatar
 
Join Date: Apr 2011
Location: BKK
Posts: 2,483
Likes (Received): 3645

Jira - Khon Kaen Double-track Railway Update
Photographs by Thairailnews | September 30, 2017

Ban Kradon Station in Nakhon Ratchasima:









Section between Nong Kan Nga and Nong Maew:



Section between Non Sung and Ban Dong Plong:





Source and more pics: https://www.facebook.com/pg/ThaiRail...72765766138744
__________________
Do Not Go Gentle Into That Goodnight.

Codename B, Jobber liked this post
Appleich está en línea ahora   Reply With Quote
Old October 5th, 2017, 02:31 PM   #819
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

Thai - Japan railway cooperation according to MoT
1. the preliminary on High Speed train from Bangsue Central to Phitsanuloke with the total distance of 380 km will be under preliminary design by JICA using the OTP design as a base
in November 2017 to be submitted to the cabinet in December 2017 and the detail design will be handled in 2018 so as to start the construction in 2019 and done in 2022

2. according to MoT, we have learnt that after Thai - Japan High Speed train from Bangsue Central to Phitsanuloke are getting EIA clearance, JICA has given the preliminary assessement
on the budget for such a project =>
2.1 Bangsue Central to Phitsanuloke is now 276,225 Million Baht, up from the result from OTP and Thai consultant at 233,771 Million Baht by 42,454 Million Baht.
2.2 Phitsanuloke to Chiang Mai via Sukhothai is now 269,338Million Baht, up from the result from OTP and Thai consultant at 216,656 Million Baht by 52,682 Million Baht.

3. For the issue of Phunamron (Kanchanaburi) to Laem Chabang along with the route to Aranyaprathet with total distance of 574 km as meter gauge rail, still under studying
4. For the issue of Maesod (Tak) to Mukdahan, still under studying - and it will create another bone of contention if SRT badly wants Nakhon Sawan - Tak - Mae Sod along with Ban Phai - Mukdahan - Nakhon Phanom as a part of Maesod (Tak) to Mukdahan - how to connect these 2 new lines with the shortest distance is the real bone of contention
5. After testrun to carry 12 feet container boxes to please the small customers who use pickups, both Thai and Japanese government have learnt very hard way that the customers have not appreciated
with small container box carrying at all as they still prefer the more familiar 20 feet container boxes and 40 feet long container boxes. This also has compelled to set up Thai - Japan cargo transportation
by rails as SPV to be implemented in 2018

6. Japan has sold 21 sets of Three-car MRT carriages for Purple line produced by J-TREC via Marubeni-Toshiba which are to be under 10-year maintainace of JR-East and Japan is goign to supply 25 set of 4-car and 6-car EMUs from Mitsubishi - Sumitomo - Hitachi for red line commuter networks at 32399 million Baht

https://www.prachachat.net/facebook-...cle/news-49518
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old October 6th, 2017, 04:28 PM   #820
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,534
Likes (Received): 2523

The massive double tracking can be started the construction in December 2017 - but the section from Klong Khanjit to Thanon Jira delayed by 12 months with 3000 Million Baht extra for 5.1 km elevated tracks
https://www.dailynews.co.th/economic/602636
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 12:16 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium