Old November 7th, 2019, 04:14 PM   #3361
AirRail781
Registered User
 
Join Date: Mar 2019
Posts: 121
Likes (Received): 61

Quote:
Originally Posted by fretburner View Post
November is supposed to be when they start digging. So we'll see...
Anything on the construction of the depot at least?
AirRail781 está en línea ahora   Reply With Quote
Sponsored Links
Advertisement
 
Old November 8th, 2019, 03:22 AM   #3362
udishomer
Registered User
 
Join Date: Oct 2019
Posts: 25
Likes (Received): 48

Quote:
Originally Posted by fretburner View Post
November is supposed to be when they start digging. So we'll see...
Drilling is supposed to start in 2020:
https://www.philstar.com/business/20...rks-start-2020

Maybe some preparation work will start this year.
udishomer no está en línea   Reply With Quote
Old November 10th, 2019, 12:33 PM   #3363
Batman2008
Registered User
 
Join Date: Apr 2008
Posts: 19
Likes (Received): 31

P355.6-B METRO MANILA SUBWAY PROJECT, PINASISIMULAN SA TAGUIG CITY

Winnie Castelo
Batman2008 no está en línea   Reply With Quote
Old November 10th, 2019, 12:48 PM   #3364
johnmizer_ver_2
Registered User
 
Join Date: Jan 2018
Posts: 244
Likes (Received): 146

Aquino apologist is my most entertaining entertainment...
johnmizer_ver_2 no está en línea   Reply With Quote
Old November 10th, 2019, 01:36 PM   #3365
jp1032
Registered User
 
Join Date: Mar 2011
Posts: 3,070
Likes (Received): 2964

Quote:
Originally Posted by Batman2008 View Post
Mas naniwala pa itong [email protected] na Castelo doon sa mga city engineers kaysa doon sa JICA experts.

Masisira ang timeline nitong MMSP dahil anothet soil testing ulet gagawin ng JICA team so another cost ulet tapos dagdag pa dyan yung ibang factors like inflation rate, etc.

Talagang di nag iisip itong mga [email protected] na politiko na ito makatipid lang kahit mas malaki ang total cost dahil sa pabago bagong scope of works
__________________

AirRail781, MegaPotato, s_w_stars liked this post

Last edited by jp1032; November 10th, 2019 at 01:43 PM.
jp1032 no está en línea   Reply With Quote
Old November 11th, 2019, 01:13 AM   #3366
AirRail781
Registered User
 
Join Date: Mar 2019
Posts: 121
Likes (Received): 61

Quote:
Originally Posted by jp1032 View Post
Mas naniwala pa itong [email protected] na Castelo doon sa mga city engineers kaysa doon sa JICA experts.

Masisira ang timeline nitong MMSP dahil anothet soil testing ulet gagawin ng JICA team so another cost ulet tapos dagdag pa dyan yung ibang factors like inflation rate, etc.

Talagang di nag iisip itong mga [email protected] na politiko na ito makatipid lang kahit mas malaki ang total cost dahil sa pabago bagong scope of works
Some of our politicians apparently don't trust foreigners, even if those foreigners are experts. That or they're just trying to discredit certain political rivals, which is nothing new.
__________________

MegaPotato, Kenjigraphics, s_w_stars liked this post
AirRail781 está en línea ahora   Reply With Quote
Old November 12th, 2019, 04:47 PM   #3367
Bisugz
Bisugz
 
Bisugz's Avatar
 
Join Date: Jun 2012
Posts: 37
Likes (Received): 31

Quote:
Originally Posted by udishomer View Post
Drilling is supposed to start in 2020:
https://www.philstar.com/business/20...rks-start-2020

Maybe some preparation work will start this year.
three stations by 2022? lol.. if they start drilling next year probably earliest niyan ay 2025
__________________

eldre456, emale, nez, s_w_stars liked this post
Bisugz no está en línea   Reply With Quote
Old November 12th, 2019, 05:53 PM   #3368
jp1032
Registered User
 
Join Date: Mar 2011
Posts: 3,070
Likes (Received): 2964

May nakita ako kaninang clearing activities doon sa tabi ng pilahan ng P2P sa tapat ng parking ng Ayala Vertis. I'm not sure kung related sa MMSP.
jp1032 no está en línea   Reply With Quote
Old November 18th, 2019, 03:47 PM   #3369
s_w_stars
Registered User
 
Join Date: Jan 2011
Posts: 7,358
Likes (Received): 4863

Quote:
Originally Posted by Bisugz View Post
three stations by 2022? lol.. if they start drilling next year probably earliest niyan ay 2025
My grab driver was surprised when I told him they haven't dug an inch yet, since he was counting on the press release that it will be done by 2023 (the 3 stations).

And to add to that, which idiot would want to run a 3 station subway line? Just wondering how much it would cost to operate and how many passengers it will carry on that very short line?

To borrow the phrase from the infamous Tugading, sa susunod na kabanata.
__________________
"Traveling and sojourning among various people make men wise." - Cervantes

mdalea liked this post
s_w_stars no está en línea   Reply With Quote
Old November 18th, 2019, 04:07 PM   #3370
[email protected]
Philippine Forum Mod
 
queetz@home's Avatar
 
Join Date: Jun 2004
Location: Ortigas (Pasig City)
Posts: 5,843
Likes (Received): 5380

Was your Grab driver referring to the site at Valenzuela? Because there really isn't any signs of digging at Vertis North onwards. I doubt anybody can see the Valenzuela site that easily unless they sneak an aerial drone. There are many soil testing though and I even personally saw one at MetroWalk a week or two ago.
__________________
SAVE LRT2

"The best solution all over the world, time tested, safe, no pollution, is still the use of the train system." - Ms. Elvira Medina, Nat'l Center for Commuter Safety and Protection
queetz@home no está en línea   Reply With Quote
Old November 19th, 2019, 03:08 PM   #3371
s_w_stars
Registered User
 
Join Date: Jan 2011
Posts: 7,358
Likes (Received): 4863

Quote:
Originally Posted by [email protected] View Post
Was your Grab driver referring to the site at Valenzuela? Because there really isn't any signs of digging at Vertis North onwards. I doubt anybody can see the Valenzuela site that easily unless they sneak an aerial drone. There are many soil testing though and I even personally saw one at MetroWalk a week or two ago.
He was referring to the press release. And I told him if they haven't dug an inch, or have opened a pit to drop their tbm's that 3 stations would be opened by 2023. So far it's all press release, more prep works, ded's, clearing etc. Are their tbm's grinding now anywhere? No one has come round and updated their press release with more realistic timelines. That would be helpful.
__________________
"Traveling and sojourning among various people make men wise." - Cervantes

florentin liked this post
s_w_stars no está en línea   Reply With Quote
Old November 19th, 2019, 03:56 PM   #3372
[email protected]
Philippine Forum Mod
 
queetz@home's Avatar
 
Join Date: Jun 2004
Location: Ortigas (Pasig City)
Posts: 5,843
Likes (Received): 5380

I'm going to wait a little while longer. Based on my own personal experience with the Evergreen Skytrain Extension in Metro Vancouver, just digging the staging area hole and assembling the TBM takes many months. I think they mentioned turning it on will be either December or January, which is still within my expected time frame. Again, unless someone in the forums has a drone shot of the Valenzuela site showing progress or the lack thereoff, all we have is speculation on the actual status of the project. No reason to jump to any conclusions at this point.
__________________
SAVE LRT2

"The best solution all over the world, time tested, safe, no pollution, is still the use of the train system." - Ms. Elvira Medina, Nat'l Center for Commuter Safety and Protection
queetz@home no está en línea   Reply With Quote
Old November 20th, 2019, 02:32 AM   #3373
JmSepe
Nobel Prize Laureate
 
JmSepe's Avatar
 
Join Date: Jan 2010
Location: Cagayan de Oro, Metro Manila
Posts: 809
Likes (Received): 246

Is it me or its kinda slow, I think what we need is China-level of construction speed.
__________________
"We cannot be satisfied until we have eliminated all others. It has nothing to do with reason. It is instinct."
- Akashi Seijuro (Crown Prince of Teiko)

You can also find me in simtropolis, sc4devotions, anime-manga forum, the blue knight forum, mangafox, archives of our own, fanfiction, tumblr, blogspot, instagram, facebook and twitter.

dewlin07 liked this post
JmSepe no está en línea   Reply With Quote
Old November 20th, 2019, 02:46 AM   #3374
-SNPKLSDMBLDR-
Welcome to the Planet
 
-SNPKLSDMBLDR-'s Avatar
 
Join Date: May 2009
Location: Metropolis
Posts: 2,151
Likes (Received): 3736

unfortunately most of the time Japan projects are slower compared to China.
__________________
DFB-GER '14 - Schweinsteiger #31/Messi #10 - Scuderia Ferrari - #DC Joker/BoP/WW'84

-SNPKLSDMBLDR- no está en línea   Reply With Quote
Old November 20th, 2019, 04:19 AM   #3375
jp1032
Registered User
 
Join Date: Mar 2011
Posts: 3,070
Likes (Received): 2964

Quote:
Originally Posted by -SNPKLSDMBLDR- View Post
unfortunately most of the time Japan projects are slower compared to China.
Yes. But what we need is Japan quality infrastructures.
__________________

maczilla, ahehe_96 liked this post
jp1032 no está en línea   Reply With Quote
Old November 20th, 2019, 04:52 AM   #3376
maczilla
Registered User
 
Join Date: May 2008
Posts: 485
Likes (Received): 96

Japanese quality over Chinese speed, anytime! Besides, understandable that this project takes time, ang laki nito eh. Some projects started during GMA and Pnoy's time are just being completed by now. Let's be patient. Mabilis lang ang 6 years.
maczilla no está en línea   Reply With Quote
Old November 20th, 2019, 05:31 AM   #3377
[email protected]
Philippine Forum Mod
 
queetz@home's Avatar
 
Join Date: Jun 2004
Location: Ortigas (Pasig City)
Posts: 5,843
Likes (Received): 5380

Quote:
Originally Posted by JmSepe View Post
Is it me or its kinda slow, I think what we need is China-level of construction speed.
China is fast cuz they don't have to worry about things like HEWMAAAN RIGHTS! The hell with property rights when it comes to ROW acquisition, or labour rights when it comes to 24/7 work with no increase pay. Just BUILD IT, even if they have to level entire villages and subjugate entire populations just so they can finish a project like yesterday...
__________________
SAVE LRT2

"The best solution all over the world, time tested, safe, no pollution, is still the use of the train system." - Ms. Elvira Medina, Nat'l Center for Commuter Safety and Protection
queetz@home no está en línea   Reply With Quote
Old November 20th, 2019, 06:39 AM   #3378
JmSepe
Nobel Prize Laureate
 
JmSepe's Avatar
 
Join Date: Jan 2010
Location: Cagayan de Oro, Metro Manila
Posts: 809
Likes (Received): 246

Quote:
Originally Posted by [email protected] View Post
China is fast cuz they don't have to worry about things like HEWMAAAN RIGHTS! The hell with property rights when it comes to ROW acquisition, or labour rights when it comes to 24/7 work with no increase pay. Just BUILD IT, even if they have to level entire villages and subjugate entire populations just so they can finish a project like yesterday...
Or a crazy senate that is trying to block emergency powers for the president.
__________________
"We cannot be satisfied until we have eliminated all others. It has nothing to do with reason. It is instinct."
- Akashi Seijuro (Crown Prince of Teiko)

You can also find me in simtropolis, sc4devotions, anime-manga forum, the blue knight forum, mangafox, archives of our own, fanfiction, tumblr, blogspot, instagram, facebook and twitter.
JmSepe no está en línea   Reply With Quote
Old November 20th, 2019, 06:46 AM   #3379
ahehe_96
Mr.V
 
ahehe_96's Avatar
 
Join Date: Mar 2013
Location: cebu city-- lanao
Posts: 942
Likes (Received): 218

its called democracy people, it's not maybe efficient but its the safest
__________________
"I dont care if i burn to HELL....
For as long as the PEOPLE
I serve live in PARADISE"
Rodrigo Duterte

AirRail781, dipdown liked this post
ahehe_96 no está en línea   Reply With Quote
Old November 20th, 2019, 06:58 AM   #3380
-SNPKLSDMBLDR-
Welcome to the Planet
 
-SNPKLSDMBLDR-'s Avatar
 
Join Date: May 2009
Location: Metropolis
Posts: 2,151
Likes (Received): 3736

We still have the thinking China projects are all low quality? If you pay the right price on the right supplier/contractor that won't be an issue.
__________________
DFB-GER '14 - Schweinsteiger #31/Messi #10 - Scuderia Ferrari - #DC Joker/BoP/WW'84

-SNPKLSDMBLDR- no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Indian Railways - Projects | News | Discussions phaedrus Railways and Transportation 18355 Today 11:27 AM
BRAZIL | Urban Transport Compilation mopc Subways and Urban Transport 2241 Today 12:38 AM
Kochi | Metro | കൊച്ചി മെട്രോ kk2008 Railways and Transportation 12212 Yesterday 06:51 PM
TOULOUSE - Troisième ligne de métro Etudiant_IEP Infrastructures et Transports 11944 December 4th, 2019 02:59 PM
ALEXANDRIA | Alexandria Regional Metro | Line 1 | Abuqir-Kilo 21 | 43km (Phase 1-3) | 33 stations | Proposed egypt69 Transport & Infrastructure Projects | المشاريع التحتية و النقل 17 November 4th, 2014 12:45 PM


All times are GMT +2. The time now is 02:42 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us