daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old January 4th, 2015, 11:58 AM   #481
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,336
Likes (Received): 26118

Taken from Serbian railways thread:

Quote:
Originally Posted by CrazySerb View Post
On-again, off-again construction of Belgrade's new railway station has begun once again, with the goal of completing basic infrastructure necessary for the relocation of the old station, allowing for construction of the multi-use "Belgrade on water" project on the land currently occupied by it.


















Quote:
Originally Posted by CrazySerb View Post
"Belgrade on Water" project - you can see the current mail rail station in the bottom, right corner - the building will be re-purposed, likely as a museum of some sort:

__________________

geometarkv liked this post
dimlys1994 no está en línea   Reply With Quote

Sponsored Links
Old February 5th, 2015, 12:46 AM   #482
takini
Registered User
 
Join Date: Aug 2008
Posts: 1,349
Likes (Received): 89

Belgrade city railway, cab view

takini no está en línea   Reply With Quote
Old February 9th, 2015, 02:42 AM   #483
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

20th anniversary of Vukov Spomenik railway station

Quote:
Originally Posted by Аполон View Post
Stanica gradske železnice BG Voz i prigradske železnice Beovoz - Vukov spomenik

Postoji više ulaza u stanicu


Ulaz(izlaz) u stanicu iz pravca Bulevara Kralja Aleksandra. To je prvi nivo stanice ispod zemlje od ukupno tri nivoa.


Pokretne stepenice koje se nalaze na drugom nivou i vode do perona gde se čekaju vozovi


Pokretne stepenice (Stanica se nalazi na 35m dubine i predstavlja jednu od najdubljih stanica u Evropi)


Unutrašnjost stanice


Dolazak kompozicije BG voza
__________________

dimlys1994, geometarkv, mrsmartman liked this post
CrazySerb no está en línea   Reply With Quote
Old February 9th, 2015, 04:44 PM   #484
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,336
Likes (Received): 26118

How old are these replaced escalators?
dimlys1994 no está en línea   Reply With Quote
Old February 10th, 2015, 11:27 PM   #485
Arnorian
Registered User
 
Arnorian's Avatar
 
Join Date: Jul 2010
Location: Moesia Superior
Posts: 2,735
Likes (Received): 14594

The station was opened in 1995. As far as I'm aware the escalators have never been replaced.
__________________
I know the pieces fit cause I watched them fall away

dimlys1994 liked this post
Arnorian está en línea ahora   Reply With Quote
Old February 15th, 2015, 07:21 PM   #486
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,336
Likes (Received): 26118

Taken from Serbian railways thread:

Quote:
Originally Posted by CrazySerb View Post
In addition to the ongoing works on "Belgrade Center" railway station seen on the previous page, Serbia's capital could potentially get one more modern passenger railway hub - across the river, in New Belgrade.

The order to remove a film set, a replica of the downtown Belgrade core that currently occupies the land in question, has just been given and hopefully, once funding is found, we may see something like this built...

Quote:
Originally Posted by Bez_imena View Post
Bus station with 15 arrival and 58 departure terminals, railway station with 8 platforms - See how future complex in New Belgrade's Block 42 will look like

New main bus station in New Belgrade will have arrival and 58 departure terminals, while the future main railway station will have 8 platforms; it has been said today at the presentation of the urban-architectonic solution of new facilities in Block 42. The first awarded solution which will serve as the base for further project and plan development is the work of the Proaspekt team with Vladimir and Milan Lojanica.



The future complex in New Belgrade which will, apart from railway and bus station, comprise attractive business premises as wel, will occupy some 21 hectares. When it is completed, some 180.000 square meters of business space should be constructed in this part of the town (including station facilities). Three towers of 23 floors, 70 meters high will be the special stamp to this location.

The competition objective was to get the most quality solution for new traffic terminals in the central zone of New Belgrade as well as for business-commercial facilities. The winning preliminary design, as well as other works submitted, has been presented today at the Urban Bureau of the City of Belgrade.

The City Manager, Goran Vesic as well as the director of the Urban Bureau, Nebojsa Stefanovic, attended the presentation. Based on the first awarded solution, the Urban Bureau will now move into the development of the detailed regulation plan.



- The relocation will enable something we wanted for decaded. We will tru to integrate all other traffic aspects as well and to make Block 42 something it has not been up till now – the City Manager pointed out.

