BRAZIL | Urban Transport Compilation - Page 109 - SkyscraperCity
 

forums map | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems


Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old July 15th, 2019, 09:00 PM   #2161
A-B
Registered User
 
Join Date: Apr 2019
Posts: 972
Likes (Received): 971

Rio de Janeiro - Tarifary integration

Injuction obtained by Rio Ônibus (the syndicate which congregates the bus companies) determinates the duration of tarifary integration should be of 2 hours and 30 minutes. In May, the City Council has approved a law determinating the duration of tarifary integration should be increased from 2 hours and 30 minutes to 3 hours.

https://g1.globo.com/rj/rio-de-janei...judicial.ghtml

Last edited by A-B; July 15th, 2019 at 09:19 PM.
A-B no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old July 15th, 2019, 09:12 PM   #2162
A-B
Registered User
 
Join Date: Apr 2019
Posts: 972
Likes (Received): 971

Recife Metro - Center Line closed since last Sunday due to vandalism on the overhead line and the typical CBTU inefficience management os its networks, as well its financial restrictions. Bus lines are being reinforced

Partial service will be reestablished only on Wednesday, and full service on next Friday (if everything works as programmed).
https://jconline.ne10.uol.com.br/can...ira-383336.php

------------

Dificuldade: 19 estações do Metrô de Recife ainda sem operação nesta manhã

Quote:
Quem depende do Metrô de Recife (Metrorec) para trabalhar enfrenta dificuldades nesta segunda-feira, 15 de julho de 2019, véspera do feriado de Nossa Senhora do Carmo. A data altera o funcionamento de alguns órgãos públicos e do comércio no Recife.

A Linha Centro do Metrô permanece sem funcionar pelo segundo dia consecutivo.

O serviço foi interrompido neste domingo, 14, após o rompimento de um cabo da rede responsável por fornecer energia para os trens, segundo a CBTU – Companhia Brasileira de Trens Urbanos.

O serviço de trens não operou em nenhuma hora do dia, e a expectativa da Companhia era que a operação da Linha Centro voltasse hoje.

Em nota ontem, a CBTU afirmou que lamentava o ocorrido e de que continuava atuando de forma ininterrupta para que o sistema voltasse a operar o mais rápido possível. A Linha Sul e o VLT funcionam normalmente.

Durante a semana cerca de 250 mil pessoas circulam pela linha, que passa por 19 estações e tem dois ramais saindo do Recife, um que segue até Camaragibe e outro que vai até Jaboatão dos Guararapes.

O Grande Recife Consórcio de Transporte afirmou que está aumentando a oferta de ônibus para suprir a demanda e atender aos usuários.
https://diariodotransporte.com.br/20...o-nesta-manha/

Last edited by A-B; July 15th, 2019 at 11:29 PM.
A-B no está en línea   Reply With Quote
Old July 15th, 2019, 09:53 PM   #2163
A-B
Registered User
 
Join Date: Apr 2019
Posts: 972
Likes (Received): 971

Salvador Public Buses System - Battery-powered bus made by BYD enters in test at some lines for 30 days.

Quote:
O ônibus 100% elétrico da empresa chinesa BYD começa a circular em algumas linhas do transporte público da cidade a partir desta terça-feira (16), com tarifa normal, durante 30 dias. O objetivo da Secretaria Municipal de Mobilidade (Semob) é checar a adequação do veículo às condições do dia a dia do transporte coletivo e as características geográficas da cidade.

Além disso, o teste permite que a Semob possa tomar uma decisão futura, tanto para a operação do transporte em outros modais, a exemplo do BRT, quanto a possibilidade de utilizar futuramente o ônibus em linhas convencionais do transporte público.

Com capacidade para 51 passageiros em pé e 26 sentados, o veículo 100% elétrico não emite qualquer tipo de poluição. O ônibus possui dois motores, sendo um em cada roda, freio ABS, potência de 400cv e consegue rodar 250km com a bateria completa, que leva até 4 horas para ser recarregada.

O sistema de carregamento da bateria é feito em uma central de abastecimento, que pode ser instalada na garagem dos veículos. O ônibus é conectado em uma tomada até concluir o processo. O veículo oferece aos passageiros conforto e segurança, além de ser sustentável.

O secretário da Semob, Fábio Mota, lembrou dos benefícios e reforçou a importância de futuramente o transporte operar com ônibus elétricos “Nós estamos testando as questões da autonomia e da logística do carregamento, assim como a funcionalidade do veículo. O ônibus elétrico é uma tecnologia limpa. É evidente que, entre ele e o normal, o elétrico leva todas essas vantagens por ser um aliado do meio ambiente” destacou.

