Old June 16th, 2007, 09:51 AM   #1
Momo1435
Marotesque
 
Momo1435's Avatar
 
Join Date: Oct 2005
Location: アルフェナンデンライン
Posts: 33,664
Likes (Received): 58504

Betuweroute Opens:

source: welcomeurope.com

New priority section of the trans-European transport network completed: the Betuweroute starts operating between the Netherlands and Germany

On 16 June 2007 about 160 km of dedicated rail freight line will start moving freights between the port of Rotterdam and Germany at a speed of 120 km/h. Through this new railroad, an average of 160 trains per day is expected to cross the Dutch-German border, carrying around 37 million tons of freight a year.
» continue reading

~~~~~~~~~~~

~~~~~~~~~~~
source: railway-technology.com

Infrastructure

The 160km line includes five tunnels with a total length of 18km and 130 bridges and viaducts with a total length of 12km. Major tunnels include the 3km Botlek rail tunnel, which was bored using the earth pressure balance method, the 8km Sophia Rail Tunnel, which uses the hydroshield method, and the 2.7km Pannerdensch Canal Tunnel. All tunnels on the Betuweroute can accommodate double-stack trains.

Significantly, the line has overhead wires energised at 25kV AC even though the Kijfhoek end remains with Dutch standard 1.5kV DC. The German end is electrified at 15kV AC. There will be four transformer stations, and a booster power house every 10km to provide consistent supply.
» continue reading

~~~~~~~~~~~~

~~~~~~~~~~~~
Map (click)


~~~~~~~~~~~~
Stats:
Length: 160km
Construction Start: 3 June 1997
Opening: 16 June 2007
Costs: 4.7 Billion Euro
Electrification: 25kV 50Hz
Signaling System: ETCS level 2 (Alstom)
Exploitation: Keyrail

~~~~~~~~~~~~
Further reading:
http://en.betuweroute.nl/home?setlanguage=en
http://en.wikipedia.org/wiki/Betuweroute
http://www.railwaypeople.com/rail-pr...rlands-35.html
__________________
天まで登れ!
キタ━━━━━━━━━(。・∀・。)ノ━━━━━━━━━!!!
Japan Projects & Construction
Momo1435 no está en línea   Reply With Quote

Sponsored Links
Old June 21st, 2007, 05:49 PM   #2
skytrax
Big boss!
 
skytrax's Avatar
 
Join Date: Nov 2006
Location: Lisbon/Luanda
Posts: 27,237
Likes (Received): 13461

great news! so Netherlands has now two main hyghspeeds line.
__________________
"I am not a saint, unless you think of a saint as a sinner who keeps on trying" (Nelson Mandela)

Angolan Forum | Luanda pictures | my World Trip

~> SkyscraperCity Angola on Facebook <~
skytrax no está en línea   Reply With Quote
Old June 21st, 2007, 06:34 PM   #3
sweek
Registered User
 
sweek's Avatar
 
Join Date: Jan 2006
Location: London NW1
Posts: 1,637
Likes (Received): 1

It's not really a high speed line; it's a freight-only line. Although, for freight trains, the speeds they will be getting here will be very high.
sweek no está en línea   Reply With Quote
Old June 22nd, 2007, 01:53 AM   #4
RzgR Spijkenisse
Raised in Spijkenisse NL
 
RzgR Spijkenisse's Avatar
 
Join Date: May 2007
Location: Spijkenisse, Rotterdam
Posts: 113
Likes (Received): 0

They haven't got a high speed line so far. The high speed line from Amsterdam to the South (Rotterdam, Antwerp, Brussels) is still being tested.
__________________
Broadcasting from a trainstation near you
RzgR Spijkenisse no está en línea   Reply With Quote
Old December 3rd, 2007, 06:19 PM   #5
33Hz
Registered User
 
33Hz's Avatar
 
Join Date: Jul 2006
Posts: 435
Likes (Received): 47

THE NETHERLANDS | High Speed Rail

Can anyone give an update on HSL Zuid please? I'm affraid my Dutch isn't good enough to read this thread http://www.skyscrapercity.com/showthread.php?t=456531


Specifically I'd like to know

1) Where things are at with the testing?
2) Have the ETCS issues been sorted out?
3) When is the projected start of service for HSA trains?
4) When is the projected start of service for Thalys?
5) What is being said regarding the possible direct Eurostar services?
6) Any other HSL ideas being discussed in the Netherlands

Thanks.

Last edited by 33Hz; December 3rd, 2007 at 07:03 PM.
33Hz no está en línea   Reply With Quote
Old December 3rd, 2007, 07:08 PM   #6
sweek
Registered User
 
sweek's Avatar
 
Join Date: Jan 2006
Location: London NW1
Posts: 1,637
Likes (Received): 1

I can't answer all your questions, but the answer to 2) is definitely no. Nothing has been sorted out, and no one really knows when trains will be able to actually ride on the line. 3) The ordered HSA trains that are being constructed by AnsaloBreda are delayed and no one really knows when they will arrive.
4) Thalys hasn't built ETCS into their trains yet. I think this should be done within a year.
5) This is a possibility, but all the other problems will have to be solved first. Eurostar would also require isolated platforms and customs faclities.
6) The Zuiderzeelijn from Amsterdam to Groningen and on to Hamburg/Bremen has been cancelled, but people do keep suggesting it. The tracks from Amsterdam Eastwards to the Rhine area have partly been quadrupled and are capable of handling 200 km/h. The rest of the line may get the same treatment.
sweek no está en línea   Reply With Quote
Old December 3rd, 2007, 07:54 PM   #7
Momo1435
Marotesque
 
Momo1435's Avatar
 
Join Date: Oct 2005
Location: アルフェナンデンライン
Posts: 33,664
Likes (Received): 58504

The services that were planned to start on 9 December 2007 are delayed because of:
1. Testing and certification of ETCS level 2, it was recently updated from the 2.2.2 to the 2.3.0 version. Because it was updated at the last moment all the test that had been were with the 2.2.2 version and should be done again. These are the only infrastructure test that need to be done, the other test are only to see if the new trains actually work properly on the line.

2. Cleaning up dust in the "Groene Hart Tunnel", because of testing the tunnel was completely covered in dust that was sucked in by the trains.

3. Approval and testing of the Class 186 locomotives build by Bombardier. These haven't been approved yet, but that's hopefully just a matter of time. Then they have to start test first before they can enter the service, these were sceduled to start in October but have been delayed.

For the High Speed Operations there's a target date of 1 October 2008. But because a 26 weeks testing period is needed before starting any commercial services the line should be completely finished on 1 April 2008. The line can be finished by then, but it's a question if the AnsaldoBreda trains are ready or at least 1. If a Thalys set is fitted with the ETCS it can also start testing by then. So hopefully we will see some high speed services next year, but I wouldn't be surprised if it will be delayed even more.

Most train manufacturers are open about the progress they make with the trains, but not AnsaldoBreda, we don't know anything. And since they already they already got such a good reputations, for example long delays and faulty new trains for Denmark and Norway. I'm scared that when the trains are here the problems won't be over.
__________________
天まで登れ!
キタ━━━━━━━━━(。・∀・。)ノ━━━━━━━━━!!!
Japan Projects & Construction
Momo1435 no está en línea   Reply With Quote
Old December 5th, 2007, 02:47 PM   #8
ziemon
Registered User
 
Join Date: May 2007
Posts: 5
Likes (Received): 0

Quote:
3. Approval and testing of the Class 186 locomotives build by Bombardier. These haven't been approved yet, but that's hopefully just a matter of time. Then they have to start test first before they can enter the service, these were sceduled to start in October but have been delayed.
latest news about this: E186 still suffer from differences in signalling systems implemented in Belgium and Holland, next plans are to use the 12 machines in pairs for the classic Benelux services between Amsterdam-border area-Brussels starting on January 15th. However, already a back-up date, February 15th, is mentioned...
ziemon no está en línea   Reply With Quote
Old February 22nd, 2008, 03:57 PM   #9
Fugit
Registered User
 
Join Date: Jul 2005
Location: Włocławek/Poznań, PL
Posts: 205
Likes (Received): 159

Any news from HSL Zuid? Still can't start???
Fugit no está en línea   Reply With Quote
Old February 22nd, 2008, 04:12 PM   #10
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 42,821
Likes (Received): 18236

Nope, there are no given dates anymore when the HSL will start service, because of safety issues.
ChrisZwolle no está en línea   Reply With Quote
Old February 23rd, 2008, 08:51 AM   #11
Momo1435
Marotesque
 
Momo1435's Avatar
 
Join Date: Oct 2005
Location: アルフェナンデンライン
Posts: 33,664
Likes (Received): 58504

The main problem right now is the change from the ETCS on the HSL to the ATB on the rest of the Dutch network. If a train comes of the HSL onto the regular tracks the safety systems won't change automatically without problems.

Hopefully it's just a software problem but it could also something more difficult to sort out.
__________________
天まで登れ!
キタ━━━━━━━━━(。・∀・。)ノ━━━━━━━━━!!!
Japan Projects & Construction
Momo1435 no está en línea   Reply With Quote
Old August 4th, 2008, 02:43 AM   #12
33Hz
Registered User
 
33Hz's Avatar
 
Join Date: Jul 2006
Posts: 435
Likes (Received): 47

THE NETHERLANDS | High Speed Rail

Things seem to have gone quiet lately.
33Hz no está en línea   Reply With Quote
Old August 4th, 2008, 07:54 AM   #13
vidya
Registered User
 
Join Date: Jun 2008
Posts: 250
Likes (Received): 11

may I know what is HSL Zuid?
vidya no está en línea   Reply With Quote
Old August 4th, 2008, 09:07 AM   #14
33Hz
Registered User
 
33Hz's Avatar
 
Join Date: Jul 2006
Posts: 435
Likes (Received): 47

The Dutch high speed line.
33Hz no está en línea   Reply With Quote
Old August 4th, 2008, 09:16 AM   #15
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 42,821
Likes (Received): 18236

Currently, there are problems with the trains, delivery is delayed, it should've been tested in the Czech town of Velim (near Prague), but from what I've heard, the train wasn't even assembled completely, so they're having problems with the testing.

Besides that, there are still problems with the tunnel underneath the "green heart" area, a lot of dust is present there, making the advanced safety systems thinking there's a fire.
ChrisZwolle no está en línea   Reply With Quote
Old August 4th, 2008, 01:13 PM   #16
xlchris
Not much
 
xlchris's Avatar
 
Join Date: Jun 2006
Location: Haarlem
Posts: 11,087
Likes (Received): 201

Does this belong to the HSL South?; (If not, sorry)

Quote:
Originally Posted by Rotterdam A View Post
(These are from Be. Forum)





__________________
"
xlchris no está en línea   Reply With Quote
Old August 4th, 2008, 05:14 PM   #17
Qaabus
Registered User
 
Join Date: Aug 2006
Posts: 327
Likes (Received): 4

Damn Italians.
Qaabus no está en línea   Reply With Quote
Old August 4th, 2008, 05:49 PM   #18
xlchris
Not much
 
xlchris's Avatar
 
Join Date: Jun 2006
Location: Haarlem
Posts: 11,087
Likes (Received): 201

^Sorry?
__________________
"
xlchris no está en línea   Reply With Quote
Old August 4th, 2008, 06:53 PM   #19
Momo1435
Marotesque
 
Momo1435's Avatar
 
Join Date: Oct 2005
Location: アルフェナンデンライン
Posts: 33,664
Likes (Received): 58504

^ Yes damn them for making crap trains that don't work. And damn the NS for buying trains in Italy, that was also very stupid.

Quote:
Originally Posted by Chriszwolle View Post
Besides that, there are still problems with the tunnel underneath the "green heart" area, a lot of dust is present there, making the advanced safety systems thinking there's a fire.
Actually the dust problem in the tunnel seems to be under control, the SNCF allowed their Thalys trains to do test rides on the line. So if all the ERMTS level 2 works and enough Thalys sets are equipped we could at least see them on the line soon. But then the SNCF has to do their job and make it possible.
__________________
天まで登れ!
キタ━━━━━━━━━(。・∀・。)ノ━━━━━━━━━!!!
Japan Projects & Construction
Momo1435 no está en línea   Reply With Quote
Old August 5th, 2008, 12:52 AM   #20
X38
Registered User
 
Join Date: Jan 2008
Location: Antwerpen
Posts: 4,213
Likes (Received): 22

It's AnsaldoBreda who builds the trains... And the Dutch Railways (NS) ordered it... Not the Belgians NMBS! .
X38 no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 01:14 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu