Since we're fully committed to a MEL via Bayswater route now, if I were a public servant I'd be strongly advocating the Government quadruple as much of the Midland line to Bayswater as is practicable before the MEL opens. The city end may be complex but the East Perth - Bayswater section is relatively simple and wouldn't involve significant engineering works so it should be fairly cheap to implement. The longer the four track section is the more independent the lines are and thus the more robust the network is overall, slightly delayed MID/FAL trains are less likely to cause MEL trains to wait for the line to clear and slightly delayed MEL trains would have the opportunity to "catch-up" to the timetable before merging onto the two track section. Also having 18 tph serve the East Perth - Bayswater stations is excessive given current demand levels and not the most efficient use of resources. The PTA might also have to make drivers be more strict with departures in peak hour, or even employ dispatchers on the stations to Bayswater in order to maintain the timetable - i.e. no more scrambling to get on after the "doors closing" chime has sounded.
__________________
|
||
![]() |
![]() |
Sponsored Links | |||
Advertisement |
|
![]() |
#24682 | |
Clyde <> Carlingford
Join Date: Aug 2008
Location: Rosehill > Camellia
Posts: 7,757
Likes (Received): 1687
|
Quote:
Better off having that delay at Daglish (or Claremont!) than at Perth, when you've got another train right behind with a full load of people wanting to alight there ![]()
__________________
"L2 is possibly the best poster this site has. He or she is concise, to the point and cuts through the dribble to say what you were really thinking about transport, urban design and politics." |
|
![]() |
![]() |
![]() |
#24683 | ||
Doo-wee-ooo
Join Date: Oct 2018
Location: Perth
Posts: 140
Likes (Received): 110
|
Quote:
Somewhat solving the city end quadruplication problem, from East Perth there could be a new tunnel running under the existing tracks with underground platforms built at Claisebrook and McIver, as well as underground platforms at Perth roughly aligned with the lifts to/from the underpass up to/down from platform 5. The tunnel could then run down to Kings Park, QEII and Nedlands before resurfacing in the Fremantle Line near Claremont.
__________________
[Insert Signature]
|
||
![]() |
![]() |
![]() |
#24684 |
Registered User
Join Date: Dec 2017
Location: Perth
Posts: 748
Likes (Received): 3088
|
Newest had a meeting today and are finalizing their price. Has to be submitted by Christmas with the christmas shutdown will be finalized late jan/early feb
|
![]() |
![]() |
![]() |
#24685 | ||
A 'Refined Bogan'
Join Date: Apr 2006
Location: Kalamunda, Perth
Posts: 7,602
Likes (Received): 2696
|
Quote:
Allow there to be bad services, and put the infrastructure budget of duplication into the bank (probably about $1b, when you factor in the Perth to East Perth section). Then wait for the general public to demand a better service. At this time direct the infrastructure budget that was saved from not doing the track duplication into a brand new corridor being a Morley tunnel (probably total cost around $4b). If you sink $1b of infrastructure into a track duplication program, no one will ever decide to build a tunnel.
__________________
I AM ME!
|
||
![]() |
![]() |
![]() |
#24686 |
A 'Refined Bogan'
Join Date: Apr 2006
Location: Kalamunda, Perth
Posts: 7,602
Likes (Received): 2696
|
Not doing track duplication would also force a Morley Tunnel to be built when the line demand grows from 3 to 4 or 5 with a northern loop along Reid Hey and also with East Wanneroo.
|
![]() |
![]() |
![]() |
#24687 | |
Doo-wee-ooo
Join Date: Oct 2018
Location: Perth
Posts: 140
Likes (Received): 110
|
And it's the same with freeway widening and upgrades. I've said it on the ATDB and I'll quote it in here:
Quote:
|
|
![]() |
![]() |
![]() |
#24688 | |
Registered User
Join Date: Jan 2012
Location: Highgate 6003
Posts: 2,885
Likes (Received): 3036
|
Is there any update on this proposal?
Quote:
|
|
![]() |
![]() |
![]() |
#24689 |
Registered User
Join Date: Aug 2018
Location: Best Coast
Posts: 100
Likes (Received): 165
|
Lately I've been noticing a lot more B Series trains on the Armadale and Thornlie Lines while I haven't seen any on the Midland or Fremantle lines recently. I was going to ask if anyone could confirm that but then I remembered the incredibly clunky Railcar Allocation tool still exists. And cccording to the allocation tool it seems that now roughly every second train on the Armadale and Thornlie lines are B Series sets, while the Freo and Midland lines have reverted back to mostly 4-car trains throughout the day after having regular 3-car trains for a while to enable the removal of the skip stop patterns.
Having B series operate on the Armadale/Thornlie lines instead of the Freo/Midland lines is more intuitive as there used to be lots of 2-car services on those lines. But I can't seem to find any information as to why there's been a massive increase in B series sets operating from Claisebrook though, the announcement for the July timetable changes made it seem like only a couple were needed for the new services. Maybe the PTA are putting the A series into a more intensive maintenance schedules or something similar, there does seem to be more A series than usual left at Claisebrook in peak hour. |
![]() |
![]() |
![]() |
#24690 | |
Registered User
Join Date: May 2013
Posts: 153
Likes (Received): 219
|
Quote:
2 3car sets are allocated to Fremantle Midland currently but are currently not in use 3 3cars are allocated Armadale on weekdays and 6 are allocated on weekends mainly Saturdays 5 3car are allocated to Thornlie on weekdays and 6 are allocated on weekends mainly Saturday A number of A series cars are off traffic due to a defective bonding adhesive used to bond the windows to the bulkhead it’ll take months to fix the defects they have to go through all 96 of them this is on top of A series cars that are off traffic for scheduled maintenance, bogie swaps, wheel lathes and refurbishments hopefully the defects and problems are fixed before the commencement of the 2020 AFL season B series cars are filling in service gaps on Armadale & Thornlie with 2 extra 4cars on Freo-Midland when available. The A series cars require extra maintenance now as the number of defects increases affecting railcar availability particularly as they begin to age past 30. Another order of B series cars would cover for the shortfall of A series cars until the C series cars arrive in mid to late 2022 |
|
![]() |
![]() |
![]() |
#24691 |
Registered User
Join Date: Nov 2007
Location: Perth
Posts: 6,232
Likes (Received): 1416
|
Are there any additional B series consists beyond what's been delivered?
__________________
Signature deliberately left blank |
![]() |
![]() |
![]() |
#24692 |
Doo-wee-ooo
Join Date: Oct 2018
Location: Perth
Posts: 140
Likes (Received): 110
|
![]()
__________________
[Insert Signature] |
![]() |
![]() |
![]() |
#24693 |
Registered User
Join Date: Sep 2006
Posts: 796
Likes (Received): 84
|
Is a “short term” B Series set even feasible at a reasonable price?
I would have thought not. |
![]() |
![]() |
![]() |
#24694 |
Registered User
Join Date: Nov 2007
Location: Perth
Posts: 6,232
Likes (Received): 1416
|
I doubt the demand is worth the price.
__________________
Signature deliberately left blank |
![]() |
![]() |
![]() |
#24695 | |
East Perth Cat
Join Date: Apr 2012
Location: Perth
Posts: 654
Likes (Received): 645
|
Northlink Dec Update:
Looks like the Northlink to Muchea will NOT open on time at the end of the year as they had hoped.Took a drive up there this morning and An awful lot of asphalting still remains to be done especially at the northern end with the linkage to Great Northern Highway and the Brand Highway. Bridges look mostly complete. Certainly the entrance to the Muchea Industrial Park opposite the new road train assembly area is almost finished in stark contrast to the Northlink itself..Maybe theres a shortage of asphalt at the moment. This will slip into next year till end of Jan imo at this rate..
__________________
|
|
![]() |
![]() |
![]() |
#24696 | |
A 'Refined Bogan'
Join Date: Apr 2006
Location: Kalamunda, Perth
Posts: 7,602
Likes (Received): 2696
|
With the route for the Ellenbrook line clearly selected by the State Government and there is no taste for a Morley Train Tunnel any time soon, it seems the facebook page has run its course for now. It'll be going quiet for a while, but I'll leave you all with this vision of an expanded rail network as a last hurray for now.
https://www.facebook.com/30140059401...nFZ4&__tn__=-R
__________________
I AM ME!
|
|
![]() |
![]() |
![]() |
#24697 |
Registered User
Join Date: Feb 2013
Posts: 627
Likes (Received): 1998
|
![]() |
![]() |
![]() |
![]() |
#24698 | |
A 'Refined Bogan'
Join Date: Apr 2006
Location: Kalamunda, Perth
Posts: 7,602
Likes (Received): 2696
|
![]() Anyway, here is the vision in a static presentation. Solid lines are existing railway tracks. Numbers are new tracks as part of that stage. Though I realise I missed new tracks between Stirling and Warwick Stations (for duplication) for the green loop when the section to Hilarys is built in stage 7. I also mis-labelled Forrestdale as Lansdale in the south. ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() I think even if Stage 5 was to be the last stage and 6 and 7 don't happen, that would still be a fantastic result.
__________________
I AM ME! |
|
![]() |
![]() |
![]() |
#24699 |
Registered User
Join Date: Oct 2013
Location: Perth
Posts: 240
Likes (Received): 147
|
![]() 1. Light rail from Hillarys or Trigg along the coast down to Freo - good for tourists. 2. SOR gap filler - a spoke in the vicinity of Stock Rd (for evenly spread coverage) down to Henderson (big employment centre) or even Rockingham. 3. NOR gap filler - a spoke in the vicinity of Wanneroo Rd/Princess Rd (for evenly spread coverage). You could join the 2 spokes together in the city centre but not at central (spread the stations around the city centre). 4. Make sure that every sports/tourist hub is connected. The less tourists on the road the better for us locals. 5. Read up on the problems with the circle line in London.....try to avoid those. |
![]() |
![]() |
![]() |
#24700 |
Opportunist Onlooker
Join Date: Jan 2013
Location: Birs
Posts: 770
Likes (Received): 404
|
nice proposal docker
think a lot of the inner suburb lines though would be better served as light rail. heavy rail would be too invasive and costly. also i reckon the extension of the freo line would follow the freight route and connect to the kwinana line to cockburn if only the government had your foresight |
![]() |
![]() |