daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Railways

Railways (Inter)national commuter and freight trains



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old November 1st, 2012, 06:03 PM   #401
pdovak
Registered User
 
Join Date: Oct 2012
Posts: 9
Likes (Received): 0

Quote:
Originally Posted by trainrover View Post
This is pretty exciting ... remind us, please, just what speeds are being bandied about here.
Operating speeds are planned for 500kph/311mph.

Quote:
Originally Posted by patrykus View Post
So what's with the unbuilt up area? Is the track going to have the tunnel there as well?
All of the outdoor sections are going to have some sort of covering, regardless of the population of the surroundings. For example, the location of the media event that was held in the Akiyama tunnel was in a valley and so remote it was only reachable by a gravel road, but this section will still be covered.
http://photo.sankei.jp.msn.com/panor...12/0514linear/
(Click the arrow on the track to move outside)

I don't believe that the train is very loud. If the system was to be built in the United States, for example, these hoods would not be necessary. According to JR Central, the noise is equivalent to the Transrapid maglev traveling at the same speeds, and quieter than other conventional rail systems.

JR Central is still researching cost reduction options for these hoods, as they are understandably very expensive.

Last edited by pdovak; November 26th, 2012 at 09:42 PM.
pdovak no está en línea   Reply With Quote

Sponsored Links
Old November 2nd, 2012, 12:38 AM   #402
trainrover
:-x
 
trainrover's Avatar
 
Join Date: May 2006
Posts: 5,787
Likes (Received): 738

Okay, this noise business is clearer. So what about for urban route segments that are neither nearby nor adjacent to tunnel portals, will this especial tube enclosure still be installed?
__________________
.
hee hee
.
trainrover no está en línea   Reply With Quote
Old November 3rd, 2012, 06:34 AM   #403
Hegemonic
Registered User
 
Hegemonic's Avatar
 
Join Date: Apr 2010
Posts: 936
Likes (Received): 366

It would be cool if they left one section open so people can appreciate the speed in and outside to train.

I see in some youtube videos that there is live please for observation perhaps once the line becomes operational it can become a museum detailing the evolution of the maglev.
Hegemonic no está en línea   Reply With Quote
Old November 3rd, 2012, 03:41 PM   #404
Equario
Борітеся поборете!
 
Equario's Avatar
 
Join Date: Jan 2010
Location: Irpin|Kyiv
Posts: 6,321
Likes (Received): 14467

Quote:
Originally Posted by pdovak View Post
JR Central is still researching cost reduction options for these hoods, as they are understandably very expensive.
I might be mistaken, but those hoods are made of concrete, aren't they?
Equario no está en línea   Reply With Quote
Old November 17th, 2012, 11:06 AM   #405
castermaild55
Registered User
 
castermaild55's Avatar
 
Join Date: Sep 2005
Posts: 4,215
Likes (Received): 3060

I went to watch the construction of chuo shinkansen in the morning

image hosted on flickr

P1010443 by castermaild, on Flickr

image hosted on flickr

P1010444 by castermaild, on Flickr

image hosted on flickr

P1010445 by castermaild, on Flickr

image hosted on flickr

P1010446 by castermaild, on Flickr

image hosted on flickr

P1010447 by castermaild, on Flickr

image hosted on flickr

P1010448 by castermaild, on Flickr

image hosted on flickr

P1010449 by castermaild, on Flickr

image hosted on flickr

P1010450 by castermaild, on Flickr

image hosted on flickr

P1010451 by castermaild, on Flickr

image hosted on flickr

P1010452 by castermaild, on Flickr

image hosted on flickr

P1010453 by castermaild, on Flickr

image hosted on flickr

P1010454 by castermaild, on Flickr

image hosted on flickr

P1010455 by castermaild, on Flickr

image hosted on flickr

P1010456 by castermaild, on Flickr

image hosted on flickr

P1010457 by castermaild, on Flickr

image hosted on flickr

P1010458 by castermaild, on Flickr

image hosted on flickr

P1010460 by castermaild, on Flickr

image hosted on flickr

P1010461 by castermaild, on Flickr

image hosted on flickr

P1010462 by castermaild, on Flickr

image hosted on flickr

P1010463 by castermaild, on Flickr

image hosted on flickr

P1010464 by castermaild, on Flickr

HD is better to watch



http://www.skyscrapercity.com/showth...415653&page=17
castermaild55 no está en línea   Reply With Quote
Old November 17th, 2012, 02:12 PM   #406
loefet
Registered User
 
loefet's Avatar
 
Join Date: Dec 2008
Location: G÷teborg
Posts: 525
Likes (Received): 233

Great update!!

