Old October 7th, 2016, 08:38 PM   #41
Nodara95
Georgian Moderator
 
Nodara95's Avatar
 
Join Date: May 2012
Location: Zugdidi
Posts: 11,421
Likes (Received): 5722

რა კალაძის საკუთრება? მატარებლის გვირაბში ვერ შეტევას გავს.
__________________
.: SSC Georgia :.
Nodara95 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old November 3rd, 2016, 06:27 PM   #42
iberia
Registered User
 
iberia's Avatar
 
Join Date: Jan 2010
Posts: 395
Likes (Received): 18

ikneb vnaxot anu moviziot video rogor trialebs da datrialda tu ara
iberia no está en línea   Reply With Quote
Old November 4th, 2016, 01:58 PM   #43
NVIDIA MAN
Registered User
 
NVIDIA MAN's Avatar
 
Join Date: Jun 2014
Location: Tbilisi
Posts: 1,688
Likes (Received): 677

რო დატრიალდება წესით გადაუღებს ვიდეო ენერგეტიკის სამინისტრო
NVIDIA MAN no está en línea   Reply With Quote
Old November 6th, 2016, 10:01 AM   #44
Noda[Med]
AKA Nodara95
 
Noda[Med]'s Avatar
 
Join Date: Nov 2016
Posts: 2,809
Likes (Received): 2364

გუშინ ვნახე გზაში და ძალიან ეფექტურია. ცოტა ხნით თავი ნორმალურ ევროპულ ქვეყანაში მეგონა
Noda[Med] no está en línea   Reply With Quote
Old December 20th, 2016, 01:02 PM   #45
Noda[Med]
AKA Nodara95
 
Noda[Med]'s Avatar
 
Join Date: Nov 2016
Posts: 2,809
Likes (Received): 2364

არსებული ქარის ელექტროსადგურის 100 მეგავატამდე გაძლიერებას განვიხილავთ.

Quote:
თორნიკე ყაზარაშვილი: არსებული ქარის ელექტროსადგურის 100 მეგავატამდე გაძლიერებას განვიხილავთ.

შპს “ქართლის ქარის ელექტროსადგურის” დირექტორთა საბჭოს თავმჯდომარის, თორნიკე ყაზარაშვილის თქმით, საქართველოს აქვს პოტენციალი, რომ 1000-დან 1100 მეგავატამდე ქარის ენერგია აითვისოს.

" - “სამომავლოდ, ისევ ამ ტერიტორიაზე, უკვე არსებული ელექტროსადგურის 100 მეგავატამდე გაძლიერებას განვიხილავთ. ამ პროექტზე მუშაობას მომავალი წლის ზაფხულისთვის დავასრულებთ და შემდეგ, ფინანსური რესურსების გათვალისწინებით, მშენებლობას დავიწყებთ. ინვესტორის მოზიდვაზე უკვე ვმუშაობთ”, – ამბობს თორნიკე ყაზარაშვილი.

შპს “ქართლის ქარის ელექტროსადგურის” დირექტორთა საბჭოს თავმჯდომარესთან საუბრიდან ირკვევა, რომ პარტნიორ კომპანიებთან ორი პროექტი უკვე არსებობს – ერთი ქართლის, მეორე კი იმერეთის რეგიონში. გარდა ამისა, პარალელურად სხვადასხვა ტერიტორიის შესწავლა მიმდინარეობს როგორც სატელიტიდან დაკვირვებით, ისე – საველე გასვლებით.

ცნობისთვის, 20,7 მგვტ-ის სიმძლავრის პირველმა ქარის ელექტროსადგურმა ნოემბრის თვეში 1,835 მლნ კვტ.სთ ელექტროენერგია გამოიმუშავა.
Noda[Med] no está en línea   Reply With Quote
Old January 18th, 2017, 01:13 PM   #46
Noda[Med]
AKA Nodara95
 
Noda[Med]'s Avatar
 
Join Date: Nov 2016
Posts: 2,809
Likes (Received): 2364

second Wind farm to be built in Zestafoni

Quote:
ქარის ელექტოროსადგური ზესტაფონშიც აშენდება.

ენერგეტიკის განვითარების ფონდი ზესტაფონში ქარის ელექტროსადგურის მშენებლობისთვის ინვესტორებს იწვევს.

ფონდის ცნობით, შერჩეულ ტერიტორიაზე წინასწარი კვლევა უკვე ჩატარებულია, წინადადებების წარდგენისთვის ინვესტორებს 18 იანვრიდან 1 თვიანი ვადა ექნებათ. გამარჯვებული კომპანია 27 თებერვალს გამოვლინდება და მასთან ხელშეკრულების გაფორმება 6 მარტამდე დასრულდება.

ზესტაფონთან დაგეგმილია 150 მეგავატი სიმძლავრის სადგურის მშენებლობა. ზესტაფონის ქარის ელექტროსადგურის სავარაუდო წლიური გამომუშავება 478.2 მლნ კვტ.სთ იქნება.
დაგეგმილია 50 ცალი 3 მგვტ-ის სიმძლავრის ტურბინების დამონტაჟება.

ზესტაფონის ქარის ელექტროსადგურის პროექტის საინვესტიციო ღირებულება 227 მლნ აშშ დოლარს შეადგენს.

შეგახსენეთ, ნოემბრიდან წარმატებულად ფუნქციონირებს 20,7 მგვტ-ის სიმძლავრის "ქართლის ქარის ელექტროსადგური", რომელსაც დაახლოებით 12 მლნ კვტ.სთ ელექტროენერგია უკვე მიწოდებული აქვს საქართველოს ელექტროსისტემისთვის.
გორთან არის პოტენციალი და შესაძლოა კიდევ 100 მეგავატის დამატება მოხდეს.
__________________

NVIDIA MAN, Novartis, Castiel667 liked this post
Noda[Med] no está en línea   Reply With Quote
Old January 19th, 2017, 08:48 AM   #47
Castiel667
Registered User
 
Castiel667's Avatar
 
Join Date: Aug 2014
Location: Tbilisi
Posts: 1,293
Likes (Received): 474

ვაა. 478 მილიონი არაა ცოტა.. წლევანდელი იმპორტია პრაქტიკულად..
Castiel667 no está en línea   Reply With Quote
Old January 19th, 2017, 08:57 AM   #48
Noda[Med]
AKA Nodara95
 
Noda[Med]'s Avatar
 
Join Date: Nov 2016
Posts: 2,809
Likes (Received): 2364

გამოჩნდება კი ინვესტორი?
Noda[Med] no está en línea   Reply With Quote
Old January 19th, 2017, 10:37 AM   #49
Castiel667
Registered User
 
Castiel667's Avatar
 
Join Date: Aug 2014
Location: Tbilisi
Posts: 1,293
Likes (Received): 474

მაგას უკვე გააჩნია... კონტრაქტში რას დაწერენ, რამდენ თეთრად ვიყიდით დენსო..

ეს ქარის ენერგია ხომ უფრო ძვირი ჯდება... ვნახოთ, ვნახოთ..
Castiel667 no está en línea   Reply With Quote
Old January 19th, 2017, 11:02 AM   #50
Noda[Med]
AKA Nodara95
 
Noda[Med]'s Avatar
 
Join Date: Nov 2016
Posts: 2,809
Likes (Received): 2364

ასოცირების ხელშეკრულებაში გვაქვს ვალდებულება მინ. 20 % მაინც დავაგენერიროთ განახლებადი წყაროებიდან.

გორის სადგური უფრო პოპულისტურია და სანახაობისთვისაა აშენებული. თუმცა ამ საქმის ვდაწყება აუცილებელი იყო.
Noda[Med] no está en línea   Reply With Quote
Old January 19th, 2017, 07:06 PM   #51
Noda[Med]
AKA Nodara95
 
Noda[Med]'s Avatar
 
Join Date: Nov 2016
Posts: 2,809
Likes (Received): 2364

Georgian Energy Development Fund announces Selection of Investor for devepolment of Zestaponi WPP Project

Quote:
SC “Georgian Energy Development Fund” is searching for an investor to establish a Joint Venture Company for development and construction of the Zestafoni Wind Power Plant Project. Project area for the above-mentioned project is located in the region of Imereti, nearby to the city of Zestafoni and estimated installed capacity amounts to 150 MW.

Interested persons have an opportunity to express the interest and submit the tendering documentation until 18:00 of February 20, 2017.
Within the nearby territory to the city of Zestafoni, the construction of the Wind Power Plant is planed with the following estimated parameters:

Project Name -Zestafoni Wind Power Plant
Installed Capacity -150 MW
Generated Power -478.2 mln/kwh per hour
Number of Turbines -50
Installed Capacity per Turbine -3 MW
Project Cost -227 Million USD

Currently pre-feasibility study on the projects exists which shall be non-cash equity contribution to the JVC by JSC “Georgian Energy Development Fund”, rated as 40 000 (forty thousand) GEL.

Initial equity capital of JVC shall amount to 400 000 (four hundred thousand) GEL.

Along with promulgation of the tender for the selection of investors, JSC “Georgian Energy Development Fund” sets the standard terms for Shareholders Agreement (decisions that needs to be made unanimously, distribution of shares, call and put options etc) that is stated in the Appendix N1.

Pre-feasibility study shall be obtained only upon the written request of the interested person and after signing of Non-Disclosure Agreement.
__________________

Novartis liked this post
Noda[Med] no está en línea   Reply With Quote
Old January 19th, 2017, 08:43 PM   #52
Noda[Med]
AKA Nodara95
 
Noda[Med]'s Avatar
 
Join Date: Nov 2016
Posts: 2,809
Likes (Received): 2364

Meeting with Vestas Wind Systems CEO

Quote:

Climate change and energy security were some of the issues discussed by Georgian Prime Minister Giorgi Kvirikashvili and Anders Runevad, CEO at Vestas Wind Systems, a leading global manufacturer of wind turbines. The meeting was held at the World Economic Forum in Davos. The parties discussed Georgia’s hydropower potential and prospects of producing renewable energy, also emphasizing the importance of investing in renewable energy projects.
According to Giorgi Kvirikashvili, Georgia, as a reliable transit country and a regional hub, has very impressive resources of almost all renewable energy sources (water, solar, and wind). According to him, the Kartli 1 wind farm (20.7 MW capacity) is already operating in Georgia.
The parties emphasized the role of smart energy technology in the development of renewable energy sources, which is important for the effective use of local resources and energy independence.
Danish Vestas Wind Systems was established in 1898. It is the largest wind turbine manufacturer in the world. The company also designs, installs, and maintains wind turbines. Generators manufactured by Vestas Wind Systems operate in 75 countries.
Noda[Med] no está en línea   Reply With Quote
Old March 9th, 2017, 04:44 PM   #53
Noda[Med]
AKA Nodara95
 
Noda[Med]'s Avatar
 
Join Date: Nov 2016
Posts: 2,809
Likes (Received): 2364

გერმანული MR Graft საქართველოში ქარის ელექტროსადგურს ააშენებს

Quote:
ზესტაფონში ქარის ელექტროსადგურს გერმანული MR Graft გეგმავს. მიმდინარე კვირაში ენერგეტიკის განვითარების ფონდი და ენერგეტიკს სამინისტრო MR Graft-თან საპარტნიორო ხელშეკრულებას გააფორმებს და მხარეები ერთობლივ ქართულ კომპანიას დააფუძნებენ.

ენერგეტიკის განვითარების ფონდის ხელმძღვანელის, მამუკა კობახიძის განცხადებით, კომპანია 18 თვის განმავლობაში ადგილზე ტექნიკურ - ეკონომიკურ კვლევებს ჩაატარებს და დადგინდება რა სიმძლავრის ათვისება მოხდება ტერიტორიაზე.

კვლევებისთვის, გერმანული მხარის მიერ საწყისი საინვესტიციო თანხა, $400,000 იქნება, რაც მცირედით შესაძლოა გაიზარდოს. ხოლო, უშუალოდ სადგურის მშენებლობის საინვესტიციო თანხები, ასათვისებელი ენერგიის მიხედვით დაზუსტდება, წინასწარი მონაცემებით, საუბარია დაახლოებით, 227 მლნ აშშ დოლარზე.

შეგახსენებთ, ადგილზე 150 მეგავატიანი სადგურის მშენებლობა განიხილება.
__________________

NVIDIA MAN liked this post
Noda[Med] no está en línea   Reply With Quote
Old March 21st, 2017, 06:08 PM   #54
Noda[Med]
AKA Nodara95
 
Noda[Med]'s Avatar
 
Join Date: Nov 2016
Posts: 2,809
Likes (Received): 2364

ზესტაფონის ქარის ელექტროსადგურის პროექტს სს „საქართველოს ენერგეტიკის განვითარების ფონდი“ და შპს „ჯეოკრაფტი“ განავითარებენ

სს „საქართველოს ენერგეტიკის განვითარების ფონდის" მიერ მიმდინარე წლის 18 იანვარს გამოცხადდა ინვესტორის შერჩევა ზესტაფონის ქარის ელექტროსადგურის პროექტის განხორციელების მიზნით, სადაც გამარჯვებულ კომპანიად გამოვლინდა შპს „ჯეოკრაფტი".


პარტნიორებს შორის წილობრივი გადანაწილება შემდეგია:


სს „საქართველოს ენერგეტიკის განვითარების ფონდი" - 10 %


შპს „ჯეოკრაფტი" - 90 %.


პროექტის განვითარების პირველი ფაზა მოიცავს იმერეთის რეგიონში, ქ. ზესტაფონის მიმდებარე ტერიტორიაზე ქარის ელექტროსადგურის (საპროექტო დადგმული სიმძლავრე - 150 მეგავატი) სრულ ტექნიკურ-ეკონომიკური კვლევის მომზადებას.
აღნიშნულთან დაკავშირებით, სს „საქართველოს ენერგეტიკის განვითარების ფონდსა" და შპს „ჯეოკრაფტის" მიერ დაარსებული საერთო საწარმო შპს „ზესტაფონის ქარის ელექტროსადგური" მიმართავს საქართველოს ენერგეტიკის სამინისტროს ურთიერთგაგების მემორანდუმის გასაფორმებლად წარსადგენი კვლევების მომზადების მიზნით.
Noda[Med] no está en línea   Reply With Quote
Old October 6th, 2017, 04:10 PM   #55
Noda[Med]
AKA Nodara95
 
Noda[Med]'s Avatar
 
Join Date: Nov 2016
Posts: 2,809
Likes (Received): 2364

განათებული არ მინახავს. კარგი იქნება

__________________
KortuasBlog on Wix & Facebook
Noda[Med] no está en línea   Reply With Quote
Old October 6th, 2017, 07:32 PM   #56
justproject
Registered User
 
justproject's Avatar
 
Join Date: Jun 2013
Location: Tbilisi
Posts: 12,026
Likes (Received): 3416

მარტო ამ სილამაზისთვის ღირს ქარის ელექტროსადგურების შენება.
__________________
follow Georgian forum
justproject no está en línea   Reply With Quote
Old October 10th, 2017, 06:59 AM   #57
kechxo
Registered User
 
kechxo's Avatar
 
Join Date: Mar 2010
Location: Tbilisi
Posts: 661
Likes (Received): 141

eg ukve gaketebuli iyo upirveles HESidan.

Quote:
Originally Posted by Noda[Med] View Post
ასოცირების ხელშეკრულებაში გვაქვს ვალდებულება მინ. 20 % მაინც დავაგენერიროთ განახლებადი წყაროებიდან.

გორის სადგური უფრო პოპულისტურია და სანახაობისთვისაა აშენებული. თუმცა ამ საქმის ვდაწყება აუცილებელი იყო.
Nodar, shegaxseneb rom saqartvelos 80% ganaxlebit wyaroebidan modis deni. Tu qaris da PV denze saubrobdi eg sxvaa
__________________
Feminist to the core
kechxo no está en línea   Reply With Quote
Old February 20th, 2018, 06:39 PM   #58
Novartis
Bayer Business Services
 
Novartis's Avatar
 
Join Date: Apr 2015
Location: Tbilisi
Posts: 754
Likes (Received): 639



Quote:
First Vice Prime Minister of Georgia, Minister of Economy and Sustainable Development Dimitry Kumsishvili discussed the energy projects in Georgia, including those of usage of the renewable energy resources with Ahmet Çalik, the Chair of the Board of the Çalık Enerji – the largest energy holding in Turkey. The meeting was held in Ankara, Turkey.

Wind power plants projects, which Çalık Enerji is developing in cooperation with the Energy Development Fund of Georgia, was also covered during the conversation.

As it was decided at the meeting, the Çalık Enerji will build a wind power plant of 50MW capacity in Georgia and namely, in the Shida Kartli region and the construction will require the investment of 75 million USD.

“We completed negotiations with Ahmet Çalik, the Founder and the Head of the Çalık Enerji, and we agreed that the wind power plant with a capacity of 50 MW and the investment of 75 million USD will be built in Shida Kartli. This is, of course, a very important investment, and at the same time, this will result into another new source of renewable energy in the electric power system of our country,” – Dimitry Kumsishvili stated.

In turn, Ahmet Çalik said that he believes in Georgia and it future. According to him, another investment implemented by Çalık Enerji will contribute to the deepening of the cooperation between the two countries in the fields of energy and economics.

“It was a very productive meeting and the most important is that we agreed that the Çalık Enerji will invest in Georgia’s wind and solar energy sectors. At this stage, the first investment will be implemented in the wind energy and a 50 MW wind power plant will be built. We believe in Georgia and its future. We have already invested in Georgia and we have very good relations with Georgia. I believe that the visit of the Vice Prime Minister to Turkey will be successful. And I hope that another investment will contribute to the cooperation of the two countries in the fields of energy and economics,” - Ahmet Çalik stated.

Prospects of cooperation in solar energy sector in Georgia was also covered during the conversation.

Deputy Ministers of Economy and Sustainable Development, Giorgi Chikovani and Romeo Mikautadze, and the Director of the Energy Development Fund of Georgian, Tornike Rizhvadze also attended the meeting.
Çalık Enerji is implementing the wind power plant project in cooperation with Energy Development Fund of Georgia.
__________________
ერთი პირის მიმართ დაშვებული უსამართლობა საფრთხეა ყველასთვის © შარლ მონტესკიე
Novartis no está en línea   Reply With Quote
Old February 21st, 2018, 08:46 AM   #59
Noda[Med]
AKA Nodara95
 
Noda[Med]'s Avatar
 
Join Date: Nov 2016
Posts: 2,809
Likes (Received): 2364











__________________
KortuasBlog on Wix & Facebook

Novartis, Castiel667 liked this post
Noda[Med] no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 11:21 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us