The investor of the competition was the Directorate for construction land and construction of the City of Belgrade.

The Urban Bureau will now start development of the Detailed regulation plan based on the first ranked design. Not everything will remain the same but the project will serve as the starting point, Vesic added.

The project of Proaspekt will also be developed with the second-ranked design of Dragan Vukovic and Kolubara invest gradnja as well as with another four purchased designs.

Vesic added that the new complex in Block 42 will comprise 180.000 square meters of quality space as well as that he expects that very soon companies ready to invest in their construction will be found.

As it was planned, new bus station will provide space for both companies – BAS and Lasta.

The author of the first awarded project, an architect, Vladimir Lojanica, pointed out that the task was not easy at all and that the competition was very strong.

- We were trying to merge architecture with the tradition and modernism heritage of New Belgrade, i.e. to leave the stamp of our times in an adequate manner – an architect added.

Director of the Urban Bureau, Nebojsa Stefanovic, reminded that 54 designs for the construction of bus and railway station were submitted, eight of which from abroad - Italy, Bulgaria, Germany and Great Britain. However, one of the competition terms was that a team lead of architects has a designing license of the Republic of Serbia.

The end of June should see a prepared catalogue of all the works and expert discussions will be organized as well. Apart from that, by the end of June, at the hall of the Urban Bureau building in Palmoticeva 30, exhibition of all the works which were submitted at the competition will be set up.

Here are a few details from the first awarded work of the Proaspekt team.

The bus station takes the central position of the block; the railway station is located along the north edge of the platform facilities and between them. The commercial and business center is located along the part of the block in Jurija Gagarina and Antifasisticke borbe streets. Supermarket is located along the edge zone of the block, along the Jurija Gagarina Street.



The bus and the railway stations will have an access zone, a bus building and platforms. The commercial facilities will be located in three subunits: on site (as separate block subunit) and in business towers.

The design implies that the entire complex is built in a few stages. The first stage refers to construction of the bus station in the scope which complies with the needs related to relocation of the Sava amphitheatre. It is not necessary to build all the platforms now or all facilities in the complex ground floor or floor. The second stage implies addition to the bus station facilities as well as the implementation of the railway complex in two steps.

The third stage includes the option of construction of hotel complex, business center and trading and servicing facilities. In the last, the fourth stage, it is necessary to construct the remaining business facilities. Apart from that, if railway platforms are not covered by that time, it will be done in this stage.

http://www.ekapija.com/website/en/pa...will-look-like


Film set in question...

__________________

geometarkv liked this post
dimlys1994 no está en línea   Reply With Quote
Old February 16th, 2015, 02:54 AM   #487
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

Swiss city of Basel will donate an additional 28 Duewag GT6 trams to Belgrade

__________________

dimlys1994, geometarkv, kyah117 liked this post
CrazySerb no está en línea   Reply With Quote
Old February 17th, 2015, 04:12 AM   #488
towerpower123
Let's Revive our Cities
 
Join Date: Feb 2013
Location: Howell/Newark, NJ
Posts: 2,252
Likes (Received): 4188

^ At least they will be put to use rather than scrapped.
__________________
If I don't say otherwise, all of my images are on my blog,
http://urbanismvsmodernism.blogspot.com/?view=sidebar

186 Newark, NJ Development projects MAPPED
http://www.skyscrapercity.com/showthread.php?t=1874870
http://urbanismvsmodernism.blogspot....l?view=sidebar

See my DeviantArt account at http://towerpower123.deviantart.com/
towerpower123 no está en línea   Reply With Quote
Old February 17th, 2015, 08:33 AM   #489
Puss in Boots
Registered User
 
Join Date: Aug 2011
Posts: 2,133
Likes (Received): 541

Will they replace existing trams or they will help grow the no of trams in service?
Puss in Boots no está en línea   Reply With Quote
Old February 19th, 2015, 12:55 PM   #490
Arnorian
Registered User
 
Arnorian's Avatar
 
Join Date: Jul 2010
Location: Moesia Superior
Posts: 2,735
Likes (Received): 14594


Both.

Belgrade's City Train crossing the New Rail Bridge over the Sava:


source
__________________
I know the pieces fit cause I watched them fall away
Arnorian está en línea ahora   Reply With Quote
Old February 23rd, 2015, 08:34 AM   #491
Markotic
Registered User
 
Join Date: Sep 2013
Posts: 276
Likes (Received): 97

Quote:
Originally Posted by CrazySerb View Post
Swiss city of Basel will donate an additional 28 Duewag GT6 trams to Belgrade
Are they an improvement over the current stuff?
Markotic no está en línea   Reply With Quote
Old March 7th, 2015, 08:03 AM   #492
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

Well, the city already operates these types of trams, so they're merely an addition to the existing fleet.


City's public transit agency will purchase some new buses...

Quote:
Public City Transport releases call for procurement of 30 buses
Sunday, 03/01/2015|21:25 | Source: eKapija

PUC Public city transport, "Beograd" released a call for submitting offers for procuremnet of 30 new low-profile buses , through financial leasing.

Interested bidders can takeover Competition documentation at the portal of public procurements and at the internet webpage www.gsp.co.rs.

Deadline for submitting offers is April 9, by 9 h and 30 minutes and public bids opening will be only half an hour later at 10 t the GSP offices.


Apparently, this contract will most likely go to the local manufacturer Ikarbus, offering up its low-floor bus on Mercedes-Benz chassis:

__________________

dimlys1994 liked this post

Last edited by CrazySerb; March 7th, 2015 at 08:11 AM.
CrazySerb no está en línea   Reply With Quote
Old May 12th, 2015, 06:18 AM   #493
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

The City indeed signed a contract with domestic manufacturer Ikarbus for delivery of 30 solo buses. First will be delieverd in September and they should resemble the buses previously deliverd to Novi Sad, with a bit more bells & whistles.
Contract worth 5,5 million euros or 185k per bus.












CrazySerb no está en línea   Reply With Quote
Old May 12th, 2015, 06:23 AM   #494
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

Next up for fleet renewal...trolley's.

__________________

Swede, geometarkv, mrsmartman liked this post
CrazySerb no está en línea   Reply With Quote
Old May 12th, 2015, 06:52 PM   #495
ExCaliBourBG
...Косово је Србија...
 
ExCaliBourBG's Avatar
 
Join Date: Mar 2011
Location: Београд
Posts: 1,637
Likes (Received): 1001

Buses will actually look like this



ExCaliBourBG no está en línea   Reply With Quote
Old May 18th, 2015, 07:00 AM   #496
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

Just a nice pic...

CrazySerb no está en línea   Reply With Quote
Old May 26th, 2015, 08:29 AM   #497
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

__________________

ExCaliBourBG, dimlys1994 liked this post
CrazySerb no está en línea   Reply With Quote
Old May 29th, 2015, 08:05 AM   #498
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

Potential new mode of public transit for Belgrade...

Quote:
City and Skijalista Srbije signed Protocol on construction of gondola in two stages
Monday, 05/25/2015|12:14 | Source: eKapija
sr de
Dejan Ljevnajic and Sinisa Mali (photo: Beograd.rs)

The mayor of Belgrade, Sinisa Mali and the acting head at Skijalista Srbija, Dejan Ljevnajic, signed on Friday a Protocol on cooperation in implementation of the project for the construction of cabin cable car-gondola in Belgrade.

The first cable car of that type in the capital should go from Novi Beograd, across Ada Ciganlija and Makis to Kosutnjak, Mali specified at the Stari dvor.

The Protocol, as he outlined, implies set up of working group which will in the next three months develop study to see whether it is possible to implement it and the funds essential for this project .

He announced the umbrella plan is to conduct project in two stages.

He specified the gondola capacity would be3.000 passengers per hour.
CrazySerb no está en línea   Reply With Quote
Old May 29th, 2015, 01:06 PM   #499
Andrej_LJ
Registered User
 
Andrej_LJ's Avatar
 
Join Date: Feb 2010
Location: Ljubljana-Sofia-Skopje
Posts: 2,703
Likes (Received): 5203

Really?
How about put the already constructed tram line over the Ada bridge into service instead of this nonsense.
__________________

ExCaliBourBG liked this post
Andrej_LJ no está en línea   Reply With Quote
Old May 29th, 2015, 03:20 PM   #500
CrazySerb
Vuk sa Ontarija
 
CrazySerb's Avatar
 
Join Date: Aug 2007
Posts: 19,746
Likes (Received): 7668

There are no tracks over Ada bridge yet and potentially, won't be for at least a few years

Traditional short-sightedness.
CrazySerb no está en línea   Reply With Quote


Reply

Tags
caf

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 03:38 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium