[BG] Bulgaria | road infrastructure • Автомагистрали - Page 390 - SkyscraperCity
 

forums map | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Highways & Autobahns

Highways & Autobahns All about automobility


Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old November 11th, 2019, 09:48 AM   #7781
vadimz
Registered User
 
vadimz's Avatar
 
Join Date: Jul 2015
Posts: 190
Likes (Received): 610

Quote:
Originally Posted by BG_AT View Post
Hello everybody !

I want to ask how the highway constructions of the A6 from Sofia to the Serbian Border are going on?

When will it be complete finished and which highway parts are the next ones that will be opened and when?
1. Serbia(border) - Dragoman:
Contracted, but work in terrain not started yet (Probably, opening in the end of 2021)

2. Dragoman - Slivnitsa:
Under construction, opening in 2020

3. Slivnitsa - Sofia.
Projected, no activity now, but it is good 2x2 lane road.
__________________
vadimz no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old November 16th, 2019, 01:29 PM   #7782
nabludatel50
Registered User
 
Join Date: Nov 2015
Posts: 867
Likes (Received): 2952

The contractor has been identified 13.2 km from Struma Motorway through the Kresna Gorge ~ 330 000 000 EuR
16.11.2019 09:00
Struma LOT 3.2.1 is designated as a contractor for a 13.2 km section of Struma Motorway through the Kresna Gorge - Lot 3.2.1. Chairman of the Board of the Road Infrastructure Agency Georgi Terziyski has signed the decision on the ranking of participants in the procedure for designation of a contractor for the selection of a contractor for the design and construction of a section of the motorway in the section between Kresna and Krupnik. This is the lane in the direction of Kulata - Sofia, which will pass east from the Kresna Gorge on a new route.

The company APP LOT 3.2.1 includes: "GROMA HOLD" EOOD, "EUROPEAN ROADS" AD, "WATER CONSTRUCTION - BLAGOEVGRAD" AD, "PUTPROEKT" EOOD and "VAHOSTAV-SK" a.s.

Lot 3.2.1 covers the section from km 375 to 389 km and the adjacent road links. It will build 3 tunnels - Simitli / 211 m /, Rakitna / 1 135 m / and Stara Kresna / 1,052 m /. The facilities will be equipped with systems for fire alarm, ventilation, power supply, lighting, traffic management, etc. 10 viaducts with a total length of 3.5 km will be built, as well as 3 overpasses and subways. Access to the route will be ensured through 3 interchanges:

The Poleto road junction at 379 km, which will provide access from the Kulata direction to the villages of Brezhani and Poleto, as well as inclusion in the Sofia highway.

Road junction Mechkul at 384 km, which will provide access from the Kulata direction to the villages Mechkul and Brezhani, as well as inclusion in the motorway towards Sofia.

The Stara Kresna road junction at 387 km, which will provide access from the Kulata direction to the villages of Stara Kresna, Oshtava, as well as to the Sofia highway.

The deadline for the execution of the public procurement is 1556 days and includes the time for design and construction.

The project for the construction of the section of Struma Motorway through the Kresna Gorge is planned to be co-financed by the Cohesion Fund of the European Union and the national budget through the OP Transport and Transport Infrastructure.
__________________
nabludatel50 no está en línea   Reply With Quote
Old November 16th, 2019, 04:03 PM   #7783
sponge_bob
Registered User
 
Join Date: Aug 2013
Posts: 7,396
Likes (Received): 4653

Quote:
Originally Posted by nabludatel50 View Post
The contractor has been identified 13.2 km from Struma Motorway through the Kresna Gorge ~ 330 000 000 EuR
16.11.2019 09:00
A lot cheaper than the 15km tunnel originally planned (I know it is not full profile). That was costed at €1.5bn.
sponge_bob no está en línea   Reply With Quote
Old November 16th, 2019, 07:43 PM   #7784
nabludatel50
Registered User
 
Join Date: Nov 2015
Posts: 867
Likes (Received): 2952

Quote:
Originally Posted by sponge_bob View Post
A lot cheaper than the 15km tunnel originally planned (I know it is not full profile). That was costed at €1.5bn.
Mistake, the price is exactly 305,000,000 euro with VAT
Нowever, this is only half of the stretch over the Struma Gorge. There will also be a reconstruction of the old route in the gorge.
Тhe section is up from the yellow line :


Last edited by nabludatel50; November 16th, 2019 at 08:00 PM.
nabludatel50 no está en línea   Reply With Quote
Old November 17th, 2019, 03:54 PM   #7785
sponge_bob
Registered User
 
Join Date: Aug 2013
Posts: 7,396
Likes (Received): 4653

OK , so at that rate it will cost ~€600m to build the bypass road around the gorge and 'an amount' is to be spent on rebuilding the old road in the gorge itself as well. Looks like a €750m project when finished, perhaps €600m

Quote:
Originally Posted by nabludatel50 View Post
Mistake, the price is exactly 305,000,000 euro with VAT
Нowever, this is only half of the stretch over the Struma Gorge. There will also be a reconstruction of the old route in the gorge.
Тhe section is up from the yellow line :

__________________

nabludatel50 liked this post
sponge_bob no está en línea   Reply With Quote
Old November 17th, 2019, 06:28 PM   #7786
nabludatel50
Registered User
 
Join Date: Nov 2015
Posts: 867
Likes (Received): 2952

Yes, Sirs
For clarity, here is how the sections are divided.

- Yellow - Lot 3.2.1

- Purple - Lot 3.2.2 from km 389 + 100 to km 399 + 500 (10.4 km) and bypass of the town of Kresna (5.5 km)

Facilities:

Tisata tunnel (171 m)
Holy Week Tunnel (1.3 km)
Kresna 1 tunnel (358 m)
Kresna 2 tunnel (230 m)
11 pcs. viaduct, 9 pcs. overpasses and underpasses
Indicative value of the public contract for design and construction: EUR 220 000 000 excluding VAT.
- Green - Road E 79, which will be rebuilt and renovated after completion of 3.2.1 and 3.2.2 - ~ EUR 50 000 000 ?+ not to forget the new shiny srash barriers - 65 000 000?

Тechnical supervision amount ~ EUR 20-30 000 000

Тotal: ~ EUR 600 - 650 000 000

- Black - tunnels -



- A3 Stratumatic under the purple line - in operation
- The asphalt has reached the yellow line these days, thanks for the photos GBG_BG

__________________

MichiH liked this post
nabludatel50 no está en línea   Reply With Quote
Old November 17th, 2019, 06:36 PM   #7787
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 6,368
Likes (Received): 3297

Quote:
Originally Posted by nabludatel50 View Post
- Yellow - Lot 3.2.1

- Purple - Lot 3.2.2 from km 389 + 100 to km 399 + 500 (10.4 km) and bypass of the town of Kresna (5.5 km)
There is no exit at the end of lot 3.2.1. Is it planned to open lot 3.2.1 and lot 3.2.2 at once or should lot 3.2.1 be opened up to the last exit. If the latter, what's the distance of this section between the exits?
__________________

Which new motorways are currently under construction?
Which new motorways will be opened next?

See 'New motorway projects' thread

** Please help completing and updating of the list **


Been/driven: A, AL, AND, B, BG, BIH, CDN, CH, CZ, D, DK, E, EST, F, FIN, FL, GB, GR, H, HR, I, IRL, L, LV, LT, M, MC, MNE, N, NL, NMK, P, PL, RO, RSM, S, SK, SLO, SRB, USA, V (My cumulative travel mapping)

nabludatel50 liked this post
MichiH no está en línea   Reply With Quote
Old November 17th, 2019, 06:52 PM   #7788
nabludatel50
Registered User
 
Join Date: Nov 2015
Posts: 867
Likes (Received): 2952

It is too early to say. The information from the RIA is that 3.2.1 and 3.2.2 will be built simultaneously. The purpose of dividing the section into two sections is to make construction progress faster.
More urgent is the construction of the A3 section and the connection with the road junction to the II-19 Bansko - Razlog BG - Drama GR road, where major traffic jams are created over the weekend.
Getting started is most important. It is expected that pseudo - green organizations will try to prevent in any way.
__________________

MichiH, lampsakos21 liked this post

Last edited by nabludatel50; November 17th, 2019 at 07:07 PM.
nabludatel50 no está en línea   Reply With Quote
Old November 17th, 2019, 09:11 PM   #7789
sponge_bob
Registered User
 
Join Date: Aug 2013
Posts: 7,396
Likes (Received): 4653

Quote:
Originally Posted by nabludatel50 View Post
Getting started is most important. It is expected that pseudo - green organizations will try to prevent in any way.
What are those psychopaths planning on doing?
sponge_bob no está en línea   Reply With Quote
Old November 18th, 2019, 12:26 AM   #7790
nabludatel50
Registered User
 
Join Date: Nov 2015
Posts: 867
Likes (Received): 2952

Ugly manipulations are expected, from paid green Bolsheviks. It will be heard soon.
__________________

ВОДА liked this post
nabludatel50 no está en línea   Reply With Quote
Old November 19th, 2019, 07:20 AM   #7791
gogo3o
Bulgaria
 
gogo3o's Avatar
 
Join Date: Feb 2011
Posts: 7,648
Likes (Received): 16228

The proposed toll tariff by the gov


The first 3 rows are for trucks, the last 2 ones are for buses. The III-class roads are excluded from the range of the system.

Prices are in BGN.
__________________
SOFIA | Metro
gogo3o no está en línea   Reply With Quote
Old December 1st, 2019, 11:33 AM   #7792
nabludatel50
Registered User
 
Join Date: Nov 2015
Posts: 867
Likes (Received): 2952

There has long been no new map of motorways in Bulgaria.The thinner lines are speedways
- blue - in operation
- green - 80 % under construction, in operation by 2023 / realistically some sections by 2027 /
- red - Highways in operation by 2030 / realistically А5 2035 - 40 /
-orange high-speed roads and 3 bridges on the Danube River in the project, in operation by 2040. There are no realistic road plans for northern Macedonia, and there are no Turkey and Romania directions near the Black Sea.



Thanks, engineer Yashev. This map is from 2016, but quite realistic.Тhe change is that Ruse - Tarnovo is a highway, not a speedway
__________________

ВОДА, lampsakos21, Uppsala liked this post

Last edited by nabludatel50; December 1st, 2019 at 12:05 PM.
nabludatel50 no está en línea   Reply With Quote
Old December 1st, 2019, 12:10 PM   #7793
srpskizmaj
Registered User
 
srpskizmaj's Avatar
 
Join Date: May 2010
Location: Jagodina/Gibraltar
Posts: 175
Likes (Received): 22

Srbija - Bulgaria

Could you please advise is motorway getting built from Serbian broder to Sofia?
What is the length being constructed? When is the planned finish date?
Is that the last section being constructed? Is it called A6?
__________________

Uppsala liked this post
srpskizmaj no está en línea   Reply With Quote
Old December 1st, 2019, 12:51 PM   #7794
nabludatel50
Registered User
 
Join Date: Nov 2015
Posts: 867
Likes (Received): 2952

Српски Змей , there are more familiar with the A6 that will answer you. A small section will be opened these days, although construction began 6 months ago. The Kalotina / Gradina checkpoint will also be expanded
nabludatel50 no está en línea   Reply With Quote
Old December 1st, 2019, 02:08 PM   #7795
cymru1
Registered User
 
Join Date: Nov 2014
Posts: 597
Likes (Received): 1380

Quote:
Originally Posted by srpskizmaj View Post
Could you please advise is motorway getting built from Serbian broder to Sofia?
What is the length being constructed? When is the planned finish date?
Is that the last section being constructed? Is it called A6?
Follow this topic for the latest progress
cymru1 no está en línea   Reply With Quote
Old December 1st, 2019, 02:54 PM   #7796
roaddor
Registered User
 
roaddor's Avatar
 
Join Date: Oct 2015
Location: Sofia, München
Posts: 11,191
Likes (Received): 8973

The BG map above is terribly wrong with the schedules. Also we should make а clear difference between the terms motorway and highway, the latter being wrongfully used in Bulgaria for motorway. The thick line denotes a motorway, the thin line - an expressway. No chance an expressway Burgas-TR border to be finished until 2023 . This is nonsense, even before A2 and A5. Also the characteristics of some roads are wrong. For example, the part in blue Kardzhali-GR border is not an expressway but a simple two-lane road. There will be a motorway from Ruse southwards, not an exrpessway and nobody will wait until 2040 to reach A2 . The most interesting thing is that it could be built all the way till Makaza/Nimfea BCP on concession. It will be known in the following 3-4 months whether the country will go for such a solution. Hopefully it does.
As for the A6, the motorway from Serbia, the section from BCP Gradina/Kalotina to I/C Hrabursko (33km in total) will be completed in 2021. The last bit (15km) towards Sofia is not confirmed yet. Hopefully this time next year its construction also gets started. There is currently a 4-lane single carriageway as an alternative to Sofia. Constant pressure should be made on finishing the whole motorway as soon as possible.
__________________
Network

MichiH liked this post
roaddor no está en línea   Reply With Quote
Old December 1st, 2019, 03:14 PM   #7797
nabludatel50
Registered User
 
Join Date: Nov 2015
Posts: 867
Likes (Received): 2952

If you read the post, it says: : There are no realistic road plans for northern Macedonia, and there are no Turkey and Romania directions near the Black Sea.
nabludatel50 no está en línea   Reply With Quote
Old December 1st, 2019, 04:34 PM   #7798
ChrisZwolle
multi-modal traveler
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 48,917
Likes (Received): 28132

The map in post #7792 is not visible to me...

When I copy the photo link, it says Your client has issued a malformed or illegal request. That’s all we know.
__________________

travel mapping • highway photography @ Flickr and Youtube
ChrisZwolle está en línea ahora   Reply With Quote
Old December 1st, 2019, 05:06 PM   #7799
g.spinoza
Lord Kelvin
 
g.spinoza's Avatar
 
Join Date: Jul 2010
Location: Brescia
Posts: 12,099
Likes (Received): 3779

Quote:
Originally Posted by ChrisZwolle View Post
The map in post #7792 is not visible to me...

When I copy the photo link, it says Your client has issued a malformed or illegal request. That’s all we know.
I can see the map fine.
g.spinoza no está en línea   Reply With Quote
Old December 1st, 2019, 05:13 PM   #7800
ChrisZwolle
multi-modal traveler
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 48,917
Likes (Received): 28132

It appears that it works in Chrome but not in Firefox, likely due to tracking of personal data embedded in Google usercontent. I can see the map when I open it in Chrome.
__________________

travel mapping • highway photography @ Flickr and Youtube
ChrisZwolle está en línea ahora   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Tags
bulgaria, highways, struma, trakia

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
15: Grand Tower | 283,4 м 62 эт | строится coth ММДЦ Москва-Сити и Большой Сити 2254 Yesterday 10:56 PM
Автомагистраль вокруг Черного моря Fenol Инфраструктура 36 April 17th, 2015 06:14 PM
Надо ли строить Охта-центр | флуд здесь coth Архи посиделки 10351 January 24th, 2011 11:47 AM
Пара фоток Арбат-Смоленка-Новинский Konoval Города 3 November 23rd, 2006 06:09 PM


All times are GMT +2. The time now is 02:05 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2020, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us