Old September 10th, 2012, 04:04 AM   #4481
s.yogendra
Registered User
 
Join Date: Dec 2010
Posts: 11,304
Likes (Received): 53

Plea to upgrade amenities at old railway station in Shimoga

Quote:
The Shimoga District Chamber of Commerce and Industry (SDCCI) has urged the Department of Railways to upgrade amenities for passengers at Old Railway Station near Vidya Nagar in the city.

“More than 50 per cent of passengers from the city and from Holehonnur and surrounding villages use this station. Unfortunately, amenities for passengers here are in bad state. The Department should upgrade the amenities here at the earliest,” member of SDCCI K.V. Vasanth Kumar has said in a press release.

The chamber has urged the department to extend the newly introduced Mysore-Shimoga passenger train up to Talaguppa. If the train service is extended up to Talaguppa, by boarding this train, people of Sagar bound for Bangalore can catch the Hubli-Bangalore inter-city train at Birur.

On the traffic problem at the railway-level crossing on Holehonnur Road near Vidya Nagar, the chamber has said that an underpass should be constructed there to ensure smooth traffic.

It has demanded that the government hand over the land in its possession for construction of a 100-foot ring road in the city.
http://www.thehindu.com/todays-paper...cle3880109.ece
s.yogendra no está en línea   Reply With Quote

Sponsored Links
 
Old September 10th, 2012, 06:31 AM   #4482
sunil.kulkarni
Registered User
 
Join Date: Jan 2012
Posts: 4,273
Likes (Received): 1933

Quote:
Originally Posted by naveen_blr View Post
There are only 3 trains

57133 Bijapur Raichur Pass... Pass SCR BJP* 11:25 GR 17:20
17308 Basava Express Exp SWR BJP 16:20 GR 22:04
57129 Bijapur-Bolarum Pass... Pass SCR BJP* 18:20 GR 23:50

Between all these go to Solapur i guess which is not needed as they come back all the way to hotgi junction.
This train could be started from Bijapur ->Hotgi->Gulburga -2 to 3 hours whilch could serve Bijapur people better as Solapur has tons of trains to Bangalore.
Bijapur connectivity to BLR is so poor with Basava Express & Golgumbaz expess which again go to Solapur
the reality is with starting of Ypr-GR-SUR superfast train ... now Blr to Gulbarga distance is covered in just 8 hours 20 minutes!!! so in 8 hours the train covers distance of 585KMs at average speed of abt 75KM/hour! thats marvelous!
sunil.kulkarni está en línea ahora   Reply With Quote
Old September 10th, 2012, 06:40 AM   #4483
sunil.kulkarni
Registered User
 
Join Date: Jan 2012
Posts: 4,273
Likes (Received): 1933

Quote:
Originally Posted by sunil.kulkarni View Post
the reality is with starting of Ypr-GR-SUR superfast train ... now Blr to Gulbarga distance is covered in just 8 hours 20 minutes!!! so in 8 hours the train covers distance of 585KMs at average speed of abt 75KM/hour! thats marvelous!
sunil.kulkarni está en línea ahora   Reply With Quote
Old September 10th, 2012, 09:11 AM   #4484
sunder.k
Sunder
 
Join Date: Jul 2012
Location: Bengaluru/Puduchery
Posts: 923
Likes (Received): 740

Quote:
Originally Posted by sunil.kulkarni View Post
the reality is with starting of Ypr-GR-SUR superfast train ... now Blr to Gulbarga distance is covered in just 8 hours 20 minutes!!! so in 8 hours the train covers distance of 585KMs at average speed of abt 75KM/hour! thats marvelous!
It is totally it is 655 km in 11hrs 15 min @58.2 kmph from Solapur to Yeshwanthpur ( via Gulbarga, Wadi, Guntakal, Kalluru and Dharmavaram).

Even from Gulbarga, it is 542km in 9 hrs 45 min @ 55.6kmph

Even Karnataka exp does not run at the speed that you have mentioned. Wish it happens fast
sunder.k no está en línea   Reply With Quote
Old September 10th, 2012, 09:41 AM   #4485
KMFS
KMFS
 
Join Date: Nov 2011
Location: Shimoga
Posts: 384
Likes (Received): 70

Railway works to be completed in 5 years, assures Muniyappa
Chikmagalur:Sept 9 , 2012 DH News Service

Union Minister of State for Railways K H Muniyappa said that all the railway works taken up in the State will be completed within five years.

Speaking to mediapersons on the sidelines of Congress convention, he said 25,000 km railwayline will be laid in the State by 2025. The foundation for providing railway connevtivity to Davangere, Tumkur, Rayadurga, Kolara, Mulabagilu will be laid in the next four months.

The railwayline work from Bangalore, Mysore taken up with the help of the State government has been completed. When Yeddyurappa was the Chief Minister, he had okayed 15 railway works.

The Minister said that railway review meeting will be held in the presence of Chief Minister Jagadeesh Shettar on September 12. The State government has released about Rs 80 crore for the development works.

He said Chikmagalur will be listed in the map of Indian railways shortly. The work on Kadur-Chikmagalur railwayline will be completed within six months.

The Government has okayed the work on providing connectivity between Chikmagalur-Sakleshpur. The work will be taken up on priority basis. More emphasis will be given for providing connectivity between Bangalore-Hassan and coastal districts.

He said that the officials have been directed to take up the work on railway connectivity between Bhadravathi and Sringeri. The permission from the environment ministry is essential to take up the railway work.

The Minister directed the officials to make alternative arrangement for the slum dwellers in Kadur before evicting them.

http://www.deccanherald.com/content/...d-5-years.html
KMFS no está en línea   Reply With Quote
Old September 10th, 2012, 10:35 AM   #4486
gentem
────✩
 
gentem's Avatar
 
Join Date: Apr 2010
Posts: 7,927

state govt cannot sponsor 2.5k crore.. currently yearly budget allocation to all railway projects is total 400-600 crore.. how can they sponsor 25k crore in 5 years for single project?? once goa-hubli doubling is done this line will be dropped. since he was there in shimoga he had to give assurances regarding this project
gentem está en línea ahora   Reply With Quote
Old September 10th, 2012, 01:02 PM   #4487
KMFS
KMFS
 
Join Date: Nov 2011
Location: Shimoga
Posts: 384
Likes (Received): 70

Talaguppa-Honnavar rail link delayed

Published: Monday, Sep 10, 2012, 16:25 IST

By DNA Correspondent | Place: Honnavar | Agency: DNA

The recent train connectivity on the Mysore-Bangalore-Shimoga-Talaguppa route has kindled a new hope for the people of the Western coast, particularly for those living in the northern parts of the coast who have to depend on buses and trucks for movement of passengers and goods.

The people have petitioned the Union minister of state for railways KH Muniyappa to complete the 60-kilometre stretch between Talaguppa in Shimoga district and Honnavar in Uttara Kannada district. They reminded him of the promises he had made to the people of Shimoga and Uttara Kannada on a number of occasions.

Muniyappa had recently said that Talaguppa-Honnavar line was an important link, which would connect Malnad areas to the coast and Uttara Kannada district to Bangalore.

“Railways has already got administrative and financial clearances from the government for both Hubli-Ankola and Talaguppa-Honnavar lines. Only forest and environment clearances are pending,” he said during an interaction with the people.

People in the state are disappointed that the railway ministry did not take up Hubli-Ankola and Talaguppa Honnavar lines despite having all clearances ready. “The Hubli-Ankola line will open a new corridor toward Mumbai and interior Maharashtra via Hubli-Belgaum. It will also connect Malnad to a large portion of north Karnataka.

Currently, road is the only means of transportation in the area, which is expensive and tedious,” said Anil Bandekar, a member of the Uttara Kannada Railway Users’ Forum.

Coast and port connectivity has been ignored and this will cost Karnataka in the long run. Trading in commodities and engineering goods mostly happen via Mangalore. Without port connectivity, a large hinterland of Mangalore has been left out.

http://www.dnaindia.com/bangalore/re...elayed_1739062
KMFS no está en línea   Reply With Quote
Old September 10th, 2012, 04:32 PM   #4488
pavan9741650414
ಹುಬ್ಬಳ್ಳಿ ಮತ್ತು ಧಾರವಾಡ
 
pavan9741650414's Avatar
 
Join Date: May 2011
Location: Hubli, bangalore
Posts: 8,707
Likes (Received): 4765



Quote:
Railways plans to introduce a new tri-weekly superfast express train between Solapur-Yesvantpur-Solapur (Train numbers 22133/22134). The inaugural run from Solapur to Yesvantpur was flagged off at Solapur Railway Station on Sunday.

According to a South Western Railway release, the regular service will commence from Yesvantpur-end from September 11 (Tuesday) and from Solapur-end from September 12 (Wednesday).

Accordingly, Train No 22134 Yesvantpur-Solapur express will depart from Yesvantpur station on Tuesdays, Thursdays and Saturdays at 8.50 pm and arrive at Solapur at 8.40 am on Wednesdays, Fridays and Sundays.

En route, the train will arrive/depart at Yelhanka at 9.08/9.10 pm; Dharmavaram at 9.40/9.45 pm; depart at Anantapur at 12.20 am; arrive/depart at Guntakal Jn. at 1.40/1.45 am; depart at Adoni at 2.30 am; Mantralayam Road at 3.05 am; Raichur at 3.40 am; Wadi at 5.45/5.50 am.

In the return direction, Train No 22133 Solapur-Yesvantpur express will depart from Solapur station on Mondays, Wednesdays and Fridays at 7.20 pm and arrive at Yesvantpur at 7.10 am on Tuesdays, Thursdays and Saturdays.

En route, the express will arrive/depart at Wadi at 10.00/10.10 pm; depart at Raichur at 10.32 pm; Mantralayam Road at 11.59 pm; Adoni at 12.40 am; arrive/depart at Guntakal Jn. At 1.40/1.50 am; depart at Anantapur at 3.05 am; arrive/depart at Dharmavaram at 4.00/4.05 am; and arrive/depart at Yelhanka at 6.36/6.38 am.

The express will have total 17 coaches, comprising one AC 2-tier coach, one AC 3-tier coach, seven second class sleepers, six general second class coaches and two second cass luggage-cum-disabled coach.
__________________
HD Forum | Karnataka | Indian Railway
pavan9741650414 no está en línea   Reply With Quote
Old September 10th, 2012, 10:33 PM   #4489
krishnaswamy
Krishna
 
krishnaswamy's Avatar
 
Join Date: Sep 2010
Location: Chennai/Thanjavur
Posts: 10,329
Likes (Received): 3223

Quote:
Originally Posted by sunder.k View Post
Definitely a very important project that has to get executed very quickly to save distance, money, fuel and precious time. If this project is a reality, Hubli/Mumbai-Bengaluru will be nearer by 70 km and hence will become the shorter route from Bengaluru to Mumbai than the predominant route via Guntakal.

Coupled with this, if Dharwad-Belagaum track is laid, then a further 40 km would be cut.

What a great saving and convenience would this be when commissioned!!!
Friends,
could you provide the english translation please.
what is this project which will save 70km in Hubli-mumbai-bengaluru project?
also is DWR-BGM direct line is sanctioned and going on? currently it is via londa and 121 km.

could anyone give some information on these projects.
1. Tumkur-Davagere directly line progress?
2. Gulbarga-Bidar project?
3. Hospet-Kotturu-Harihar project completed? i could not find any train services.
4.Tumkur-Davangare via Chitradurga started?
5. KRPuram-Kolar (direct line) project is going on?
__________________
Ek Bharat, Shresht Bharat - ஒரே பாரதம் உன்னத பாரதம்! - Narendra Modi
krishnaswamy está en línea ahora   Reply With Quote
Old September 11th, 2012, 05:05 AM   #4490
pavan9741650414
ಹುಬ್ಬಳ್ಳಿ ಮತ್ತು ಧಾರವಾಡ
 
pavan9741650414's Avatar
 
Join Date: May 2011
Location: Hubli, bangalore
Posts: 8,707
Likes (Received): 4765

__________________
HD Forum | Karnataka | Indian Railway
pavan9741650414 no está en línea   Reply With Quote
Old September 11th, 2012, 05:54 AM   #4491
sunil.kulkarni
Registered User
 
Join Date: Jan 2012
Posts: 4,273
Likes (Received): 1933

Meeting on rail projects tomorrow

Minister of State for Railways K.H. Muniyappa has said that the Railways accord priority to infrastructure projects whose costs are shared by the States.
He said here on Monday that Karnataka had shared half the cost of 15 projects and Andhra Pradesh for 12.
“They remain priority projects. We are committed to completing all of them on time,” Mr. Muniyappa said, before flagging off the Bidar–Hyderabad Intercity Express here. States such as Chhattisgarh and Tamil Nadu too were following this model now, he said.
“The Karnataka government shared two-thirds of the cost of doubling the railway line between Bangalore and Mysore. The work is in progress and we plan to complete it by December 2012 or early 2013,” he said.
Mr. Muniyappa said the progress of all railway projects in the State would be reviewed at a meeting with Chief Minister Jagadish Shettar in Bangalore on Wednesday.
He said the departure timing of the Nanded–Bangalore Express from Bidar had been changed to 2.30 p.m. from 12.30 p.m. However, it would be difficult for the Railways to change the timings to make it an overnight train from Bidar to the State capital. It involved coordination among three zones and required changes in the timings of other trains, he said. Mr. Muniyappa said the Railways were forced to consider running an intercity train between Bidar–Hyderabad following appeals from the former Chief Minister N. Dharam Singh and some other organisations.
The Minister said the Railways could study the demand for extending the Nanded–Bombay Express to Bidar and running trains on the newly laid track between Bidar and Humnabad.
“We would also consider demands of stopping the Kacheguda–Manmad train at Kamal Nagar station in Aurad taluk,” he said.
G.N. Asthana, South Central Railway General Manager, said that they were working on laying new lines between Bidar–Gulbarga, Raichur–Gadwal and Kadapa–Bangarpet. Work on the first two tracks was 60 per cent complete. Work on the third had started.
“We are on the verge of completing a project to convert Bidar Railway Station into an ‘Adarsh’ station. We have given it a facelift and provided passenger amenities. We will build pay and use toilets, platform shelters and extend the foot bridge on either sides,” he said.
sunil.kulkarni está en línea ahora   Reply With Quote
Old September 11th, 2012, 06:49 AM   #4492
sfs
Registered User
 
Join Date: May 2010
Location: Bangalore
Posts: 1,086
Likes (Received): 1011

Quote:
Originally Posted by krishnaswamy View Post
Friends,
could you provide the english translation please.
what is this project which will save 70km in Hubli-mumbai-bengaluru project?
also is DWR-BGM direct line is sanctioned and going on? currently it is via londa and 121 km.

could anyone give some information on these projects.
1. Tumkur-Davangere directly line progress?
2. Gulbarga-Bidar project?
3. Hospet-Kotturu-Harihar project completed? i could not find any train services.
4.Tumkur-Davangare via Chitradurga started?
5. KRPuram-Kolar (direct line) project is going on?
@ krishnaswamy,

what is this project which will save 70km in Hubli-Bengaluru project?
Tumkur-Davangere new line via Chitradurga

1. Tumkur-Davangere directly line progress?
Final location survey is going on and on....
2. Gulbarga-Bidar project?
Bidar-Humnabad completed, Humnabad-Gulbarga is in progress.
3. Hospet-Kotturu-Harihar project completed? i could not find any train services.
Since 3 years, the project is ' almost ' completed and in one of the Railway Budgets it was announced that Harihar-Hospet train services will start once the project is ' completed '. Some signalling and miscellaneous work still left and going on since ages.
4.Tumkur-Davangare via Chitradurga started?
5. KRPuram(Whitefield)-Kolar (direct line) project is going on?
For Q. No. 4 and 5, refer ans to 1.

Last edited by sfs; September 11th, 2012 at 08:26 AM.
sfs no está en línea   Reply With Quote
Old September 11th, 2012, 06:57 AM   #4493
gentem
────✩
 
gentem's Avatar
 
Join Date: Apr 2010
Posts: 7,927

no need of whitefield kolar line.. railways want to grab as much land near metros
gentem está en línea ahora   Reply With Quote
Old September 11th, 2012, 07:24 AM   #4494
devaraju
ಬೆಂಗಳೂರು
 
devaraju's Avatar
 
Join Date: Jan 2012
Location: Bangalore
Posts: 316
Likes (Received): 52

Quote:
Originally Posted by gentem View Post
no need of whitefield kolar line.. railways want to grab as much land near metros
What you mean to say?
devaraju no está en línea   Reply With Quote
Old September 11th, 2012, 07:28 AM   #4495
sfs
Registered User
 
Join Date: May 2010
Location: Bangalore
Posts: 1,086
Likes (Received): 1011

Quote:
Originally Posted by gentem View Post
no need of whitefield kolar line.. railways want to grab as much land near metros
For the same reason, it may face problems from the people in that region.
sfs no está en línea   Reply With Quote
Old September 11th, 2012, 07:44 AM   #4496
gentem
────✩
 
gentem's Avatar
 
Join Date: Apr 2010
Posts: 7,927

instead they can build malur-kolar line, that would amount to same distance between bangalore and kolar
gentem está en línea ahora   Reply With Quote
Old September 11th, 2012, 08:07 AM   #4497
naveen_blr
Registered User
 
naveen_blr's Avatar
 
Join Date: Jul 2010
Location: Namma Bengalooru/NY
Posts: 2,977
Likes (Received): 546

We should ask for Gulburga->Hyd or Gul->Pune or Raichur->Hyderabad Intercity.
naveen_blr no está en línea   Reply With Quote
Old September 11th, 2012, 08:58 AM   #4498
krishnaswamy
Krishna
 
krishnaswamy's Avatar
 
Join Date: Sep 2010
Location: Chennai/Thanjavur
Posts: 10,329
Likes (Received): 3223

.Thanks SFS.

Friends,
then what are the 15 projects that KA govt shared?
From SWR website, i got the below info on Rail projects in Karnataka.is there any other projects going on?

1. Kolar-Chikballapur GC
2. Blre-Mysore doubling
3. Kadur-sakleshpur via Chikmagaluru
4. Munirabad-Raichur
5. Tumkur-Kalyandurg-Rayadurg
6. Bengaluru-Chamarajnagar via Kanakapura
7. Bengaluru-Hasan via shravanabelagola
8. Hospet-Kotturu GC, Kotturu-Harihar New line
9. Arsikere-Birur doubling
10. Birur-Chikjajur doubling is also started?
11. Gulbarga-Bidar (SCR)
12. Hubli-Londa Jn doubling.
13. Hubli-Ankola new line.pending with Env ministry.
14. Talaguppa-Honnavar proposed new line. pending with Env ministry.

Kadur-Chikmagalur is for sure this year.
part of Gulbarga-Bidar.
bengaluru-Nelamangala this year,
what about the rest?
__________________
Ek Bharat, Shresht Bharat - ஒரே பாரதம் உன்னத பாரதம்! - Narendra Modi

Last edited by krishnaswamy; September 11th, 2012 at 09:05 AM.
krishnaswamy está en línea ahora   Reply With Quote
Old September 11th, 2012, 09:24 AM   #4499
devaraju
ಬೆಂಗಳೂರು
 
devaraju's Avatar
 
Join Date: Jan 2012
Location: Bangalore
Posts: 316
Likes (Received): 52

Quote:
Originally Posted by krishnaswamy View Post
.Thanks SFS.

Friends,
then what are the 15 projects that KA govt shared?
From SWR website, i got the below info on Rail projects in Karnataka.is there any other projects going on?

1. Kolar-Chikballapur GC
2. Blre-Mysore doubling
3. Kadur-sakleshpur via Chikmagaluru
4. Munirabad-Raichur
5. Tumkur-Kalyandurg-Rayadurg
6. Bengaluru-Chamarajnagar via Kanakapura
7. Bengaluru-Hasan via shravanabelagola
8. Hospet-Kotturu GC, Kotturu-Harihar New line
9. Arsikere-Birur doubling
10. Birur-Chikjajur doubling is also started?
11. Gulbarga-Bidar (SCR)
12. Hubli-Londa Jn doubling.
13. Hubli-Ankola new line.pending with Env ministry.
14. Talaguppa-Honnavar proposed new line. pending with Env ministry.

Kadur-Chikmagalur is for sure this year.
part of Gulbarga-Bidar.
bengaluru-Nelamangala this year,
what about the rest?
devaraju no está en línea   Reply With Quote
Old September 11th, 2012, 01:11 PM   #4500
mangalore mania
Indian First
 
mangalore mania's Avatar
 
Join Date: Jun 2009
Location: Mangalore/Abu Dhabi
Posts: 11,776
Likes (Received): 2177

ತಾಳಗುಪ್ಪಾ-ಹೊನ್ನಾವರ ರೈಲು ತಿರುಕನ ಕನಸು

ಭರವಸೆ ನೀಡುತ್ತಾ ಬಂದ ಸಚಿವರು
Quote:
ಹೊನ್ನಾವರ: ಶತಮಾನದ ಹಿಂದಿನ ತಾಳಗುಪ್ಪಾ-ಹೊನ್ನಾವರ ರೈಲಿನ ಬೇಡಿಕೆ ತಿರುಕನ ಕನಸಿನಂತಾಗಿದೆ. ದಶಕ್ಕಕ್ಕೊಮ್ಮೆ ಆಸೆ ಹುಟ್ಟಿಸುವ ರಾಜಕಾರಣಿಗಳು ಆಡುವ ಭರವಸೆ ಮಾತುಗಳು ಐತಿಹಾಸಿಕ ವ್ಯಂಗ್ಯವಾಗಿದೆ.

ಬ್ರಿಟಿಷರು ಗೇರುಸೊಪ್ಪಾವನ್ನು ಜಾಗತಿಕ ಬಂದರನ್ನಾಗಿಸಿದ್ದರು. ತಾಳಗುಪ್ಪಾಕ್ಕೆ ರೈಲು ತಂದಿದ್ದರು. ಗೇರುಸೊಪ್ಪಾ ಬಂದರಿಗೆ ರೈಲನ್ನು ಜೋಡಿಸುವುದು ಅವರ ಕನಸು. ಹೊನ್ನಾವರ ಜಿಲ್ಲಾ ಕೇಂದ್ರವಾಗಿತ್ತು. ಆ ಕಾಲದ ವ್ಯಾಪಾರಿಗಳು ರೈಲು ಸಂಪರ್ಕಕ್ಕಾಗಿ ಬೇಡಿಕೆ ಇಟ್ಟಿದ್ದರು. ಹಲವು ಬಾರಿ ಸರ್ವೆ ನಡೆದಿದೆ. ಇದಕ್ಕಿಂತ ದಟ್ಟ ಅರಣ್ಯ ಇರುವ ದೇಶದ ಇತರ ಭಾಗಗಳಲ್ಲಿ ರೇಲ್ವೆ ಓಡಾಡುತ್ತಿದೆ. ಗೋವಾ ರೈಲು ಜಿಲ್ಲೆ ಕಾಡನ್ನು ಹಾದುಹೋಗುತ್ತಿದೆ. ಸಮಗ್ರ ಕರಾವಳಿ, ಬಂದರು, ಮಲೆನಾಡಿನ ಅಭಿವೃದ್ಧಿಗೆ ಕಾರಣವಾಗಬಹುದಾಗಿದ್ದ 83 ಕಿ.ಮೀ. ಉದ್ದದ ತಾಳಗುಪ್ಪಾ ಹೊನ್ನಾವರ ರೈಲಿಗೆ ಮಾತ್ರ ಮುಹೂರ್ತ ಬರಲಿಲ್ಲ. ರೈಲು ನೆರೆಯ ಜಿಲ್ಲೆಯಾದ ಧಾರವಾಡ-ಹುಬ್ಬಳ್ಳಿಗೆ ಎಂದೋ ಬಂತು. ಐದು ವರ್ಷದ ಹಿಂದೆ ಮಂಗಳೂರಿಗೆ ಬಂತು. ಈ ವರ್ಷ ತಾಳಗುಪ್ಪಕ್ಕೂ ಬಂತು. ಉತ್ತರ ಕನ್ನಡ ಮಾತ್ರ ನಡುಗಡ್ಡೆಯಾಯಿತು.

ಉತ್ತರ ಕನ್ನಡದ ಜನಕ್ಕಿಂತ ಮುಖ್ಯವಾಗಿ ತಾಳಗುಪ್ಪಾ ಸಾಗರದ ಜನ ಹೊನ್ನಾವರ ರೈಲು ಸಂಪರ್ಕಕ್ಕಾಗಿ ಹೋರಾಡುತ್ತ ಬಂದಿದ್ದಾರೆ. ಮೂರು ಬಾರಿ ಸಮೀಕ್ಷೆ ಆಗಿದೆ. ವರದಿ ಸರಕಾರದ ಮುಂದಿದೆ. ಎರಡು ವರ್ಷದ ಹಿಂದೆ ಇಂಟರ್*ಸಿಟಿ ರೈಲಿನ ಆರಂಭಕ್ಕೆ ಬಂದಿದ್ದ ಕೇಂದ್ರ ರೇಲ್ವೆ ಮಂತ್ರಿ ಮುನಿಯಪ್ಪ ಮತ್ತು ಮುಖ್ಯಮಂತ್ರಿಗಳಾಗಿದ್ದ ಯಡಿಯೂರಪ್ಪ ಬಹಿರಂಗ ಸಭೆಯಲ್ಲಿ ತಾಳಗುಪ್ಪಾ-ಹೊನ್ನಾವರ ರೈಲಿಗೆ ಬೇಕಾದ 4 ಸಾವಿರ ಕೋಟಿ ರೂ.ಗಳಲ್ಲಿ ಅರ್ಧ ಭಾಗವನ್ನು ವಹಿಸಿಕೊಳ್ಳಲು ಪರಸ್ಪರ ಒಪ್ಪಿಕೊಂಡಿದ್ದರು. ಯಡಿಯೂರಪ್ಪನವರಿಗೆ ತದಡಿ, ಹಳದೀಪುರ ಬಂದರು ಮತ್ತು ತಾಳಗುಪ್ಪಾ-ಹೊನ್ನಾವರ ರೈಲು ಆದರೆ ಮಲೆನಾಡು ಹಾಗೂ ಉತ್ತರ ಕನ್ನಡ ಅಭಿವೃದ್ಧಿಯಾಗುತ್ತದೆ ಎಂಬ ಸ್ಪಷ್ಟ ಕಲ್ಪನೆ ಇತ್ತು. ಜಿಲ್ಲೆಯ ಯಾವ ಪಕ್ಷದ ರಾಜಕಾರಣಿಯೂ ಈ ಯೋಜನೆ ಬೆನ್ನು ಹತ್ತಲಿಲ್ಲ. ಅದು ಅಲ್ಲಿಗೇ ನಿಂತುಹೋಯಿತು.

ರೇಲ್ವೆ ಮಂತ್ರಿಗಳ ಹಿಂದಿನ ಭೇಟಿಯಲ್ಲಿ ಹುಬ್ಬಳ್ಳಿ-ಅಂಕೋಲಾ ಮತ್ತು ತಾಳಗುಪ್ಪಾ-ಹೊನ್ನಾವರ ರೈಲುಮಾರ್ಗದ ಸಮೀಕ್ಷೆಗೆ ಆದೇಶಿಸಿದ್ದರು. ಸಮೀಕ್ಷೆಗೆ ಬಂದವರು ರೇಲ್ವೆ ಇಲಾಖೆಗೆ ವರದಿ ಕೊಡುವುದನ್ನು ಬಿಟ್ಟು ಅಂಕೋಲಾ ಮಾರ್ಗದಲ್ಲಿ ಕಾಡು ನಾಶವಾಗುತ್ತದೆ, ಹೊನ್ನಾವರ ಮಾರ್ಗದಲ್ಲಿ ರೇಲ್ವೆ ಸಾಧ್ಯವಿಲ್ಲ ಎಂದು ವಿಚಾರಣೆಗೆ ಮೊದಲು ತೀರ್ಪು ಕೊಟ್ಟಿದ್ದಾರೆ. ಪಶ್ಚಿಮಘಟ್ಟದಲ್ಲಿ ಯಾವುದೇ ಯೋಜನೆ ಬರುವುದು ಸಾಧ್ಯವಿಲ್ಲ, ನಾವು ಅದಕ್ಕೆ ಪರವಾನಿಗೆ ಕೊಡುವುದಿಲ್ಲ ಎಂದು ಕೇಂದ್ರ, ರಾಜ್ಯ ಅರಣ್ಯ ಇಲಾಖೆ ಅಧಿಕೃತ ವಕ್ತಾರರಂತೆ ನಮ್ಮ ಪಶ್ಚಿಮಘಟ್ಟ ಕಾರ್ಯಪಡೆ ಅಧ್ಯಕ್ಷರು ನಿತ್ಯ ಘೋಷಿಸುತ್ತ ಬಂದಿದ್ದಾರೆ. ತಾಳಗುಪ್ಪಾ-ಸಿದ್ಧಾಪುರ, ಹಾವೇರಿ-ಶಿರಸಿ ರೈಲು ಮಾರ್ಗಕ್ಕೆ ನಮ್ಮ ಸಂಸದರು ಪ್ರಸ್ತಾವನೆ ಮಾಡಿದ್ದಾರೆ. ಕೊಂಕಣ ಮಾರ್ಗದಲ್ಲಿ ರಾಜಧಾನಿಯಿಂದ ಒಂದು ರಾತ್ರಿ ರೈಲನ್ನು ತರಲಾಗದ ಸಂಸದರಿಂದ ಸಾವಿರಾರು ಕೋಟಿ ರೂಪಾಯಿಯ ತಾಳಗುಪ್ಪಾ, ಅಂಕೋಲಾ ಮಾರ್ಗ ಕೊಡಿಸಲು ಸಾಧ್ಯವಿಲ್ಲ.

ಅರಣ್ಯ ಇಲಾಖೆ ಮತ್ತು ಖಾಸಗಿ ಭೂಮಿಯಾದರೂ ಹೊನ್ನಾವರದಿಂದ ಗೇರುಸೊಪ್ಪಾವರೆಗಿನ 35 ಕಿ.ಮೀ. ಮತ್ತು ಮಾವಿನಗುಂಡಿಯಿಂದ ತಾಳಗುಪ್ಪಾವರೆಗಿನ 16 ಕಿ.ಮೀ. ಮಾರ್ಗದಲ್ಲಿ ದೊಡ್ಡ ಗಿಡಮರಗಳಿಲ್ಲ. ತಾಳಗುಪ್ಪಾದಿಂದ ಹೊನ್ನಾವರದವರೆಗಿನ ಒಟ್ಟು ಮಾರ್ಗದ ಅರ್ಧದಷ್ಟು ಭಾಗದಲ್ಲಿ ಕಾಯ್ದಿಟ್ಟ ಅರಣ್ಯ ನಾಶದ ಪ್ರಶ್ನೆ ಬರುವುದಿಲ್ಲ. ಸಚಿವರು 60 ಕಿ.ಮೀ. ಸುರಂಗ ನಿರ್ಮಿಸಬೇಕಾಗುತ್ತದೆ ಎಂದು ಹೇಳಿದ್ದಾರೆ. ಇಷ್ಟುದ್ದ ಸುರಂಗ ನಿರ್ಮಿಸಿದರೆ ಅರಣ್ಯ ನಾಶದ ಪ್ರಶ್ನೆ ಬರುವುದಿಲ್ಲ. ಕೇವಲ 27 ಕಿ.ಮೀ. ಮಲೆಮನೆ ಘಟ್ಟದಲ್ಲಿ ಸುರಂಗ ನಿರ್ಮಿಸಿದರೆ ವೆಚ್ಚ ತಗ್ಗಿಸಬಹುದು. ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿಗಿಂತ ಕಡಿಮೆ ಕೇವಲ 40 ಮೀಟರ್* ಅಗಲದ ಭೂಮಿ ಸಿಕ್ಕಿದರೆ ರೈಲು ಓಡುತ್ತದೆ. ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿಗಿಂತ ಕಡಿಮೆ ಹಾನಿ, ಅತಿಕ್ರಮಣದ ತೊಂದರೆ ಇಲ್ಲದೇ ರೈಲು ಅಗಾಧ ಪರಿವರ್ತನೆ ತರಬಲ್ಲದು.

ಮಧ್ಯಪ್ರದೇಶದ ಖಂಡ್ವಾದಲ್ಲಿ ಅಣೇಕಟ್ಟಿನ ಜಲಮಟ್ಟವನ್ನು ಇಳಿಸಲು, ಪುನರ್* ವಸತಿ ಕೇಳಲು ಅನಕ್ಷರಸ್ತ ರೈತ ವಯೋವೃದ್ಧ, ವೃಧೆœಯರು ನಡೆಸಿದಂತಹ ಒಗ್ಗಟ್ಟಿನ ಪ್ರಾಮಾಣಿಕ ಹೋರಾಟ ನಡೆಯದಿದ್ದರೆ ಜಿಲ್ಲೆಯ ಯಾವ ಬೇಡಿಕೆಗಳೂ ಈಡೇರುವುದಿಲ್ಲ.

ತಾಳಗುಪ್ಪಾ-ಮಾವಿನಗುಂಡಿ 16.2 ಕಿ.ಮೀ., ಮಾವಿನಗುಂಡಿ-ಮಹಿಮೆ 37.5 ಕಿ.ಮೀ., ಮಹಿಮೆ-ಯಲಕೋಟೆ 49.2 ಕಿ.ಮೀ., ಯಲಕೋಟೆ-ಕೊಳಗದ್ದೆ 66 ಕಿ.ಮೀ., ಕೊಳಗದ್ದೆ-ಹೊನ್ನಾವರ (ಕರ್ಕಿ)-83 ಕಿ.ಮೀ. ಹೀಗೆ ನಿಲ್ದಾಣಗಳನ್ನು ಗುರುತಿಸಲಾಗಿದೆ.

ತಾಳಗುಪ್ಪಾವರೆಗಿನ ಬ್ರಾಡ್*ಗೆàಜ್* ಉದ್ಘಾಟನೆಗೆ ಬಂದ ಮುನಿಯಪ್ಪನವರು ಪುನಃ ತಾಳಗುಪ್ಪಾ-ಹೊನ್ನಾವರ ರೈಲು ಮಾರ್ಗದ ಭರವಸೆ ನೀಡಿದ್ದಾರೆ. ರಾಜ್ಯ ಸರಕಾರ 2500 ಕೋಟಿ ರೂ. ಕೊಟ್ಟರೆ ಕೇಂದ್ರ ಸರಕಾರ 1500 ಕೋಟಿ ರೂ. ತೊಡಗಿಸಿ ರೈಲು ಮಾರ್ಗ ಮಾಡಿಕೊಡುವ ಭರವಸೆ ಕೊಟ್ಟಿದ್ದಾರೆ. ಈ ಬಾರಿ 500 ಕೋಟಿ ರೂ. ಹೆಚ್ಚು ಕೇಳಿದ್ದಾರೆ. ನೆರೆಯ ಎಲ್ಲ ಜಿಲ್ಲೆಗಳಿಗೂ ರೈಲು ಬಂದಿದೆ. ಮಹತ್ವಾಕಾಂಕ್ಷೆ ರಾಜಕಾರಣಿ ಯಡಿಯೂರಪ್ಪನವರ ಕೈಲಿ ಅಧಿಕಾರ ಇಲ್ಲ. 100 ಕೋಟಿ ರೂ. ಪ್ಯಾಕೇಜ್* ಕೊಡಿಸುವ ಯೋಗ್ಯತೆ ಇಲ್ಲದ ಜಿಲ್ಲೆ ರಾಜಕಾರಣಿಗಳು ರೇಲ್ವೆಗಾಗಿ 2500 ಕೋಟಿ ರೂ. ಕೊಡಿಸಬಲ್ಲರೇ? ಸಾಧ್ಯವಿಲ್ಲ ಎಂದು ಗೊತ್ತಿರುವುದರಿಂದಲೇ ಮುನಿಯಪ್ಪ ಭರವಸೆ ಕೊಟ್ಟಿದ್ದಾರೆ.
__________________
My Flickr

Changing from Enjoying the Mangalore's rise to Karnataka's Pride

Mangalore Forum
mangalore mania no está en línea   Reply With Quote


Reply

Tags
karnataka

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 12:16 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu