COMPLETED

  • Tower center Rijeka (150 mil €, november 2006) 1 2
  • Rijeka bypass (east): Orehovica – Sv. Kuzam section (45.5 mil €, december 2006) jpeg jpeg2 jpeg3 jpeg4 1 during construction, rest on [Autocesta A7] thread
  • City cemetary central building (4.5 mil €, october 2007) 1 2
  • Zagrad (20 mil €, 2008) 1
  • Trsat Pastoral Episcopate Centre "The Hall of Pope John Paul II" (1.6 mil €, june 2008) 1 2
  • Rujevica POS residential area (11.5 mil €, july 2008) 1
  • Kantrida swimming pool complex (35 mil €, july 2008) 1 2 3 4 5 6 more at [Rijeka] - bazeni Kantrida
    • Kantrida swimming pool complex - Phase 5 (finished in June 2011.) 1 2
  • Completion of Rijeka-zagreb motorway (22. 10. 2008.) 1 2 3 4
  • ‘Superator’ project Agatic, Intelligent Building (city center) - 7.5 mil €, by the ned of 2008 1 jpeg
  • Planetarium and Astronomical center - 1.75 mil €, expected in december 2008 (finished in april 2009) 1 2 3 4
  • Zamet center and Zamet sport hall - 21.2 mil €, expected in may 2009 (finished in september) 1 2 3 4 5 6 more at [Rijeka] - Centar Zamet thread
  • Rijeka Gateway project - 155 mil $ 1 2 3 4 5 [Rijeka] - Rijeka Gateway
    • Cruise ship terminal - (don't know exact price because iit is being build as a part of gateway project) – in july 2009
  • Sušak University Hospital Center - 300 mil €, not until 2020 1 2 3
    • Phase 1: Hemodialysis building - 7.5 mil € (opened on 17.11.2009.) 1 2
  • Rijeka bypass (south lane) - 137 mil €, expected to be finished before 2010 (finished 22.12.2009 :cheers:) jpg 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 rest on [Autocesta A7] thread snow jpeg 16
  • Kvarner vista project - 25.2 mil €, (february 2010.) 1 2
  • Kantrida athletic gymnasium - 5 mil €, (may 2010) 1 2 3 4 5 6 7
  • Upgrade of water supply system - 3.6 mil € currently, last of the current phase will end in sep 2009
  • Rujevica POS phase 2 - 4.7 mil € - july 2010 1 2 3 4
  • University campus of Rijeka – phase 1 - 70 mil €, expected in 2009
    • Academy of applied arts - October 2006
    • Science and Technology Park Rijeka (STeP Ri) - 1.2 mil €, expected in january 2009 (finished in april) 1 2 3
    • Faculty of Philosophy - January 2011
    • Road infrastructure - January 2011
    • Canteen - April 2011
    • Faculty of Civil engineering - November 2011
  • Rijeka Gateway project - 155 mil $
    • D 404 junction road - 43(?) mil €, should be done in 2009 (but didn't, hopefuly it will be in 2010, opened on May 30th 2011. :nuts:) jpeg Pecine tunnel 1 2 3

UNDER CONSTRUCTION

  • Rijeka Gateway project - 155 mil $ 1 2 3 4 5 [Rijeka] - Rijeka Gateway
    • Expansion of Brajdica container terminal - started in march 2010. end is expected in 2013. 1 2 3 4 5
      6
  • University campus of Rijeka – phase 1 - 70 mil €, expected in 2009 1 2 3 4 5 6 jpeg 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
    • University sections
      • Mathematics, Physics, Informatics
      • University center for Biology and Ecology
      • Computer modeling center
      • University informatic center
    • Social and Cultural centre
  • Rijeka bypass (east): Sv. Kuzam - Križišće section - 110 mil €, expected in june 2011. jpeg jpeg2 [Autocesta A7] thread 1 2 3 4 5 6 7 8 9 10 11 12 13 14
  • Mosque and Islamic center - 4-5 mil €, expected by the end of 2009 or begining of 2010 1 2
  • Refinery shut down – new business complex in rafinery area
  • Zagrad B - 6 mil. € - 2010/11
  • West Trade Center (ZTC) 1 2 more on [Rijeka] - Zapadni Trgovacki Centar (ZTC) thread 3 4
  • Srdoči kindergarten - 2.4 mil € - 2011 1
  • Central waste management centre - Marišćina 1
  • Pastoral Centre "Riječ i Život" (translate: "Word and Life") - Baptist Church 1
  • Expaansion of Omišalj crude oil terminal (8 tanks = 640.000m3 + 100.000m3 for petroleum products) - 115 mil €, started in february 2011., expected in 2015.


ANNOUNCED

  • Rijeka Gateway II - 88 mil € (128.4 mil $) 1 2 3 more at [Rijeka] - Rijeka Gateway
    • D403 junction road jpeg jpeg2
    • Extension of Zagreb pier - 33 mil € + 40 mil € for sanation of soil (estimated total investment of Public–private partnership in infrastructure and suprastructure is 250 - 300 mil € ), should be done by 2013
  • Delta complex 1 2 3
    • Central city park 1
  • Sušak University Hospital Center - 300 mil €, not until 2020
  • Modern and Contemporary Arts Museum - over 20 mil € 1 2
  • New City library - 12 mil €, starts in 2010... ?? 1 2-video
  • Školjić rehabilitation and recreation complex
  • West Žabica bus terminal - 40 mil € 1 jpeg 2 - video 3 4 - video
  • Kastav Trade Center - 200 mil €, start in 2009 1
  • Gomila complex (archaeological park and underground garage) - 70 mil € 1 2
  • Underground garages and new city roads - 26.7 mil €, in 2008 and 2009
  • Rjecina bank and Hartera reconstruction 1
  • Rujevica city stadium and Rujevica city arena 1
  • Rujevica secundary city center
  • Rujevica residential area (aprox. 3.200 apartments, schools, church, sports hall, shopping mall...) 1
  • Martinkovac-Diracje 1000 new apartments - 150 mil €, start in 2009, expected in 2012 1
  • Kantrida marina and hotel - 21 mil €, date unknown
  • Preluk tourism area - 130 mil €
  • Kostabela tourism area
  • Shooting Range hall
  • Shopping (city) centre in Kikovica – Grobnik (100 mil € - 60 mil € shopping centre; 40 mil € road infrastructure) 1 2
  • Drenova POS residential area 1
  • Business-Apartment complex Novi Belveder 1 2
  • University campus of Rijeka – phase 2
    • University sections (Biology and Chemistry)
    • Faculty of Maritime studies
    • Faculty of Economy
    • University Library
    • Dormitory
    • Sport infrastrucure (optional)
  • Sušak University Hospital Center - 300 mil €, not until 2020 1 2 3
    • Phase 2: shoud start in 2011. - 125 mil €
      • Gynecology section
      • Pediatrics section
      • Technical block
    • Phase 3: new general medicine complex
    • Phase 4: reconstruction of current buildings (they will be used as college study area)
  • Refuge for women victims of violence 1

ANNOUNCED PROJECTS OF MAJOR IMPORTANCE FOR RIJEKA

  • Expansion of city container port (Voz, Krk island, new container temnial)
  • New Krk bridge jpeg
  • LNG terminal (Omisalj, Krk island) 1 2
  • New Rijeka bypass (Permani - Konj)
  • High-speed railway Rijeka – Zagreb – Botovo (Hungarian border) railway - 3.65 billion € (Ri-Zg) 1 2 3
  • Liburnic bypass (from Rijeka to Medveja)
  • New Ucka Tunnel (as a part of A8 motorway) EIA jpeg
  • Oil pipeline Omišalj (Krk island) - mainland - 11 mil €
  • Gas pipeline Omišalj (Krk island) - Kukuljanovo (mainland industrial zone) - 23 mil €
  • Platak ski resort 1

here are Rijeka's projects that were finished in last couple of years and ones that are going to be build in near future :cheers:



in the first map which covers east part of Rijeka we can see massive achievement in road infrastructure. there is completely new east bypass of Rijeka, which streches from Orehovica to St. Kuzam, opened in dec 2006. there is also national road D404 which connects city center and east bypass. this part will be opened in copule of months. and you can see Rijeka's bypass which is being widened so it will be 2x2 profiled in all it's length.:cheers:

blue line is city railroad system which is going to be some sort of a metro in the future

1. Tower center (shopping center worth 150 mil EUR, opened in nov 2006)
2. Brajdica container terminal (part of Rijeka Gateway project)
3. Trsat university campus (phase I - 70 mil EUR, expectred in sep 2009)
4. Sušak university hospital (300 mil EUR, expected by 2020)
5. Sv. Križ Planetarium and Astronomical center (1.75 mil EUR, opened in apr 2009)
6. Trsat Pastoral Episcopate Centre "The Hall of Pope John Paul II" (1.6 mil €, june 2008)
33. gas station Donja Vežica
39. underground garage on square of Mažuranić brothers
40. underground garage Vojak, near Paris
44. marina Pećine



this is the map of city center. the roads taht are being built are bypass of Rijeka (widened to 2x2), national road D404 which will connect Zagreb quay and the bypass (it will be built in 4 years period), and county road Ž5025 which connects Rijeka and Viškovo

blue line is city railroad system which is going to be some sort of a metro in the future

7. Zagreb quay container terminal (33 mil EUR, expected in 2013)
8. cruise ship passenger terminal (expected in may 2009)
9. Delta complex - Rijeka waterfront project
10. Porto Baroš megayachts marina
11. West Žabica bus terminal (40 mil EUR)
12. West Trade Center (ZTC)
13. Zagrad 1 (20 mil EUR, 2008)
14. Zagrad 2 (6 mil EUR, 2010/11)
15. Gomila complex - archaeological park and underground garage (70 mil EUR)
16. City library (12 mil EUR, starts in 2010)
17. ‘Superator’ project Agatic, Intelligent Building (7.5 mil EUR, dec 2008)
18. Business-Apartment complex Novi Belveder
19. Rujevica secundary city center (Minakovo)
20. residential area Rujevica POS - phase 1 (11.5 mil EUR, jul 2008) - phase 2 (4.7 mil EUR, 2010)
21. fish stock market (FishLog project)
22. Modern and Contemporary Arts Museum in Rikard Benčić (over 20 mil EUR)
23. Rjecina bank and Hartera reconstruction
24. Školjić rehabilitation and recreation complex
35. Kvarner Vista project (intelligent buildings Lovor and Lavanda in Krnjevo)
41. undergorund garage and commercial area Brajda
42. business building on the corner of Pomerio and Prvomajska
43. Refinery shut down – new business complex in rafinery area
46. future city goverment's building (baroque sugar rafinery palace)



the west most part of the bypass is shown in this map. and road 233 (Rijeka-Kastav)
25. Kantrida swimming pool complex (35 mil EUR, july 2008)
26. Kantrida athletic gymnasium
27. Zamet center and Zamet sport hall (21.2 mil EUR, may 2009)
28. Kantrida marina and hotel (21 mil EUR)
29. Martinkovac-Diracje 1000 new apartments (150 mil EUR, start in 2009, expected in 2012)
30. Kastav Trade Center (200 mil EUR, start in 2009)
34. reconstruction of church in Srdoči
36. Plodine trade center in Srdoči
37. baptist church/temple
38. Mosque and Islamic center (4-5 mil €, 2010)
45. garage base of Autotrolej
47. Rujevica city stadium and Rujevica indoor arena



31. Preluka hotel complex
32. Costabela tourism area



Rijeka bypass
 
See less See more
7
#134 ·
Centre Zamet, a new architectonic wonder in Rijeka

Rijeka, 10 September 2009

Yesterday, a new sports hall was opened in Rijeka, another big investment in the city's sports infrastructure. It is a modern public complex located near the market and the primary school, which in addition to the sports hall will include a library, an office of the local committee Zamet, a number of commercial facilities, a public square and a garage. The sports hall has been designed to host various sports competitions and cultural events.

Another big investment made by the City of Rijeka



Architectonically, the Centre Zamet has been perfectly integrated into the surrounding terrain owing to the architecture bureau "Studio 3LHD" from Zagreb, that in Rijeka has already projected the Memorial Bridge, monument to Croatian defenders, awarded on several occasions so far. The complex consists of the new sports hall, of the total area of 6,768 sq. m, shopping and service facilities of the area of 1,582 sq. m, and public squares of the area of 4,283 sq. m. The new access road that enables a link with the primary school and the hall, as well as with the shopping and service facilities from the northern side is important for the Centre Zamet.

The underground garage with 250 parking spaces, including parking spaces for disabled and for motorcycles, is situated under the hall and the shopping and service facilities. Uniquely designed, nuanced ceramic tiles reminding of rocks or a handball ball give the whole complex a specific feature, as there are more than 51.000 such tiles laid in the building. The tiles were used to form the sign "Centre Zamet" inserted into the square in front of the hall, that can be easily noticed already when observed from the first floor, and the architects say that the sign will be visible through popular Google Earth search. As explained by the architect, Silvije Novak, although the complex is completed, for its full integration with the environment, it still misses greenery, that according to his words, will be in abundance, and its decoration is to follow soon.



The indoor playground with its size, owing to a system with telescopic stands, enables the arrangement of floor seats in two parallel handball grounds. This is achieved by movable blinds or partitions. The main stands have 2198 seats, and nearby is the VIP seating area that can accommodate 128 visitors. Thus, the auditorium has at its disposal overall 2326 seats, and additional 23 seats for disabled. The hall has been designed for major international sports competitions in compliance with the state-of-the-art world sports standards, and the parquet floor has been manufactured in conformity with the International Basketball Federation, FIBA. On the fourth level, which is actually the first floor, impressive hall premises are situated intended for clubs, the management board and VIP persons etc.

The main entrance to the hall is on the western side at the square level. When the hall is regularly used for training and recreation, this entrance is designed for all the users – sportsmen, employees, recreationists and visitors. During competitions or events, the entrance is exclusively intended for spectators.



The accompanying facilities are located in the northern part of the hall, and they include locker rooms with showers for sportsmen, judges, official persons, and trainers, as well as outpatient clinics and anti-doping rooms. Near the entrance hall, as a separate unit, are saunas, massage rooms and a trim cabinet.

Within the shopping and service facilities, the complex will provide various services. It is expected that the restaurant, fitness centre and tobacco store will start with operation in a couple of months. Furthermore, the premises of the local committee Zamet of the total area of 190 sq. m. are also situated there and a hall with 90 seats. Also, a branch of the City Library Rijeka of the area of 409 sq. m. including a library storage, is located in the commercial part.

According to mayor Vojko Obersnel who visited the centre in the company of the architect and the director of the company Rijeka sport, Zlatan Hreljac, the premises of the local committee and the library should be put in operation in about three weeks. Mayor Obersnel said to the media that the most important fact is that the sportsmen have got excellent work premises. Obersnel reiterated that a precondition for big investments in sports infrastructure in Rijeka, is that after their completion, a maximum number of people, in particular young ones, should practice sports activities.



The Centre Zamet project was financially supported by S Immorent Leasing International Holding d.o.o. Zagreb, and the constructor was the company "GP Krk". The building costs of the Centre Zamet amount to HRK 152 million, increased by the costs of financing by way of an operating lease over a period of 25 years. The construction of the sports hall itself costs HRK 90 million.

The investor of the Centre Zamet is the company Rijeka sport d.o.o., in 100% ownership of the City of Rijeka, and the certificate of occupancy has been granted to the Centre Zamet – for the sports hall, the garage and the public surfaces of the centre.



The construction of the Centre Zamet with the sports hall is a reflexion of the sports tradition of that part of the city, in particular handball tradition. Namely, handball clubs Zamet (male club established in 1957, and female club established in 1958) have given numerous members of the national handball team and Olympic handball players.

After the swimming-pool complex at Kantrida, opened in July 2008, new turfgrass and the draining system laid at stadium Kantrida and the completion of this centre; the Athletic hall at Kantrida, which completion is expected in the first half of the next year, will continue this investment cycle, as well as a new diving pool, also within the complex at Kantrida, pointed out mayor Obersnel. (I.N.)

http://www.rijeka.hr/Default.aspx?art=20607&sec=394
 
#136 ·
rijeka bypass, Rječina bridge

Danas spajanje mosta Rječina

Sinoć oko 22 sata počelo betoniranje posljednja dva metra
Foto: Spojen most preko Rječine











Darko PAJIĆ
Snimio: Vedran KARUZA
http://www.novilist.hr/Vijesti/Rijeka/foto-3A-spojen-most-preko-rjecin.aspx
ARZ opet produžio rok izgradnje punog profila riječke obilaznice

Od Škurinja do Orehovice tek oko Božića







http://www.novilist.hr/Vijesti/Rijeka/od-skurinja-do-orehovice-tek-oko.aspx
 
#138 ·
Rijeka bypass (Diracje - Orehovica section) has officially been opened on 22. 12. 2009. :banana::banana::cheers::cheers:

here are some pictures just to see what this project was abut :cheers:



so this part from Diracje to Orehovica was widened to 2x2 profile

just to visualize the terrain







:cheers:

this part from Sv. Kuzam to Krizisce is under construction
 
#139 ·
here is a full report from this opened section :cheers:

Evo i mog završnog pogleda na zaobilaznicu u smjeru zapada

Prije Orehovice





tunel Trsat



Most Riječina



Tunel Katarina

Izlaz iz tunela Katarina



podvožnjak Kozala



iznad groblja na Kozali





bukobrani





Iznad Rastočina



pored umjetnog tunela





viadukt Mihačeva Draga



tuneli Škurinje I

Čvor Škurinje



Nakon tunela Škurinje II



bukobrani



Kod čvora Rujevica



kod crkve na Krnjevu



Krnjevo



Bukobrani





Opet bukobrani



Zamet





čvor Diračje

 
#140 ·
here is some sort of timeline for rijeka road projects



this main roads are widened and opened in last year and couple of months.... and one big city tunnel (1.300m) with connection to the bypass will be opened in spring 2010. (I hope there will be no more prolongation, this road should have been opened in 2008 or 2009 as I remember)...

and this section form Sv. Kuzam to Krizisce is under construction...

alll other red and dark blue roads in this pic are not going to be built in near future.... this roads are still in the phase of research. exact corridors willl be published in 2010. when Rijeka (and Primorsko-Goranska county) traffic study is expected to be finished...

...

interesting :cheers:

Rijeka bypas 1980. and 2009. :cheers:



 
#142 ·
Sušak University Hospital Center: Phase 1: Hemodialysis building - 7.5 mil €

17.11.2009. - openning day :cheers:

Realizirana prva faza nove sveučilišne bolnice

Foto: Danas otvorenje nove dijalize na Sušaku



...

Barbara ČALUŠIĆ
Snimio Marko GRACIN











 
#149 · (Edited)
exom group's

Kvarner Vista project

  • web page: http://www.kvarnervista.hr/about.html
  • land area 7.000 m2
  • 17.000 gross m2 of built area
  • 206 residential units
    • 118 units in two smaller buildings
    • 88 units in one taller bilding (this part is not sure to be built)
  • commercial space and underground parking facility
  • project sales 35.2 mil €









 
#158 ·
Rijeka's east bypass: Sv. Kuzam - Krizisce IV

:cheers:

Ulaz u Viaduktovu bazu u Kriziscu:
D8, pogled na trasu Kuk-Krizisce, bijeli usjek na slici... vidi se koliki ce biti nagib/pad tog dijela dionice (ipak tu pocinje veci spust s Hreljina prema cvoru Smrika):


Tunel Burlica, usjek i vijadukt Kuk - lijepo se vide zemljani radovi radi prirodnog kontrasta bijelo vs. smedje.. samo danas, sutra vise toga nema:


Segment trase buduceg nasipa, iznad je D501. Radi se naveliko, iako je to na ovoj u voznji uhvacenoj slici malo teze primjetiti:


Podrucje Kuka, s D501 iz smjera Hreljina:


Lokacija vijadukta Kuk - tek kad snijeg padne vidi se koliko je tu prezida bilo (i jos ih ima) :)
 
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top