Old January 15th, 2018, 01:45 PM   #1
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 36,137
Likes (Received): 13585

Braila Danube Bridge | ROMANIA | U/C








Braila Danube Bridge will be the third bridge over Danube in Romania, and 5th in Europe in terms of span.

The project was awarded today to a consortium formed of Astaldi and Japanese IHI.

Lenght of bridge:1,974.30 m, of which 1,120 m main span, and 489.65 on Braila foot, and 364.65 m on Tulcea foot.

Height of bridge: 47 m

Vertical clearing: 38 m (maritime clearing)

Width of bridge: 31.70 m : 22 m for 2x2 road lanes (3.5 m each) + 2x1 shoulders (2.5 m each) + 2 passenger/bike routes (2.8 m each)

Lenght of project: 23.413 km, of which: Brăila - Jijila main road 19.095 km and connection road with DN22 Smardan - Măcin 4.328 km

Financing: EU POIM 2014-2020

Estimated cost: 2 B Ron (approx 440 m Euro)

Status: contracted








Map of location and connection routes:






__________________

Last edited by Le Clerk; January 16th, 2018 at 11:00 AM.
Le Clerk no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old January 15th, 2018, 05:38 PM   #2
3tmk
Rusty Robot
 
3tmk's Avatar
 
Join Date: Nov 2002
Location: Floor 7˝
Posts: 10,774

On a macro scale for Romania, from what I can see on the map, it appears that this bridge will connect Tulcea to the rest of Romania other than having to pass through Constanta or ferry connections


I like the bridge, clean lines, ageless
__________________
3tmk no está en línea   Reply With Quote
Old January 15th, 2018, 05:52 PM   #3
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 36,137
Likes (Received): 13585

It's much more than that. The bridge will open an alternative main corridor to A1/A2 to Constanta port for N/NE Romania and further for Moldova/Ukraine freight transport. Further motorways/expressways will have to be built to connect the bridge.

__________________

brailita, Zaz965 liked this post
Le Clerk no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old January 15th, 2018, 06:20 PM   #4
smokiboy
Registered User
 
Join Date: Aug 2007
Location: Toronto
Posts: 1,148
Likes (Received): 184

I am a little surprised that there does not seem to be a rail connection included as part of the bridge plan. A link between Brăila and Tulcea would make sense.
smokiboy no está en línea   Reply With Quote
Old January 15th, 2018, 08:52 PM   #5
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 36,137
Likes (Received): 13585

Indeed. That is one of the most important downside of the project.
Le Clerk no está en línea   Reply With Quote
Old January 16th, 2018, 09:49 AM   #6
rudiwien
Registered User
 
Join Date: Jan 2015
Posts: 1,435
Likes (Received): 1695

Thanks for the updates on the bridge. But, isn't it a bit premature to set the status of the bridge as "U/C"?

As far as I know, the contract was signed yesterday (and then the prime minister resigned..), but when is construction expected to actually start?
Wouldn't be the first time that it takes a significant amount of time for a big infrastructure project in Romania to actually be under construction after the contract signing..
rudiwien no está en línea   Reply With Quote
Old January 16th, 2018, 09:59 AM   #7
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 36,137
Likes (Received): 13585

The contract was signed yesterday, therefore we have a builder for it, and a good one for such a project. That is one thing.

Actual construction is not yet started but the design can start ASAP - also part of the contract as we have 12 months for technical design and it is the first step in the project (Yellow FIDIC). So, the project is currently under design phase to be exact, according to the contract. In parallel the expropriations will be made.
__________________

Zaz965 liked this post

Last edited by Le Clerk; January 16th, 2018 at 10:04 AM.
Le Clerk no está en línea   Reply With Quote
Old January 16th, 2018, 10:33 AM   #8
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 36,137
Likes (Received): 13585

Quote:
Originally Posted by 3tmk View Post
I like the bridge, clean lines, ageless
Golden Gate style

__________________

Zaz965 liked this post
Le Clerk no está en línea   Reply With Quote
Old January 17th, 2018, 07:33 AM   #9
Florin
Registered User
 
Join Date: Feb 2008
Location: Bucureşti, România
Posts: 830
Likes (Received): 593

The construction of the bridge will make another project viable, Tulcea Airport, where investments were made in the runway and related infrastructure. It should be rebranded as Brăila-Galați-Tulcea airport after the bridge is complete.
__________________

Le Clerk, mikeciprian, Zaz965 liked this post
Florin no está en línea   Reply With Quote
Old January 17th, 2018, 02:40 PM   #10
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 36,137
Likes (Received): 13585

New renders:



















Sursa
__________________

TRINACRIA FELIX, SLASH_2, Zaz965 liked this post
Le Clerk no está en línea   Reply With Quote
Old March 7th, 2018, 11:14 AM   #11
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 36,137
Likes (Received): 13585

Order for works commencement was given on 26.02.2018.
__________________

Zaz965 liked this post
Le Clerk no está en línea   Reply With Quote
Old May 21st, 2018, 05:03 PM   #12
k%
Fortis Fortuna Adiuvat
 
k%'s Avatar
 
Join Date: May 2007
Location: Kraków, Małopolska
Posts: 8,913
Likes (Received): 24690

nice bridge Romania
__________________
Jak to mawiał stary góral...

marty11, Le Clerk liked this post
k% no está en línea   Reply With Quote
Old July 27th, 2018, 05:32 PM   #13
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 36,137
Likes (Received): 13585

An update here. Part of the design was performed, and is ahead of schedule (design is scheduled for 12 months according to contract). Also ahead of schedule, the builder plans to start works proper in last quarter of 2018 (works should span for 36 months).

Building technique will be similar to Osmangazi bridge, also designed by the same Japanese IHI Systems.

__________________

mikeciprian, Lion007, DJaCoNdA, k%, Zaz965 liked this post
Le Clerk no está en línea   Reply With Quote
Old August 31st, 2018, 05:35 AM   #14
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 36,137
Likes (Received): 13585

An update here. The technical design of the project has been completed a bit ahead of schedule, and we expect first mobilisation of works this fall.
Le Clerk no está en línea   Reply With Quote
Old September 13th, 2018, 11:11 PM   #15
rudiwien
Registered User
 
Join Date: Jan 2015
Posts: 1,435
Likes (Received): 1695

In other news related to the bridge, the road authority has today cancelled, the second attempt already, the tender to "design and execute the relocation of the electrical and telephone networks" in the area of the Braila Danube bridge - because no offer was submitted, even though the contract value was raised from 3,5 to 12,4 million RON....

Again, a nice example how "well" projects are prepared - they sign the contract for the main works way well in advance before they manage to even auction that works for getting the construction site clear... Should be rather the other way around ...
rudiwien no está en línea   Reply With Quote
Old September 13th, 2018, 11:19 PM   #16
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 36,137
Likes (Received): 13585

Source??

This is really not the authorities fault . Noone showed up to the tender. They should internalise these kind of works to the general contractor or to the CNADNR.
Le Clerk no está en línea   Reply With Quote
Old September 14th, 2018, 01:27 AM   #17
Tonik1
Registered User
 
Tonik1's Avatar
 
Join Date: May 2018
Posts: 585
Likes (Received): 1415

Romania's Golden Gate.
__________________

Zaz965 liked this post
Tonik1 no está en línea   Reply With Quote
Old February 20th, 2019, 10:55 PM   #18
smokiboy
Registered User
 
Join Date: Aug 2007
Location: Toronto
Posts: 1,148
Likes (Received): 184

Any updates on this project?
smokiboy no está en línea   Reply With Quote
Old March 15th, 2019, 12:11 AM   #19
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 36,137
Likes (Received): 13585

First pier preparations on the easternside bank of Danube.



Source: https://m.adevarul.ro/locale/galati/...m_medium=email
__________________

AlexisMD, Zaz965 liked this post
Le Clerk no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 09:59 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us