Old February 17th, 2020, 07:23 AM   #25901
Crazyguru94
Registered User
 
Join Date: Aug 2014
Location: chennai
Posts: 1,477
Likes (Received): 1377

https://www.thehindu.com/news/cities...37572.ece/amp/

The final revised cost of the project will be sent to the MoHUA, after apprising the State government. After it approves the final cost, a few minor modifications will be made in the detailed project report as well, the source added.

Sources said the Centre was likely to release funds in phases for Phase II, as requested by the State government.
Crazyguru94 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old February 17th, 2020, 07:46 AM   #25902
ganeshcsit
Ganesh Kumar
 
Join Date: May 2013
Location: Bangalore/Sivakasi
Posts: 886
Likes (Received): 2429

CMRL Invites Bids for Chennai Metro Line-1 UG Stations’ Balance Work

After terminating its Rs. 371 cr civil construction contract with IL&FS – PJSC Kyivmetrobud JV due to poor progress, the Chennai Metro Rail Ltd. (CMRL) on February 14 invited bids from construction firms for completing the remaining (balance) works of the underground Sir Theagaraya College and Korukkupet stations on the 9.051 km northern extension of Chennai Metro’s 23.1 km Blue Line to Wimco Nagar.

Both stations were originally part of package UAA-09, but now their balance works has been divided up into two separate packages. The tender notices are not yet up on CMRL’s website’s tender page, but a reader supplied copies –

CONTRACT BW-UAA-09- STATIONS (ARCH)/STC – CONSTRUCTION OF BALANCE WORKS OF CIVIL, ARCHITECTURAL BUILDING WORKS & FINISHES (ABWF), SIGNAGES ETC WORKS AT SIR THIYAGARAYA COLLEGE UNDERGROUND STATION.

Tender BW-UAA-09- STATIONS (ARCH)/SKP – CONSTRUCTION OF BALANCE WORKS OF CIVIL, ARCHITECTURAL BUILDING WORKS & FINISHES (ABWF), SIGNAGES ETC WORKS AT KORUKKUPET UNDERGROUND STATION.

• Duration of contract: 6 months
• Prebid meeting: 25-02-2020 at 11:00
• Last date submission: 13-03-2020 up to 15:00 hrs
• Date of opening Technical Bid: 14-03-2020 at 15:00 hrs



Route of Chennai Metro Blue Line’s 9.051 km northern extension which includes station package UAA09 with 2 stations at Sir Theagaraya College and Korrukupet – view Chennai Metro route map & information

At the time of termination, here’s what The Hindu reported –

According to CMRL officials, they were left with no choice but to terminate the contract because they were displeased with the poor pace of construction. “Usually, we try to do everything possible to help the firm finish the work. We terminate contracts only if there is no other option. They [ITNL] struggled with severe cash crunch for several months and the progress of work was poor. Hence, we decided to end the contract recently,” an official said.

North of Korukkupet Station, the under construction line runs in an elevated mode with 6 new stations at Tondiarpet, Toll Gate, Thangal, Gowri Ashram, Tiruvottiyur and Wimco Nagar where an elevated stabling yard is being built, with further plans to build a 20 storey residential / commercial tower.

Track-work on the underground section has been completed and CMRL plans to run a diesel locomotive, like they typically first do, through the tunnels and maybe the elevated section if the tracks are ready towards the end of February prior to commencing trial runs with one of their Alstom trains.

Source : https://themetrorailguy.com/2020/02/...-balance-work/
ganeshcsit no está en línea   Reply With Quote
Old February 17th, 2020, 12:27 PM   #25903
saysenthil
Registered User
 
Join Date: Sep 2009
Location: Kalpakkam / Hamburg
Posts: 3,305
Likes (Received): 3825

Metro Rail slashes Phase II estimate by ₹7,000 crore

Housing and Urban Affairs Ministry has deemed initial cost to be very high

Quote:
In a huge development, the Chennai Metro has drastically cut down the estimate of its Phase II project by nearly ₹7,000 crore.

From an initial estimate of ₹69,180 crore for 118.9 km, the project cost has been brought down to ₹62,000 crore, highly placed sources told The Hindu.

The Union Ministry of Housing and Urban Affairs (MoHUA) has directed Chennai Metro Rail Limited (CMRL) to reduce the project cost, as it deemed it to be very high, the sources said.

Over the last year, CMRL officials held several rounds of discussions with MoHUA officials to find ways to bring down the project cost.

“It was an extremely challenging and tough process, but we managed to do it. It was very difficult as Bhopal Metro Rail was set as the benchmark for calculating cost per kilometre for the project. It may not be right to compare Chennai with Bhopal, as the purchase price of raw material and labour will be different,” a source said.

A slew of changes made in land acquisition and systems and operations helped in bringing down the cost by about ₹7,000 crore. “The MoHUA also gave recommendations on pricing for some of the systems, and changes were made accordingly,” another source said.

The final revised cost of the project will be sent to the MoHUA, after apprising the State government. After it approves the final cost, a few minor modifications will be made in the detailed project report as well, the source added.

Funds in phases
Sources said the Centre was likely to release funds in phases for Phase II, as requested by the State government.

After signing an MoU with the Japan International Cooperation Agency (JICA), for a loan of ₹20,196 crore, the Metro has been in talks with the Asian Development Bank and the Asian Infrastructure Investment Bank for loans for some of the stretches of the project.

Chennai Metro has already begun floating tenders to first start work on 52 km of the 118.9 km, and the tunnelling contracts will be awarded in a few months.
__________________
saysenthil no está en línea   Reply With Quote
Old February 17th, 2020, 04:14 PM   #25904
nambi83
Registered User
 
nambi83's Avatar
 
Join Date: Jun 2009
Location: chennai
Posts: 2,118
Likes (Received): 6541

Video Courtesy : The Muthoot Group.

__________________
Save Panai Maram, Panai Maram is our state tree.https://www.youtube.com/watch?v=N2p2VzLnoFA
nambi83 no está en línea   Reply With Quote
Old February 18th, 2020, 03:49 PM   #25905
Pritt_Chennai
Registered User
 
Join Date: Jul 2019
Posts: 42
Likes (Received): 54

Quote:
Originally Posted by saysenthil View Post
Metro Rail slashes Phase II estimate by ₹7,000 crore

Housing and Urban Affairs Ministry has deemed initial cost to be very high
Will this once again delay the project?
Pritt_Chennai no está en línea   Reply With Quote
Old February 18th, 2020, 06:33 PM   #25906
Crazyguru94
Registered User
 
Join Date: Aug 2014
Location: chennai
Posts: 1,477
Likes (Received): 1377

Quote:
Originally Posted by Pritt_Chennai View Post
Will this once again delay the project?
I don't think so. I would say this is a good news as this is the first time we're hearing that the central government may actually approve the project.
__________________
Crazyguru94 no está en línea   Reply With Quote
Old February 19th, 2020, 06:59 AM   #25907
srikant
Registered User
 
Join Date: Dec 2018
Posts: 338
Likes (Received): 218

Quote:
Originally Posted by Pritt_Chennai View Post
Will this once again delay the project?
No, in fact, seeing as delays increase costs, trying to keep costs down means going faster!
__________________

Pritt_Chennai liked this post
srikant no está en línea   Reply With Quote
Old February 19th, 2020, 05:33 PM   #25908
Crazyguru94
Registered User
 
Join Date: Aug 2014
Location: chennai
Posts: 1,477
Likes (Received): 1377

Perhaps for the first time, I travelled in the metro during peak hour time in the morning from airport until thirumangalam. A few points to note:

1. There are quite a lot of feeder vans to/from the airport and a lot of people use it. It costs only 10 bucks. I could see good number of people coming in from the tirusulam subway too. Only about 30% of people were from the airport and rest were officegoers.

2.The baggage screening at the airport is pathetic. The machine is damn weak and cannot pull the heavily loaded flight suitcases. This formed a long queue at the screening terminal. Many of the commuters just skipped the baggage screening and went to the trains. Something must be done about this.

3. Just like suburban systems, the ticketing queue was long while the ATVMs were lying unused. I always use the ATVMs for recharging my travel card and I did it today too and saved quite a few time.

4. The crowd patterns were interesting. A lot of pax who boarded in GST road stretch got down before and in thirumangalam while a new set of passengers continued coming in Inner ring road stations who were going beyond thirumangalam.

5. Road interchage/MTC transit point Stations like airport, alandur, ashok nagar, koyambedu, thirumangalam see a lot of footfalls and most of them seem to be from nearby areas.

6.Thirumangalam was clearly the most crowded station(more than even the airport). I suspect a good no. of people boarding here might be interchanging at central for sure towards their offices in broadway or mount road. Some poor fellow had a eatery stall here back when only the stretch upto nehru park was operational and the footfalls were low. Things have improved a lot since then and this station might have a food outlet soon. A2B has an outlet at many of the stations and seem to be doing good business.
Crazyguru94 no está en línea   Reply With Quote
Old February 19th, 2020, 09:36 PM   #25909
Pritt_Chennai
Registered User
 
Join Date: Jul 2019
Posts: 42
Likes (Received): 54

Quote:
Originally Posted by srikant View Post
No, in fact, seeing as delays increase costs, trying to keep costs down means going faster!
I admire your optimism, but with changes in alignment, wouldn't it need another rounds of approval and other stuff before anything starts?
Pritt_Chennai no está en línea   Reply With Quote
Old February 20th, 2020, 05:42 AM   #25910
darkprinz
DP
 
darkprinz's Avatar
 
Join Date: Jul 2008
Location: Singara Chennai :) <3
Posts: 2,280
Likes (Received): 2654

The article says land acquisition , operations and systems ...

Land acquisition may well be trimming the excess land requisite .. operations and systems looks to me more of operational workforce , contracts and systems design of the services which can be optimised technically ...

None of these really require re approvals or going to drawing board for civil execution ...
__________________
venks
darkprinz no está en línea   Reply With Quote
Old February 20th, 2020, 09:07 PM   #25911
Arun Gokularaman
Registered User
 
Join Date: May 2017
Location: London
Posts: 43
Likes (Received): 30

Anybody know why the turnstiles in meenambakkam station towards chrompet side is always non functional. Is it a technical snag or for operational reasons? Day by day it has become bothersome.
Arun Gokularaman no está en línea   Reply With Quote
Old Yesterday, 04:46 AM   #25912
metro lover
singara chennai
 
Join Date: Oct 2014
Location: chennai
Posts: 220
Likes (Received): 349

Quote:
Originally Posted by Arun Gokularaman View Post
Anybody know why the turnstiles in meenambakkam station towards chrompet side is always non functional. Is it a technical snag or for operational reasons? Day by day it has become bothersome.


For want of better patronage and more crowd the turnstiles are not put to use.

Opening up that entrance would incur additional expenses towards salary for extra manpower. Hence when patronage picks up considerably That entrance would be opened up.

I got this reply once when I emailed cmrl
__________________

dayalanr, srikant, agandhisurya19 liked this post
metro lover no está en línea   Reply With Quote
Old Yesterday, 07:40 AM   #25913
karkal
Registered User
 
Join Date: Jan 2012
Posts: 18,414
Likes (Received): 25866

Chennai Metro rail set to gobble up more parks, Amma canteen

Read more at:
http://timesofindia.indiatimes.com/a...campaign=cppst
__________________
"First they ignore you, then they laugh at you, then they fight you, then you win”
karkal no está en línea   Reply With Quote
Old Yesterday, 01:35 PM   #25914
vinodhkumar
Registered User
 
vinodhkumar's Avatar
 
Join Date: Feb 2011
Location: Chennai
Posts: 787
Likes (Received): 1120

https://www.thehindu.com/news/cities...le30879050.ece

Chennai Metro to rope in one more contractor to finish work on two stations

Chennai Metro Rail is now in the process of looking out for a contractor who will complete finishing work in two stations in the phase I extension project in north Chennai.

This project — covering 9 km to link Washermanpet with Wimco Nagar — that is due for opening in June this year, is facing a challenge now, as a contract was terminated. Recently, Chennai Metro Rail ended the contract worth nearly ₹370 crore with IL&FS Transportation Networks Limited (ITNL) as the firm failed to meet the deadline and it was felt the progress of construction of work was poor, officials said. This firm had to build Korukkupet and Sir Theagaraya College stations in the 9 km stretch.

Following this, Chennai Metro Rail had immediately roped in two contractors to finish the remaining construction work of both these stations and the work has been on for a while now.

According to officials of Chennai Metro Rail Limited (CMRL), they want a contractor just to finish some of the interior work. “We have just called tenders now for this work. We should finalise the contract in a month and award the contract. The new firm will have to provide sanitary installations, rainwater pipes and fittings, rainwater harvesting and tube wells and other such related work as well,” an official said.

This is not the first time that CMRL had to terminate a contract in the Metro project. For instance, in the phase I project that covers 45 km of the city, Gammon India and CCCL contracts too were terminated by CMRL as the work was getting inordinately delayed.
__________________

srikant, agandhisurya19, srinath liked this post
vinodhkumar no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Μετρό Θεσσαλονίκης | Thessaloniki Metro project GrigorisSokratis Θεσσαλονίκη | Thessaloniki 5342 Yesterday 07:34 PM
IT Corridor | OMR | Madhyakailash to Kelambakkam |Project updates Anniyan Chennai 5556 February 20th, 2020 04:03 PM
#PROJECT: ABU DHABI METRO malec Infrastructure and Transport 117 February 6th, 2020 01:43 PM
[Tehran] Metro Project blackforest Urban Transportation and Infrastructure 1087 December 30th, 2019 12:49 AM
Chennai Update I - project news from Chennai theguy Chennai 2888 June 15th, 2006 12:00 AM


All times are GMT +2. The time now is 06:05 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2020, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us