Old August 17th, 2014, 04:39 AM   #81
n20
Vicarious Urbanizer
 
n20's Avatar
 
Join Date: Oct 2012
Posts: 2,206

Quote:
Originally Posted by Bombay2Calcutta View Post
http://www.railnews.co.in/ahmedabad-...cal-monuments/
Ahmedabad Metro to go Undergroud to protect Archaeological monuments

Ahmedabad (ADI): More than one-sixth of the nearly 36 kilometers metro rail corridor in the first phase of the Ahmedabad Metro project will be underground, the updated detailed project report (DPR) submitted by Delhi Metro Rail Corporation, shows. Officials said the presence of protected monuments was the reason why they have opted for underground Metro in the Walled City areas.

According to officials of the Metro-Link Express for Gandhinagar and Ahmedabad (MEGA), the 6.3-km stretch of the Metro’s East-West corridor, from Shahpur to New Cotton Mills, will be underground and the remaining 29.62 km would be elevated.
“We realised that it was not possible to have elevated structure for Metro in the Walled City areas due to the presence of several ASI (Archaeological Survey of India) protected monuments, which is why we have decided to opt for underground Metro on that stretch,” Vijay Nehra, chief executive officer of MEGA, said.

Some of the protected monuments in the area are Delhi Darwaja, Kalupur Darwaja, Prem Darwaja, Shaking Minarets, Sidi Syed Jali, Bhadrakali temple, Bhadra Fort, Jami Masjid, among others.

Areas within 100 metres of all protected monuments are declared prohibited by the ASI and all construction activity is barred in those parts.

Officials said several routes were considered for the elevated Metro corridor in areas where many of the protected monuments exist. But, none of the options worked as the route overlapped with the prohibited area of one or the other monument. “We felt the underground stretch was the best option to avoid prohibited areas around protected monuments,” said an official.

The elevated Metro corridor is estimated to cost around Rs.200 crore for every kilometre, while the underground section costs Rs.500 crore per km.

The cost of first phase of the Ahmedabad project is pegged at Rs.9300 crore. The cost of the 20.53-km East-West corridor is estimated at Rs.5800 crore, whereas the 15.42-km-long North-South corridor would cost Rs.3500 crore. There will be 32 Metro stations in the first phase, of which 28 will be elevated and four — Shahpur, Relief Road, Kalupur railway station and New Cotton Mills — will be underground.

The updated DPR of the Ahmedabad Metro was approved by the MEGA board on Monday and sent to the state government on Friday.

According to the DPR, the Metro will carry 4.60 lakh passengers every day once it becomes operational in 2018. The number of passengers will go up to 6.63 lakh by 2021, 9.24 lakh by 2031 and 12.45 lakh by 2043.

The cost of first phase of the Ahmedabad project is pegged at Rs.9300 crore.

32 Metro stations in the first phase, of which 28 will be elevated and four — Shahpur, Relief Road, Kalupur railway station and New Cotton Mills — will be underground.
Metro depots at Gyaspur, Apparel Park

Source

n20 no está en línea   Reply With Quote

Sponsored Links
Old August 17th, 2014, 04:45 AM   #82
n20
Vicarious Urbanizer
 
n20's Avatar
 
Join Date: Oct 2012
Posts: 2,206

The Detailed Project Report
n20 no está en línea   Reply With Quote
Old September 4th, 2014, 04:38 AM   #83
n20
Vicarious Urbanizer
 
n20's Avatar
 
Join Date: Oct 2012
Posts: 2,206

Quote:
Originally Posted by C-DAC View Post


BRT bus started from 1st Jan 2014
originally posted by gandhi.rushabh1992

The Gulbai Tekra - Nehrunagar BRT line that opened end-2013

n20 no está en línea   Reply With Quote
Old September 4th, 2014, 04:40 AM   #84
n20
Vicarious Urbanizer
 
n20's Avatar
 
Join Date: Oct 2012
Posts: 2,206

Operational BRT 2010 map

source

Today, there are 13 lines with total 86 km length.
__________________

Vakai liked this post

Last edited by n20; September 4th, 2014 at 04:48 AM.
n20 no está en línea   Reply With Quote
Old September 4th, 2014, 04:46 AM   #85
n20
Vicarious Urbanizer
 
n20's Avatar
 
Join Date: Oct 2012
Posts: 2,206

originally posted by gandhi.rushabh1992

BRTS commuters can rent cycles from April 1

AMC to rent cycles allowing commuters to travel the distance from BRTS station to their work place or home on bicycles

Source





Quote:
Originally Posted by nikul.patel View Post











__________________

Vakai, invincibletiger, solomun liked this post
n20 no está en línea   Reply With Quote
Old October 6th, 2014, 06:17 PM   #86
VCM AHMD
Registered User
 
Join Date: Aug 2014
Location: AHMEDABAD /CHENNAI
Posts: 802
Likes (Received): 911

AHMEDABAD ROCKS
THALTEJ UNDERPASS INAUGRATED TODAY

just now I passed thru this underpass , it was smooth drive.

I drove from vaishnadevi circle to fun republic and crossed this stretch in 15 minutes and 4 minutes stop due to hotel Pakwan circle . Absolutely no traffic signal between vaishnadevi to fun republic except near Pakwan.


Fantastic underpass.

I will post photos later this week.
__________________

gandhi.rushabh1992 liked this post
VCM AHMD no está en línea   Reply With Quote
Old October 7th, 2014, 08:38 AM   #87
gandhi.rushabh1992
amdavad meri jaan
 
gandhi.rushabh1992's Avatar
 
Join Date: Dec 2010
Location: New Delhi ~ Ahmedabad
Posts: 12,182
Likes (Received): 9801

Now the Pakvan Crossroads remains the only big headache on this stretch. They could have lengthened the underpass to cover this point also.
__________________
Ahmedabad EYE - SSC Ahmedabad on FB
gandhi.rushabh1992 no está en línea   Reply With Quote
Old December 19th, 2014, 04:40 AM   #88
VCM AHMD
Registered User
 
Join Date: Aug 2014
Location: AHMEDABAD /CHENNAI
Posts: 802
Likes (Received): 911

Quote:
Originally Posted by gandhi.rushabh1992 View Post
Now the Pakvan Crossroads remains the only big headache on this stretch. They could have lengthened the underpass to cover this point also.
Is there any plan by corporation to construct bridge near Pakwan circle.
In the evening time nearly it takes more than 5 minutes to cross this circle.
VCM AHMD no está en línea   Reply With Quote
Old December 19th, 2014, 07:20 AM   #89
gandhi.rushabh1992
amdavad meri jaan
 
gandhi.rushabh1992's Avatar
 
Join Date: Dec 2010
Location: New Delhi ~ Ahmedabad
Posts: 12,182
Likes (Received): 9801

They were planning a flyover along the SG Road but I dont know if there has been any progress. Will be a major headache for commuters during construction.
__________________
Ahmedabad EYE - SSC Ahmedabad on FB
gandhi.rushabh1992 no está en línea   Reply With Quote
Old December 19th, 2014, 07:21 AM   #90
gandhi.rushabh1992
amdavad meri jaan
 
gandhi.rushabh1992's Avatar
 
Join Date: Dec 2010
Location: New Delhi ~ Ahmedabad
Posts: 12,182
Likes (Received): 9801

Have prepared a map indicating the Metro routes, BRTS routes and Regional Railway lines so as to get a comprehensive idea about how each system overlaps the other and in what way they all can be fused together to form a multi-modal transport network.

Colour Scheme:
Quote:
White - SP Ring Road

Yellow - SG Highway

Blue - Metro Phase 1 routes

Green - BRTS Phase 1 routes

Orange - BRTS Phase 2 routes

Cyan - BRTS Phase 3 routes (proposed)

Pink - Regional Rail Citywide Network (existing)

Quote:



__________________
Ahmedabad EYE - SSC Ahmedabad on FB

Swede, givary98 liked this post
gandhi.rushabh1992 no está en línea   Reply With Quote
Old December 19th, 2014, 11:39 AM   #91
Swede
forumer #29
 
Swede's Avatar
 
Join Date: Aug 2002
Location: sol.III.eu.se.08
Posts: 4,215
Likes (Received): 1663

No rail or even BRT line to the airport?
How are the interchanges planned? Will they actually facilitate quick changes between lines?
__________________
Forumers met so far:
Huopa, Nightsky, Jo, wolkenkrabber, ThisSideofSteinway, jacksom, New Jack City, LeCom, Ellatur, Jan, Dennis, Ace, Bardamu, AtlanticaC5, Ringil, Dysfunctional, stacey, karakhal, ch1le, Hviid, staff, kjetilab, Þróndeimr, queetz, FREKI, sander, Blue Viking, nomels, Mantas, ristov, Rafal_T, khaan, Chilenofuturista, Jonte Myra, safta20, AW, Pas, Jarmo K, IceCheese, Sideshow_Bob, sk, Ingenioren, Ayreonaut, Silver Creations, Hasse78, Svartmetall
Swede no está en línea   Reply With Quote
Old December 19th, 2014, 12:12 PM   #92
gandhi.rushabh1992
amdavad meri jaan
 
gandhi.rushabh1992's Avatar
 
Join Date: Dec 2010
Location: New Delhi ~ Ahmedabad
Posts: 12,182
Likes (Received): 9801

Airport will be connected by Metro rail phase 2. The first priority was to connect the major Railway Stations via public transport and that is being accomplished right now.

The metro stations are being placed near important BRT junctions as well as state transport depots. Further, on a micro level, they will try to physically connect these places via subways, foot overbridges and skywalks. 4 of the city's biggest and busiest railway stations including Ahmedabad Central will have either BRT or Metro connectivity right inside the station complex.
__________________
Ahmedabad EYE - SSC Ahmedabad on FB

Swede liked this post
gandhi.rushabh1992 no está en línea   Reply With Quote
Old November 5th, 2015, 03:47 PM   #93
Pals_RGB
Resigned
 
Join Date: Apr 2013
Location: Chandigarh | Bangalore | Guwahati
Posts: 5,904
Likes (Received): 8054

Construction started after a long delay.. some recent pics

Quote:
Originally Posted by Bhawin View Post
Metro Update 18OCT 2015

Vastral Gam

DSC_1258 by Sherlock Holmes, on Flickr

DSC_1259 by Sherlock Holmes, on Flickr

Vastral Casting Yard

DSC_1263 by Sherlock Holmes, on Flickr
__________________
Account waiting for deletion...
Pals_RGB no está en línea   Reply With Quote
Old November 5th, 2015, 03:48 PM   #94
Pals_RGB
Resigned
 
Join Date: Apr 2013
Location: Chandigarh | Bangalore | Guwahati
Posts: 5,904
Likes (Received): 8054




Quote:
Originally Posted by gandhi.rushabh1992 View Post
__________________
Account waiting for deletion...

dimlys1994 liked this post
Pals_RGB no está en línea   Reply With Quote
Old January 5th, 2016, 06:32 PM   #95
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,355
Likes (Received): 26177

Taken from Indian transport thread:

Quote:
Originally Posted by shashpant View Post
__________________
Для Вас:
Страница в ВК:

For you:
Facebook & Flickr pages

shashpant, gandhi.rushabh1992 liked this post
dimlys1994 no está en línea   Reply With Quote
Old January 7th, 2016, 05:38 PM   #96
shashpant
Registered User
 
Join Date: Mar 2015
Posts: 653
Likes (Received): 713

Couple of more videos.



__________________

dimlys1994, gandhi.rushabh1992 liked this post
shashpant no está en línea   Reply With Quote
Old January 19th, 2016, 05:01 PM   #97
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,355
Likes (Received): 26177

From Rail Journal:

Quote:
http://www.railjournal.com/index.php...ml?channel=525

Ahmedabad launches metro train tender
Tuesday, January 19, 2016



METRO Link Express for Gandhinagar and Ahmadabad (Mega), the special purpose vehicle established by the Indian government and the state of Gujarat to construct the Ahmedabad metro network, launched an international competitive tender on January 15 to supply 96 metro cars for the first phase of the project

According to the detailed project report for Phase 1, the 750V dc standard-gauge trains will have a maximum speed of 80km/h and stainless steel bodyshells. Each 2.9m-wide three-car train will accommodate up to 450 passengers under normal conditions and 764 passengers in crush loading

...
__________________
Для Вас:
Страница в ВК:

For you:
Facebook & Flickr pages
dimlys1994 no está en línea   Reply With Quote
Old January 21st, 2016, 04:34 PM   #98
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,355
Likes (Received): 26177

From Railway Gazette:

Quote:
http://www.railwaygazette.com/news/n...etro-line.html

Ahmedabad breaks ground on second metro line
21 Jan 2016





INDIA: Gujarat Chief Minister Anandiben Patel laid the foundation stone for the second metro line in Ahmedabad on January 17.

The 17·2 km north-south Line 2 will connect Motera Stadium in the north with APMC in the south via an elevated alignment with 15 stations. The depot would be at Gyaspur, beyond the southern terminus.

In December IL&FS Engineering Services was awarded a Rs3·74bn civils contract to build the southern section between the depot and Shreyas, with four stations; work is due to be completed in 120 weeks

...
__________________
Для Вас:
Страница в ВК:

For you:
Facebook & Flickr pages
dimlys1994 no está en línea   Reply With Quote
Old January 22nd, 2016, 03:05 PM   #99
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,355
Likes (Received): 26177

Ahmedabad metro map was added to urbanrail.net:
http://www.urbanrail.net/as/in/ahmedabad/ahmedabad.htm

__________________
Для Вас:
Страница в ВК:

For you:
Facebook & Flickr pages

Swede, ilovecoffee liked this post
dimlys1994 no está en línea   Reply With Quote
Old January 22nd, 2016, 07:09 PM   #100
Falubaz
Registered User
 
Falubaz's Avatar
 
Join Date: Nov 2004
Location: Zielona Gora, Polska
Posts: 14,799
Likes (Received): 2940

Looks like in India they like to build separate metro lines, which start somewhere in the suburbs and then after next openings they come closer and closer and eventually - one day - they get connected.
It's pretty unusual in other cities...
__________________
Zielona Góra - Ziemia Lubuska

₪₪₪Zielona Góra moim okiem₪₪₪ Zielonogórskie autobusy₪₪₪Port Lotniczy ZIElona Góra₪₪₪ BRT₪₪₪ścieżki rowerowe w ZG
₪₪₪[Świat] „Przebłyski pamięci”₪₪₪Moja Ameryka - nie tylko Stany

Ashis Mitra liked this post
Falubaz no está en línea   Reply With Quote


Reply

Tags
ahmedabad, gujarat

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 05:10 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium