Yamuna Expressway | Greater Noida - Agra | 165 Kms | 6 Lanes | Completed

Quote:
The Yamuna Expressway (formerly Taj Expressway) Project was conceived with the idea of reducing the travel time between New Delhi and Agra.

It will be a 6-lane (extendable to 8 lanes) access-controlled Expressway and will connect Delhi with Agra via Mathura.

The Expressway is to be developed in three phases:-

Phase I: Expressway Stretch between Greater Noida & Taj International Airport.
Phase-II: Expressway Stretch between Taj International Airport and an intermediate destination between Taj International Airport & Agra.
Phase III: Expressway Stretch between intermediate destination & Agra.
Project is slated to be completed by 2010 and is being executed by Jaypee group.


website

Status check on Yamuna Expressway project
Euromast no está en línea   Reply With Quote

Sponsored Links
 
Old March 23rd, 2009, 03:22 PM   #2
Arul Murugan
Registered User
 
Join Date: Jun 2006
Location: Salem-Chennai
Posts: 13,753
Likes (Received): 2165



Great expressway

Here is the official site

http://www.yamunaexpresswayauthority.com/
__________________
Click on---->



அருள் முருகன்
தமிழ்நாடு/இந்தியா
Arul Murugan no está en línea   Reply With Quote
Old March 24th, 2009, 05:25 AM   #3
COOLIO101
Registered User
 
Join Date: Mar 2009
Posts: 3
Likes (Received): 0

Thats pretty cool, but not as cool as me.
COOLIO101 no está en línea   Reply With Quote
Old March 24th, 2009, 08:53 PM   #4
skganji
Registered User
 
Join Date: Dec 2006
Location: Irvine
Posts: 642
Likes (Received): 164

Have they started working on this project ?. I hope the government realizes the importance of this project to UP and keeps its credibility.
skganji no está en línea   Reply With Quote
Old March 24th, 2009, 09:38 PM   #5
IU
->
 
IU's Avatar
 
Join Date: Apr 2006
Location: Hanooz Dilli dur ast
Posts: 10,492

Quote:
Originally Posted by skganji View Post
Have they started working on this project ?. I hope the government realizes the importance of this project to UP and keeps its credibility.
Yes they have. Check out the Status check on Yamuna Expressway project video in Euromast's first post.


Quick facts

Code:
Length-------------------------->165.537 Km
Right of Way-------------------->100m
Number of Lanes ---------------->6 Lanes extendable to 8 lanes
Type of Pavement---------------->Rigid (Concrete)

Structures
Interchange------------------------>7
Main Toll Plaza-------------------->3
Toll Plaza on Interchange Loop----->7
Underpass-------------------------->35 
Rail Over Bridge------------------->1
Major Bridge----------------------->1
Minor Bridge----------------------->42
Cart Track Crossing---------------->68
Culverts--------------------------->204

Technical Specifications
Code:
Pavement width of Carriageway (One Direction)----->15.70 m
Earthen Shoulder Width 	-------------------------->5.10 m

Pavement width of Service Road
Urban Area --------------------------------------->7.00 m
Rural Area  -------------------------------------->5.50 m

Thickness of Pavement, Quality & Concrete
Main Carriageway 3 ------------------------------->20 mm
Urban Area Service Road -------------------------->290 mm
Rural Area Service Road -------------------------->220 mm

All the the maps on the YEA's website have the north side directed towards the left side instead of the conventional top like this one:




So after rotating another map, here's how the expressway alignment would look like true to the direction:



Here's a map of the Taj economic zone that'll come up along the expressway. This is also where the Taj International airport (Noida airport) will come up if approved by the central govt.



The deadline to the complete the project is September 2010, a month before the commonwealth games begin.
IU no está en línea   Reply With Quote
Old July 30th, 2009, 10:03 PM   #6
arnabx
Registered User
 
arnabx's Avatar
 
Join Date: May 2009
Location: York
Posts: 23
Likes (Received): 0

Yamuna Expressway (YEW)

Yamuna Expressway (YEW) - Green Yamuna Township
Maiden plot scheme location map:
o

