Old April 5th, 2018, 03:46 PM   #1961
Lorezo
Registered User
 
Join Date: Dec 2012
Location: São Paulo
Posts: 325
Likes (Received): 783

Quote:
Originally Posted by mopc View Post
Sao Paulo Metro (CMSP) - Latest plans on future lines whose projects have been completed



Original PDF
The extension of line 17 was left out.
__________________

Cesco Dias liked this post
Lorezo no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old April 5th, 2018, 06:58 PM   #1962
xrtn2
Registered User
 
xrtn2's Avatar
 
Join Date: Jan 2011
Posts: 23,357
Likes (Received): 29253

Sao Paulo Metro (CMSP) - Moema station opened today LINE 5










Estação Moema, da Linha 5–Lilás do Metrô by Governo do Estado de São Paulo, no Flickr


Estação Moema, da Linha 5–Lilás do Metrô by Governo do Estado de São Paulo, no Flickr


Estação Moema, da Linha 5–Lilás do Metrô by Governo do Estado de São Paulo, no Flickr
__________________
#OLAVO TEM RAZÃO

Last edited by xrtn2; April 5th, 2018 at 09:44 PM.
xrtn2 no está en línea   Reply With Quote
Old April 6th, 2018, 07:40 PM   #1963
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Sao Paulo Metro (CMSP) - Line 15 monorail - Four new stations opened today: São Lucas, Camilo Haddad, Vila Tolstoi and Vila União. They make out 5,5 km. The next 4 stations to terminus São Mateus will open in June/July.

Quote:
Originally Posted by xrtn2 View Post




Por Thiago Morais Maia






Last edited by mopc; April 6th, 2018 at 07:46 PM.
mopc está en línea ahora   Reply With Quote
Sponsored Links
Advertisement
 
Old April 6th, 2018, 08:34 PM   #1964
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Quote:
Originally Posted by xrtn2 View Post
Sao Paulo Metro (CMSP) - Moema station opened today LINE 5
I was too emotional to post this yesterday, my favorite station, thanks for filling in for me!
mopc está en línea ahora   Reply With Quote
Old April 6th, 2018, 08:54 PM   #1965
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

More line 15 MONORAIL

Quote:
Originally Posted by xrtn2 View Post
Mais fotos do face Clodoaldo Pelissioni









mopc está en línea ahora   Reply With Quote
Old April 8th, 2018, 07:27 AM   #1966
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Santos Light Rail (SIM - VLT da Baixada Santista) - Line 2 to be defined this year

Quote:
Originally Posted by AndrePerez View Post
State defines the second phase of VLT as of May

EMTU intends to have the name of the contractor that will be responsible for the works from the 5th of that month



The Metropolitan Urban Transport Company of São Paulo (EMTU) expects to define the person responsible for the implementation of the second phase of the Light Rail Vehicle (VLT) from May 5. The date appears in the edict published yesterday in the Official State Gazette (DOE). The expectation is that the installation of the modal in the section Counselor Nébias - Valongo begins in the second half. At a cost of R $ 270 million, the work must last 30 months.

On the date scheduled in the public notice, the organ of São Paulo will analyze the documentation and financial proposals of the companies interested in the execution of the works. Who wins the lowest price wins. However, it is possible that the schedule may change, due to the possibility of requesting revision of the result, by contractors involved in the event.

The fact has already occurred during the public session of delivery of proposals for the implementation of the first phase of the VLT - between the terminals Barreiros in São Vicente and Porto in Santos. In 2012, the meeting was extended twice, due to requests for clarification from companies.

For this reason, the state provides for expansion in the stage of physical works and does not spell a date for the beginning of the works. The EMTU is limited only to indicate the start of the works for the second semester.

If there are no arrears, the São Paulo body estimates that the contractor with the winner should be signed in September. And the first passengers are transported within two years after the start of work.

Impact

One of the challenges to bring the VLT to the central region was to reduce impacts on the environment, such as in historic areas and architectural preservation. However, the Andradas Square in the Center will be cut in half for the passage of the rails.

"We will try to preserve at most everything that Santos has, but to pass a train it is necessary to make some interventions," summarizes the state secretary of Metropolitan Transportation, Clodoaldo Pelissioni.

The target project will be eight kilometers long on single tracks, one for each direction (see table). The route will attend the universities, Hospital of the Stevedores, Municipal Market, Pelé Museum among other attractions. "It will value the environment," says Pelissioni.

This is the third proposal discussed for this phase. The original idea was that the two railroads passed through Avenida Conselheiro Nébias. "It had an understanding with the City Hall, along with the environmental preservation agencies, and it was decided that the best way are streets without large movement of vehicles and that will require intervention without major inconvenience," says the owner of the folder.

Integration

With the second phase of the VLT, a larger volume of passengers is expected in the new mode of transport. Currently, there are more than 35 thousand users who use the modal on weekdays between São Vicente and Santos. Because the central region of Santos is one of the poles that generate employment, it is believed that this number can multiply by three.

The transfer of the trunk axis of the VLT will take place in two stations: Counselor Nébias and Campos Melo (member of stage 2). According to the EMTU, the current platform was "scaled to shelter also the users of the second stretch, not needing to be enlarged".

CET-Santos, meanwhile, has carried out studies to reorganize the municipal transportation system, with a review of the lines and routes. Currently, 13 itineraries circulate from Counselor Nébias to the Center.

Incentives

The bet of improvement in the most degraded regions encourages the City. The Santista administration plans to provide tax incentives to stimulate the construction of housing in the central region, especially in the margins of the VLT. One of the ideas is also to transform the Municipal Market into a nucleus for the development of a creative economy in the City.

Third phase

The bridge A Tribuna, known as the Barreiros Bridge, in São Vicente, does not need to be demolished, in the third phase of VLT implementation. According to Gov. Geraldo Alckmin, who was in Santos Monday, technical reports confirmed that the structure is not doomed. The recovery and reinforcement of the bridge will be necessary for the transposition of the channel, connecting the VLT to the Continental Area of ​​the City, by the Samaritá, boundary with Praia Grande.






fonte: http://www.atribuna.com.br/noticias/...partir-de-maio
__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

Infraholic liked this post

Last edited by mopc; April 9th, 2018 at 06:25 AM.
mopc está en línea ahora   Reply With Quote
Old April 8th, 2018, 08:34 AM   #1967
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Line 15 Monorail timelapse trajectory from Vila União to Vila Prudente stations

Quote:
Originally Posted by Tront_ View Post
Enfim gente, não vou conseguir postar fotinhas hoje mas... fiz esse vídeo timelapse e ficou bem interessantinho! Da Estação Vila União até Oratório em... 16 segundos! :o



Interessante notar como o trajeto é através desse vídeo
__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

Arthur Baz liked this post
mopc está en línea ahora   Reply With Quote
Old April 10th, 2018, 06:58 PM   #1968
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Line 15 Monorail aerial pictures by forumer

Quote:
Originally Posted by ejsantos View Post
Fala, pessoal.
Dei uma passada hoje na região e registrei algumas fotos.

SAPOPEMBA


JARDIM PLANALTO


JARDIM PLANALTO


JARDIM PLANALTO


VILA UNIÃO


CAMILO HADDAD


VILA TOLSTOI


SÃO LUCAS
__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

Tennyson Vital, lgot, mdiasp95, luk4ss liked this post
mopc está en línea ahora   Reply With Quote
Old April 11th, 2018, 07:15 AM   #1969
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Salvador Metro - Airport station a few days from opening

Quote:
Originally Posted by Flacor View Post
Ai ai ai ai... tá chegando a hora!






Garoa Produtora
mopc está en línea ahora   Reply With Quote
Old April 11th, 2018, 07:50 AM   #1970
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Fortaleza Metro (Metrofor) - Tender process opens for last unfinished South Line station (Padre Cícero) and for the first phase of East Line (first five stations, one at grade, four underground)

Quote:
Originally Posted by eliadefilho View Post
Station service order expected for April

Last Friday, the Secretariat published the dates of four bids for the other line, East


Tenders to continue work on the Eastern Line should be launched in the coming months, according to Seinfra

01:00 · 10.04.2018

The Fr. Cícero Station, the last of the 20 South Lines of the Fortaleza Metro that has not yet been completed, will have the service order issued by the Infrastructure Secretariat of the Government of Ceará (Seinfra) this April. According to the owner of the Folder, Lúcio Gomes, there is only one license from the City Hall so that the work can be resumed.

"The station has requested work, in the past we had to re-enter because the construction company (winner of the edict) went bankrupt. "said the secretary." At any moment, we will issue the order. " According to him, the expectation is that the entire South Line of the subway transport, this year about 11 million people. By 2017, there were approximately nine million passengers.

The Padre Cícero station has partially completed works and is located on José Bastos Avenue, between Benfica and Porangabussu stations, in the Damas neighborhood - at the height of the Ceará Sporting Club field. With the signing of the contract for completion, two side walkways will be built, creating access to the station on both sides of the railway.

Last Friday (6), the State Official Gazette brought the dates defined by Seinfra to hold two of the four bids that will continue the project of the East Line of the Subway of Fortaleza.

Works

One of the events will be for the implementation of the civil works and systems and acquisition of workshop equipment of the Phase 1 call of the enterprise. The other object is the completion of the shaft construction, which is the entrance through which the tunneling machines will begin the excavation work of the tunnels. The budgets for the works are of R $ 6,546,792.06 and R $ 1,709,251,083.09, respectively. On May 10, interested parties must deliver the commercial proposals and qualification documents to the Central Government Procurement Office (PGE).

In this phase, according to Seinfra, will be implanted 7.3 km of extension of the line that will connect the Center of Fortaleza to Papicu. A surface station (Tirol-Moura Brazil) and four underground ones (Chico da Silva, Colégio Militar, Nunes Valente and Papicu) will be executed.

According to Lúcio Gomes, the expectation of resumption of works continues this semester. "We hope that in June it will be able to homologate and start the service," he said.

New bids

In order to materialize the venture, other bids will still be carried out: one for the hiring of a Management and Supervision company and another for the acquisition of rolling stock (trains).

"We will be closing next week to launch the third bid, and by the end of May we will probably launch the rolling stock bid," Gomes said.

In February, the government rescinded the contract signed with Marquise Engenharia and Acciona for the construction of the Linha Leste. According to Seinfra, there was a public hearing and the consortium tried for a writ of mandamus, which was not granted by Justice.

Fonte: http://diariodonordeste.verdesmares....bril-1.1921364
__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

carl_Alm, dimlys1994, eduardoazul liked this post
mopc está en línea ahora   Reply With Quote
Old April 17th, 2018, 05:13 PM   #1971
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Sao Paulo Metro - Campo Belo station (line 5 and line 17) construction update

__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

JustWatch liked this post
mopc está en línea ahora   Reply With Quote
Old April 18th, 2018, 10:51 PM   #1972
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

GENERAL - Survey on metro and urban rail progress nationwide by the National Passenger Rail Transportation Society for the years 2017-2018

http://www.mobilize.org.br/midias/pe...o-20172018.pdf

VIDEO

__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

Infraholic, JustWatch, carl_Alm liked this post

Last edited by mopc; April 19th, 2018 at 05:26 AM.
mopc está en línea ahora   Reply With Quote
Old April 19th, 2018, 11:05 PM   #1973
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Sao Paulo Metro & CPTM - Summary of system expansion over fast few years

According the their count, they opened 45 stations since 2001 on CMSP & CPTM metro train networks. There are another 10 stations to open this year (a couple maybe by early 2019) on the metro network:

5 stations on Line 5 (AACD-Servidor, Hospital SP, Santa Cruz, Chacara Klabin and Campo Belo)
4 stations on Line 15 Monorail (until São Mateus)
1 station on Line 4 (São Paulo-Morumbi)




https://www1.folha.uol.com.br/cotidi...m-6-anos.shtml
__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

JustWatch, Cesco Dias liked this post
mopc está en línea ahora   Reply With Quote
Old April 20th, 2018, 03:26 AM   #1974
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Campinas BRT - video update

__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

JustWatch liked this post
mopc está en línea ahora   Reply With Quote
Old April 21st, 2018, 12:06 AM   #1975
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Sao Paulo Suburban Rail (CPTM) - Renders of future Line 9 stations Mendes-Vila Natal and Varginha, whose construction was on hold and now is about to resume. They are expected for 2020.


Quote:
Originally Posted by ed.seykota View Post



Fonte: cptm.sp.gov.br/a-companhia/PublishingImages/Pages/Linha9%20-%20Extens%C3%A3o%20Graja%C3%BA-Varginha.png



Quote:
Originally Posted by Teo Felipe View Post
Acho que os externos já foram postados aqui, mas os internos eu não lembro:

Mendes Vila-Natal







Varginha







Fonte
__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

Tennyson Vital, luk4ss, carl_Alm liked this post

Last edited by mopc; April 22nd, 2018 at 12:12 AM.
mopc está en línea ahora   Reply With Quote
Old April 21st, 2018, 12:08 AM   #1976
mdiasp95
Apenas mais um louco
 
Join Date: Oct 2017
Location: São Paulo
Posts: 3,679
Likes (Received): 7102

Quote:
Originally Posted by mopc View Post
Sao Paulo Suburban Rail (CPTM) - Renders of future Line 9 stations Mendes-Vila Nova and Varginha, whose construction was on hold and now is about to resume. They are expected for 2020.
Vila Natal
mdiasp95 no está en línea   Reply With Quote
Old April 22nd, 2018, 02:09 PM   #1977
Cesco Dias
Registered User
 
Cesco Dias's Avatar
 
Join Date: Aug 2014
Location: Rio de Janeiro
Posts: 168
Likes (Received): 182

EDIT.

Last edited by Cesco Dias; April 22nd, 2018 at 07:13 PM.
Cesco Dias no está en línea   Reply With Quote
Old April 26th, 2018, 06:10 PM   #1978
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Salvador Metro - Internation Airport station opens



Metro-Shuttle Bus trajectory


Quote:
Originally Posted by tonyssa View Post


BONUS

Aerial footage of Line 2

mopc está en línea ahora   Reply With Quote
Old April 26th, 2018, 06:21 PM   #1979
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

São Paulo Metro (CMSP) - Forumer pics of new Metro history exhibit & new Metro souvenir shop at Sé station (Lines 1 & 3)

Includes mockup of original metro train rolling stock (A Fleet Budd-Mafersa early 70s train)

Quote:
Originally Posted by SavianoMarcio View Post
Fui hoje ver o mockup do Frota A e as comemorações na Sé, seguem imagens:

01) Lojinha no mezanino.
Metrô-50anos-25042018 (1) by Marcio Saviano, no Flickr

02) Produtos.
Metrô-50anos-25042018 (2) by Marcio Saviano, no Flickr

03) Me disseram que o Metrô vai ter mais que 2 neurônios e começar a explorar isso definitivamente.
Metrô-50anos-25042018 (3) by Marcio Saviano, no Flickr

04) Maquete mostrando as linhas com Led.
Metrô-50anos-25042018 (4) by Marcio Saviano, no Flickr

05)
Metrô-50anos-25042018 (5) by Marcio Saviano, no Flickr

06)
Metrô-50anos-25042018 (6) by Marcio Saviano, no Flickr

07)Tem um trenzinho que ficava circulando embaixo da maquete e em cima.
Metrô-50anos-25042018 (7) by Marcio Saviano, no Flickr

08) Exposição de fotos antigas.
Metrô-50anos-25042018 (8) by Marcio Saviano, no Flickr

09) E o mockup da frota A.
Metrô-50anos-25042018 (9) by Marcio Saviano, no Flickr

10) Feito todo com peças retirada dos trens. Nunca mais verão um frota A tão bonito e Limpo de novo.
Metrô-50anos-25042018 (10) by Marcio Saviano, no Flickr

11) E os ventiladores do salão e cabine funcionavam.
Metrô-50anos-25042018 (11) by Marcio Saviano, no Flickr

12) Painel original com luzes funcionando.
Metrô-50anos-25042018 (12) by Marcio Saviano, no Flickr
mopc está en línea ahora   Reply With Quote
Old May 9th, 2018, 05:42 PM   #1980
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 18,788
Likes (Received): 17688

Sao Paulo Metro (CMSP) - Line 17 monorail - train depot construction update

Quote:
Originally Posted by AlBertone View Post
Fotos aéreas do pátio em 21/04 pra verificar a laje sendo concretada:





__________________
THREAD TO ACCESS ALL MY THREADS
BRAZIL URBAN TRANSPORT COMPILATION - full updates of all projects on first page!
BRAZIL GENERAL INFRASTRUCTURE -
LINGUÍSTICA - CETICISMO

Tennyson Vital, Arthur Baz liked this post
mopc está en línea ahora   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Tags
brazil, buses, commuter rails, monorails, subways, trams, transport, transporte coletivo

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 10:43 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us