Old September 3rd, 2015, 10:58 AM   #61
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Subway line project to Istanbul’s third airport launched


Quote:
A project to construct a subway line connecting Istanbul’s third airport to the city center has been launched, said Transportation Minister Feridun Bilgin.

A tender for the project’s testing and preparation stage has started, with the aim of completion in one year’s time, Bilgin said. The tender was made July 27 and after a year of project testing and other processes, the construction’s main tender will be made in mid-2016, said the minister.

“The new subway line will enable people to reach the third airport from several points in the city center faster,” Bilgin noted, as quoted by Anadolu Agency.

The subway line, starting from Gayrettepe, will be 33 kilometer-long and will take 26 minutes from one end to the other. Gayrettepe, where the existing subway, Metrobus and bus lines currently meet, will be the main transfer point for both the Asian and European sides, Bilgin said.

The trip from Istanbul’s touristic İstiklal Street to the new airport will take 42 minutes and 70 minutes from the Kadıköy district on the Asian side, he added.

The new airport is being constructed at the road junctions of Arnavutköy, Göktürk and Çatalca, north of Istanbul’s European side, between the Black Sea regions of Yeniköy and Akpınar. There is currently no sea or subway transportation to the site from the city center.

Phase A of the construction’s first stage has plans to be finished in the first quarter of 2018 to serve 90 million passengers, according to company representatives in an exclusive interview with Hürriyet Daily News.

At this time, two landing fields and one terminal will be opened. Sixteen months after the phase’s completion, the company will need to open the third landing field.

After its completion, the new airport will serve a total of 150 million passengers and over 150 airline companies, while employing 100,000 people.
http://www.hurriyetdailynews.com/sub...&NewsCatID=345
__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old September 3rd, 2015, 10:59 AM   #62
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Construction of Istanbul's third airport 6 months ahead of plan





August 20, 2015
Construction of Istanbuls third airport 6 months ahead of plan
The new airport's construction is proceeding smoothly with 7,500 people working on the project, a number that might swell to 30,000. Once completed, the airport will relieve the pressure on Atatürk and Sabiha Gökçen airports, which are overcapacity

The construction of Istanbul's third airport is progressing faster than planned with the project expected to be completed six months earlier than scheduled, according to the CEO of the project Yusuf Akçayoğlu. While the third airport was planned to be completed in the third quarter of 2018, Akçayoğlu said they are working to finish the project in the first quarter of 2018.

The formal process started with the construction site delivery on May 1. Two runways, a terminal with a capacity of 90 million passengers and other additional buildings will be constructed in 42 months in the first phase. The construction of the third runway will be completed in the 58 months that follow site delivery in the second phase. Istanbul's Atatürk and Sabiha Gökçen airports face capacity problems because of the rapid growth in the civil aviation transportation sector in recent years. Therefore, the airport project will be completed in the first quarter of 2018, although its formal construction period ends in October 2018. After the revised master plan of the airport project was approved on June 22, 2015, infrastructure and superstructure projects that will accelerate construction activities have also been confirmed. The construction is running smoothly and the Ministry of Transport, Maritime Affairs and Communication are holding coordination meetings with the General Directorate of State Airports Authority (DHMİ) on a regular basis.

There are a number of earthworks taking place on the project site. The poor-quality earth, which consisted of mine dumps, was completely removed from the area where upper structures will be built. Additionally, elevated areas are also being excavated. Rehabilitation and fill work is continuing in the marsh area, parts of which were drained in the first phase.

Design firms started work after the finalization of all tenders regarding the design of the airport. Tenders regarding subcontractor companies and equipment have also been completed to a major extent. The construction work is continuing in parallel with the confirmation by design firms. All equipment related to the construction work, including baggage, bridges, main energy center, facade, roofs, steel, elevators, escalators and fuel will be ordered by the end of 2015.

When the project is completed, the new airport will set an example by having the highest international flight safety standards. The most advanced technology and experience in the aviation sector are being closely pursued to this end.

A total of 7,500 people - 653 white collar and 6,846 blue collar - are employed on the project. When the construction work reaches the most intense level, it will offer jobs to a total of 30,000 people. Currently, there are 1,460 trucks deployed on the site.

A total of 10 million trees will be planted in place of those trees that were cut down as a part of the project.

The airport will have 165 passenger-boarding bridges, four terminals connected with a railway system, three maintenance buildings, eight air traffic control towers, six runways, 16 taxiways, an airport hangar of 6.5 million square meters with a capacity of 500 airplanes, a parking lot with a capacity of about 70,000 vehicles and touted as the largest airport parking lot in Europe, a clinic, fire department, hotels, a convention center and recycling and waste disposal plants. The airport will be connected to the Istanbul metro and multi-lane highways will be built to facilitate access. The area where the airport is being built was chosen with the consideration of ecological balance, wind data and the natural and artificial obstacles of the region.
http://www.dailysabah.com/money/2015...-ahead-of-plan
__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Old September 6th, 2015, 03:12 PM   #63
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Nuovi render del nuovo aeroporto di Istanbul


Quote:
Originally Posted by bigblackmaputo View Post






__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old September 13th, 2015, 12:11 PM   #64
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

dal forum internazionale

Quote:
Originally Posted by SkunkWorks View Post
Air Traffic Report 2015 ( Stand July )

Fastest growing airports in Europe

During July, airports welcoming more than 25 million passengers per year
(Group 1),


1. Istanbul IST (+16.9%)
2. Madrid (+13.1%)
3. Amsterdam (+8.4%)
4. Frankfurt (+6.6%)
5. London LGW (+6.4%)

Airports welcoming between 10 and 25 million passengers (Group 2)

1. Istanbul SAW (+28.5%)
2. Ankara (+25.7%)
3. Athens (+20.6%)
4. Tel Aviv (+18.9%)
5. Dublin (+16.9%)

Airports welcoming between 5 and 10 million passengers (Group 3)

1.Gothenburg (+30.0%)
2. Porto (+15.0%)
3. Budapest (+14.3%)
4. Glasgow (+13.6%)
5. Stuttgart STR (+11.0%)

and airports welcoming less than 5 million passengers per year (Group 4)

1. Turku (+752.9%)
2. Ohrid (+70.1%),
3. Bucharest BBU (+51.3%)
4. Rome CIA (+44.7%)
5.Trabzon (+39.5%)
__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Old December 26th, 2015, 09:14 AM   #65
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Istanbul's third airport to open on Feb 26, 2018




December 11, 2015

Istanbuls third airport to open on Feb 26, 2018
Transport Minister Yıldırım gave a precise date for the opening of Istanbul's third airport. Accordingly, the world's biggest airport will be officially inaugurated on Feb. 26, 2018



Minister of Transport, Maritime and Communication Binali Yıldırım has set the date for the opening of Istanbul's third airport as Feb. 26, 2018. Yıldırım attended the inauguration ceremony of an event in Istanbul called the Satellite, Space and Technology Days powered by TÜRKSAT, where he announced the date for the opening of the world's biggest airport.

The first broadcast from the TÜRKSAT 4B Satellite was actualized during the inauguration, which was streamed via the 4K teleconference, featuring the latest images from the ongoing construction of Istanbul's third Bosporus Bridge, the third airport and the İzmit Bay Bridge. Also, the TAI Satellite Test Center in Ankara participated in the live broadcast.

People attending the ceremony were also witness to some amusing scenes, as Yıldırım maintained his "outspoken man" reputation. During the live broadcast of the third airport, Yıldırım asked the project's chairman Nihat Özdemir if he wants to say something as the "property owner" referring to the agreement giving operational rights to IGA for 25 years. The IGA, Havalimanı İşletmesi A.Ş. Consortium, includes five big construction companies, which won a tender held in May 2013 to build Istanbul's new airport. "Sorry, I mean long-term renter," added Yıldırım. The minister further asked Özdemir when the airport will start to operate. Özdemir said that they expect the first flight to arrive in the first quarter of 2018. The minister, who has 13 years of experience, set the date for the opening as Feb. 26, 2018. The original plan for the project was set for the second half of 2018, which was later changed by IGA, noting that the project will be completed six months earlier than planned.

On Wednesday, Özdemir announced tha when the first phase of Istanbul's third airport comes into operation, operations at Istanbul Atatürk International Airport will cease.

The total budget of the project's first phase is about 6 billion euros, and 25 percent of this budget will be financed by the consortium's equity capital. The four phases of the project will be financed by bank credits totaling 80 percent and equity capital totaling 20 percent. Moreover, it is not expected to be a burden on the Treasury.

The airport is planned to serve an average of 200 million people annually when all four phases become operational. Currently, a total of 8,000 people are employed on the project; however, when the construction work reaches the most intensive level, it will offer jobs to a total of 100,000 people. Also, there are 2,500 trucks and heavy equipment machines deployed at the site.

The airport will have 165 passenger jetways, four terminals connected with a railway system, three maintenance buildings, eight air traffic control towers, six runways, 16 taxiways, a 6.5 million-square-meter airport hangar with a capacity of 500 airplanes, an approximately 70,000 vehicle capacity parking area - touted as the largest airport parking lot in Europe - a clinic, fire department, hotels, a convention center and recycling and waste disposal plants. The airport will also host 150 airlines. The airport will be connected to the Istanbul metro, and multi-lane highways will be built to facilitate access. The area where the airport is being built was chosen after the ecological balance, wind data and the natural and artificial obstacles of the region were taken into consideration.
http://www.dailysabah.com/money/2015...on-feb-26-2018
__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Old December 26th, 2015, 09:18 AM   #66
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Istanbul’s 3rd airport’s air control tower to have tulip-inspired design

December 24, 2015





Pininfarina and Aekom's innovative tulip-inspired design was announced Thursday as the winner of the international design competition for the airport traffic control tower of Istanbul's third airport.

The AECOM and Pininfarina design is an elliptical tower that harnesses aerodynamics. The design combines speed, modernity and romanticism, while its tulip-inspired shape is a beautiful reference to the centuries-old Turkish history.

Initiated by the IGA (Istanbul Grand Airport), the contest saw many world-renowned designers from both aviation and automotive sectors. The tulip-inspired design was chosen from a total of six entries from international architectural teams such as Zaha Hadid, Moshe Safdie, Fuksas, Grimshaw-Nordic and RMJM.

Commenting on the results of the contest, IGA CEO Yusuf Akçayoğlu said that the airport traffic control tower had an especially symbolic meaning for the new Istanbul Airport-which is set to be the world's largest new airport in terms of annual passenger capacity.

Stating that they were looking for just the right design that would fit for a 21st century airport while at the same time remaining sensitive to Istanbul's unique heritage, the CEO said that it was a tough call between the six top designs.

"The new air traffic control tower will be an iconic structure, visible to all passengers travelling through the airport," said Akçayoğlu reminding that the new tower will rise on a 5.000 sq. meter construction area with a height of 95 m.

"We aim to complete the air traffic control tower in October 2017, "he said, adding that the construction will begin in May 2016.

The new airport is currently being built on the European side of Istanbul and the construction is expected to be completed by 2018. It will also have an initial capacity of 90 million passengers per year, but with extensions it will be able to host 200 million.

The IGA consortium, which won a tender held in May 2013 to build Istanbul's new airport, comprises of five leading Turkish construction companies Cengiz, Mapa, Limak, Kolin and Kalyon.

In October, IGA made an agreement with Turkey's state-owned Halkbank, Ziraat Bankası and VakıfBank as well as foreign-financed banks DenizBank, Garanti Bankası and Finansbank for a €4.5 billion loan for the first phase of the aviation project.
http://www.dailysabah.com/istanbul/2...nspired-design
__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Old December 27th, 2015, 02:45 PM   #67
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Avanzamento lavori



http://www.buyuyenturkiye.com/haber/...ihi-belli-oldu
__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Old January 14th, 2016, 11:20 PM   #68
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Dal forum internazionale,
statistiche traffico passeggeri principali aeroporti turchi:


Quote:
Originally Posted by chngr View Post
Turkish Airports

İstanbul Atatürk 61.322.729 +8%
İstanbul Sabiha Gökçen 28.112.438 +20%

Antalya 27.724.249 -2%
Ankara Esenboğa 12.326.869 +12%
İzmir Adnan Menderes 12.139.788 +11%
__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Old January 15th, 2016, 07:03 PM   #69
doctor magistralis
Registered User
 
Join Date: Dec 2015
Posts: 1,374
Likes (Received): 432

E così Istanbul è quasi a quota 90 milioni. Nel 2018/19 il nuovo aeroporto (se sarà già aperto) avrà già quasi saturato le sue prime tre piste così come SAW sarà prossimo ai 50 milioni a meno che non tengano aperto anche l'attuale in attesa di completare al più presto il progetto da sei piste di IGA. Certo avrà un bacino di utenza da paura vista la favorevolissima posizione geografica.
doctor magistralis no está en línea   Reply With Quote
Old April 10th, 2016, 04:54 PM   #70
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Round-the-clock work on Istanbul’s new airport
More than 13,000 workers from 16 countries are working on Istanbul’s 3rd airport, whose first stage is planned to open in 2018

02.04.2016




The construction of Istanbul’s new airport, expected to be the world’s largest, is taking place 24 hours a day, 7 days a week, with more than 13,000 workers from 16 countries.

Anadolu Agency photographed Istanbul’s third airport – after Ataturk and Sabiha Gokcen – now under construction in the northwestern part of the city in the European part of Istanbul.

The first stage of the project is expected to be open by 2018.

The project is seen as one of the world's largest in terms of the site and the number of workers.

The first two-and-a-half years of the project – set to include shopping malls, hotels, and social and religious facilities – carry a price tag of some 6 billion euros.

The airport will have connections to the metro, the high-speed train, and bus service.

The project’s infrastructure and superstructure work has been carried out in different zones simultaneously due to deadlines.

Turkish President Recep Tayyip Erdogan said last October that the new airport would set an example to the world in terms of being environmentally friendly. “Generating its own energy, this airport is designed to be eco-friendly and handicapped accessible,” he said.

The new airport’s waiting areas will be decorated with live plants.

Erdogan said that once the new airport is completed, it would be one of the largest in the world in terms of passenger capacity.
http://aa.com.tr/en/turkey/round-the...airport/548161
__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte

flyingthai liked this post
brick84 no está en línea   Reply With Quote
Old May 14th, 2016, 03:26 PM   #71
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Aggiornamento lavori







__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Old May 14th, 2016, 07:38 PM   #72
Michele-TRN
Registered User
 
Michele-TRN's Avatar
 
Join Date: Jun 2008
Posts: 387
Likes (Received): 122

Grazie Brick, il terzo video è impressionante!
__________________
TRN Addict - http://www.facebook.com/associazioneflytorino

brick84 liked this post
Michele-TRN no está en línea   Reply With Quote
Old May 16th, 2016, 09:43 PM   #73
chunhim_lai
Registered User
 
Join Date: Apr 2015
Posts: 25
Likes (Received): 35



Last edited by chunhim_lai; May 16th, 2016 at 10:04 PM.
chunhim_lai no está en línea   Reply With Quote
Old May 25th, 2016, 04:02 PM   #74
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Construction of New Airport in Istanbul Complete by Over 25%
RUFIZ HAFIZOGLU ON MAY 13, 2016



Quote:
May 12--Construction of the third airport in Istanbul is complete by over 25 percent, the Turkish newspaper Milliyet reported May 12.

To date, as much as $1.8 billion has been spent on the airport's construction.

The newspaper also reported that the construction of the third airport in Istanbul, which began in 2013, has been accelerated.

The third airport of Istanbul is planned to be commissioned in early 2018.

It is being built near the Lake Terkos in the north of Istanbul.

The airport is expected to be one of the largest in the world and will be named after the country's President Recep Tayyip Erdogan.
http://www.aviationpros.com/news/122...ete-by-over-25
__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Old May 25th, 2016, 04:28 PM   #75
Fly80
Svaluser
 
Fly80's Avatar
 
Join Date: Feb 2013
Location: Italy-UK
Posts: 532
Likes (Received): 154

Quote:
Originally Posted by brick84 View Post
Istanbul’s 3rd airport’s air control tower to have tulip-inspired design

December 24, 2015





Pininfarina and Aekom's innovative tulip-inspired design was announced Thursday as the winner of the international design competition for the airport traffic control tower of Istanbul's third airport.
http://www.dailysabah.com/istanbul/2...nspired-design
ed io che sogno una cosa simile ed iconica anche per FCO, con buona pace del grande P.L. Nervi
Fly80 no está en línea   Reply With Quote
Old June 22nd, 2016, 01:03 PM   #76
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Avanzamento lavori




http://aa.com.tr/tr/pg/foto-galeri/b...ndu--/0/227574
__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Old June 24th, 2016, 03:02 AM   #77
Giandui8
Registered User
 
Giandui8's Avatar
 
Join Date: Nov 2010
Location: Torino
Posts: 425
Likes (Received): 95

Ciao ragazzi! Qualcuno gentilmente saprebbe indicarmi dove possa trovare delle info sulla nuova linea di treno/metropolitana che dovrebbero realizzare tra il centro città ed il nuovo aeroporto? Grazie mille!
Giandui8 no está en línea   Reply With Quote
Old June 24th, 2016, 03:25 PM   #78
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

Quote:
Originally Posted by Giandui8 View Post
Ciao ragazzi! Qualcuno gentilmente saprebbe indicarmi dove possa trovare delle info sulla nuova linea di treno/metropolitana che dovrebbero realizzare tra il centro città ed il nuovo aeroporto? Grazie mille!
Ciao.
Forse qui puoi trovare qualcosa in merito:
http://www.hurriyetdailynews.com/sub...&NewsCatID=345

http://www.dailysabah.com/istanbul/2...tender-in-2016
__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Old June 26th, 2016, 03:38 PM   #79
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

timelapse video

__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Old August 20th, 2016, 03:14 PM   #80
brick84
Registered User
 
brick84's Avatar
 
Join Date: Aug 2007
Posts: 46,949

dal forum internazionale


Quote:
Originally Posted by sponge_bob View Post
The new airport hits 30% completion from a May 2015 start point and may be completed and tested in late 2018 now. Here is Terminal 1 at present.

__________________
"Quello che facciamo per noi stessi,muore con noi quello che facciamo per gli altri e per il mondo rimane, ed e’ immortale" - Albert Pine.

Ponte sullo Stretto di Messina - Prima parte
Ponte sullo Stretto di Messina - Seconda parte
brick84 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Tags
istanbul, turchia

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 07:01 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us