Jaipur Projects Thread - Page 32 - SkyscraperCity
 

forums map | news magazine | posting guidelines

Go Back   SkyscraperCity > Asian Forums > India > North > North India projects > Rajasthan


Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old December 2nd, 2012, 09:02 AM   #621
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

SKY TERRACES BY ABL @ SHIPRA PATH
24 STOREYS...SECOND TALLEST BUILDING IN JAIPUR
[IMG]http://i50.************/23msk8w.jpg[/IMG]

Last edited by JAYESH99; December 2nd, 2012 at 09:32 AM.
JAYESH99 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old December 2nd, 2012, 09:05 AM   #622
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

Adarsh Build Estate’s" Mega Residential project PARK REGENCY (1st Sports City of Rajasthan )
[IMG]http://i49.************/16m6fet.jpg[/IMG]

Last edited by JAYESH99; December 2nd, 2012 at 09:35 AM.
JAYESH99 no está en línea   Reply With Quote
Old December 2nd, 2012, 05:58 PM   #623
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

लग्जरी आवासों ने बढ़ाया क्रेज

जयपुर में शीघ्र होगी 2 हजार फ्लैटों की लाचिंग, लाइफ स्टाइल में बदलाव से हुआ इजाफा वाणिज्य संवाददाता जयपुर, 1 दिसम्बर। लोगों की लाइफ स्टाइल में तेजी से आ रहे बदलाव के चलते तथा धनी लोगों की संख्या में तेजी से वृद्धि होने से जयपुर शहर में लग्जरी आवासीय रियल सेगमेंट में मांग तेजी से बढऩे लगी है। अगर अपवाद को छोड़ दिया जाए तो अब तक जयपुर मध्यम वर्ग प्रोजेक्ट्स के लिए ही प्राथमिकता रहा है। लेकिन अब लग्जरी सेगमेंट में गति देखने को मिल रही है। आवासीय प्रोपर्टी के जानकार सूत्रों के मुताबिक 2013 में तीन-चार माह बाद ही शहर में 2000 फ्लेटों की लांचिंग होने की संभावना है। बिल्डरों का कहना है कि शहर की सम्पन्नता में लग्जरी आवासीय सेगमेंट का प्रचलन तेजी से बढऩे लगा है। जिसके चलते आगामी छह माह में ही इस सेगमेंट में विभिन्न परियोजनाओं की लांचिंग देखी जाएगी। जिनमें गौरव टॉवर के पास ज्वैल्स ऑफ इंडिया, कोठारी समूह पृथ्वीराज नगर में लग्जरी प्रोजेक्ट तथ एनप्लेस का मास्टर प्रोजेक्ट शीघ्र ही लांच किया जा रहा है। इसके अलावा अन्य परियोजनाएं लांचिंग प्रक्रिया से गुजर रही है और शीघ्र ही अस्तित्व में आने की इनकी संभावनाएं है। इन सभी परियोजनाओं में अन्तरराष्ट्रीय स्तर की सुविधाएं उपलब्ध कराई जाएंगी। निर्माताओं ने इन प्रोजेक्टों में फ्लैट्स की कीमातें का खुलासा नही किया है। दूसरी ओर एनआरआई के आकर्षण के कारण मेट्रो शहरों मेेें 1 करोड़ से 15 करोड़ के रुपए के लग्जरी और अल्ट्रा लग्जरी फ्लैटों की मांग को प्रोत्साहन मिल रहा है। अनेक प्रोजेक्ट्स में फ्लेट की कीमतें इससे भी ज्यादा होने की संभावनाएं बनने लगी है।

SEEMS LIKE JEWEL OF INDIA IS REVIVING ........
SOURCE-MAHANAGAR TIMES

Last edited by JAYESH99; December 2nd, 2012 at 06:04 PM.
JAYESH99 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old December 5th, 2012, 03:03 PM   #624
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

NEW DELHI: US-based iconic cult bike maker Harley Davidson is targeting smaller towns in India as it looks to enhance presence in the country.
The company, which launched its 'Fat Bob' model in India priced at Rs 12.8 lakh, also said it will consider increasing the number of models assembled in India to offer its products at "affordable rate" for the customers here.

"We are looking to expand our dealer network. Currently, we have nine showrooms and by the end of the year we will have our tenth and next year we will add three more in Jaipur, Indore and Pune," Harley Davidson India Managing Director Anoop Prakash told reporters here.

He said the company has taken a conscious decision to spread presence in the tier II towns as there is a latent demand for Harley Davidson bikes.

"We are getting a good pull in smaller towns. There are a lot of people who have the same key attributes as we have, in wanting personal freedom. The kind of enthusiasm we had received in a place like Kochi was the same as in any metro," Prakash said.

There was a tremendous response when the company held the Harley Rock Riders concert in places like Shillong and Guwahati, he added.

Sounding bullish on the Indian market, he said the company will clock over 2,000 units by the end of 2012 as cumulative sales since it started selling its bikes in India in July 2010.

When asked if Harley Davidson will assemble more models in India to bring down the price, he said: "Although there is no immediate plan for adding to our CKD line up, we will keep the option open for future in order to make our products affordable to customers."

The company will continue to adopt and invest in strategies that make its "products and ownership experience accessible to more enthusiasts and customers in India," Prakash said.

The latest model Fat Bob, which is powered by a 1,600 cc engine, is the sixth model assembled in the company's plant at Bawal in Haryana. It presently sells 13 models from its 2013 line up in India.
source
JAYESH99 no está en línea   Reply With Quote
Old December 5th, 2012, 03:21 PM   #625
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

Honda's exclusive diesel engine plant to be set up in Rajasthan

Dailybhaskar.com | Nov 30, 2012, 14:06PM IST

Jaipur: Japanese car giant, Honda is finally going to come up with a diesel engine. The company has announced that it would be setting up a new diesel engine plant in Rajasthan.

The new factory would be set up at their site Tapukara, Rajasthan. This site has been unutilized for the past five years and hence the company has narrowed down to this site where from they will be producing Honda's first global compact car which will make its appearance by early 2013 and will have diesel engines manufactured at the Rajasthan plant.

Honda has confirmed that the new diesel engine plant will be set for production by next year while details of investment and capacities have yet to be finalized. Initially commencing production with a 1.5 liter diesel engine which will be seen in the Honda Amaze, the same engine will also follow in models such as Jazz and City, which are scheduled for 2014.
JAYESH99 no está en línea   Reply With Quote
Old December 5th, 2012, 03:31 PM   #626
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

KEC International to set up Fabricated Structural unit in Jaipur
Tuesday, 27 Nov 2012

Project Basic Details
Promoter KEC International
Industry Manufacturing > Metal > Iron & Steel
Status Planning
Product Transmission Tower Parts
Capacity 6000 MT

Location of Project

Zone South Asia
Country India
Region North
State Rajasthan
SOURCE
JAYESH99 no está en línea   Reply With Quote
Old December 5th, 2012, 03:43 PM   #627
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

Paving the way

On Tuesday, the engineers of the corporation initiated welding works on the elevated concrete tracks
A flash butt welding machine is being used for this work on the track near Mansarovar station
In next couple of days, the tracks will be laid and welded by the machine
The entire work of laying tracks would take at-least two to three months time. The work would be finished by February end

[IMG]http://i47.************/71qjc4.jpg[/IMG]

DMRC initiates groundwork to lay Metro tracks
The work to fix rails on the Metro route on Mansarovar-Chandpole stretch will begin in a couple of days. Santosh Sharma.DNA
DNA Correspondent

The Delhi Metro Rail Corporation (DMRC) has started technical works to lay the tracks to run the metro.

On Tuesday, the engineers of the corporation initiated welding works on the elevated concrete tracks. A flash butt welding machine is being used for this work on the track near Mansarovar station.

In next couple of days, the tracks will be laid and welded by the machine.

Doubts are being raised over timely completion of works on Mansarovar-Chandpole stretch of the Metro route.

Sources said that the entire work of laying tracks would take at-least two to three months time. The work would be finished by February end. Anil Singhal, deputy chief engineer with DMRC, said, “With the flash butt welding machine, the rails will be welded on the elevated route. The process will take at least two to three months.”

Sources also added that the tracks would be laid on the spots where the viaduct construction work has been completed.

Notably, the corporation has delayed the construction works at Railway Station-Sindhi Camp Bus Stand site. Civil works on the elevated route are pending at this site. Due to this delay, the project is unlikely to get complete by June 2013, the deadline for the task. However, the DMRC has changed the contractor of this site and handed over the civil works to another contractor on December 1.

Published Date: Dec 05, 2012 in DNA
JAYESH99 no está en línea   Reply With Quote
Old December 7th, 2012, 08:59 AM   #628
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

[IMG]http://i45.************/70gz68.png[/IMG]
JAYESH99 no está en línea   Reply With Quote
Old December 7th, 2012, 09:03 AM   #629
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

[IMG]http://i49.************/2a5dwuc.png[/IMG]

[IMG]http://i48.************/21nnu3p.png[/IMG][IMG]http://i48.************/346uh3k.jpg[/IMG]

[IMG]http://i47.************/2eeyan7.png[/IMG][IMG]http://i47.************/sl38uq.jpg[/IMG]
JAYESH99 no está en línea   Reply With Quote
Old December 22nd, 2012, 09:56 AM   #630
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

Jaipur to develop Appu Ghar soon

Wednesday, October 10, 2012, 10:00 Hrs [IST]
By HBI Staff | Mumbai

Adding yet another attraction to its enviable list of must-visit places, Jaipur is soon going to have its own Appu Ghar. This Appu Ghar is being developed as 'Jaipur Mega Tourism City' by a private firm nearly eight kilometre off the Vishwakarma area.

With over 18 million tourists
visiting the state every year, the mega city will be designed as a weekend destination offering people ways to unwind by enjoying a dip in the water park, teeing off at a golf course or trying out cuisines at a restaurant. The park will have retail, hospitality and entertainment options for the visitors. Themed retail spread over 20 acres offer dining and entertainment options in the form of bowling alleys, club, pubs, health club, and multiplex, according to The Times of India report.

Spread over 300 acres, 'Jaipur Mega Tourism City' would be the fifth Appu Ghar in India but the largest among all. "After being allotted the land in 2006 by the Jaipur Development Authority for a lease period of 99 years, the project got embroiled in litigation. Now, all the legal hurdles have been cleared and the ground work has already begun. We would be able to launch the first phase within six months," said Abhinav Chandla, Vice-President, International Amusement Limited (IAL).

"The project also proposes to build a golf course to offer a premium leisure holiday destination to tourists. The 18-hole golf course is expected to be ready in a year-and-a-half. The amusement and adventure part of the project would be launched within six months. We are also in talks with some four and five star hotels," said Chandla.

IAL plans to develop 773 residential villas spread over 40 acres. About 70 per cent of these would be overlooking the golf course. The sample villa is already under construction and would be available at a base price of Rs 1.25 crore.

As per the report, the company is investing nearly Rs 2500 crore over a period of six-seven years. "The project is proposed to be financed by way of equity, debt and partly through sale of resorts and villas. Integrated development of the project makes it financially lucrative and also front-ends the cash flow, allowing substantial self-funding of the project," Chandla added.
JAYESH99 no está en línea   Reply With Quote
Old December 22nd, 2012, 10:05 AM   #631
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

रेलवे स्टेशन पर एग्जीक्यूटिव लॉन्ज के लिए जगह तय
जयपुर त्न जयपुर रेलवे स्टेशन पर नए साल में एग्जीक्यूटिव लॉन्ज (विशेष विश्राम स्थल) का काम प्रारंभ हो जाएगा। स्टेशनों पर इन्हें बनाने की रेलवे बोर्ड की योजना के तहत इंडियन रेलवे कैटरिंग एंड टूरिज्म कॉरपोरेशन (आईआरसीटीसी) को रेलवे प्रशासन से जगह मिल चुकी है। यह जगह रेलवे स्टेशन पर जन आहार केंद्र और स्टेशन प्रबंधक के ऑफिस के बीच है। यहां आईआरसीटीसी को 2 हजार वर्ग फीट जगह दी गई है। अब जल्दी ही आईआरसीटीसी इस जगह के हिसाब से सुविधाएं विकसित करने के लिए कंसलटेंट की नियुक्ति करेगा। यह काम जनवरी में प्रारंभ हो सकता है। देश का पहला लॉन्ज दिल्ली में बनकर तैयार है। जनवरी में इसके उद्घाटन के बाद जयपुर में भी इसके बनाने का काम प्रारंभ कर दिया जाएगा। लॉन्ज पूरी तरह से वातानुकूलित होगा। यहां यात्रियों के लिए टीवी, इंटरनेट, वाईफाई, मोबाइल व लैपटॉप चार्जर की सुविधा होगी। कंप्यूटर और प्रिंटर होंगे। जहां यात्री ट्रेन आने तक अपना इंटरनेट से संबंधित काम कर सकते हैं व अपना प्रिंट ले सकते हैं। क्लॉक रूम में सुविधा भी होगी, जहां यात्री अपना लगेज रख सकेंगे।
JAYESH99 no está en línea   Reply With Quote
Old December 26th, 2012, 11:44 AM   #632
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

KGK Commercial Project, Jaipur

Work can be fun if your workspace is located amidst the most premium and sought after destination in the city. Imagine your office work starting over a cup of coffee at an opulent restaurant of international repute. And every space and corner of the world class efficient workspace offering you the same comfort as your own home. First time in the history of the city, corporates and professionals have an opportunity to enjoy being in luxurious office space that truly resemble one of the finest addresses across the globe.

Weaved around the unique concept of work and play, situated in the CBD of Jaipur, city-based KGK Infrastructure, a wholly owned subsidiary of KGK Group brings 5,50,000 sqft (approx.) of office space as part of a mixed land use development that includes hotel, offices, retail and club which spreads across 15 acres. Apart from the office space, the project will house outlets of some of the most popular and trusted international brands and retail giants. On the occasion of the announcement, KGK Infra’s promoter Shri Sanjay Kothari said, “Our vision is to give to the city of Jaipur a unique workplace that becomes a mark of craftsmanship, superb architecture and opulence. Occupier’s satisfaction and comfort is our goal and KGK Group is known for its core aptitude i.e. design and creativity and KGK Infrastructure accede to the same. This project will be a key to success by offering plug and play facility to those who want ready-to-use space for their businesses.” p>

Why pick Jaipur?

It is predicted that tier II and III cities are the next centre of economic growth. Jaipur has emerged as one of the most developed city in the tier II segment. Being on the international tourist circuit, city’s fast growing infrastructural facelift will give visitors the experience of a truly international city. The city’s landscape offers a fine mix of culture, royalty and the richness of modern era. Widely acclaimed as the Pink City of India, Jaipur proliferates in its magnificent past, rich history, renowned tradition, architectural elegance and natural ambience. The city is famous for its captivating forts and palaces, serene temples and havellis. Apart from the fascinating monuments, the city offers exquisite handicrafts and jewellery.

The pre-modern city of Jaipur is witnessing tremendous growth and expansion across areas and sectors, respectively. Most importantly the growth can be seen around the road and transport, real estate and retail. Located on the upcoming Delhi-Mumbai corridor, Jaipur, the capital city of the princely state of Rajasthan is among the well-planned cities in the country.

The city which already has an airport, is witnessing construction of a rapid metro transport system under the Jaipur Metro Rail. The first phase of the metro comprises of a stretch of 9.2 kilometres from Mansarovar to Chandpole Bazaar. The work on the metro line has already begun in November 2010.

In coming 2-3 years, Jaipur’s strategic location, proximity to the national capital Delhi, its fast transport system, superb connectivity and a world class infrastructure will offer immense potential to multinational firms and corporates to set their front-end, back-end offices and manufacturing units in the city.

To tap the expansion and growth potential of the city and offer a window of opportunity to companies opening their offices in the city, KGK Infrastructure brings a commercial office project for those who would want comfort, style and compliments the lifestyle of ultra-rich.

Situated in the CBD (central business district) of Jaipur, right on the edge of the airport, the spectacular project will be a perfect mix of upmarket sophistication, magnificent work space, world class amenities, entertainment and quality execution. The total development will have 5.5 lakh sqft of built up space under the phase I. This will be a part of a promising landmark development to be completed in three phases.

Located at the intersection of Jawahar Circle and Tonk Road, the project has been designed by the renowned Italian architecture firm. International consultants further reassure world class development.
Project Features:

KGK Infrastructure is committed towards green sustainability. The project strikes a perfect balance between nature and work. The project’s outlay sets high standards in terms of energy efficiency by harnessing renewable resources and reducing rainwater run-off, using materials from local sources reducing energy consumption and optimizing operational systems within the premise.

Connectivity:

The project tops on the accessibility and connectivity with other key areas of the city. The biggest unique selling point (USP) of the project is its connectivity. Being located at a stone-throw distance from the Jaipur Airport and a kilometre from Jawahar Circle, the project offers proximity to business travellers coming to Jaipur for meetings and conferences. The project also offers fast connectivity to other parts of the region. It is just 10km away from the main Jaipur Railway station. The planned development close to the airport will be a catalyst for an emerging city of Jaipur which is now a global hub for many industries and multi-national companies.

Phase 1:

The phase I of the project involves four parallel commercial towers that will offer new age workspace to corporates, software majors and IT-enabled services firms, who are used to working in global lifestyle. The design incorporates large, efficient floor plates and high floor-to-floor clearance allowing the occupiers for optimal space utilization. The entire building will be earthquake resistant and will have all disaster management safety measures. Mirrored with each other, the four towers will have independent lobbies and separate service and passenger elevators.

The entire phase I of the project will have four towers in a G+7 structure, with three-entrances and ample surrounding parking space in the basement and around the building. All four towers will have modern fire extinguishers, suppression systems with sprinklers, fire and smoke detectors.

Backed by strong facilities management team of the KGK Group, the towers will have round the clock, all day security for occupants along with 24-hour CCTV security system. With its air-conditioning for each floor the corporate tower will provide a perfect environment for corporates. All floors in each of the four towers will have provisions for Wi-Fi and plug and operate facility. For a round the clock work environment, the tower will have 100% power back up facility for each floor.

Work While you dine:

The tower will be combination of opulence, international office ambience with additional benefit of retail, and food and beverages. While the project will provide world class workplace occupiers of the office space would have enough options to lunch and dine in some of the finest restaurants and eateries planned on ground level and terrace. For office occupiers it would even be possible to have corporate meetings at lunch or dinner or an evening snack.

Business Centre:

In addition, a business centre is planned on the 7th floor. There will also be an art and exhibition centre on the ground floor. This can also be utilised for holding large corporate meetings, seminars and events.

Value Added Services:

A lounge is synonymous with the hotel industry. However, the project too will have a mega lounge for giving it a flavour of a five star property. Reflecting the casual character of the evening, the lounge will be the key differentiator within the premise. The entire social milieu within the project would gradually transform in the evening from its formal environment during the day. This unique feature will be one of the key USPs of this development.

Serviced Apartments:

KGK’s brand symbolises high quality service. Premium business travellers and who’s who of the corporate world can stay at our luxurious exclusive 24-serviced apartments. Nestled at the top of the first tower, the guests staying at these apartments will be serviced 24-hours by KIIPL’s in-house efficient facilities management team. Adjacent to serviced apartments will be another business centre meant for select corporate meetings. .

Future Plans:

While phase I i.e. Corporate Tower would be completed in the next 24 months, starting from the next month, the entire project comprising of Hotel, Club and Retail over the next three years. The phase II of the mixed-land use development that would commence by February 2013 comprises of 200-keys mid-segment hotel and a multi-storey club for the uber rich of the city. Meant for those who want exclusivity with pure entertainment, the club will offer them membership at competitive rates. Within the club, members will get an array of indoor and outdoor activity with huge emphasis on the entertainment of international standards. The company plans to build around 1 lakh sqft of indoor space for club’s activities.

Adjacent to the first two phases, the KGK Group wants to create en entertainment and hospitality hub for the city of Jaipur. Thus, phase III will have a mix of five-star hotel, entertainment complex and retail area to serve all kinds of visitors.
LINK
JAYESH99 no está en línea   Reply With Quote
Old December 26th, 2012, 11:46 AM   #633
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

Knowledge City, Bagru, Jaipur

In keeping with their vision to create global citizens and leaders of tomorrow through traditional values of love, empathy, discipline and respect, KGK Group has envisioned a world class 100 acre Knowledge City in Jaipur.

KGK Infrastructure will develop the mammoth project which is located on main Ajmer Road (NH 8), near RIICO Industrial Area, Bagru.

Phase I of the project will see the development of around 40 acres of the area, and the remaining land in subsequent phases. The project is located at an exceptional area, closed to the 3000 acre Mahindra SEZ, and surrounded by prestigious townships like Grass Fields, Omaxe City, My Haveli, Vatika Infotech City, World City, etc all coming up in a 5km radius.

The Knowledge City project is coming up right opposite the site where Jaipur Development Authority has proposed to build and international convention center. Also, the Institute of Chartered Accountants of India has already laid the foundation stone to build a CA University nearby.
JAYESH99 no está en línea   Reply With Quote
Old December 31st, 2012, 09:28 AM   #634
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

Rajdhani Metropolis

A good infrastructure is the backbone of every building. At Rajdhani Metropolis we assure you of the best infrastructural facilities, to service the needs of business and commerce. Creating infrastructure that will be a legacy for future generations. Amenities on offer include new office and residential towers, top-quality shopping and hotel facilities. http://dreamax.in/rajdhani-details.aspx
JAYESH99 no está en línea   Reply With Quote
Old December 31st, 2012, 09:30 AM   #635
JAYESH99
YO DUDE
 
Join Date: Feb 2011
Location: JAIPUR
Posts: 202
Likes (Received): 1

Green Triveni

Green TrivenI
Project Status: Ongoing
The Township

Triveni group is coming up with the project 'Green Triveni', a proposed integrated township in the fast developing city, Jaipur. The township includes residential areas with commercial and business centres, an exclusinve shopping and entrtainment mall apart from facilities like community centres, medical facilities, schools, shopping centres, restaurants, clubs, parks, play areas, jogging tracks and much more will make it a complete township.
JAYESH99 no está en línea   Reply With Quote
Old January 9th, 2013, 11:25 AM   #636
World8115
Registered User
 
Join Date: Oct 2010
Posts: 9,492

Jaipur's three long-awaited projects to be ready soon

Quote:
Come January 20, three long-pending projects of the city will be opened for the residents of Pink City. The three are Ghat Ki Guni tunnel, Ramniwas Bagh parking and the underpass at Gujjat Ki Thadi. An announcement to this effect was made by minister for urban development and housing Shanti Dhariwal during his visit to Ghat Ki Guni tunnel and Ramniwas Bagh parking project on Tuesday.

With the announcement, the JDA will have to work round-the-clock to complete the remaining work of Ghat ki Guni tunnel and Ramniwas Bagh parking till middle of this month as the Ashok Gehlot government intends to get projects inaugurated by UPA chairperson Sonia Gandhi and other leaders including the prime minister, who will be visiting the state during the Chintan Shivir.

JDA commissioner Kuldeep Ranka assured that the tunnel project will be completed by January 15 while the deadline for Ramniwas Bagh parking project will be January 16. The Gujjar Ki Thadi underpass project, which was completed since long, will also be inaugurated this month.

During the visit, the minister also directed the officials to prepare a proposal and send it to the chief minister to seek approval for location where the inauguration ceremony for the tunnel project will be held. The officials have proposed three locations near the tunnel namely, Jawahar Nagar bypass (entry point of tunnel) open land near leprosy hospital on Agra Road and near the flyover on Agra Road.

Meanwhile, JDA sources claim that it will be a big challenge for the officials to complete the project by the set date as work on the entry and exit points of the tunnel is still pending. "The work to widen the road at Jawahar Nagar end is slow. The complete construction work including the rotary can only be done after that," said an official.

Recently, many houses on either side of Transport Nagar flyover were razed to widen the roads. The JDA's official version however remains that the project can be completed well in time. Officials said that the work inside the tunnel is complete and only construction of the proposed rotary and widening of road is left. The miscellaneous work including painting and plantation will be done within five days.

"Currently, the road near Jawahar Nagar bypass end along the flyover is 7.5 metre wide. To avoid congestion, the width of the road will be increased by another 30 metres. The construction work can be completed if extra manpower is deputed," said the official.
World8115 no está en línea   Reply With Quote
Old January 20th, 2013, 09:41 AM   #637
World8115
Registered User
 
Join Date: Oct 2010
Posts: 9,492

Ramniwas Bagh parking, Gujjar Ki Thadi underpass opening postponed

Quote:
The proposed inauguration of RamniwasBagh parking and the underpass at GujjarKiThadi will not take place on Saturday. However, the GhatKiGuni tunnel will be opened for public around 2.40 pm.

According to sources, the decision to cancel the inauguration of the two long-pending projects were made at the last minute after Congress supremo Sonia Gandhi reportedly expressed some apprehensions.

However, a JDA official said: "The decision has been taken at state government level. The projects are completed and will be open for public soon after receiving a nod from the higher authorities. "The project will now be inaugurated by chief minister Ashok Gehlot after the Chintan Shivir, said sources.

According to officials, the UPA chairperson will inaugurate Ghat Ki Guni tunnel with the help of remote technology. "The inauguration programme will be telecasted live at 17 venues with larger screens. Also, 20 hoardings announcing the inauguration had already been erected."

On the other hand, the residents will continue to face inconvenience as the opening of the parking and underpass project have been delayed once again. Despite extending the deadline thrice, the JDA announced to open the parking project this month. If the parking was inaugurated, around 915 cars could have been parked.

Similarly, Gujjar Ki Thadi underpass opening would have provided swift passage to the residents coming and going towards Mansarovar. The area is witnessing traffic jams due to ongoing Metro work.
World8115 no está en línea   Reply With Quote
Old January 26th, 2013, 11:43 PM   #638
Yagya
ecrasez l'infame
 
Yagya's Avatar
 
Join Date: Oct 2010
Posts: 4,772

Gurjar ki Thadi Underpass

image hosted on flickr

Gujar ki Thadi Underpass, Jaipur by YagyaYagya, on Flickr
__________________
Rajasthan|पधारो म्हारे देस...

In Realm Of The Senses
Yagya no está en línea   Reply With Quote
Old January 26th, 2013, 11:59 PM   #639
Yagya
ecrasez l'infame
 
Yagya's Avatar
 
Join Date: Oct 2010
Posts: 4,772

Second phase of Ramniwas Bagh parking likely soon

Quote:
JAIPUR: The state government may soon launch phase II of RamniwasBagh parking by extending the area to accommodate nearly 1,500 more cars. If implemented the project is pitched to become the country's largest underground parking with space for 2,500 cars.

If everything goes according to plan, Urban Development and Housing (UDH) department will construct the underground parking parallel to MI road. An underpass to facilitate the underground traffic is also being considered. "Proposal is under serious consideration. We are looking to the possibilities and if it happens the parking space be almost doubled," said Shanti Dhariwal, UDH minister.

To look for feasibility, agencies have been asked to make a detailed project report. But officials are sure that project can be conceived and it won't take much time kick off the second phase. "The idea came to our minds only after the current parking space was created. There are technical issues involved but the expansion is practical and possible," said a senior government official.

The project will be one-of-its-kind in the country. At present, the biggest public multi-level parking is at Indira Gandhi Airport, New Delhi, which has a parking space for 4,300 cars. But in the five-storied parking only two slots are underground while rest are at or above ground level.

Current parking capacity of Ramniwas Bagh is 950 cars. It is expected to be opened for general public from January 27. Once it opens, it will be mandatory for the visitors to park their vehicles in the parking area to ensure free flow of traffic on the Walled city roads.

"The expansion will give a major boost to the ongoing efforts for decongestion of roads, especially in the Walled City markets and MI road that bustles with traffic. But looking to the government's track record of phase-I, it is unlikely that phase II would be completed soon," said Trilokchand Agarwal, president, Jaipur Vyapar Mahasangh.


source
__________________
Rajasthan|पधारो म्हारे देस...

In Realm Of The Senses
Yagya no está en línea   Reply With Quote
Old January 27th, 2013, 12:21 AM   #640
Yagya
ecrasez l'infame
 
Yagya's Avatar
 
Join Date: Oct 2010
Posts: 4,772

Construction of Jaipur International Centre to be kicked off in Feb

Quote:
JAIPUR: To add another project in its kitty before the state goes to elections, the Gehlot government is all set to lay the foundation for the Jaipur International Centre next month.

Though a delayed project, an official claimed the construction work is expected to start in February. "The decision to start the construction work in December was taken at a meeting headed by chief secretary C K Mathew who was also shown a presentation. However, due to delay in the tender process, the construction work was also delayed," he said and added that the "The JDA executive has now approved the tender and the work order will be released soon."

Initially, the centre was modelled on the India Habitat Centre in New Delhi. However, after chief minister raised concerns on the model, it was decided that the centre would be designed on the lines of the India International Centre, which is a cultural centre without any government offices.

As per the proposal, the international centre would have a conference hall and a lecture hall with a seating capacity for 60-100 people. A lawn, restaurant, lounge, gymnasium, banquet hall and a dinning hall have also been proposed. An underground and surface parking for 1,000 cars is also part of the project.

Recently, the JDA ( Jaipur Development Authority) identified 25,980 square metre of land near Akshay Patra behind JLN Marg for construction of the centre. As per the design, it would have three auditoriums, with the first one having a seating capacity of 700, while the other two auditoriums would accommodate 300 people each.

For the project, the state government has also cancelled the lease of the land near Jhalana institutional area which was allotted to the Confederation of Indian Industry (CII). The confederation will now be allotted a new land.

The state's general administration department (GAD) had allotted approximately 12,000 square metre land to CII. Since no construction had started on the land, the state government decided to cancel the allotment.

"Once the allotment is cancelled, the building for Engineering Staff Training Institute (ESTI) will be shifted to the proposed JIC land," a senior official said.

source
__________________
Rajasthan|पधारो म्हारे देस...

In Realm Of The Senses
Yagya no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Projects in Lithuania | Projektai Lietuvoje Dompcz Lithuania 305 March 18th, 2019 08:30 PM
London - Full Summary of Projects 9 wjfox London Metro Area 1002 November 24th, 2006 07:51 PM
What about the banners posted in the new size thread and never shown? Rhoy About the forums 0 October 6th, 2006 01:47 PM


All times are GMT +2. The time now is 10:59 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2020, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us