To discuss more about YEW Township / YEIDA, feel free to join this google group: http://groups.google.com/group/yeida?hl=en
arnabx no está en línea   Reply With Quote
Old July 31st, 2009, 11:02 AM   #7
bains1971
ताज़ा समाचार
 
bains1971's Avatar
 
Join Date: Sep 2008
Posts: 634
Likes (Received): 5

How much progress has been made in this project any pictures.
__________________
The Athletes' Village for the Commonwealth Games in New Delhi has been officially opened and described as "better than the Beijing Olympics" by Craig Hunter, the Chef de Mission for England's team.
The dates for the Games are 3 - 14 October 2010, inclusive of the Opening and Closing Ceremonies. Weather wise the city experiences an October mean temperature of a minimum 17.2 degrees centigrade and maximum 31.3 degrees centigrade with humidity ranging from 31 to 78% for the October and November months.
Punjab Aviation in India
bains1971 no está en línea   Reply With Quote
Old August 2nd, 2009, 06:14 AM   #8
ramkan
Registered User
 
ramkan's Avatar
 
Join Date: Jul 2005
Posts: 1,125
Likes (Received): 2

I think they made some progress in identifying locations enroute to New Delhi for more statues of Mayawati & co.. Not sure if they have started installing them though..
ramkan no está en línea   Reply With Quote
Old August 15th, 2009, 06:42 PM   #9
sidney_jec
Complex Equation
 
sidney_jec's Avatar
 
Join Date: Jun 2005
Posts: 6,227

The project is very much on.
saw some construction activity at the site today and took some pics..
they are building an interchange where the expressway ends in Gr Noida..

CC: Myself











__________________
Everything that can be done, either by Man or God, has been done in India - Mark Twain

myIncredibleIndia | flickr | Sids Photography | Will you fight a monkey?
sidney_jec no está en línea   Reply With Quote
Old August 15th, 2009, 07:33 PM   #10
bains1971
ताज़ा समाचार
 
bains1971's Avatar
 
Join Date: Sep 2008
Posts: 634
Likes (Received): 5

Great pictures thanks for the posting.
__________________
The Athletes' Village for the Commonwealth Games in New Delhi has been officially opened and described as "better than the Beijing Olympics" by Craig Hunter, the Chef de Mission for England's team.
The dates for the Games are 3 - 14 October 2010, inclusive of the Opening and Closing Ceremonies. Weather wise the city experiences an October mean temperature of a minimum 17.2 degrees centigrade and maximum 31.3 degrees centigrade with humidity ranging from 31 to 78% for the October and November months.
Punjab Aviation in India
bains1971 no está en línea   Reply With Quote
Old September 3rd, 2009, 09:38 PM   #11
arnabx
Registered User
 
arnabx's Avatar
 
Join Date: May 2009
Location: York
Posts: 23
Likes (Received): 0

The following pictures are copied from the following Google Group about Yamuna Expressway (YEIDA).
http://groups.google.com/group/yeida

Picture credit goes to Mr Safal Suri and Mr Raj Yadav of YEIDA Google Group.

Yamuna Expressway (Point Zero)


Yamuna Expressway (Point Zero)


Yamuna Expressway (Point Zero)

Last edited by IU; September 4th, 2009 at 11:47 PM.
arnabx no está en línea   Reply With Quote
Old September 3rd, 2009, 09:43 PM   #12
arnabx
Registered User
 
arnabx's Avatar
 
Join Date: May 2009
Location: York
Posts: 23
Likes (Received): 0

The following pictures are copied from the following Google Group about Yamuna Expressway (YEIDA).
http://groups.google.com/group/yeida

Picture credit goes to Mr Safal Suri and Mr Raj Yadav of YEIDA Google Group.

Master Plan of YEA / Greater Noida / Noida
-----------------------------------------------



Tech Zone Map (Very close to YEIDA)


Last edited by IU; September 4th, 2009 at 11:49 PM.
arnabx no está en línea   Reply With Quote
Old September 3rd, 2009, 09:44 PM   #13
arnabx
Registered User
 
arnabx's Avatar
 
Join Date: May 2009
Location: York
Posts: 23
Likes (Received): 0

The following pictures are copied from the following Google Group about Yamuna Expressway (YEIDA).
http://groups.google.com/group/yeida

Picture credit goes to Mr Safal Suri and Mr Raj Yadav of YEIDA Google Group.

Yamuna Expressway (Point Zero)


Yamuna Expressway (Point Zero)


Yamuna Expressway (Point Zero)



Last edited by IU; September 4th, 2009 at 11:49 PM.
arnabx no está en línea   Reply With Quote
Old September 4th, 2009, 05:58 AM   #14
Euromast
Mast Malang
 
Euromast's Avatar
 
Join Date: Apr 2007
Location: Raania da pind
Posts: 5,619
Likes (Received): 446

Thank you for updates
Euromast no está en línea   Reply With Quote
Old September 4th, 2009, 06:01 PM   #15
qwertyasd
India Waiting
 
qwertyasd's Avatar
 
Join Date: Feb 2008
Location: Mum-Bay Area
Posts: 931
Likes (Received): 0

how do they plan to complete this? only an year to go!
qwertyasd no está en línea   Reply With Quote
Old September 4th, 2009, 07:08 PM   #16
arnabx
Registered User
 
arnabx's Avatar
 
Join Date: May 2009
Location: York
Posts: 23
Likes (Received): 0

Quote:
Originally Posted by qwertyasd View Post
how do they plan to complete this? only an year to go!
The above picture is about the interchange from Noida-GN Expressway to Yamuna Expressway (YEW). This interchange will not be ready next year.
What we know is, by Oct 2010, 1X1 Lane of YEW will be operational upto Agra.
The interchange 1, will also connect the proposed 3 X 3 Toll-Free road connecting PariChowk to Badarpur, Delhi.

As because this interchange / flyover will not be ready, you have to go through the Pari Chowk, GN round about to get to YEW and vice-versa.

By December 2009, 1X1 Lane YEW is expected to be operational till Jewar.

2013 - YEW will be fully operational (all 3X3 lanes with toll plaza etc).

Few other development about this area.

1) Formula 1 will be ready for 2011 race.
2) Gautam Buddha Univ. operational for Masters Level courses (No under grad yet).
3) Eastern Peripheral Expressway is calling new tender (Reliance tender is canceled). So the project will start by 2011.
4) LRTS Metro connecting Sector 32 Noida with PariChowk GN, is likely to be a PPP project with Mitsubishi Corp. and expected to finish by 2013. Phase 3 of the metro to terminate in Jewar. The alignment of LRTS Metro is along the Expressway.

So this area will be seeing good ROI by 2014, I guess as the major triggers of development takes shape. Not to mention, an investment from companies like Infosys Technologies could be a game changer besides Jewar Intl. Airport (which can be taken up by Congress Govt in UP in the future)

Last edited by arnabx; September 4th, 2009 at 07:39 PM.
arnabx no está en línea   Reply With Quote
Old September 4th, 2009, 11:51 PM   #17
IU
->
 
IU's Avatar
 
Join Date: Apr 2006
Location: Hanooz Dilli dur ast
Posts: 10,492

arnabx, thanks for the info and pics. I've moved all the commercial development images to the Noida thread.

http://www.skyscrapercity.com/showth...=612116&page=7
IU no está en línea   Reply With Quote
Old September 15th, 2009, 02:47 AM   #18
Abhishek901
Registered User
 
Abhishek901's Avatar
 
Join Date: May 2009
Posts: 10,316
Likes (Received): 372

Thanks for converting once dead thread into an active one by great updates
Abhishek901 no está en línea   Reply With Quote
Old September 15th, 2009, 05:48 AM   #19
arnabx
Registered User
 
arnabx's Avatar
 
Join Date: May 2009
Location: York
Posts: 23
Likes (Received): 0

The maiden plot scheme (YEA01) consisting of 21K plots consists of 300, 500, 1000, 2000 and 4000 SQM plots respectively.
The 300 and 500 SQM plots will be located in Sector 18 (see the above master plan post dated July 30th, 2009).
1000, 2000, 4000 SQM plots will be located in Sector 20, which will be one of the posh sectors of YEIDA, if the area picks up.

All the applicants can check the status of their applications online at
http://results.yamunaexpresswayauthority.com/index.htm

The date of draw is on Oct 14th, 2009 (2 days before Diwali).
arnabx no está en línea   Reply With Quote
Old October 20th, 2009, 04:10 AM   #20
arnabx
Registered User
 
arnabx's Avatar
 
Join Date: May 2009
Location: York
Posts: 23
Likes (Received): 0

YEA conducted draw for 1000, 2000 and 4000 SQM plots on Oct 14, 2009. Majority of the applicants have won their plots. Market premiums are very little (some Rs 50-90/SQM).
300, 500 SQM plots will be drawn on Nov 17th, 2009 and it will be a computerized draw. Some 19000+ plots will be entering the market in Greater Noida area. Will be fun to see, too many sellers trying to dispose off their plots.
Remember that this residential schemes are meant for very long term investors (10+ years) or for end users who will live there.
arnabx no está en línea   Reply With Quote


Reply

Tags
india

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 06:14 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu