LAUSANNE | Malley - Page 4 - SkyscraperCity
 

forums map | news magazine | posting guidelines

Go Back   SkyscraperCity > European Forums > Euroscrapers > Local discussions > Switzerland > Lausanne


Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools Rating: Thread Rating: 7 votes, 5.00 average.
Old February 14th, 2012, 08:26 PM   #61
General Electric
Registered User
 
General Electric's Avatar
 
Join Date: Sep 2010
Location: Lausanne
Posts: 8,110
Likes (Received): 9562

MALLEY CENTRE: 1er prix

MALLEY CENTRE: 1er prix concours d'urbanisme:











General Electric no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old February 14th, 2012, 08:55 PM   #62
General Electric
Registered User
 
General Electric's Avatar
 
Join Date: Sep 2010
Location: Lausanne
Posts: 8,110
Likes (Received): 9562

Malley Centre: 24heures.ch

Quote:
Lausanne

Le futur visage de Malley Centre dévoilé

Par Cindy Mendicino. Mis à jour à 18h00


Le concours d’urbanisme qui visait à dessiner le cœur de Malley s’est achevé. Les lauréats, un bureau d’architectes lyonnais, prévoient de faire la part belle aux parcs et à la culture.

Image: Infographie DR



Un grand plan d’eau devant le gazomètre, un parc à l’ouest qui ouvre sur le théâtre Kléber-Méleau et une place devant ce même établissement. Le cœur de la future ville de Malley aura ses espaces verts.

La future halte RER Prilly-Malley sera elle aussi encadrée par deux parcs : l’un à ciel ouvert, l’autre grandement arborisé.
Un axe formé de places publiques s’étendra ainsi d’est en ouest. Un axe perpendiculaire sera lui dédié à la culture, entre la halte RER et le théâtre.

Le concept urbanistique de cette zone de 16 hectares est ainsi posé. Il faudra maintenant établir les plans d’affectation et négocier, avec les propriétaires (la commune de Lausanne et les CFF en grande partie), le visage définitif de ce nouveau centre urbain.
A terme, ce seront 2500 habitants et emplois qui s’y installeront. Les constructions, pour moitié destinées au logement, pourraient débuter en 2014.
(24 heures)
Créé: 14.02.2012, 18h00
http://www.24heures.ch/vaud-regions/...story/11770537

Last edited by General Electric; May 16th, 2012 at 04:34 PM.
General Electric no está en línea   Reply With Quote
Old February 14th, 2012, 09:19 PM   #63
HYPEster
Registered User
 
HYPEster's Avatar
 
Join Date: Feb 2009
Location: Lausanne
Posts: 1,525
Likes (Received): 21

Mouais mouais mouais... j'attend de pouvoir lire le rapport mais ça me semble léger pour le "centre". J'aurais préféré une grande tour plutôt que 3 petites. Ou alors enlever un étage aux immeubles du quartier pour les inclure dans les tours histoire de gagner en hauteur.
HYPEster no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old February 14th, 2012, 09:42 PM   #64
HYPEster
Registered User
 
HYPEster's Avatar
 
Join Date: Feb 2009
Location: Lausanne
Posts: 1,525
Likes (Received): 21

HYPEster no está en línea   Reply With Quote
Old February 14th, 2012, 09:44 PM   #65
General Electric
Registered User
 
General Electric's Avatar
 
Join Date: Sep 2010
Location: Lausanne
Posts: 8,110
Likes (Received): 9562

Quote:
Originally Posted by HYPEster View Post
Mouais mouais mouais... j'attend de pouvoir lire le rapport mais ça me semble léger pour le "centre". J'aurais préféré une grande tour plutôt que 3 petites. Ou alors enlever un étage aux immeubles du quartier pour les inclure dans les tours histoire de gagner en hauteur.
Il y avait un projet comme ça, mais même si plus de hauteur ne m'aurait pas dérangé, j'aime assez bien celui-ci, qui propose un paysage découpé faisant la part belle aux espaces publics. J'estime les 3 tours entre 60 et 80 mètres?

Projet non-retenu avec une seule tour plus grande:
General Electric no está en línea   Reply With Quote
Old February 14th, 2012, 09:53 PM   #66
General Electric
Registered User
 
General Electric's Avatar
 
Join Date: Sep 2010
Location: Lausanne
Posts: 8,110
Likes (Received): 9562

Le reportage de la TSR:

Quote:
14 février 2012
VD: "Coulisses", c'est le nom du projet architectural choisi pour le réaménagement du quartier de Malley près de Lausanne
C'est un cabinet lyonnais qui remporte le concours international. Le projet veut redonner vie et verdure à ce quartier.
General Electric no está en línea   Reply With Quote
Old February 14th, 2012, 11:14 PM   #67
Vaud
Registered User
 
Join Date: Sep 2011
Posts: 937
Likes (Received): 2243

Je le trouve parfait, ils ont choisi un très bon équilibre entre densité et espace, il faut voir comment seront-ils les bâtiments parce la réalité est souvent différent de ce qu'on montre dans un render.

Et par curiosité, c'est pas faux de dire "halte" au lieu d'arrêt? je pensais que c'était quelque chose de genevois hehe
Vaud no está en línea   Reply With Quote
Old February 14th, 2012, 11:56 PM   #68
HYPEster
Registered User
 
HYPEster's Avatar
 
Join Date: Feb 2009
Location: Lausanne
Posts: 1,525
Likes (Received): 21

Je trouve pas mal ce projet non retenu, notamment avec les ilôts. Par contre, la tour unique ne semble pas être beaucoup plus haute que la plus élevée du projet retenu.

Je pense que ton estimation de hauteur est juste compte tenu du nombre d'étages. Le schéma directeur prévoyait en tout cas la possibilité d'aller jusqu'à une trentainre d'étages. Enfin, on jugera une fois le rapport disponible.

Il reste maintenant à espérer que la tour au nord de Malley-Lumières avec la "place du Galicien" (hors projet car parcelle privée il me semble) soit belle et grande!
HYPEster no está en línea   Reply With Quote
Old February 15th, 2012, 12:48 AM   #69
General Electric
Registered User
 
General Electric's Avatar
 
Join Date: Sep 2010
Location: Lausanne
Posts: 8,110
Likes (Received): 9562

C'est quand même dommage de pas avoir exploité, sur au moins une tour, la hauteur maximale, d'autant plus avec la pénurie de logement et la volonté de densifier. Si pour En Dorigny, dont le projet retenu proposait plus d'hab.-emplois que souhaiter pour ce secteur, ils ont demandé finalement de supprimer la tour, peut-être que pour celui-ci ils vont les rehausser. Car les 2500 hab-emplois de ce projet sont loin des 5'000 -7'000 annoncées par le sdol pour ce secteur Malley-centre.

Le rapport du jury sera très instructif sur ce plan là, il doit surement mentionner ce point-là.

Last edited by General Electric; February 15th, 2012 at 12:53 AM.
General Electric no está en línea   Reply With Quote
Old February 22nd, 2012, 04:36 PM   #70
General Electric
Registered User
 
General Electric's Avatar
 
Join Date: Sep 2010
Location: Lausanne
Posts: 8,110
Likes (Received): 9562

Quote:
Originally Posted by HYPEster View Post


Flumeaux 41 (2012)


Quote:
Sécurité

La police de l’Ouest lausannois veut déménager

Par Cindy Mendicino . Mis à jour le 21.02.2012 8 Commentaires


A l’étroit dans ses locaux et dispatchée dans tout le district, la police intercommunale de l’Ouest lausannois propose de regrouper ses services à Prilly, dans un bâtiment encore à construire.



[...]



C’est un bâtiment qui se situera à la route des Flumeaux 41 à Prilly qui pourrait l’accueillir et ce dès l’automne 2013. A quelques mètres de l’usine Bobst.



Suite de l'article 24heures.ch
Ce sera peut-être l'administration de la police de l'Ouest-lausannois qui occupera ce bâtiment!

Quote:
Originally Posted by General Electric View Post
Flumeaux 41, Prilly (au nord de la patinoire de Malley Malley)

image hosted on flickr


image hosted on flickr


image hosted on flickr






Last edited by General Electric; February 22nd, 2012 at 04:43 PM.
General Electric no está en línea   Reply With Quote
Old February 22nd, 2012, 05:38 PM   #71
HYPEster
Registered User
 
HYPEster's Avatar
 
Join Date: Feb 2009
Location: Lausanne
Posts: 1,525
Likes (Received): 21

Eh ben ca sera bien à l'Est de l'Ouest! Avec la Police de la région morgienne qui se rassemble ne serait-il pas plus simple former un corp de police du Grand Lausanne plutôt que par disctricts?
HYPEster no está en línea   Reply With Quote
Old February 23rd, 2012, 10:00 PM   #72
General Electric
Registered User
 
General Electric's Avatar
 
Join Date: Sep 2010
Location: Lausanne
Posts: 8,110
Likes (Received): 9562

Quote:
Originally Posted by HYPEster View Post
Eh ben ca sera bien à l'Est de l'Ouest! Avec la Police de la région morgienne qui se rassemble ne serait-il pas plus simple former un corp de police du Grand Lausanne plutôt que par disctricts?
De mémoire il en avait été question, d'une police du Grand Lausanne, mais il avait été préféré à l'époque un découpage par district. Je pense aussi, que ce soit pour la police ou le reste, que les districts découpant le Grand Lausanne est une aberration. Je suis donc pour un district "Lausanne" regroupant les territoire de Tolochenaz à Cully, d'Ouchy à Cheseaux.
General Electric no está en línea   Reply With Quote
Old February 25th, 2012, 01:43 AM   #73
Lausanne
Registered User
 
Lausanne's Avatar
 
Join Date: Oct 2004
Location: Lausanne, Switzerland
Posts: 542
Likes (Received): 7

Quote:
Originally Posted by General Electric View Post
De mémoire il en avait été question, d'une police du Grand Lausanne, mais il avait été préféré à l'époque un découpage par district. Je pense aussi, que ce soit pour la police ou le reste, que les districts découpant le Grand Lausanne est une aberration. Je suis donc pour un district "Lausanne" regroupant les territoire de Tolochenaz à Cully, d'Ouchy à Cheseaux.
C'est exactement l'inverse qui a été fait il y a 2-3- ans avec une explosion de l'ex-district du Gd-Lausanne en 3 districts.
__________________
Follow your euronotes all around Europe http://www.eurobilltracker.com/?referer=55084
Lausanne no está en línea   Reply With Quote
Old March 12th, 2012, 02:14 AM   #74
General Electric
Registered User
 
General Electric's Avatar
 
Join Date: Sep 2010
Location: Lausanne
Posts: 8,110
Likes (Received): 9562

11.03.2012

11.03.2012 Chantier Zenith, Av de Provence











General Electric no está en línea   Reply With Quote
Old March 23rd, 2012, 07:28 PM   #75
HYPEster
Registered User
 
HYPEster's Avatar
 
Join Date: Feb 2009
Location: Lausanne
Posts: 1,525
Likes (Received): 21

Quote:
Originally Posted by HYPEster View Post

Les travaux ont commencé!
HYPEster no está en línea   Reply With Quote
Old March 24th, 2012, 12:25 PM   #76
And1
Edel-Kuhschweizer
 
And1's Avatar
 
Join Date: Jun 2009
Location: Zürich / 蘇黎世
Posts: 1,590
Likes (Received): 3865

Il n'y a pas de visualisations des projets finaux avant de commencer les travaux? (Zentih et les tours?)
And1 no está en línea   Reply With Quote
Old March 24th, 2012, 02:06 PM   #77
HYPEster
Registered User
 
HYPEster's Avatar
 
Join Date: Feb 2009
Location: Lausanne
Posts: 1,525
Likes (Received): 21

Quote:
Originally Posted by And1 View Post
Il n'y a pas de visualisations des projets finaux avant de commencer les travaux? (Zentih et les tours?)
Ce concours portait surtout sur les espaces publics comme les avenues et les parcs qui seront réalisés en premier. Il y aura d'autres concours d'architecture pour les tours j'imagine...
HYPEster no está en línea   Reply With Quote
Old March 24th, 2012, 03:21 PM   #78
General Electric
Registered User
 
General Electric's Avatar
 
Join Date: Sep 2010
Location: Lausanne
Posts: 8,110
Likes (Received): 9562

Quote:
Originally Posted by And1 View Post
Il n'y a pas de visualisations des projets finaux avant de commencer les travaux? (Zentih et les tours?)
Zenith n'a rien à voir avec ces projets sur les friches de Malley, c'est un projet dans le cadre d'un programme lancé il y a quelques années par la ville: "3000 logements durable". Il est situé tout au sud du quartier, sur un ancien parking relais qui se trouve maintenant à Vidy, près de la Bourdonnette.
General Electric no está en línea   Reply With Quote
Old March 24th, 2012, 04:37 PM   #79
HYPEster
Registered User
 
HYPEster's Avatar
 
Join Date: Feb 2009
Location: Lausanne
Posts: 1,525
Likes (Received): 21

Effectivement, le projet Zenith est à "Provence" qui n'est pas Malley à proprement parler.

Pour les visualisations il y en a ici: http://farralakis.ch/projets/provence.php# (attention aux yeux!)
HYPEster no está en línea   Reply With Quote
Old March 31st, 2012, 07:59 PM   #80
General Electric
Registered User
 
General Electric's Avatar
 
Join Date: Sep 2010
Location: Lausanne
Posts: 8,110
Likes (Received): 9562

29.03.2012 Flumeaux 41 Administration




Last edited by General Electric; April 2nd, 2012 at 09:31 PM.
General Electric no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Tags
malley

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 08:42 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us