Altamente sustentável, o ônibus possui, dentre as características, a presença de 100% de suspensão pneumática, que oferece mais conforto ao passageiro com o sistema de ajoelhamento, compreendendo o piso baixo e a ausência de degraus. Com acionamento de um botão, o veículo é inclinado para o lado direito, onde uma prancha é deslizada para facilitar o acesso dos cadeirantes e pessoas com deficiência com tranquilidade e segurança.
http://www.agenciadenoticias.salvado...terca-feira-16

Quote:
Originally Posted by Pessoa14 View Post
Aparentemente vai entrar em testes pela Plataforma.




fonte das imagens

vídeo
__________________

João Paulo liked this post

Last edited by A-B; July 15th, 2019 at 10:33 PM.
A-B no está en línea   Reply With Quote
Old July 17th, 2019, 11:13 AM   #2164
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17687

São Paulo Metro (CMSP) - Line 4 - Oscar Freire new west access ready to open.

Quote:
Originally Posted by Infraholic View Post
Oscar Freire
Acesso Clínicas, ontem, 3/7/19











Acesso Jardins
Área antes ocupada por faixa para carros que entrariam na Oscar Freire é “devolvida” aos pedestres (o que deveria ocorrer também em muitos outros pontos da cidade). Resultado: ótima área livre para quem caminha (melhor ainda quando tiver bancos. Parabéns a quem concebeu e aprovou):

__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

Infraholic, CARIOCAemSSA liked this post
mopc no está en línea   Reply With Quote
Old July 17th, 2019, 10:55 PM   #2165
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17687

Sao Paulo Metro (CMSP) - Line 15 monorail stations official update videos. The last 4 stations will open in a few months.

Quote:
Originally Posted by Diego FTP View Post

Quote:
Originally Posted by Lucas-Sousa View Post
Pilares a oeste de Vila Prudente:

mopc no está en línea   Reply With Quote
Old July 17th, 2019, 10:58 PM   #2166
A-B
Registered User
 
Join Date: Apr 2019
Posts: 972
Likes (Received): 971

São Paulo Commuter Rail - Video from CPTM showing improvements on the system during the 1st half of 2019

__________________

Infraholic liked this post
A-B no está en línea   Reply With Quote
Old July 17th, 2019, 11:05 PM   #2167
A-B
Registered User
 
Join Date: Apr 2019
Posts: 972
Likes (Received): 971

Petrópolis (state of Rio de Janeiro) - 10 new buses enter in operation



Quote:
Ônibus novos começam a operar em Petrópolis

Os novos ônibus que chegaram à cidade de Petrópolis, no Rio de Janeiro, começaram a operar na tarde desta terça-feira, 16 de julho de 2019. Os veículos foram direcionados para o atendimento das linhas 603 – Águas Lindas, 606 – Alcides Carneiro, e 705 – Cuiabá.

A Turb Petrópolis, uma das empresas responsáveis pelo transporte coletivo de Petrópolis, no Rio de Janeiro, adquiriu dez ônibus zero-quilômetro, que chegaram à cidade na primeira semana do mês.

Relembre e confira os detalhes: https://diariodotransporte.com.br/20...orte-coletivo/

A previsão da empresa é de que, ainda nesta semana, outras linhas contem com os novos ônibus. Ao todo, em menos de um ano, a Turb Petrópolis renovou cerca de 30% da frota, com investimentos que ultrapassam os R$ 11 milhões.

De acordo com Jean Moraes, diretor da empresa, os novos ônibus vão oferecer mais conforto aos passageiros do sistema de transporte coletivo, além de tecnologia e aumento da eficiência operacional.

“A renovação da frota é uma forma de garantir a qualidade no transporte público para o cliente. Nosso investimento demonstra a preocupação que temos com os nossos passageiros e a busca por um melhor atendimento”, disse, em nota.

A empresa atende a 55 linhas do município. Os dez novos ônibus recentemente adquiridos se juntam aos outros 20 veículos comprados no ano passado, sendo 12 micro-ônibus, seis coletivos padrão rodoviário e dois ônibus alongados.

Segundo a empresa, todos são acessíveis e adaptados para pessoas com deficiência ou mobilidade reduzida, e apresentam computadores de bordo, que sinalizam aos motoristas informações importantes e, em tempo real, como o consumo de combustível, pressão e níveis de água e óleo.
https://diariodotransporte.com.br/20...em-petropolis/
A-B no está en línea   Reply With Quote
Old July 17th, 2019, 11:11 PM   #2168
A-B
Registered User
 
Join Date: Apr 2019
Posts: 972
Likes (Received): 971

Brazil (General) - Drivers from transportation network companies like Uber and 99 are using GPS-spoofing to manipulate prices

Quote:
Motoristas de aplicativos burlam GPS do celular para fraudar valor da corrida
Golpe ficou conhecido como “treme-treme”, e segundo especialistas funciona somente em aparelhos Android

ALEXANDRE PELEGI

Se você é daqueles que usa o transporte por aplicativo por acreditar que preço e qualidade são fatores importantes, cuidado: você pode estar sendo lesado.

Um método conhecido como “Treme Treme”, adotado por alguns motoristas “espertos” do Uber e 99Pop, tem sido utilizado para aumentar consideravelmente o valor final da corrida contratada.

A técnica usada pelo motorista foi descrita pelo portal da BandNews, e se resume a colocar o celular no modo de economia de energia. Com isso, os motoristas de aplicativos conseguem burlar o GPS, fazendo o valor da corrida aumentar em até 300%.

A malandragem, no entanto, só funciona em celulares do sistema Android .

No modo de energia, o funcionamento do GPS do aparelho do motorista é afetado diretamente, já que o modo de alta precisão de localização é desativado. Dessa forma, o aparelho passa a registrar uma localização aproximada, alterando a forma como a plataforma calcula o valor da corrida. O nome “Treme Treme” advém daí: o GPS fica dando voltas durante o deslocamento do veículo, aumentando a extensão da corrida, o que impacta no custo final.

Para o usuário as coisas aparentam estar certas, já que o destino final é percorrido normalmente.

GOLPES

Os golpes por aplicativos vêm se disseminando, uma maneira nada ética dos motoristas maximizarem seus ganhos. Os passageiros que reclamam junto às empresas, como Uber, conseguem que os motoristas sejam punidos e escapam da cobrança excessiva.

Mas segundo o portal TechTudo, há motoristas que conseguem comprar aparelhos celulares com o aplicativo já logado em uma conta com dados de terceiros. Ou seja, continuam pegando e fraudando corridas, mesmo após serem punidos pelas plataformas.
https://diariodotransporte.com.br/20...or-da-corrida/
A-B no está en línea   Reply With Quote
Old July 17th, 2019, 11:18 PM   #2169
A-B
Registered User
 
Join Date: Apr 2019
Posts: 972
Likes (Received): 971

São Paulo Public Transportation - Study from University of São Paulo appoints carpooling service from Uber (known as Uber Juntos) is taking out passengers from public transportation

More details at: https://diariodotransporte.com.br/20...squisa-da-usp/

Last edited by A-B; July 17th, 2019 at 11:34 PM.
A-B no está en línea   Reply With Quote
Old July 17th, 2019, 11:26 PM   #2170
A-B
Registered User
 
Join Date: Apr 2019
Posts: 972
Likes (Received): 971

Maceió Regional Rail - CBTU launches app for consulting trains schedule

------

CBTU Maceió lança aplicativo de consulta de horários dos trens

Quote:
Os usuários de trens de Maceió, Satuba e Rio Largo agora podem consultar o horário das viagens por meio de um aplicativo desenvolvido pelos próprios funcionários da CBTU. O app VLTrem já está disponível para celulares com sistema operacional Android e pode ser baixado gratuitamente através da plataforma Google Play.

Com o aplicativo é possível consultar o horário do próximo trem por estação no sentido Jaraguá e no sentido Lourenço de Albuquerque, além de verificar outras informações como o valor da tarifa, telefones úteis e o funcionamento operacional dos trens no dia. A grade horária completa também pode ser acessada pelo app que tem como objetivo ser mais um meio de comunicação direto entre a Companhia e os usuários.
https://www.cbtu.gov.br/index.php/pt...d=1102&id=7951
A-B no está en línea   Reply With Quote
Old July 18th, 2019, 06:12 PM   #2171
A-B
Registered User
 
Join Date: Apr 2019
Posts: 972
Likes (Received): 971

Brasília Metro - Strike is finished after 77 days, the longest in the history of Brasilia Metro. Stations are opened, but in most of them ticket sales are suspended and they're conceding free pass because of lack of agreement between the workers union and Metrô-DF. According to the report, ticket sales are only happening on 11 stations. Other 13 are operating with free passes. Also some delays can happen because issues on workers transporations to the stations. Metro-DF losses with strikes were about 9 million BRL and 1.7 million passengers.

https://www.correiobraziliense.com.b...da-greve.shtml

Last edited by A-B; July 18th, 2019 at 11:04 PM.
A-B no está en línea   Reply With Quote
Old July 18th, 2019, 06:26 PM   #2172
A-B
Registered User
 
Join Date: Apr 2019
Posts: 972
Likes (Received): 971

Recife Metro - After 5 days, Center Line is reopened, with no operational restrictions.

https://g1.globo.com/pe/pernambuco/n...nco-dias.ghtml
A-B no está en línea   Reply With Quote
Old August 2nd, 2019, 08:19 PM   #2173
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17687

Sao Paulo Metro (CMSP) - Line 4 - Oscar Freire station western access finally opens. The station was opened in 2018 with only its main access (Eastern access) available. State governor opens the new access and also promises construction of a people mover between CPTM Airport station (line 13) and International Airport.


Quote:
Originally Posted by Edson Fukumoto View Post
Doria inaugura acesso da estação Oscar Freire e diz que ligação entre Cumbica e CPTM ficará pronta em maio de 2021

Por Tahiane Stochero, G1 SP
31/07/2019 09h43 Atualizado há 4 horas

Os três terminais de embarque terão ligação direta, por meio de um monotrilho, com a estação Aeroporto da linha 13-Jade da CPTM, segundo governador



Doria inaugura acesso da estação Oscar Freire, da Linha Amarela
fonte Imagem


O governador de São Paulo, João Doria (PSDB), anunciou nesta quarta- feira (31) que, em maio de 2021, os três terminais de embarque do Aeroporto Internacional de Cumbica, em Guarulhos, terão ligação direta com a estação Aeroporto da linha 13-Jade da Companhia Paulista de Trens Metropolitanos (CPTM).

"A conversa para isso ocorreu desde o início do nosso governo com o governo federal e a Gru Airport [concessionária que administra Cumbica]. Nós formalizamos este entendimento e as obras serão iniciadas já neste segundo semestre", disse. "Esta extensão de 1.300 metros levará até os três terminais do aeroporto."

"Esta obra era algo que machucava São Paulo. A linha de Metrô, que ligava ao aeroporto mais importante do país, e que não chegava até os terminais do aeroporto e que chegará até os terminais em 2021. Não haverá mais a necessidade de subir e descer escadas e desembarcar com malas como acontece hoje, infelizmente", acrescentou o governador.

De acordo com o governo do estado, o monotrilho terá 2,6 km de extensão, com paradas nos três terminais de passageiros do aeroporto e na Estação Aeroporto Guarulhos da CPTM, e capacidade de 2 mil passageiros/hora para cada sentido. O monotrilho fará em cerca de seis minutos o trajeto total entre a estação da CPTM e o Terminal 3 do Aeroporto.




Monotrilho vai ligar estação da linha 13-Jade da CPTM a terminais 1, 2 e 3 do aeroporto internacional de Guarulhos
Foto: Rodrigo Cunha



O anúncio ocorreu quando o governador inaugurava o acesso Clínicas da estação Oscar Freire da Linha 4 -Amarela do Metrô. A estação funciona desde abril de 2018 e a entrega da outra entrada ocorreu com mais de um ano de atraso. Segundo o secretário de Transportes Metropolitanos, Alexandre Baldy, é extremamente demandada pela população, por onde passarão 100 mil pessoas por dia.

"Está estação facilitará o acesso de todos ao Hospital das Clínicas. O Metrô de São Paulo é um dos melhores serviços do estado", acrescentou Doria.

O governo do estado disse que o acesso Clínicas da estação tinha interferências com concessionárias de serviços públicos, como de abastecimento de água, que não poderia ser interrompido para as obras necessárias, e que cumpriu o compromisso de entregar o acesso em julho deste ano.




Doria inaugura acesso da estação Oscar Freire
fonte Imagem


No evento, o secretário Alexandre Baldy divulgou ainda o início das obras de melhoria na estação Capão Redondo da Linha Lilás do Metrô, que serão feitas pela concessionária Via Mobilidade, dentro do contrato assinado com o governo do estado.

As obras na estação Capão Redondo já começaram e ocorrerão na ligação da estação de Metrô com o terminal de ônibus, para facilitar o deslocamento e acesso dos usuários entre os dois locais, com ampliação da entrada.

"É uma estação extremamente demandada e esperamos que, até o fim de dezembro deste ano, as obras de melhoria de acesso estejam concluídas sem atrapalhar os usuários", acrescentou ele.




fonte Imagem



https://g1.globo.com/sp/sao-paulo/no...-de-2021.ghtml


Quote:
Originally Posted by Issun View Post

Bom, é um acesso na rua mais chique se São Paulo onde o governador compra suas gravatas!

Vídeo do novo acesso, eu achei que por fim após todos esses séculos não ficou algo de encher os olhos, mas tá bão, faltou criatividade, por exemplo, com essa (esqueci o nome) chaminé de entrada de ar 70's style, poderiam ter deixado ela virada pro lado, não pra avenida na vista de todos, ou mesmo lá no fundo, mas enfim.

__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

Arthur Baz, CARIOCAemSSA liked this post
mopc no está en línea   Reply With Quote
Old August 11th, 2019, 10:32 AM   #2174
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17687

Sao Paulo Metro (CMSP) - State government develops plans for future line 19 - its first section will connect the city center to Guarulhos

Quote:
Originally Posted by Edson Fukumoto View Post
Metrô contrata estudos para Linha 19-Celeste entre a capital e Guarulhos

5 de agosto de 2019 06:47
Renato Lobo

Uma publicação no Diário oficial da conta de que o Metrô de São Paulo abriu duas licitações para contratação de uma empresa para levantamento topográfico, além de sondagens das redes de utilidade pública, da Linha 19-Celeste, que deve ligar o Bosque Maia, em Guarulhos, até o centro da capital paulista







A entrega das propostas está prevista a partir do dia 27 de agosto. Os editais devem estar disponibilizados no site da companhia a partir desta segunda-feira, 05 de agosto de 2019.

A Linha 19 é aguardada por passageiros que moram na cidade de Guarulhos, além de bairros paulistanos que não contam com uma ligação metroviária, como a Vila Maria.

Quando pronta, terá 17,6 km de extensão, e inicialmente com 15 estações sendo, Anhangabaú, São Bento, Pari, Silva Teles, Catumbi, Vila Maria, Curuçá, Jardim Japão, Jardim Brasil, Jardim Julieta, Itapegica, Dutra, Vila Augusta, Guarulhos e Bosque Maia. A demanda prevista é de 526 mil passageiros por dia.





https://viatrolebus.com.br/2019/08/m...l-e-guarulhos/
mopc no está en línea   Reply With Quote
Old August 11th, 2019, 10:47 AM   #2175
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17687

Sao Paulo Suburban Rail (CPTM) - Line 9 new intermediate João Dias station to start construction "still in 2019"

Quote:
Originally Posted by Edson Fukumoto View Post
Obras da estação de trem João Dias, da Linha 9-Esmeralda, devem começar ainda em 2019

02/08/2019
por G1

A futura estação João Dias, que fará parte da Linha 9-Esmeralda, deve ter suas obras iniciadas ainda em 2019




Maquete da estação João Dias - Foto: Divulgação/CPTM



A Companhia Paulista de Trens Metropolitanos (CPTM) entrou com pedido de licença ambiental junto à Companhia Ambiental do Estado de São Paulo (Cetesb) e, segundo informações da empresa, assim que esse documento for expedido os trabalhos poderão ter início.

Para o desenvolvimento da nova estação, a CPTM avalia quais serão as intervenções necessárias no trânsito e na operação da Linha 9. Futuramente, a linha deverá ter a via férrea e a rede aérea (fios que fornecem eletricidade para que os trens circulem) remanejadas no trecho onde as plataformas da nova estação serão construídas. A estação ficará na altura do Complexo 17007, um conjunto de torres empresariais construído pela Tegra, na Avenida das Nações Unidas,

O prazo previsto de construção da estação é de 37 meses; a demanda prevista é de cerca de 10.500 usuários por dia útil. O investimento será de R$ 60 milhões.

Doação

O modelo de construção da estação João Dias é inédito em São Paulo. O aparelho será construído pela Tegra, que manifestou o desejo de investir na estação e doa-la ao Estado.

A CPTM, por obrigação legal, organizou um chamamento público em abril deste ano para que outros interessados pudessem manifestar interesse na construção da estação, mas não houve nenhum novo projeto enviado.

Dessa forma, a incorporadora arcará com os custos da estação, que terá edifício principal, passarela de acesso à plataforma central, escadas rolantes/fixas e elevadores, além de equipamentos de acessibilidade.

A estação terá uma entrada dentro do prédio da incorporadora e uma entrada principal na pista local da Marginal Pinheiros.




Brookshields - Divulgação


http://www.revistaferroviaria.com.br...dMateria=30272
__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

Arthur Baz, Infraholic liked this post
mopc no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Tags
brazil, buses, commuter rails, monorails, subways, trams, transport, transporte coletivo

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 09:53 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us