Quote:
Originally Posted by castermaild55 View Post
Seems to me that they won't extend these hoods on all sections, as previously discussed. Only on the sections where the tunnels are close together. These holes in the panels will reduce the pressure waves so that the tunnel booms will be reduced.
loefet no está en línea   Reply With Quote
Old November 18th, 2012, 08:58 AM   #407
bluemeansgo
Registered User
 
bluemeansgo's Avatar
 
Join Date: Oct 2008
Posts: 451
Likes (Received): 124

Yeah, I think the line is planned to be 60% tunneled (unless that has changed), so there will be "photo-op" locations. There will just be fewer than on other Shinkansen lines.

By the looks of things, they are planning on creating the guideway to have the capability of being tunneled in the future. So, as the speeds ramp up or as an area becomes more urban and the tunnel boom affects more people, they will be able to retrofit covers for some sections as well.

Japan's urban highways have sound barriers along much of their length as well... and as much as it makes a drive along them less pleasant, it allows a MUCH more livable environment around them.
bluemeansgo no está en línea   Reply With Quote
Old November 18th, 2012, 12:55 PM   #408
Hegemonic
Registered User
 
Hegemonic's Avatar
 
Join Date: Apr 2010
Posts: 936
Likes (Received): 366

Awsome photos, thanks for keeping us updated.

That last photo does go some way to explaning how they plan to disipate the tunnel boom.
Hegemonic no está en línea   Reply With Quote
Old November 19th, 2012, 04:22 PM   #409
pdovak
Registered User
 
Join Date: Oct 2012
Posts: 9
Likes (Received): 0

Wow! These photos are great. I will try to get some information about the hoods from this, if I can.

Also, I learned that the revenue service vehicles that will be tested on the line when it reopens will be delivered on Thursday! Hopefully there will be a lot of people there to take photos.
pdovak no está en línea   Reply With Quote
Old November 20th, 2012, 09:57 PM   #410
trainrover
:-x
 
trainrover's Avatar
 
Join Date: May 2006
Posts: 5,787
Likes (Received): 738

Wow...maglev looks promising
__________________
.
hee hee
.
trainrover no está en línea   Reply With Quote
Old November 22nd, 2012, 08:43 PM   #411
quashlo
Registered User
 
Join Date: Jun 2008
Posts: 14,835
Likes (Received): 3215

JR Central gives first peek at new L0 series maglev train
http://sankei.jp.msn.com/economy/new...0200008-n1.htm

Quote:
 JR東海は22日、山梨県都留市の山梨リニア実験線車両基地で、リニアモーターカーの新型車両「L0(エル・ゼロ)系」の車体搬入作業を行った。リニアの新型車両を報道公開するのは初めて。

 この新型車両は、リニア中央新幹線計画の実現に向けた試作車という位置づけ。この車両を使い、同社では早ければ「2013年冬ごろ」(山田佳臣社長)をめどに、同線の延伸工事を終え、リニア車両の走行試験を再開する方針とする。

 同社によると、リニア中央新幹線計画は2027年に東京(品川)-名古屋間を最短で約40分、2045年に東京(品川)-大阪(新大阪)間を同1時間で結ぶ。国土交通省が昨年5月、整備計画を決定した。
ANN news report (2012.11.22):



Kyōdō news report (2012.11.22), including footage of the delivery by trailer:

__________________
San Francisco
Japan 2013; Japan 2011
: Tōkyō I, II, III (Kamakura), IV (Yokohama), V; Ōsaka I (+Kyōto +Kōbe), II (Kyōto), III (Nara); Hiroshima; Fukuoka; Nagasaki; Kita-Kyushu + Shimonoseki; Nikkō
quashlo no está en línea   Reply With Quote
Old November 22nd, 2012, 10:24 PM   #412
chornedsnorkack
Registered User
 
Join Date: Mar 2009
Posts: 4,979
Likes (Received): 388

Quote:
Originally Posted by quashlo View Post
JR Central gives first peek at new L0 series maglev train
Specifically in which month of 2013 shall 43 km of Chuo Shinkansen be completed?
chornedsnorkack no está en línea   Reply With Quote
Old November 23rd, 2012, 03:46 AM   #413
SamuraiBlue
Registered User
 
Join Date: Apr 2010
Posts: 1,232
Likes (Received): 195

Quote:
Originally Posted by chornedsnorkack View Post
Specifically in which month of 2013 shall 43 km of Chuo Shinkansen be completed?
The article quashlo posted only states winter of 2013 although I believe it will be within fiscal 2012(March) or they would not have accepted delivery of the train set since they will have to report it as asset within their 2012 annual statement.

Last edited by SamuraiBlue; November 23rd, 2012 at 04:03 AM.
SamuraiBlue no está en línea   Reply With Quote
Old November 23rd, 2012, 03:04 PM   #414
Hegemonic
Registered User
 
Hegemonic's Avatar
 
Join Date: Apr 2010
Posts: 936
Likes (Received): 366

When will construction of the comercial line start, and will there be any portions operational before 2027?
Hegemonic no está en línea   Reply With Quote
Old November 23rd, 2012, 03:44 PM   #415
Sopomon
Hideous and malformed
 
Sopomon's Avatar
 
Join Date: Oct 2010
Posts: 870
Likes (Received): 153

It looks far better than I had expected, very sleek and minimal.
__________________
And he kicked so many rosebushes at her that eventually, Sasuke turned into a log.
Sopomon no está en línea   Reply With Quote
Old November 23rd, 2012, 04:21 PM   #416
SamuraiBlue
Registered User
 
Join Date: Apr 2010
Posts: 1,232
Likes (Received): 195

Quote:
Originally Posted by Hegemonic View Post
When will construction of the comercial line start, and will there be any portions operational before 2027?
In a way it had started in 1990 when they first started constructing the Yamanashi test site since it will be incorporated into the Chuo Shinkansen line.
As for operation before 2027, there was a plan to operate between Kanagawa and Yamanashi around 2020 but I believe that had been scrubbed. JR Tokai will resume admission based test runs to the public sometime in 2013 or 2014.
SamuraiBlue no está en línea   Reply With Quote
Old November 28th, 2012, 08:47 AM   #417
trainrover
:-x
 
trainrover's Avatar
 
Join Date: May 2006
Posts: 5,787
Likes (Received): 738

A US news headline yesterday revealed to me a new term, hover train.
__________________
.
hee hee
.
trainrover no está en línea   Reply With Quote
Old November 28th, 2012, 07:49 PM   #418
quashlo
Registered User
 
Join Date: Jun 2008
Posts: 14,835
Likes (Received): 3215

Survey shows Yamato Kōriyama City as preferred location for Nara maglev station
http://mainichi.jp/area/nara/news/20...40565000c.html

Quote:
 県は27日、リニア中央新幹線の新駅(中間駅)の設置場所について、誘致に名乗りを上げている生駒、大和郡山の両市を除く37市町村を対象に実施したアンケート調査の結果を公表した。設置場所は「大和郡山市」と回答したのが9市町村で最多で、「生駒市」との回答はなかった。「奈良市北部」としたのは、アンケート実施後に誘致に乗り出した奈良市のみだった。

 アンケートは県が市町村の意見を参考にするために実施。9月10日の県・市町村サミットで生駒、大和郡山の両市がプレゼンテーションしたそれぞれの利点を踏まえ、設置場所や重視すべき条件などを問う内容で、両市を除く全37市町村から回答を得た。

 設置場所は自由記述で21市町村が回答。「大和郡山市」が、宇陀市など9市町村で最も多く、それ以外でも「県中央」「少しでも南部に」「大和郡山が北限」など、中和地区を想定しているとみられる回答が、香芝市など8市町村に上った。これ以外では、「奈良市北部」(奈良市)、「県が最適とする場所」(東吉野村)など。

 重視すべき条件を問う項目では「駅設置による波及効果が高い場所」が下北山村など7市町村で最も多かった。

県は「意見集約の結果は、今後、議論を深める際の参考にしたい」としている。【伊澤拓也】
__________________
San Francisco
Japan 2013; Japan 2011
: Tōkyō I, II, III (Kamakura), IV (Yokohama), V; Ōsaka I (+Kyōto +Kōbe), II (Kyōto), III (Nara); Hiroshima; Fukuoka; Nagasaki; Kita-Kyushu + Shimonoseki; Nikkō
quashlo no está en línea   Reply With Quote
Old December 6th, 2012, 10:29 AM   #419
castermaild55
Registered User
 
castermaild55's Avatar
 
Join Date: Sep 2005
Posts: 4,215
Likes (Received): 3060

リニア新駅近く、列車見える防音壁に 山梨同友会が提言
観光資源に活用

Quote:
山梨経済同友会は、リニア中央新幹線開通に伴う山梨県の活性化策をまとめた提言書を山梨県に提出した。15年後に想定される開業を待たずに、速やかに実現できる施策を盛り込んだのが特徴。来年末以降に再開が計画されるリニア実験線の試乗を、単なる試乗会に終わらせず、さらなる集客に向けた観光資源化として活用することなどを県に求めた。

 提言書は、「リニア開業までに山梨県の活性化策を」と題した。まずリニア実験線の開設以来、東海旅客鉄道(JR東海)と連携してきたアドバンテージに着目。県に対し、実験線の試乗が再開される際は「団体試乗枠」を優先的に確保できるようJR東海に働きかけるよう求めた。県が企画する会議・研修、国際会議と試乗をセットにすれば観光振興につながると分析している。

 リニアの線路は全線、基本的に防音壁が施される。同友会は甲府市郊外に立地が見込まれる新駅周辺2~3キロ程度の防音壁を、コンクリートシェルターから透明シェルターにし「見える化」を実現するよう提言書に盛り込んだ。新駅に発停車する列車は速度を落とすため、透明シェルターにすれば列車そのものが観光スポットになり、集客に貢献するという。
http://www.nikkei.com/article/DGXNAS...01C12A2000000/

Yamanashi Prefecture proposed a transparent shield instead of concrete tube because the train stops reduces speed to Yamanashi station
so does departure
castermaild55 no está en línea   Reply With Quote
Old December 16th, 2012, 06:17 AM   #420
quashlo
Registered User
 
Join Date: Jun 2008
Posts: 14,835
Likes (Received): 3215

Nagano Prefecture forecasts ridership at new maglev station
http://www.shinmai.co.jp/news/201212...I090030000.php

Quote:
 2027年に東京―名古屋間が開業するリニア中央新幹線で、県が県内中間駅の開業時の1日当たり乗降人員を約6800人とする推計をまとめたことが14日、分かった。県は現在、リニア開業や北陸新幹線延伸を見据えた新たな総合交通ビジョンを策定中で、推計は「参考値」として活用するとしている。

 県内中間駅は、飯田市座光寺から下伊那郡高森町南東部を含む直径5キロ円内に設置予定。今回の推計は、09年にJR東海側が公表した、県内中間駅の予測値「7千人」に近い値。県内の新幹線駅と比較すると、軽井沢の2732人(2011年度)の2倍余、長野の2万859人(同・在来線利用者も含む)の3分の1程度に当たる。

 推計の条件などは異なるが、山梨県が実施した同県内駅の開業時点の1日当たり乗降人員は約8900人。

 長野県の今回の推計は、民間に委託した。国土交通省が05年に調査した旅客流動に関する公表データを活用。県内中間駅と品川(東京)間を40分程度で結ぶリニアの時間短縮効果で自動車などから乗り換える需要や開業に伴う新たな需要などを計算式により求めたという。
Nagano’s maglev station will be located on the initial segment to open between Tōkyō and Nagoya in 2027. On 2012.12.14, Nagano Prefecture published the results of a ridership analysis that forecasted approx. 6,800 daily boardings and alightings at the new maglev station, very close to JR Central’s original 2009 forecast of about 7,000 passengers. Comparing to ridership at Nagano’s existing Shinkansen stations, the number is over twice current ridership at Karuizawa Station (2,732 daily boardings and alightings in FY2011), but less than the approx. 8,900 forecasted by Yamanashi Prefecture for its station on the maglev line.
__________________
San Francisco
Japan 2013; Japan 2011
: Tōkyō I, II, III (Kamakura), IV (Yokohama), V; Ōsaka I (+Kyōto +Kōbe), II (Kyōto), III (Nara); Hiroshima; Fukuoka; Nagasaki; Kita-Kyushu + Shimonoseki; Nikkō
quashlo no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:25 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium