Surat BRTS

Surat Sitilink (BRTS)


cc Krunal.Smart

Design for the bus stops is being done by S Team Designs (website)

Quote:
Bus stop design



Canal Corridor



Background

Following the Successful rollout of BRTS in Ahmedabad, Surat is soon set to implement the Rs 78 Crore 1st Phase of its own System that aims to revitalise public transport in the Diamond City.




Surat BRTS Project to be Kicked off on Sardar Patel Jayanti (31st Oct)

Quote:
Ambitious Surat Bus Rapid Transit System(BRTS) project will be kicked off by Gujarat Chief Minister Narendra Modi on 31st October - Sardar Patel Jayanti. Modi will perform groundbreaking of Rs.78 crore first phase of the project.

The Surat Municipal Corporation(SMC) had recently approved Rs. 228 crore Bus Rapid Transit System(BRTS) project. Cost wise, this is be the biggest project approved by the SMC in its history.

A 19 km long 200 meter wide BRTS lane will come up on Dumas resort-Udhna-Magdalla-Vir Narmad university-Citylight Anuvrat gate route. The BRTS lane would also be constructed on both sides of the Citylight canal(60 ft road on each side)-Khatodara-Kharvarnagar-Puna old octroi post-Puna-Sumada-Sarthana Savji Korat bridge rout.

Under the project, a canal will be restructured and proper lining would be done. The project also includes construction of several fly-over bridges, cc road, paver blocks, street lights, a track for bus, vehicles track, gardening, picnic points, shopping mall, carriage way, cycle track, light vehicle track, activity areas, parking space, bus-stands and service road.


Below are some slides taken from a Surat Municipal Corporation pdf presentation comprehensively detailing the 20 year, 3 phase plan for the Surat BRTS project:

BRTS Network



BRTS Phasing



Corridor 1



Corridor 2



Phase 1 Route Structure



Canal Rd Design



Canal Rd Design 2



Interchange Location



Flyover Integration



Intersection Treatment



45m Cross Section



60m Cross Section



Access to Bus Stops



Subway Design



Subway Design 2



Activity Areas



Utilities




Since the Presentation was made, it would appear that the Route labelled as Corridor 2 of Phase 1 on these slides, will actually be the first Route to be built.

Last edited by GJ10; July 28th, 2012 at 12:36 PM. Reason: updates
GJ10 no está en línea   Reply With Quote

Sponsored Links
 
Old October 28th, 2009, 02:34 AM   #2
Kewl Batty
When it rains, it pours!
 
Join Date: Sep 2008
Location: Amsterdam
Posts: 2,695
Likes (Received): 11

Nice compilation!
Kewl Batty no está en línea   Reply With Quote
Old October 28th, 2009, 06:26 AM   #3
pbuddy
Registered User
 
Join Date: Feb 2009
Posts: 215
Likes (Received): 7

Simply amazing. I am speechless. Never imagined something so well planned out would ever be implemented in India (I hope I'm not speaking too soon).
pbuddy no está en línea   Reply With Quote
Old October 28th, 2009, 08:35 AM   #4
ferrari_fan
Forza!
 
ferrari_fan's Avatar
 
Join Date: Jan 2006
Location: Chennai + Hyderabad
Posts: 3,703
Likes (Received): 188

Wow - I am just so impressed!! Way to go Gujarat!!
ferrari_fan no está en línea   Reply With Quote
Old October 28th, 2009, 03:58 PM   #5
think_different
Registered User
 
think_different's Avatar
 
Join Date: Aug 2009
Location: CT/TN-chennai
Posts: 872
Likes (Received): 94

awesome, CM & his team rocks.
think_different no está en línea   Reply With Quote
Old October 28th, 2009, 08:05 PM   #6
shanware
Registered User
 
shanware's Avatar
 
Join Date: Jul 2009
Posts: 1,216
Likes (Received): 10

Awesome man ...nice work on the thread...any idea when Phase I will be commissioned ?
shanware no está en línea   Reply With Quote
Old October 29th, 2009, 02:27 PM   #7
todscreen
Registered User
 
Join Date: Jun 2007
Location: Mumbai/ Atlanta
Posts: 1,600
Likes (Received): 8

i like the maps.
__________________
K O L K A T A

Bengali Review: First ever user-generated review site for Bengali movies, restaurants, and events.
todscreen no está en línea   Reply With Quote
Old October 31st, 2009, 04:16 AM   #8
shreyas1684
THE AVIATOR
 
shreyas1684's Avatar
 
Join Date: Jul 2006
Location: vadodara/Toronto
Posts: 740
Likes (Received): 182

very well..
shreyas1684 no está en línea   Reply With Quote
Old October 31st, 2009, 04:45 AM   #9
India101
.
 
India101's Avatar
 
Join Date: Jul 2008
Posts: 10,083
Likes (Received): 1437

Man, am I impressed. Good job GJ10.
__________________
South Mumbai Project Map
███████
█████
███████
India101 no está en línea   Reply With Quote
Old November 8th, 2009, 01:52 AM   #10
GJ10
Registered User
 
GJ10's Avatar
 
Join Date: Apr 2007
Posts: 2,489
Likes (Received): 554

Civic Body to Develop BRTS as a Brand in Surat

Quote:
Surat: The BRTS, one of the most ambitious projects of the Surat Municipal Corporation (SMC), will soon now have a brand name, logo and color code as identification. Civic authorities have decided that they will spread awareness among people about the project.

The SMC will also complete tendering process of other important parts of the project till April -May.

To make the Rs500 crore BRTS (Bus Rapid Transit System) project more people friendly, the SMC has decided to create a separate brand for it, having a logo and color code. The civic authorities have decided that, the logo will be placed wherever the work for BRTS will be in progress.

To finalise the logo and other things, a meeting between CEPT, SMC and UMTS officials was held recently, where authorities were able to achieve success on the issue.

Besides this, the SMC has also decided to wrap up the tender processing activity for other components of the projects - excluding procuring of buses and preparing routes.

This includes passenger and bus information system and automatic ticketing machines. Civic authorities are planning to complete this work till April-May 2010. The cost of tenders is estimated to be around Rs40 crore. This was decided as work for preparing routes and flyovers have begun and civic authorities do not want to get delayed for the project.

"The BRTS project is for the people and to make them aware a separate logo and color code is necessary. We will also give a separate name to the project to create its identity," municipal commissioner S Aparna, said. There will be 60 bus stops in all developed in both routes.

"We have finalized the design and a sample bus stop will be prepared and review of will be taken from the experts, to make any changes if needed," Aparna added.
GJ10 no está en línea   Reply With Quote
Old November 22nd, 2009, 01:21 PM   #11
Abhishek901
Registered User
 
Abhishek901's Avatar
 
Join Date: May 2009
Posts: 10,316
Likes (Received): 372

Great project. Hope that it implemented well like Ahmedabad.
Abhishek901 no está en línea   Reply With Quote
Old February 2nd, 2010, 05:25 AM   #12
Indtrans
Registered User
 
Join Date: Jan 2010
Posts: 290
Likes (Received): 10

Can anybody please update about current status of Surat BRT project. When it is expected to be in operation.
Indtrans no está en línea   Reply With Quote
Old February 4th, 2010, 01:56 AM   #13
Meeeet
Mitesh Ahir
 
Meeeet's Avatar
 
Join Date: Aug 2009
Location: Panama/Miami
Posts: 145
Likes (Received): 19

I think it will start operating by the 2011 because when i was in india (a week before) they were digging the stretch of udhna( in the city) to navsari...they are cutting trees of udhna navsari stretch so they can expand the road to 4 lanes ( which is 2 lanes rite now).. so the work is in progress!!!
Meeeet no está en línea   Reply With Quote
Old February 7th, 2010, 04:06 AM   #14
India101
.
 
India101's Avatar
 
Join Date: Jul 2008
Posts: 10,083
Likes (Received): 1437

Quote:
Originally Posted by GJ10 View Post
Canal Rd Design



Canal Rd Design 2


I remembered a airport in India had a canal in it and then I turned out to be Vadodara. Canals are very popular in Gujarat I guess
__________________
South Mumbai Project Map
███████
█████
███████
India101 no está en línea   Reply With Quote
Old February 7th, 2010, 08:15 AM   #15
SBC-YPR
Registered User
 
Join Date: Jan 2010
Location: Bangalore
Posts: 412
Likes (Received): 5

Looks excellent and carefully planned. Hope the implementation is a success
SBC-YPR no está en línea   Reply With Quote
Old February 7th, 2010, 12:54 PM   #16
Abhishek901
Registered User
 
Abhishek901's Avatar
 
Join Date: May 2009
Posts: 10,316
Likes (Received): 372

It shows 4 lanes for buses (2 on each side). Is it so ?
Abhishek901 no está en línea   Reply With Quote
Old February 7th, 2010, 01:06 PM   #17
GJ10
Registered User
 
GJ10's Avatar
 
Join Date: Apr 2007
Posts: 2,489
Likes (Received): 554

Quote:
Originally Posted by Meeeet View Post
I think it will start operating by the 2011 because when i was in india (a week before) they were digging the stretch of udhna( in the city) to navsari...they are cutting trees of udhna navsari stretch so they can expand the road to 4 lanes ( which is 2 lanes rite now).. so the work is in progress!!!
Cheers for the update!

Hope u had a good trip!!!

@AK901

The 2 Lanes either side of the canal is a mistake by whoever did the graphics.

The schematics of the Canal Road stretch (pg 39 on the presentation) show only one lane either side of the Canal.
GJ10 no está en línea   Reply With Quote
Old April 10th, 2010, 12:24 AM   #18
GJ10
Registered User
 
GJ10's Avatar
 
Join Date: Apr 2007
Posts: 2,489
Likes (Received): 554

Surat BRTS mentioned in this article

Quote:
In another major development, a 7.7 km stretch of road under Bus Rapid Transit System (BRTS) project at a cost of Rs 71.63 crore has also been proposed for approval.

BRTS is another much awaited dream project of SMC. Of the total cost of Rs 469 crore, this year SMC plans to spend about Rs 190 crore in financial year 2010-11.

Sources said to develop the canal corridor, the work will be undertaken in two segments. In the first segment, 8.7 km from Dumas resort to Kharwarnagar junction.The approval has already been given for this segment, which will cost Rs 105 crore. The approvals for the second segment of Kharwarnagar to Simada junction of 7.7 km stretch is being sought. The cost for this segment is estimated at Rs 71.63 crore. Meanwhile, the third and the shortest segment will be from Simada junction to Sarthana at a cost of Rs 35.67 crore. This segment will be 3.3 km long.

"This cost will cover development and construction of CC road, tar road, bus lane, carriage way, cycle track, activity area on both the sides, service, utility and canal lining and development," Dalal said.
A few days later, it appears as though one of the other "segments" mentioned there has now had a contract signed for it as well. Meaning that only the final 3.3km segment from Simada to Sarthana is left in terms of Phase I, as this contract has been awarded for Udhna - Simada, rather than just Kharwarnagar - Simada

Construction firm wins Surat BRTS contract

Quote:
The Cube Ashoka Company has been awarded the contract to develop the BRTS corridor between Udhna and Simada in Surat. This has come after the ruling party leaders in the Surat Municipal Corporation (SMC) rejected Municipal Commissioner S Aparna’s proposition of awarding the tender to Gujarat Construction Company (GCC), said sources.

For the said project, bids had been opened by SMC earlier. Over 10 parties showed their interest and submitted their bids to SMC. Proper analyses were done in terms of financial capability and technical valuation before processing them. Municipal Commissioner S Aparna had proposed to the ruling party leaders that the tenders submitted by GCC should be accepted.

When the ruling party discussed the issue in the standing committee, they found that GCC’s quoted amount of Rs 71 crore was the lowest. But Cube Ashoka edged it out in the parameters of financial valuation and technical capability.

On Thursday, the standing committee cleared Cube Ashoka Company for the project. Standing Committee Chairman Mukesh Dalal said: “The municipal commissioner had proposed that GCC be awarded the contract, but it does not fit into our scheme of things and we have found another more competent firm. It is normal procedure and the Standing Committee is empowered to award such contracts. We have done the right thing.”
Good to see them choosing expertise and capability rather than even if it is more expensive.

FWIW, According to Cube Constructions website:

"We have started Our new Road Project work for Bus Rapid Transit System at Surat-Gujarat."
GJ10 no está en línea   Reply With Quote
Old July 23rd, 2010, 12:49 AM   #19
GJ10
Registered User
 
GJ10's Avatar
 
Join Date: Apr 2007
Posts: 2,489
Likes (Received): 554

Firstly thanks to Meeeet who found these latest updates on the Cube Constructions site

Based on the last article, this is work on the Udhna - Simada stretch, no idea how recent the pics are!

















GJ10 no está en línea   Reply With Quote
Old September 2nd, 2010, 07:38 AM   #20
pbengani
Registered User
 
Join Date: Aug 2009
Posts: 37
Likes (Received): 1

slow

been in surat recently. BRT work is going on very very slowly... snail pace
pbengani no está en línea   Reply With Quote


Reply

Tags
gujarat, surat

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 08:44 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu