Old January 5th, 2017, 10:35 AM   #1
CULWULLA
Registered User
 
CULWULLA's Avatar
 
Join Date: Sep 2002
Posts: 68,816
Likes (Received): 17383

Discussion | 2017 Projects

this is from this time last year

i created this thread annually to post what is "scheduled" to start or planned to be lodged and what we can look forward to this year.

2016
1. Greenland tower will start to happen sloooowly. with removal of existing cladding and gutting of tower.atleast its progressing
2. design comp winner for 505George will be announced this quarter and DA lodged and maybe even start late 2016.
3.182George st will become a planning application and hoping once endorsed by council the design comp will happen and DA lodged.
4.One Sydney harbour towers will be lodged soon made public and constructon should start this year
5. Crowns approval should be this year along with constructon of carpark.
6.233 castlereagh st should be lodged as a stage1 DA and maybe even design comp later on. this will be a big one. 235m+
7. 33 Bligh st is being demolished as we speak and construction to start on the tower.
8. old wales bank on top of 60 Martin place is set to be demolsihed this year
9. city tats design comp soon
10.York and George should start to rise
11.sydney by Crown should start to rise
12.Goldfields should start demolition to make way for 1 Alfred
13.1 Wynyard st tower demoltion?
14.9-25 commonwealth st starts?
15.130 Elizabeth st starts demoliton of existing?
16.Aspire parramatta new design unveiled and lodged?
17-ICC hotel top out mid 2016?
18,new DA lodged for Star city tower?
19. barangaroo tower 3 opens first quarter and tower 1 completed mid year
20-GREEN SQUARE- construction of 90m OVO & 60m CROWN! plus many others.
21-IMAx blob may start?
--------------------------------------


2017

1. yep, slowly progressing
2. design comp happening. hopefully soon winner announced
3.will be lodged any week now
4.approvals soon, mayb start late 2017
5. crown is uc and carpark will start soon
6.stage1 approval soon, design comp and da lodged this year
7. nothing happening for 5 years
8. demolition well underway. should start construction mid 2017
9. in court
10.core should be rising this half
11.will rise up this year
12.Goldfields should start demolition soon
13. demoltion to start
14.?
15.construction underway
16.may start late2017
17-ICC hotel near completed
18,stage1 soon, da mid year
19. barangaroo towers done,now smaller bldgs to be completed
20-GREEN SQUARE- construction of 90m OVO & 60m CROWN! well underway
21-IMAx demoltion.
__________________
Macquarie Tower-1818, St James Church -1822, Garden Palace- 1879, Sydney Harbour Bridge -1932, Sydney Opera House- 1973, Sydney Tower- 1981, Crown Sydney- 2020, 505George-2023 , 338 Pitt- 2024 https://www.buildsydney.com/forum

Last edited by CULWULLA; April 22nd, 2017 at 08:17 AM.
CULWULLA no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old January 5th, 2017, 11:13 AM   #2
upwards
Registered User
 
upwards's Avatar
 
Join Date: Feb 2011
Posts: 6,246
Likes (Received): 8249

2. 505 george st

Nothing happened in 2016 on this project - very slow process

2017 must be a big year with DA and likely start in 2018
upwards no está en línea   Reply With Quote
Old January 5th, 2017, 11:49 AM   #3
Beep1Beep2
Registered User
 
Beep1Beep2's Avatar
 
Join Date: May 2013
Posts: 1,204
Likes (Received): 1298

I'll just quote myself from last year. Replace "2016" with "2017":

Quote:
Originally Posted by Beep1Beep2 View Post
What will 2016 bring? Delays and more delays.
Beep1Beep2 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old January 6th, 2017, 02:13 AM   #4
CULWULLA
Registered User
 
CULWULLA's Avatar
 
Join Date: Sep 2002
Posts: 68,816
Likes (Received): 17383

yes 505G is taking waaaaay to long.
Hoping Mirvac announce something soon.
__________________
Macquarie Tower-1818, St James Church -1822, Garden Palace- 1879, Sydney Harbour Bridge -1932, Sydney Opera House- 1973, Sydney Tower- 1981, Crown Sydney- 2020, 505George-2023 , 338 Pitt- 2024 https://www.buildsydney.com/forum
CULWULLA no está en línea   Reply With Quote
Old January 6th, 2017, 04:31 AM   #5
lordpine
Registered User
 
lordpine's Avatar
 
Join Date: Aug 2013
Location: Sydney
Posts: 586
Likes (Received): 354

funny/sad to see how many things are taking way longer than even an expert such as yourself predicted.
lordpine no está en línea   Reply With Quote
Old January 6th, 2017, 07:48 AM   #6
michael_n_
Registered User
 
Join Date: Apr 2014
Location: Brisbane
Posts: 4,007
Likes (Received): 1009

Isn't there going to be a small refurb of Sydney Tower's levels? Not sure only rumour from someone I know who lives down there but they may do some bits and pieces to modernise the four floors.

I can't believe sometimes I am old enough to have watched it go up. It was pretty amazing to watch. But last time I was up there in 1986 the inside look dated anyway.
michael_n_ no está en línea   Reply With Quote
Old January 6th, 2017, 08:37 AM   #7
Harry Andrews
Registered User
 
Join Date: Sep 2013
Posts: 4,859
Likes (Received): 1375

Quote:
Originally Posted by CULWULLA View Post
yes 505G is taking waaaaay to long.
Hoping Mirvac announce something soon.
Personally I think 505 George is dying in the arse. The developers are probably keeping a close eye on things abroad. In the meantime, they miss the current development cycle altogether, aided and abetted by Sydney City's labyrinthine approvals process.

A bit like the original early 1970s plan for the Hoyt's development, which was going to be just five cinemas, not the seven they eventually opened, topped by a Sheraton hotel. Similar in general terms to Civic Tower above the Masonic Centre - tapering in (from memory) then cantilevering out from the podium.

That one hit a brick wall because the expected 1970s inbound tourism boom didn't eventuate.

Maybe this proposal is going the same way, for now at least.
Harry Andrews no está en línea   Reply With Quote
Old January 8th, 2017, 10:20 AM   #8
michael_n_
Registered User
 
Join Date: Apr 2014
Location: Brisbane
Posts: 4,007
Likes (Received): 1009

Can't they build on top of Event? Why the total demolition? I know things move on, I used to hang around those cinemas between 1979 and 1985, and in later years when it converted from 7 up on and off. Sure it's sleazy in bits and the 505 looks like an ok tower, but still, sad to see if it goes.
michael_n_ no está en línea   Reply With Quote
Old April 22nd, 2017, 08:25 AM   #9
CULWULLA
Registered User
 
CULWULLA's Avatar
 
Join Date: Sep 2002
Posts: 68,816
Likes (Received): 17383

Quote:
Originally Posted by CULWULLA View Post
this is from this time last year

i created this thread annually to post what is "scheduled" to start or planned to be lodged and what we can look forward to this year.

2016
1. Greenland tower will start to happen sloooowly. with removal of existing cladding and gutting of tower.atleast its progressing
2. design comp winner for 505George will be announced this quarter and DA lodged and maybe even start late 2016.
3.182George st will become a planning application and hoping once endorsed by council the design comp will happen and DA lodged.
4.One Sydney harbour towers will be lodged soon made public and constructon should start this year
5. Crowns approval should be this year along with constructon of carpark.
6.233 castlereagh st should be lodged as a stage1 DA and maybe even design comp later on. this will be a big one. 235m+
7. 33 Bligh st is being demolished as we speak and construction to start on the tower.
8. old wales bank on top of 60 Martin place is set to be demolsihed this year
9. city tats design comp soon
10.York and George should start to rise
11.sydney by Crown should start to rise
12.Goldfields should start demolition to make way for 1 Alfred
13.1 Wynyard st tower demoltion?
14.9-25 commonwealth st starts?
15.130 Elizabeth st starts demoliton of existing?
16.Aspire parramatta new design unveiled and lodged?
17-ICC hotel top out mid 2016?
18,new DA lodged for Star city tower?
19. barangaroo tower 3 opens first quarter and tower 1 completed mid year
20-GREEN SQUARE- construction of 90m OVO & 60m CROWN! plus many others.
21-IMAx blob may start?
--------------------------------------


2017

1. yep, slowly progressing
2. design comp happening. hopefully soon winner announced
3.will be lodged any week now
4.approvals soon, mayb start late 2017
5. crown is uc and carpark will start soon
6.stage1 approval soon, design comp and da lodged this year
7. nothing happening for 5 years
8. demolition well underway. should start construction mid 2017
9. in court
10.core should be rising this half
11.will rise up this year
12.Goldfields should start demolition soon
13. demoltion to start
14.?
15.construction underway
16.may start late2017
17-ICC hotel near completed
18,stage1 soon, da mid year
19. barangaroo towers done,now smaller bldgs to be completed
20-GREEN SQUARE- construction of 90m OVO & 60m CROWN! well underway
21-IMAx demoltion.
approaching mid 2017

1. painful
2. design comp happening.
3.DA will be lodged soon
4.site works
5. crown well underway
6.stage1 da soon to be approved
7. nothing happening for 5 years
8. demolition well underway. should start construction mid 2017
9. in court
10.core should be rising this half
11.will rise up this year
12.Goldfields under demo
13. under demoltion
14.? still no activity
15.construction underway
16.still no DA
17-ICC hotel done
18,stage1 soon, da mid year
19. barangaroo towers done,smaller bldgs soon to be completed
20-GREEN SQUARE- construction of 90m OVO & 60m CROWN! well underway
21-IMAx demod. ribbon has started
__________________
Macquarie Tower-1818, St James Church -1822, Garden Palace- 1879, Sydney Harbour Bridge -1932, Sydney Opera House- 1973, Sydney Tower- 1981, Crown Sydney- 2020, 505George-2023 , 338 Pitt- 2024 https://www.buildsydney.com/forum
CULWULLA no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 02:24 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us